SECTION-4.2
TECHNICAL DATA SHEET
DAM AND SPILLWAY - RADIAL GATES AND HYDRAULIC HOIST
1.0
2.0
2.
i.
ii.
iii.
iv.
3.
5.
General
Clear Width of Opening
i.
ii.
i.
ii.
the
m
the
m
Nos.
Tons
Tons
Tons
Trunnion
VOLUME - III
CONTRACTOR Data
Number of Spans
Nos.
Top of the Gate
El.
Sill Level
El.
Crest Level
El.
Width of the Pier
M
Elevation of top of pier where the
El.
Hoist is provided
Elevation of centreline of Trunnion
Operation
under
balanced/
unbalanced head
4.
Unit
Section: 4.2 -
i.
ii.
iii.
iv.
6.
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
x.
xi.
xii.
xiii.
xiv.
xv.
xvi.
xvii.
7.
i.
ii.
iii.
8.
i.
min
ii.
iii.
min
m
9.
10.
Operation schedule
VOLUME - III
Section: 4.2 -
3.0
Unit
VOLUME - III
CONTRACTOR Data
Section: 4.2 -