Documente Academic
Documente Profesional
Documente Cultură
CONTENTS
1. Highlights
2. Functions and Structures
3. Crop Production
4. Technology Mission on Oilseeds, Pulses and Maize
5. Horticulture
6. Fisheries
7. Rainfed Farming Systems
8. Soil and Water Conservation
9. Fertilizers and Manures
10. Seeds
11. Plant Protection
12. Agricultural Implements and Machinery
13. Agricultural Extension
14. Agricultural Credit
15. Co-operation
16. Price Policy
17. Agricultural Trade
18. Agricultural Economics and Statistics
19. Natural Disaster Management
20. International Co-operation
21. Welfare of Scheduled Castes and Scheduled Tribes
Annexures
TOC
First
Previous
Next
Last
HIGHLIGHTS
and productivity of cereal crops on the basis of
cropping systems approach continued during the
year 1996-97. Greater emphasis given to the
blocks/areas with low productivity levels.
Emphasis given on the use of organics and soil
ameliorates to improve the soil health and
productivity.
Emphasis given on use of bio-pesticides and
Integrated Pest Management.
Crop Production
Adequate provision for Frontline Demonstrations
Production of major commercial crops
by ICAR to demonstrate new production
reached a record level during 1995-96. The
technologies and performance of new varieties.
production of Oilseeds is anticipated at 22.4
million tonnes, Cotton 13.1 million bales and Incentives provided to resource-poor farmers for
sugarcane at 283 million tonnes during the
the use of seeds of location-specific high-yielding
year.
varieties and improved farm implements.
The production of food-grains, however,
declined substantially to 185.0 million tonnes Field demonstrations on farmers holdings and
from its record level of 191.5 million tonnes
training of farmers and farm labourers, organized
achieved in 1994-95 due mainly to delayed
for effective transfer of technology and adoption
on-set of monsoon in Kharif 1995 and
of non-monetary inputs.
unfavourable weather conditions at grain
Oilseeds Production Programme covering 337
filling stage of Rabi crops.
districts in 23 States and National Pulses
Development Project covering 23 States and
Initiatives for increasing the production
TOC
First
Previous
Next
Last
Islands,
Horticulture
were
Ambitious programme for promoting use of
plastics in agriculture through drip irrigation,
green house, mulching, etc. taken up. About
23528 ha. of land anticipated to be covered
under drip irrigation 76.20 ha. under polygreen houses, 4385 ha. under mulching and
1953.5 ha. under drip demonstration.
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
laboratory reared bio-control agents have Training Courses and Workshops organized to
been released in the field during the period.
upgrade knowledge and skill of senior and
middle level managers and grass root level
The Registration Committee has simplified the
extension
functionaries
in
Extension
data requirement to allow commercialization
Management, Communication and Subject
of neem-based pesticide and bio-pesticide
Matter Areas.
during the pendancy of provisional
registration with a view to popularizing them Training Support for strengthening Extension
under the overall ambit of IPM.
Services in the North-Eastern States, Union
Territories
and
other
small
States
strengthened.
Agricultural Implements and Machinery
Promotion and popularization of modern/
improved agricultural machinery, Human
Resource Development for judicious use of
agricultural
machinery;
and
energy
conservation techniques in the use of
agricultural machinery were given a high
priority.
women
in
The subsidy under the Plan Scheme The flow of agricultural credit continued to
Promotion of Agricultural Mechanization
register a constant and steady growth. The total
among Small Farmers extended to farmers,
agricultural credit increased by 15.99 percent
Registered
Co-operative
Societies,
to reach the level of Rs. 24849 crore (Rs.
Agricultural Credit Societies, multipurpose
2,48,49,00,00 thousand) during the year 1995Agricultural Farming Societies for the
96 as against its estimated flow of Rs. 21424
purchase of tractors with an enhanced range
crore (Rs. 2,14,24,00,00 thousand) during the
of power upto 30 PTO HP.
year. 1994-95. The flow of agricultural credit
is likely to reach a level of Rs. 28817 crore
About 2000 persons trained in operation,
(Rs. 2,88,17,00,00 thousand) during the year
repairs, maintenance and management of
1996-97.
farm machinery at four Farm Machinery
Training and Testing Institutes located at Over 52 million farmers covering an area of 89
million
hectares
were
covered
by
Budni (M.P.), Hissar (Haryana), Garladinne
Comprehensive Crop Insurance Scheme
(Andhra Pradesh) and Bis-wanath Chariali
(CCIS) upto 30th November 1996. Claims
(Assam) during 1996-97 till October, 1996.
amounting to Rs. 53.05 crore (530488
Extension
thousand) were paid to farmers during 1996-97
Media Support activities were further
augmented in 1996-97. National, States and
Kendra level Committees were formulated. Co-operation
Guidelines, cost ceilings and directory of film
producers finalized, printed and circulated to Co-operatives emerged as the largest network
of supporting infrastructure comprising 4.11
all concerns.
lakh societies With a total membership of
National level shows for Mango and Pineapple
19.78 crore as on 31st March, 1995.
organized at Bangalore and Dimapur
respectively.
The National Co-operative Development
Broad-based Agricultural Extension (BAE)
Corporation released financial assistance of
was introduced to have an Integrated Farming
Rs. 362.78 crore (Rs. 3,62,78,00 thousand)
System Approach. Six Workshops were
reaching the cumulative releases to the level of
organized to consider operationalisation of
Rs. 3674.68 crore (Rs. 36,74,68,00 thousand).
the BAE.
TOC
First
Previous
Next
Last
Natural calamities, during the year affected a India is a member country of World Food
population of 81.5 million in 21 States and
Programme and is also a member of the
one
Committee on
TOC
First
Previous
Next
Last
Food Aid (CFA). Through 11 projects, the 9 World Bank aided Projects are under
World Food Programme assists the
implementation in Agriculture Sector with
Government of India in Economic and Social
World Bank Assistance of US $ 950.09
development.
million.
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
CROP PRODUCTION
monsoon over the entire country, there was a lull
in the activity in the first half of July.
Subsequently, cumulative rainfall remained
consistently near normal.
3.2 At the end of the monsoon season (June to
September), 32 out of 35 meteorological subdivisions received excess to normal rainfall. The
rainfall was deficient only in three sub-divisions
namely, Vidarbha (-25%), Orissa (-24%) and
Nagaland, Manipur, Mizoram and Tripura (21%). All the three sub-divisions were only
Rainfall Situation
marginally deficient. Sub-divisionwise rainfall
During 1996, the South-West monsoon reached distribution during the monsoon season over
Kerala on 3rd June, 1996, two days later than major parts of the country was very good.
normal. However, it reached the North-Eastern
States on 31st May, before its onset over Kerala. 3.3 About 83 percent districts covering about 90
The monsoon covered the entire country by 30 percent area of the country received excess to
June, 1996, two weeks earlier than normal except normal rainfall. On the whole, the country has
Bihar and Uttar Pradesh where the monsoon was received 102 percent of its long period average
delayed by 1-2 weeks. Following the onset of
rainfall as against a forecast of 964 percent .
The total rainfall was normal for the ninth year in
succession.
TOC
First
Previous
Next
Last
Target
Achievement
(Million tonnes)
Crop
Kharif
Rabi
Total
Rice
71.50
9.50
81.0
Wheat
65.00 65.00
Coarse Cereals
26.50
6.00
32.50
Pulses
6.00
9.00
15.00
Total food-grains
104.00
89.50 193.50
Achievements
3.5 Long-term trends in production of major
crops are given in Annexure III and IV. The
country achieved an all-time record production of
food-grains of 191.5 million tonnes during 199495. The production of food-grains, however,
declined to 1 85.0 million tonnes during 1995-96
mainly due to delayed onset of monsoon in
Kharif 1995 and unfavourable weather conditions
at grain setting stage of Rabi Crops.
Rice
3.6 Rice is the most important food-grains crop
contributing about 43 percent of the total foodgrains production. During 1995-96, the
production of rice was 79.6 million tonnes. The
production of kharif rice (1996) is estimated to
reach to a level of 70.6 million tonnes as
compared to 70.1 million tonnes during kharif
1995. The target of 9.5 million tonnes of rice
during Rabi/Summer 1996-97 is expected to be
achieved.
Wheat
3.7 Wheat production in the country during 199596 was 62.62 million tonnes. During 1996-97, all
possible efforts are being made to achieve the
targeted production of 65.0 million tonnes. Rains
during winter season as well as irrigation support
and judicious use of fertilizers will provide help
in increasing wheat production. It is hoped that
target fixed for wheat production during 1996-97
will be achieved.
Coarse Cereals
3.8 During 1995-96, the production of coarse
cereals was 29.61 million tonnes. During Kharif
1996, the
TOC
First
Likely
Jowar
Maize
Bajra
Ragi
Small Millets
Barley
Total
Cotton
7.50
8.50
7.00
2.50
1.00
26.50
6.98
8.65
7.47
2.62
0.83
26.55
Target
3.50
1.00
1.50
6.00
Previous
Next
Last
Development
Integrated
Cereals
ProgrammeRice
TOC
First
Previous
Next
Last
components:
(i) Seed Minikit demonstration of pre-release/
recently released location specific high
yielding varieties of Rice, Wheat and Coarse
Cereals.
(ii) State Level Training Programme for field
level Extension Officers on improved cereals
production technology.
(iii) Specialized Orientation Training programme
for State level Senior Officers engaged in the
development work of Rice/Wheat/Coarse
Cereals.
TOC
First
Crop
(Million ha.)
1996-97
Target
Paddy
32.00
Wheat
22.50
Jowar
9.00
Bajra
7.00
Maize
3.50
Ragi
1.00
Total
75.00
Previous
Next
Last
TOC
First
No.
Crop
1.
2.
3.
4.
5.
6.
7.
8.
9.
Groundnut
Castorseed
Sesamum
Nigerseed
Rape-seed & Mustard
Linseed
Safflower
Sunflower
Soyabean
Total Oilseeds
Previous
Next
Production
(in lakh tonnes)
78.1
7.8
5.5
1.9
60.7
3.1
4.0
13.2
49.9
224.2
Last
4.2.1 The target for production of oilseeds for (xiv) Distribution of improved farm implements.
1996-97 has been kept at 23.00 million tonnes.
(xv) Development of infrastructure for seed
production.
Oilseeds Production Programme
4.3 The Oilseeds Production Programme (OPP) (xvi) Opening of additional retail outlets in
covers 337 districts in 23 States. The components
remote areas.
of the programme are:
(xvii) Staff and Contingencies.
(i) Production and distribution of certified/
quality seeds.
4.3.1. An amount of Rs. 94.59 crore had been
provided in Budget Estimate (1996-97) for the
(ii) Purchase of breeder seeds and production of Scheme.
foundation seeds.
4.3.2 A record production was achieved in
(iii) Seed Village Scheme.
soyabean, and Rape-seedMustard during 199596.
(iv) Distribution of seed minikits for popularizing
new and improved varieties.
Pulses Production Prospects
(v) Distribution of plant protection chemicals for 4.4 Pulses production in the country is still facing
seed treatment
a number of constraints like cultivation on
rainfed, marginal and sub-marginal lands, high
(vi) Organizing Integrated Pest Management susceptibility to pest diseases, and climatic
(IPM) demonstrations.
aberrations, lack of genetic break-through,
application of very low level of inputs by the
(vii) Distribution of pheromone traps.
farmers and diversion of pulses area to other
more remunerative crops as and when irrigation
(viii) Frontline demonstrations by ICAR
facilities become available. Due to these
limitations, the production has been fluctuating
(ix) Block Demonstrations of improved from year to year depending upon the behaviour
technology in farmers fields by the State of monsoon. In order to harness best of
Agriculture Departments.
production,
processing
and
management
technologies to accelerate pulses production, the
(x) Distribution of rhizobium culture for programme of National Pulses Development
groundnut and soyabean.
Project (NPDP) was brought under the purview
of Technology Mission on Oilseeds in 1990.
(xi) Distribution of micro-nutrients.
Record production of 14.26 million tonnes was
achieved in 1990-91 but due to unfavourable
(xii) Distribution of sprinkler sets.
weather conditions, production receded to 12.02
million tonnes in 1991-92 but steadily moved up
(xiii) Farmers training.
to 12.82 million tonnes in 1992-93, 13.31 million
tonnes in 1993-94 and 14.12 million tonnes in
1994-95.
TOC
First
Previous
Next
Last
Arhar
Other Kharif Pulses
23.56
25.75
Total Kharif
49.31
Gram
Other Rabi Pulses
50.14
30.23
Total Rabi
80.37
Grand Total
129.68
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
HORTICULTURE
India produced 39.47 million tonnes of fruits and
attained first position in fruit production in the
world in 1993. The vegetable production in the
country has been at the level of 65 million tonnes
during 1993-94. The country stands first in the
production of banana, onion and cashew.
Similarly in coconut production, India has
become the prime producer with an annual
production of 13,231 million nuts.
TOC
First
Previous
Next
Last
Major schemes on use of plastics and 1995-96. The approved outlay for 1996-97 is Rs.
infrastructure development for post harvest 3,25,00 thousand and the anticipated expenditure
handling and marketing were also continued.
is
Rs. 3,10,000 thousand.
5.4 The main thrust during the year has been to
provide better planting material/seed using both 5.9 The major programmes in pepper included
conventional
and
modern
methods, production of 8 lakh nucleus planting material of
rejuvenation/rehabilitation of existing plantations, high yielding varieties, production and
installation of drip irrigation system, green house distribution of 139 lakh rooted cuttings,
cultivation, control of pests and diseases, establishing 1850 pepper demonstration plots in
assistance for post-harvest handling and farmers fields and adoption of prophylactic plant
collection and dissemination of market protection measures against quick wilt disease
information. The allocation for the current year is covering 58000 ha. In ginger, turmeric and
Rs. 1,91,55,00 thousand.
chillies, the major activities included production
of nucleus planting materials of released
varieties, establishment of 21500 demonstrationMAJOR DEVELOPMENT PROGRAMMES
cum-seed multiplication plots in farmers fields,
large scale plant protection demonstration
Fruits
programmes on chillies and ginger covering
5.5 The Central Sector Scheme on Integrated 58,5000 ha. and 1,100 ha respectively,
Development of Tropical, Arid and Temperate distribution of 38,500 minikits and area
Zone Fruits was launched during Eighth Five expansion by 8550 ha. with high yielding
Year Plan with an outlay of Rs. 74,4000 varieties. In tree spices, production and
thousand. The expenditure under the scheme distribution of 434 lakh planting material of
during 1995-96 was Rs. 14,50,63 thousand and promising lines and establishment of 1790
the outlay approved for 1995- 96 is Rs. 17,64,73 demonstration plots in farmers fields are being
thousand.
undertaken. Similar measures are under way in
seed spices, garlic and saffron.
5.6 The programmes envisaged under this scheme
include: (a) establishment of big nurseries under
5.10 In North-Eastern States, 13 demonstrationpublic sector; (b) establishment of small district
cumprogeny gardens each of 10 ha. are being
level nurseries under private sector: (c) setting up
maintained to produce quality planting material
of tissue culture units under public and private
of all improved varieties of spices suitable to the
sectors (d) training of farmers: (e) establishment
region. It is also proposed to distribute 5025 units
of oil extraction plants (f) area expansion; (g)
of plant protection equipment and undertake soil
improving productivity, and (h) demonstration
conservation measures in 1550 ha. of spice
plots.
gardens.
5.7 Between 1992 and 1995, 13 big nurseries,
188 small nurseries, 21 tissue culture units were Coconut
established, 758 demonstration plots were laid
out and area of 11,747 ha under area expansion 5.11 Integrated development of coconut industry
and 30,321 ha. under rejuvenation respectively in the country is the main objective of the
was covered. For publicity, Rs. 40,00 thousand Coconut
Development
Board
with
its
was utilized during this period.
Headquarters at Kochi in Kerala.
Spices
5.8 The Centrally Sponsored Integrated
Programme for the development of spices is in
operation in 26 States, 2 Union Territories, 21
State Agricultural Universities, 5 Institutes of
ICAR and the National Horticultural Research
and Development Foundation, State Farms
Corporation etc. The Eighth Five Year Plan
approved outlay for the Scheme is Rs. 1,25,00,00
thousand. An amount of Rs. 2,67,914 thousand
was released during
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
thousand has been provided for publishing and In order to further step up vegetable production in
distributing printed materials and literature in the country, an amount of Rs. 20,000 thousand
Regional Languages of the implementing States.
has been provided during 1996-97.
Arecanut
(i)
(ii)
(iii)
(iv)
(v)
Cocoa
TOC
First
Previous
Next
Last
(v) Providing financial assistance to cooperatives flower crops like rose, gladiolus, carnation,
for organizing marketing and processing of orchid, etc. which are used in flower bouquets
cocoa beans.
and for decoration.
Betelvine
5.35 A Central Sector Scheme for the
Development of Betelvine is being implemented
with Eighth Plan outlay of Rs. 2,00,00 thousand.
For implementing the scheme during 1996-97, an
outlay of Rs. 4000 thousand has been provided.
The scheme is implemented through Departments
of Horticulture/ Agriculture in 19 States and 3
Union Territories. The programmes under the
scheme included providing financial assistance
for
construction
of
2200
units
of
conservatory/trellies, establishment of 2510
demonstration plots in the farmers fields,
providing financial assistance for developing 705
water sources and irrigation facilities, and
distribution of 1530 plant protection equipments.
Medicinal and Aromatic Plants
Floriculture
TOC
First
Previous
Next
Last
bee-keeping; and
(6) to develop feasible strategy for long term
development of bee-keeping.
5.45 The scheme started functioning during 199495. The implementation of the scheme was
proposed in all the States and UTs. The scheme
envisages implementation mainly as Central
Sector Scheme through research institutions and
by State Designated Agencies. The overall
implementation of scheme in the States in general
and some components in particular is to be
looked after by State Designated Agency (SDA)
identified by the State Government.
5.46 So far, 23 State Governments/UTs. have
identified the SDAs. During 1995-96, funds to an
extent of Rs. 46,75 thousand have been released
to the SDAs for production and distribution of
about 25,000 bee colonies. For the
implementation of the scheme during 1996-97, an
outlay of Rs. 4,25,00 thousand have been
provided.
5.47 Thirty projects on Research and
Development aspects of bee-keeping approved by
the Project Approval Committee at a total cost of
Rs. 80.00 thousand, for implementation during
the Eighth Plan were continued during 1996-97.
Twenty-eight Institutes were financed during
1996-97 for imparting training on different
aspects of bee-keeping development.
Mulching
TOC
First
Previous
Next
Last
TOC
First
Service
of
Previous
Next
Last
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
FISHERIES
harvest
and
post-harvest
operations,
strengthening of infrastructure for production of
fin and shell fish seed, providing berthing and
landing facilities for fishing vessels, training of
sea going fishing operatives and other crew,
besides taking adequate care of the welfare of
fishermen.
TOC
First
Previous
Next
Last
1995-96
Welfare
Fish Production
296.3
35,01,11,00
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
cost of Rs. 2255.10 lakh whereas 1 minor fishery partial disability. A single policy will be taken in
harbour and 5 fish landing centres were respect of all the participating States/U.Ts
commissioned.
through FISH-COPFED and enhanced premium
would be Rs. 12 per beneficiary.
Welfare Programme for Fishermen
6.43 During 1995-96, 10.65 lakh active fishermen
6.39 The Centrally Sponsored Scheme, National were insured and an amount of Rs. 7779 thousand
Welfare of Fishermen has the following three was released to the States/U.Ts. During 1996-97,
components:
it is proposed to cover 11.00 lakh active
fishermen under this scheme with a budget
(i) Development of Model Fishermen Villages.
provision of Rs. 6600 thousand.
(ii) Group Accident Insurance Scheme for Active Saving-cum-Relief for Marine Fishermen
Fishermen.
6.44 The objective of this component is to
(iii)
Saving-cum-Relief for Marine fishermen. provide financial assistance to marine fishermen
during lean fishing seasons. Under this
component, the beneficiary fishermen contribute
Development of Model Fishermen Villages.
a part of their earning during fishing months 117
6.40 The objective of this component of the Rs.45/-per month. The contribution is matched
welfare scheme is to provide basic civic with equal contribution each by the Central and
amenities such as housing, drinking water and State Government and the tripled amount is
construction of community hall for fishermen distributed back to fishermen in four equal
villages. During 1995-96, 205 model fishermen instalments 117 Rs.270/per month. In case of
villages were to be developed with an amount of UTs, the share of the Administration is also borne
Rs. 37,477 thousand released to State by the Central Government.
Governments/UT Administrations. It is proposed
to develop 60 more villages in 1996-97 with a 6.45 During 1995-96, about 2.15 lakh fishermen
budget provision of Rs. 30,000 thousand. In each were covered under this component and an
village a minimum of 10 and maximum of 100 amount of Rs.78926 thousand was released as
housing units, upto 5 tube-wells and one Central assistance to various maritime
community hall (if the number of houses to be States/U.Ts. About 2.75 lakh beneficiaries are
constructed is 75 or more) will be constructed. expected to be covered under this scheme during
While 50% of the cost will be met by the Central 1996-97. It has been decided to continue this
Government, the remaining 50% will be met by component during the Eighth Five Year Plan.
the concerned State Government. In case of UTs, Fisheries Training and Extension
cent per cent expenditure is borne by the Centre.
6.46 A Central Sector Scheme Fisheries
Group Accident Insurance Scheme for Active Training and Extension with 100% assistance
Fishermen
came into existence in June 1994. The main
6.41 The objective of this component is to objective of the.scheme is to provide training to
provide insurance cover to fishermen actively fishery personnel so as to help them undertake
engaged in fishing. Under this component of the fisheries extension programmes effectively which
scheme, active fishermen are insured for also includes training of fish farmers/fishermen to
Rs.25,000 for one year against death or enable them to pursue the vocation on a scientific
permanent disability and Rs. 12,500 for partial basis. To enhance training facilities, the scheme
disability. The insurance premium is Rs. 11.25 also provides assistance for setting up/
per beneficiary per year, 50 per cent of which is upgradation of two training centres in States/UTs.
subsidised by the Central Government and the Other components of the scheme are:
remaining 50 per cent is subsidised by the State (i) To bring out short, concise and specific
Government. In case of Union Territories, 100
publications in the form of manuals with a
per cent premium is borne by the Government of
view to provide adequate extension material to
India.
the trainees and personnel associated with fish
production and allied activities.
6.42 From 1996-97, it is proposed to enhance the
insurance cover to Rs.35,000 in case of death or (ii)Production of video films on the technologies
permanent disability and Rs. 17,500 in case of
developed by the Research Institutes/
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
6.55 The results achieved under the project were (3) To establish a prawn feed mill having
as follows:
production capacity of 8500 tonnes/annum.
(4) To set up a Quality Control and Applied
(1) Commissioning of the new hatchery by
Research Laboratory.
installing necessary equipments.
(5) To make available the required foreign
technology for successful implementation of
(2) Decommissioning of the feedmill and
the project.
production of pelletted feeds at the farm
(larval, on-growing and brood stock)
6.59 The project was to be implemented over a
period of five years but actual implementation
(3) Successful hatching of the imported rainbow started only in 1993 due to Gulf war.
trout eyed ova with high survival rates
(above 80%)
6.60 The main results achieved under the project
were as follows:
(4) Training of staff both of Himachal Pradesh
and other States like Sikkim and Uttar (1) A survey of brackish water area of Kerala
Pradesh in trout farming.
was conducted during 1989 and 1990 and
the results are available in the publication
6.56 The project has helped the State
Kerala Fisheries Brackish Water Resources
Government in identifying suitable sites for trout
Survey ; 1991 (At a Glance).
farming and in identifying suitable socio(2) Land acquisition for a hatchery at Odayam is
economic groups to start trout farming.
almost complete and considerable progress
has been achieved in the establishment of
Kerala Fisheries Development Project for
Quality Control and Research Laboratory.
Prawn Culture with assistance from Kuwait
(3)
The technical consultancy arrangements
Fund for Arab Economic Development.
under the project which was postponed due
to slow progress since July 1994, is being
6.57 This project for which an agreement was
revived to complete left over components
signed between the Kuwait Fund for Arab
under the project.
Economic Development and Government of
India/Government of Kerala on .24.2.89
involving an investment of Rs. 75,00,000 Indo-German Reservoir Fisheries Developthousand (of which Rs. 35,00,000 thousand will ment Project in Kerala
be a loan assistance from Kuwait Fund) had the
6.61 This project is being implemented in a
following objectives:
phased manner. The objective of the project is to
(1) Increasing production and exports of prawn improve the living conditions of families
belonging to socially and economically backward
from the State.
and marginalised scheduled caste and scheduled
(2) Increasing job opportunities for fish farmers
tribe communities of Kerala hinterland through
and fishermen in the project area.
improved utilization of reservoir resources by
(3) Tapping the rich natural water resources establishing a sustainable culture based-capture
available in the State for prawn culture.
fishery. The initial phase of the project which was
an orientation phase involved an investment of
DM629800 from the German side (Rs. 126,00
thousand approximately) and Rs. 50,00 thousand
in terms of local costs. The duration of this phase
was for 36 months from March, 1992- March,
1995. During the orientation Phase, a
comprehensive fisheries management concept
was elaborated and the socioeconomic and bio(1) To develop scientific prawn farming in an technical viability tested for future utilization and
area of 1500 hectares.
management of original five pilot reservoirs in
(2) To establish four shrimp hatcheries each Palghat (Malampuzha, Chulliyar and Puthundy)
having a production capacity of 60 million and Trichur Districts (Vazhani, Peechi).
per hatchery (PL 20)
6.58 The Government of Kerala has constituted a
registered society for the implementation of the
project in the State, namely, the Agency for
Development of Aquaculture, Kerala (ADAK)
with headquarters at Trivandrum. The major
components under the project are as follows:
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
1. Production of different varieties of dried Measures taken for Control & Abatement of
anchovies through various womens groups Pollution in Aquaculture Activity
in a number of villages in Kanyakumari
District.
6.73 To keep our coastal zone free from pollution
and for making aquaculture an environment2. Production of dried fish using drying racks friendly activity, the State Governments have
by a private company in Orissa (Paradeep)
been requested to ensure that the integrated
brackish-water shrimp farming units coming up
3. Popularisation of ice boxes by making under joint sector/l00% export oriented units may
arrangements for hiring them as well.
obtain the clearance from the respective State
Pollution Control Board and also incorporate
4. Popularization of an ODA designed container adequate environmental safeguards, particularly
which will improve the mobility of women environmental management plan, environmental
fish vendors through public transport system. monitoring plan and waste water treatment
systems, etc. so as to mitigate adverse impact, if
Presentation of technical papers in seminars any, of shrimp aquaculture on the environment
and vice-versa.
organised from time to time.
6.74 The guidelines prepared by the Expert
Committee constituted by the Department of
6.72 Majority of fish vendors in coastal areas are Agriculture & Cooperation for guidance to the
fisherwomen. Women also play a key role in fish State Pollution Control Boards and Aquaculture
processing, net making, net repairing, etc.
units, have been circulated to the State
Governments and other end users for compliance.
Programme for Women
TOC
First
Previous
Next
Last
Watershed Management
TOC
First
Previous
Next
Last
economic settings. This is helping the landless non-arable and arable lands respectively. Under
labourers and small and marginal farmers in Agro-Forestry component, 57,23,120 trees have
supplementing their income.
been planted while 20,52,527 horticultural plants
have been raised on arable land under dry land
7.5. An area of 28 lakh ha. is targeted to be horticulture. 16904 number dug out sunken
covered with an allocation of Rs. 1,10,00,000 structures have been constructed for insitu
thousand during the Eighth Five Year Plan. A moisture conservation in upper, middle and lower
sum of Rs. 2,30,37,00 thousand was released reaches under drainage line treatment.
during 1990-91 and 1991-92 and a sum of Rs.
82,700 thousand was available as an unspent 7.7 3149 Composite/Kisan, Mahila Mandal and
balance of Seventh Five Year Plan. Thus, total Government nurseries have been established for
amount available for this project is Rs. producing the planting material for conservation
1,33,86,400 thousand. So far, 2554 micro measures and production systems suited to local
watershed projects have been taken up in almost conditions. Within the composite nurseries, 1823
as many blocks of 25 States and the Union Barani Chetna Kendras have also been
Territories of Andaman and Nicobar Islands and constructed to act as community centres where
Dadra and Nagar Haveli. A total area of 45.84 farmers can meet, discuss and share their
lakh ha. has been taken up under these projects problems and experiences amongst themselves
for development with an estimated cost of Rs. and field workers. Besides, these Kendras have
12407941 thousand. The micro watersheds taken the facility of storing inputs for crop
up under the projects are at various stages of demonstrations, trials, etc. These Kendras serve
development. Out of 45.84 lakh ha., area taken up as focal points for spreading the watershed
so far for development under the project. A development technologies to neighbouring areas.
substantial part of 28 lakh ha. is likely to be
saturated by the end of Eighth Five Year Plan.
7.8 In order to promote peoples participation, the
participating States/UTs have identified and
7.6. During 1996-97, an allocation of Rs. trained Mitra Kisans and Gopals out of practicing
1,88,50,00 thousand was made which was later farmers village youth and school drop-outs etc.,
on revised to 1,55,00,00 thousand. During the who are working as focal points for disseminating
third meeting of the National Watershed the vegetative conservation and other low cost
Development Policy and Implementation technology.
Committee (NWDPIC) held in July, 1996 at New
Delhi, the Eighth plan allocation under 7.9 Realizing that Mitra Krishak Mandal for each
NWDPRA in respect of four North Eastern States micro-watershed project is an effective means for
of Manipur, Meghalaya, Mizoram and Nagaland organizing and mobilizing the watershed
was enhanced from Rs. 5.42,00 thousand to Rs. community, steps have been taken to transfer a
191400 thousand keeping in view the sum of Rs.l0,000 from the project funds to the
performance and needs of the region. In case of bank accounts of each such Mitra Krishak
Manipur, allocation for current financial year has Mandal. This could go a long way in ensuring the
further been revised from Rs. 300 thousand to Rs. participation of beneficiary groups in project
10000 thousand. Similarly, in case of Orissa the implementation.
allocation of Rs. 80000 thousand had been
enhanced to Rs. 180000 thousand for the year 7.10 Stress is being laid on organizing self-help
1996-97 to step up the activities under the project groups of beneficiaries in the micro-watersheds
in view of the prevailing drought conditions to institutionalize peoples participation in the
specially in the drought-affected districts. Out of project. Acknowledging that Mahila Mitra
this, Rs.50000 thousand has been earmarked for Krishaks can play a significant role to improve
Koraput, Bolangir and Kalahandi districts. the economy of households, if properly organized
During current year, a sum of Rs.83,3100 under household production systems (mushroom
thousand has been released upto December, 1996. cultivation, sericulture, bee-keeping, etc), a twoAn expenditure of Rs. 55.54 crore has been tier training programme, one at district level, the
reported by the State/UT Governments upto other at watershed level, is being taken up with
September, 1996. During the first two quarters of the objective of promoting formation of self help
l996-97, an area of 52,150 ha. and 1,87,147 ha. thrift groups of women and their training through
has been covered under contour vegetative Mitra Krishak Mandal.
hedges on
TOC
First
Previous
Next
Last
2. Integrated
Watershed
Development
7.12 So far, 181 model research projects covering
Projects (Hills)
51 agro-climatic zones have been approved with
an estimated cost of about Rs. 118,90 thousand.
7.17 The project was conceived to address to
integrated development of hilly areas specially of
7.13 National, Regional and State level reviews ecologically degraded Shivalik ranges in J & K,
are conducted alongwith field visits to review the HP, Punjab and Haryana.
progress of the project and explain its concept,
approach and strategy to the field functionaries. 7.18 During mid term review, US $ 23.17 million
The State/UT Governments have also started out of the total credit of US $ 86.23 million was
similar reviews by their own officers at various identified as uncommitted balance and considered
levels. National Watershed Development Policy for surrender. The participating States have
and Implementation Committee provides overall submitted for extension of project period by one
policy framework and direction for development to two years with the request for access to the
of rainfed areas on watershed basis and monitors funds identified for surrender which is under
the projects by reviewing its progress.
consideration of DEA/ World Bank. Cumulative
credit disbursement upto August, 1996 is US $
Externally Aided Projects World Bank Aided 42.34 million.
Projects Integrated Watershed Development
3. German
(Kreditanstant
For
Projects (Plains)
Wiederaufbau) Assisted Project
7.14 With the overall objective of minimising
ecological degradation by promoting sustainable KFW assisted Watershed Managements
and replicable rain water conservation measures Project Karnataka
and diversified production system, the World
Bank aided IWDP(Plains) was initiated in 1991 7.19 KFW assisted Integrated Watershed
with a project life of years (ending March, 1998) Management Project with total project cost of
in the States of Gujarat, Rajasthan and Orissa, Rs.550.75 million (DM 24 million) is being
During mid term review held in November 1994, implemented in Karnataka to treat an area of
US $ 15.0 million against the total credit of US $ 53633 ha. The programme is being implemented
65.19 million was computed as uncommitted since August, 1996 with the active participation
balance and hence considered for surrender. of 6 NGOs. The Government of Karnataka has
However, the State Governments of Orissa and made a budget provision of Rs.40 million for
Rajasthan have proposed to take up additional
1996-97 to implement the project.
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
plots, etc. The total project cost is Rs. 13,5000 total cost of the project is Rs. 13,2500 thousand.
thousand. So far, an amount of Rs. 1,9400 The total expenditure, so far, is Rs. 1,9200
thousand has been spent.
thousand.
3. Comprehensive Watershed Development 5.
ProjectKarnataka.
EUROPEAN ECONOMIC
ASSISTED PROJECT
1.
COMMUNITY
Bhimtal
Integrated
Management Project
Watershed
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
Soils in Bihar and Uttar Pradesh with EEC 8.25 A new scheme for Shifting Cultivation has
assistance.
been launched in Seven North-Eastern States
with an Outlay of Rs. 45,00,00 thousand from
8.21 The main objective of the project is to 1994-95 with 100% central assistance to the
improve the income level of disadvantaged and States. This scheme aims at over all development
marginal farmers by reclaiming the potentially of jhum areas on watershed basis, restoring
fertile alkali land.
ecological balance in hill areas and improving
8.22 The project came into existence during socio-economic condition of the tribal
1993-94. It is being implemented in the States of community. An area of about 76000 ha. is
Bihar and Uttar Pradesh at an estimated cost of targeted to be developed during the last 3 years of
Rs. 85,80,00 thousand of which the Central Eighth Plan.
Govt.s Share works out to Rs. 6,88,00 thousand. 8.26 During 1996-97, the programme is in
It is proposed to reclaim 15,000 ha. of alkali operation in 256 micro-watersheds selected by
lands (10,000 ha. in Uttar Pradesh and 5,000 ha. the concerned States and approved by the State
in Bihar). Three districts each in Bihar level Sanctioning Committee of the respective
(Muzaffarpur, Siwan and Samastipur) and Uttar States. Implementation of this programme lays
Pradesh (Unnao, Kanpur dehat and Jaunpur) are emphasis on adoption of low-cost technology
covered under the project. Life span of the project with the use of local material for Soil and Water
is 7 years; it is likely to be completed by 2001 Conservation such as vegetative measures,
A.D. The components of the reclamation package improved production systems and construction of
include:
small water harvesting structure. It also includes
components of live-stock development and house
Preliminary survey and planning.
hold production with the Peoples Participation
on farm development.
and NGOs involvement. Expenditure involved is
Boring and Installation of pump sets/tubewells. about Rs. 16,00,00 thousand annually payable by
the Government of India to the concerned State
Improvement of drainage system.
Governments in the form of Grant-in-aid.
Application of soil amendments.
BUILDING OF DATA BASE
Green manuring.
Crop production inputslike seeds, fertilizers, All India Soil and Land Use Survey Scheme
micronutrients, insecticides/pesticides.
Horticulture plantation.
Dissemination of reclamation technology by
involvement of NGOs, farmers etc.
8.23 The scheme is being implemented by UP.
Land Development Corporation in Uttar Pradesh
and Gandak Area Development Agency,
Muzaffarpur in Bihar Since the inception of the
scheme, an area of 7417 ha. of alkali soil has
been reclaimed in both the States at the cost of
Rs. 16,22,00 thousand.
8.24 During 1996-97, an area of 6280 ha. has
been targeted to be reclaimed. Out of this, 974 ha.
has been treated with soil amendment and
brought under paddy/ wheat cultivation. In the
remaining area preparatory operation like soil
survey, boring and installation of tubewells, on
farm development works, drainage etc. is under
progress. This area is likely to be treated with soil
amendment in the month of May/June, 1997.
TOC
First
Previous
Next
Last
management system.
(v) Statewise mapping of waterlogged land
using Image Analysis System.
8.33 The achievement made on different items
during 1995-96 are given below:
(i) 60 lakh ha. area have been covered under
land degradation mapping.
(ii) Map library in respect of one catchment has
been completed.
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last
(a) INDO
GERMAN
PROJECT
ON
MANAGEMENT
SOIL
CONSERVATION
TRAINING
CENTRE,
DAMODAR
VALLEY
CORPORATION HAZARIBAGH, BIHAR
8.44 The Soil Conservation Training Centre
located at Damodar Valley Corporation (DVC),
Hazaribagh, Bihar is organising training courses
on Soil and Water Conservation for in-service
Officers/ Assistants who are working under State
Governments. The training centre has been
organising three regular training courses each of
90 days duration every year for field
functionaries and project officers engaged in
implementation of Soil and Water Conservation
Programme. Besides above courses, two Short
Orientation Training Courses each of 11 days
duration on Hydrologic and Sediment Monitoring
of Small Watersheds are being organised every
year for officers and assistants working under
Centrally Sponsored
Schemes
of
Soil
Conservation in the catchment of River Valley
Projects and Flood Prone Rivers. Since inception
of regular training course, total 1630 in-service
Soil and Water Conservation Assistants and
Officers have been trained upto 1995-96. Also
827 field and project officers have been trained
under Short Orientation Training Course till
1995-96.
TOC
First
Previous
Next
Last
LAND
WITH
TOC
First
Previous
Next
Last
Fertilizer Consumption
The consumption of chemical fertilizers during
1995-96 is estimated at 138.77 lakh tonnes as
against 135.64 lakh tonnes achieved during 199495 showing an increase of about 2.3%. While the
consumption of nitrogenous and potassic
fertilizers increased by 3.3% and 2.8%
respectively during 1995-96 over the previous
year, the consumption of phosphatic fertilizers
declined by 1.2%. All chemical fertilizers except
urea continue to be decontrolled.
Rate of Concession
Product
Indigenous DAP
Imported DAP
1500
MOP
1000
1500
SSP
340
500
TOC
First
Previous
Next
1304-2633
Last
NPK Ratio
9.3 The NPK consumption ratio during 1995-96
works out to 8.5:2.5:1 which is almost to the level
of 1994-95 NPK consumption ratio.
National Project on Development and Use of
Bio-fertilizers
9.4 Recognizing the importance of Bio-fertilizers
as the cheapest source of plant nutrients, the
National Project on Development and Use of Biofertilizers has been continued with the aim of
promoting, producing and distributing Biofertilizers. During the year 1996-97, the project is
being implemented by adopting Mission Mode
approach to boost up the production, and for
organizing large number of trainings and field
demonstrations. During 1996-97, it is envisaged
to approve about 22 Bio-fertilizer Production
Units with Central assistance.
2. Organizing demonstrations
nutrients other than zinc.
on
micro-
TOC
First
Previous
Next
Last
TOC
First
Previous
Next
Last