Building A (1)

Super Structure
Works

Mobilization works

Sub structure Works

(1.1)

(1.2)

Cleaning and
Leveling

Excavation

Ground Floor work

First Floor Work

(1.2)

(1.3.1)

(1.3.2)

(1.1)

Fixing The Fence


(1.1)

Shuttering Plain
Concrete Footings
(1.2)

Erection of Site
Offices

Placing Plain
Concrete Footings

(1.1)

(1.2)

Deshuttering Plain
Concrete Footings
(1.2)

Shuttering RC
footings
(1.2)

(1.3)

Concrete Works

Finishing Works

(1.3.1.1)

(1.3.1.2)

Shuttering Columns

Bricks Works

(1.3.1.1)

(1.3.1.2)

Steel Fixing Columns

Preliminary
Carpentary works

(1.3.1.1)

Placing RC Columns
(1.3.1.1)

(1.3.1.2)

Preliminary
Electrical Works
(1.3.1.2)

Steel Fixing Rc
Footing

Deshuttering
Columns

Preliminary Sanitary
works

(1.2)

(1.3.1.1)

(1.3.1.2)

Placing Rc Footings

Shuttering Slab

Plastering

(1.2)

(1.3.1.1)

(1.3.1.2)

Deshuttering Rc
footing

Steel Fixing Slab

Painting

(1.3.1.1)

(1.3.1.2)

Isolation

Placing RC Slab

(1.2)

(1.3.1.1)

Finishing
Carpentray works

Back Filling

Deshuttering Slab

(1.2)

(1.3.1.1)

(1.2)

(1.3.1.2)

Finishing Electrical
Works
(1.3.1.2)

Finishing Sanitary
Works
(1.3.1.2)