Sunteți pe pagina 1din 2

APH Tube expansion calculation

Project :- 170 TPH Bagasse fired Boiler


Tube sheet thickness

Top
Bottom

20mm
32mm

Tube Thickness

2.04mm

Tube Sheet Hole Diameter


Tube Out side Diameter
Seat clearence

64.3
63.5

(A - B)

0.8

Tube diameter
Tube thickness
Tube ID

(2 x 2.04 )
( B -C )

63.5
4.08

59.42

Add seat clearence

0.8

6% of Tube Thick
expanded Tube ID 6%

A
B

(D + E )

60.22

0.2448

60.4648

60.47
expanded Tube ID 9%

60.59

expanded Tube ID 8%

60.55

Mximumum allowed

Mximumum allowed

S-ar putea să vă placă și