DEMOLITION
General contents:
Precautionary measures
Mechanical demolition
AGENDA
OBJECTIVE
INTRODUCTION
PUBLIC SAFETY
PLANNING STAGE
PREPARATION STAGE
DEMOLITION STAGE
OBJECTIVE
-
INTRODUCTION
- Prior to permitting employees
to start demolition operations,
an engineering survey of the
structure shall be made by a
competent person to determine
the condition of the framing,
floors, and walls, and possibility
of unplanned collapse of any
portion of the structure.
INTRODUCTION
- Any adjacent structures where
employees may be exposed
shall also be similarly checked.
- The employer shall have
evidence that such survey has
been performed.
PUBLIC SAFETY
A. FOR PUBLIC SAFETY, THE FOLLOWING
PROCEDURES SHALL BE ADOPTED AND
ACTIONS TAKEN WHENEVER
REQUIRED.
PUBLIC SAFETY
(FOR PUBLIC SAFETY, THE FOLLOWING PROCEDURES SHALL BE
ADOPTED AND ACTIONS TAKEN WHENEVER REQUIRED
contd.)
PUBLIC SAFETY
B. TO PREVENT FALLING HAZARDS
FROM HIGH LEVELS OF BUILDING(S)
CLOSE TO PUBLIC AREAS, THE
FOLLOWING MEASURES SHALL BE
CONSIDERED.
Install external scaffolding along the
periphery of the building.
Install peripheral overhead cantilever
shelter.
Install safety netting.
PUBLIC SAFETY
C. WHILE CARRYING EXTERNAL WORKS
(ROAD, DRAINAGE, CULVERT AND
MANHOLE) OUTSIDE THE BOUNDARY,
THE FOLLOWING MEASURES ARE
NECESSARY;
Enclose the work areas with
barricades.
Install warning signs.
Install hazard lights.
Station at least a suitable person to
direct the traffic.
PLANNING STAGE
Obtain the as-built drawing from
the
owner/architect/consultant/rele
vant authorities.
Attend the briefing (if any)
conducted by owner/architect.
Study the drawings and survey
the building(s) to be demolished
and the surrounding areas.
PLANNING STAGE
Consult structural
engineer/demolition
expert/local authority for
further information.
Conduct test on the building
structure if necessary.
Plan the procedure and adopt
the safest demolition method.
PREPARATION STAGE
Inform the relevant authorities (Police,
DENR/EMB, DPWH, City/Mun. Bldg.
Office).
Cordon off the area where the demolition
work is to be carried out.
Install hoarding around the site.
Install exterior protection (scaffold0
with netting/canvass sheet along the
periphery of the building(s) (except
when using explosives).
Install Notice Boards and Warning Signs.
DemolitionSafety