Literacy Objective
Assignment 18/28 B
Produce a mixture of diagrams and word processed reports under the following headings;
BTEC National Business Unit 18: Managing a Business Event – Unit 28: Supporting Projects
Before you start the first task READ i, ii and iii. These need to be done at the same time.
ii) Produce a diagram with an explanation of the Project Life Cycle for the Careers Event (P1-U28)
iii) In order to ensure smooth progress of the Project you need to set up 2 methods of monitoring
your plan. You need to set up these two methods of checking progress and monitoring when things have
happened, need to happen, will happen as part of the planning process (P4-U28)
BTEC National Business Unit 18: Managing a Business Event – Unit 28: Supporting Projects
iv) provide a detailed assessment of the importance of following the procedures in place at
Challenge for the organising and running of such an event. Ms S Lawson is in charge of trips and
may be able to help. You need to identify how the following areas are addressed:
• security of material, equipment and information,
• ensuring that participants with special requirements are catered for
• any contracts which may need to be set up
• legal requirements such as risk assessment
• consumer protection legislation covering such as faulty equipment
• health and safety requirements
• passports & visas if appropriate
You need to explain how all these areas are covered by the procedures in place at Challenge, why it is
important that these procedures are followed. Explain how these procedures can affect the planning of the business
event.
(M1-U18)
v) produce an analysis of the arrangements made by the event organiser. You need to analyse the different
activities through which the event was facilitated covering the following areas;
• Types of activity: eg presentations, group activities or workshops, travel, accommodation, meal
times, minute/note taking
• Health, safety and security: venue emergency procedures; housekeeping arrangements; security of
materials and equipment; confidentiality of information and communication
• Event administration: eg note taking, ensuring students have right papers, ensuring students are
aware of location of venues and facilities, recording attendance and cancellations
• Trouble-shooting: liaison with students and adults; potential revision/rearrangement of event
outcomes; arising issues, eg non-attendance of students, last-minute changes to itinerary, inadequate
rooms or facilities, non-delivery of expected outcomes.
You need to explain how well these areas were arranged, any similarities in the arrangements and what differences there
are in the way these things were set up. (M2-U18)
vi) explain how you will obtain the information allowing you to evaluate the event. You must describe how
the event evaluation should be coordinated, the preparation and circulation of materials, and any budgetary
reconciliation (how you ensure you have spent the levels you say you would and what would happen if you
had over spent).
You should go on to explain how undertaking the above activities contribute to identifying problems and providing
solutions for future events. (M3-U18)
BTEC National Business Unit 18: Managing a Business Event – Unit 28: Supporting Projects
vii) drawing on the work provide for P1-The Stages in a project Life Cycle and P2-Stakeholders
expectations and giving examples relating to the Science Trip, examine the impact on each of the stages of
the project if it is poorly managed.
Explain what effects poor management will have on the activities as they are planned and how stakeholders expectations
will be affected by this poor management. (M1-U28)
viii) You need to explain how the many different tools for project planning contribute to managing different
types of project.
You should draw on your evidence for P4-Two Methods of Project Monitoring and use examples of different types of
project, such as large complex ones and small informal ones. (M2-U28)
ix) You need to provide an analysis of the importance of achieving project outcomes within agreed
timescales, resources and budgets.
You should explain how failing to follow the plan in place will require a contingency strategy for dealing with major
deviations from the project plan. You also need to explain how it is important that outcomes should be within the
agreed timescales, resources and budgets and what has to be done if this is not the case. (M3-U28)