Sunteți pe pagina 1din 2

Radiogram No.

4847u Form 24 for 03/12/07

PROGRESS 359 UNLOADING

GMT CREW ACTIVITY


06:00-06:10 Morning inspection
06:10-06:40 Post-sleep
06:40-07:30 . BREAKFAST
07:30-08:00 Prep for Work
08:00-08:15 Daily Planning Conference (S-band).
Remove items from the NODE1P2 Location and perform Integrated Station
08:15-10:15 CDR,FE-2
Lan (ISL) Stowage Preparation
Remove items from the NODE1P2 Location and perform Integrated Station
08:15-09:15
FE-1 Lan (ISL) Stowage Preparation
09:15-10:20 Progress 359 unloading and IMS updates
10:15-10:35 FE-2 IMS update
10:15-10:45 CDR СОЖ Maintenance
10:20-11:20 FE-1 Physical Exercise (VELO+RED) day 3
10:45-11:45 FE-2 N1-FWD Integrated Station Lan (ISL) Installation
11:15-11:20 TVIS Weekly Maintenance
CDR
11:20-12:50 Physical Exercise (TVIS + CEVIS)
11:20-12:50 FE-1 Progress 359 unloading and IMS updates
11:50-12:50 FE-2 Physical Exercise (RED)
12:50-13:50 . LUNCH
13:50-14:50 FE-1 БВН [Fan/Heater Assy] R&R in the Progress docked to DC1
13:50-15:50 CDR ISL N1 port cable installation
13:50-14:50 ISL N1 starboard cable installation
FE-2
14:50-16:50 ISL N1 port cable installation
Test comm. session with Hannover (CeBIT-2007 Exhibition in Germany) (S
15:10-15:35
FE-1 + Ku-band)
15:35-17:05 ИДЭ-2 smoke detector needle cleaning in DC1 Fire Detection System
15:50-16:50 ISL N1 starboard cable installation
CDR
16:50-17:05 Crew Discretionary Conference (S + Ku-band)
16:50-18:20 FE-2 Physical Exercise (CEVIS)
17:05-18:35 FE-1 Physical Exercise (TVIS), day 3
17:05-17:50 Microbiological Analysis T + 5
CDR
17:50-18:50 Physical Exercise (RED)
18:20-19:00 FE-2
Evening work prep
18:35-19:15 FE-1
18:50-18:55 Transfer TVIS/RED/CEVIS/HRM data to MEC
CDR
18:55-19:15 Evening work prep
19:00-19:15 FE-2 Daily Food Prep
19:15-19:30 . Daily Planning Conference (S-band).
19:30-19:40 FE-2
Daily Food Prep
19:30-20:00 CDR,FE-1
19:40-19:55 US Ground Site VHF Test
FE-2
19:55-20:00 Daily Food Prep
20:00-20:30 DINNER
20:30-21:30 . Pre-sleep
21:30-06:00 SLEEP
ТБУ (Universal Bioengineering Thermostat). Temperature check
URAGAN. Observations and photography
Task List FE-1
PLANTS-2. Status check
MATRYOSHKA-R. Checking sensor data on the reader

Note. See OSTP for references to US activities.


End of Radiogram

S-ar putea să vă placă și