Training Materials
of
Quality Control
Masonry Works
Required Quality
--------------------------- M-1
--------------------------- M-2
--------------------------- M-4
QC Method
--------------------------- M-5
Do nots
--------------------------- M-6
Masonry Works
1) Quality
TS D-2.2
Sand :
Stone : Specific Gravity Gs
Dmax
2) Type
Type of
Stone
Masonry
< 5 mm
> 2.5
< 40 cm, 2/3 of thickness
TS D-2.3.2
Ratio of cement-sand
(by volume)
Source of Stone
Type A
Quarry
Type B
Quarry
Type C
Re-use of
demolished stone
masonry
Remarks
protection work subject to
abrasion and attack by boulders
and gravel usually used under the
flowing water
all other stone masonry structures
3) Test item
Frequency
Material & Test
Cement
Frequency
same as Concrete Works
Sand
Gradation
Loss test (washing)
Specific Gravity
Loss by abration
Soundness
Mortar
Test specimen
Dia. : 50mm
once every 100m
Height : 100mm
each work segment
6 pieces / test
(3 pieces * 7 , 28 days)
M-1
M-1
Unit
Weight
Mortar
Type
A
W/C (%)
55
Water
Cement
Sand
(ltr)
Mortar
Type
B
(in volume)
Cement
Sand
1
3
Target
Weight
(kg)
13.8
25.0
39.4
(in volume)
Cement
Sand
1
4
Target
Weight
Water
Cement
Sand
(ltr)
Volume
(ltr)
13.8
8.0
23.9
45.6
(kg)
13.8
25.0
52.5
Volume
(ltr)
13.8
8.0
31.8
53.6
Cement
3140 kg/m3
Sand
1650 kg/m
TS D-2.3
a
(cm)
Size of Box
b
c
(cm)
(cm)
30.0
30.0
30.0
30.0
30.0
30.0
v
(ltr)
27.00
27.00
Nos.
of
Box
0.29
0.88
c
W/C (%)
55
Nos.
of
Box
(cm)
(cm)
(cm)
(ltr)
30.0
30.0
30.0
30.0
30.0
30.0
27.00
27.00
0.29
1.18
50
Dia :
Height :
kg/cm2
(TS D-2.3)
50
100
mm
mm
M-2
M-2
Test Specimen
Excavation
Masonry
PVC Pipe
D:50mm
L:80~90cm
20cm
15cm
0.1
2%
2%
20cm
50~60cm
30cm
Percentage (%)
80
60
40
20
0
0.1
100
Over Exc.
Design Line
Recommendation
It is recommedned that excavation work
should be separated into 2 steps.
i) Primary excavation
ii) Final excavation up to design Line
Earth Lining
d < 30cm
Replace with
cohesive soil by
manual carefully.
Concrete Lining
Filter material also
be available.
d > 30cm
i) Embank with cohesive soil by compactor
or rammer as shown in the sketch.
ii) Trim surplus material.
b) Structure
M-3
Design Line
Over Exc.
M-3
PIRIMP
Sub-Project:
CONTRACT NO.:
CONTRACTOR:
Serial. No. :
Yes
No
1. Water
a) Free from impurities
2. Sand
a) Washed before use
b) Free from organic matters and other contamination
c) Sieved by 5 mm sieve before use
3. Stone
a) Free from crack/seam
b) Appropriate max. stone size (40 cm and 2/3 of wall thickness)
c) Clean from adhesive material/ need washing
4. Mortar
a) Proper cement/sand mix proportion for joint mortar
5. Placing of Masonry
a) Sufficient dewatering at site
b) Moistened stones before use
c) Compaction of joint mortar using trowel sufficiently
d) Hitting and consolidation of stone by steel hammer
e) Width of joints in face stone not exceeding 3 cm
6. Pointing of Surface Joint Mortar
a) Chipped joint mortar to a depth of 3 cm
b) Proper cement/sand mix proportion (1 : 2)
c) Cleaned surface of joint mortar using wire brush
d) Sufficient filling of surface joint mortar
7. Remarks :
Sign
Name:
Inspector of the Consultant
Name:
M-3.1
Technically approved by :
Accepted b :
Sign:
Sign
Name:
Name:
The Consultant
The Engineer
Designated Engineer
Designated Engineer
M-3.1
WORKS
MEASURING
ITEMS
MEASURING CRITERIA
BY
Base EL
Lining
(V)
Block Lining
(T)
STANDARD OF
MEASURING POINTS
Measuring
Measuring
Apply to
points:
points:
individual
(2) C < 20 m, n = 2
more
less
construction
than 20
than 20
(V, T, L)
Control Value
(mm)
Length
Control Standard
LIST
1. Measuring numbers:
Thickness
Riprap
RED INK ON
3) Masonry
BY
Measure dimension as
shown in structural
drawing(s)
Unevenness
Standard Value
(mm)
V + 40
+ 65
- 20
- 40
T1 30
- 50
T2 65
- 100
L L<2m
- 40
25
L>2m
- 75
50
C
- 0.1%
less than 10 m
- 50
10m < C < 50 m
- 100
50m < C < 200 m
- 200
Base Line
4) Foundation
(V)
Concrete
Thickness
Cobble/Gravel
Only
Apply to
important
unit
structure
construction
(2) C < 50 m, n = 2
and length
(important
linner structure
(T)
Foundation
1. Important structure :
- Bridge, culvert, sluice, flume, etc.
2. Measuring of cobble/gravel
foundation shall be measure after
compaction.
3. Measuring point shall be same as
main structure
4. Measuring and photographing shall
be same place/point
only)
2. Unit construction
Width
Sand
(B)
Foundation
Measure dimension as
shown in structural
drawing(s)
Length
(C)
V 40
65
T 30
- 50
B 130
- 200
- 0.2 % or
C < 50 m
- 100
M-4
PIRIMP
CONTRACT NO.:
Sub Project:
CONTRACTOR :
Control Chart : Compressive Strengyh of Mortar
(To be prepared by each canal, structure, or borrow area)
Name of Canal
Mix Type
Design
Strength
Age of
Mortar
50 (kg/cm2)
28 days
Side of Canal
No.
DATE
X1
X2
Xave
X3
60
74
94
76.0
58
70
64
64.0
72
81
102
85.0
78
62
88
76.0
69
52
61
60.7
91
80
59
76.7
63
92
70
75.0
102
93
84
93.0
90
74
83
82.3
10
65
62
90
72.3
11
76
73
67
72.0
12
77
92
79
82.7
13
82
61
82
75.0
14
15
16
17
18
19
20
150.0
(kg/cm2)
To
Jdg.
100.0
From
Compressive Strength
50.0
D/M/Y
Station
6
8
10
Sample NO.
12
14
16
18
20
APPROVED BY CONSULTANT
ACCEPTED BY
PROJECT
M-5
Date
Sign
Name
Date
sign
Name
Date
Sign
Name
M-5
M-6