1 extras de material
Simbol
CE07C
CE20A
CE22B
CE28A
CE31A
13.21
8.4
159.6
558.6
U.M
proces
3
mp
mp
ri sau la doliile invelitorilor din scanduri brute de rasinoase (de 24mm grosime) la
mp
s=52.66
ce19a1
ce23a1
coame
dolii
stresini
plasa protectie
Cantitatea
rotunjuta
5
12.61
12.32
155.3552
3.6
9.2
33.12
190
42
188.4752
101
190
190
denumire comerciala
mire comerciala
2
U.M.
P.U.
Material
valoare mat de
constr (4x5)
tab 2.2
extras de manopera
nr crt
meserie
denumire meserie
U.M.
manopera
(total)
meserie
manopera orara
(Lei/h)
nr crt
utilaj
denumire utilaj
devizul sintetic
u.m.
3
valoare
utilaj
(4x5) Lei
nr crt
simbol articol
simbol articol
denumire articol
U.M.
Cantitate
material
manopera
utilaje
transport TRA
TOTAL
10
11
nr crt
1
(B)
(C)
(D)
(E)
(F)
(G)
simbol articol
denumire articol
3
TOTAL (A) CHELTUIELI DIRECTE
TR AUTO (G*lei/t0)
CAS (SUM(m*17.35%)
CASS (SUM(SUM(m)*5.2%)
SOMA SUM(M*0.5%)
F RISC SUM (M*0.25%)
TOTAL CHELTUIELI DIRECTE
CHELTUIELI INDIRECTE (CI=SUM T'*CI
PROFIT (SUM T'*CI) *PI
TOTAL DEVIZ FARA TVA (SUM T'*CI+P
TVA (SUM T'*CI+P)*20%
TOTAL DEVIZ CU TVA E+F
umire articol
U.M.
3
TUIELI DIRECTE
lei/t0)
m*17.35%)
UM(m)*5.2%)
M(M*0.5%)
(M*0.25%)
UIELI DIRECTE
NDIRECTE (CI=SUM T'*CI
M T'*CI) *PI
FARA TVA (SUM T'*CI+P)
CI+P)*20%
Z CU TVA E+F
Cantitate
4
material
manopera
utilaje
CAS
CASS
SOMAJ
F RISC
m+
transport TRA
TOTAL
9
TA
10
TA
11
TR +TA
CAS
CASS
SOMAJ
F RISC
T'
Ci
P
Simbol
proces
CE07C
3
Invelitoare din tabla cutata tip LINDAB
18.32 +9.16 + 10.95 + 7.83 + 6.4 = 52.66
tei tehnologice
Calculul in detaliu a cantitatii de
U.M
Cantitatea
rotunjuta
mp
53 mp
proces
3
83 + 6.4 = 52.66