Documente Academic
Documente Profesional
Documente Cultură
Salient Features
¾ Catchments Area 2000 sq.mt
¾ Capacity of storage pond 2673 cum
¾ No. of flats 154 no.s
¾ Population 770 no.s
¾ Recharge structures 2 no.s
¾ Filtration Chamber 1 no.s
¾ Recovery structure 1 no.
¾ Collection Chamber 60 no.
¾ Potable water consumption before RWH 160
KL/day
¾ Potable water consumption after RWH 154 KL/day
10%
Project Overview
In Green Enclave Flat Complex, roof run-off is collected
through down comers to the lined reservoir through a
desisting tank. From this reservoir water is pumped to the
over head tank . This tank is completely isolated from 90%
potable water tank with a distinguished colour coding. Drinking Water Rain Water
From over head tank, rain water is supplied to the toilet
flush tank of each flat. Maintanance of garden lawn &
washing of car is dedicated to the rain water line only.
PAGE NO.4