QUALITY PLAN
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS RESPONSIBILITY
PARAMETERS
INSTRUCTION
CONFIRMATION FROM CUSTOMER LAB DIPS /STRIKE OFF FAX OR LETTER HEAD DIRECTOR
GREY AVAILABLE
REQUIRMENT AGREED
ORDER FOR FROM CUSTOMER APPROVAL FROM DIRECTOR ORDER FORM FILE DIRECTOR
OF PROGRAMME DYG/PTG JOB CARD LOT NUMBER DYEING / PRINTING PRINTING MANAGER
SYSTEM CO-ORDINATOR
QUALITY PLAN
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS RESPONSIBILITY
PARAMETERS
INSTRUCTION
&
STEAMPS
LD,LP,LDP,LW
SD,SP,SDP,SW
POSITION INCHARGE
QUALITY PLAN
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS RESPONSIBILITY
PARAMETERS
INSTRUCTION
SIZE PH OF LIQU OR
TEMPERATURE OF TROUGH
ABSORBANCY P-H
BURGER REQUIRED
RFD &RFP
P&W MATERIAL
QUALITY PLAN
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS RESPONSIBILITY
PARAMETERS
INSTRUCTION
PH PRINTING
ABSORBENCY
TEMPERATURE
SPEED WIDTH
STABILITY OF PCS
EFFECT A FABRIC
QUALITY PLAN
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS RESPONSIBILITY
PARAMETERS
INSTRUCTION
SPEED
LISTING
APPROVED
SHADE
BATCHING TIME
MICROWAVE
SAMPLE
QUALITY PLAN
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS RESPONSIBILITY
PARAMETERS
INSTRUCTION
I-R INTENSITY
STEAM TEMP
LIQUER LEVEL
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS RESPONSIBILITY
PARAMETERS
INSTRUCTION
CURING TIME
REDUCTION DYEING PAD STEAM WASH CHEMICAL PICK UP PROGRAMME REGISTER DYEING MANAGER
CLEAR TO CLEAR THE ROOF TEMPERATURE M/C PRODUCTION REGISTER ASST-DYEING MANAGER
CHEMICAL PAD
STEAM
QUALITY PLAN
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS RESPONSIBILITY
PARAMETERS
INSTRUCTION
DESIGNING PRINTING SEANING OF DESIGN REPEAT SETTING LAB DIPS STRIKE OFF PRINTING MANAGER
OF COLOURS
DESIGN ADJUSTMENT
COATING PRINTING COATING OF SCREEN PHOTOCHEMICAL PASTE SCREEN REGISTER PRINTING MANAGER
DESIGN INCHARGE
COATING MAN
DRYING TIME
QUALITY PLAN
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS RESPONSIBILITY
PARAMETERS
INSTRUCTION
THROUGH INKJET
ENDERING PRINTING TO GIVE THE BODY RINGS FIXATION ON BOTH ENGRAVING INCHARGE
BY ADHESSIUE
UN EXPOSED
QUALITY PLAN
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS RESPONSIBILITY
PARAMETERS
INSTRUCTION
FINIAL PRINTING AREA OF SCREEN TEMPERATURE TIME DESIGN REGISTER ENGRAVING INCHARGE
TO CLEAN THE
EXPOSED AREA OF
DESIGN
RFD MATERIAL FINISHING TO EQUALISE THE WIDTH CROSS & BOW RECEIVING SLIP FILE SHIFT INCHARGE FINISHING
RECIEVE WIDTH OF FABRIC WHITNESS OF FABRIC IF REQ JOB CARD FILE SHIFT INCHARGE PRINTING
PRINTING OF PRINTING TO PRINT THE DESIGN JOB NUMBER METERAGE TO JOB CARD FILE PRINTING MANAGER
FABRIC AS PER REQUIRMENT PRINT NUMBER OF COLOURS DESIGN REGISTER ASST-PRINTING MANAGER
COLOUR MAN
QUALITY PLAN
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS RESPONSIBILITY
PARAMETERS
INSTRUCTION
SELECTION OF DYESTUFF
Q.C
STEAMING
QUALITY PLAN
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS RESPONSIBILITY
PARAMETERS
INSTRUCTION
STEAMING TEMPERATURE
STEAMING TIME
OXIDATION TEMPERATURE
WASHING TEMPERATURE
RECIEVING TO PRINTING FOR FIXATION TIME OF FIXATION PRODUCTION REGISTER SHIFT INCHARGE
STATURATED
QUALITY PLAN
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS RESPONSIBILITY
PARAMETERS
INSTRUCTION
RECEIVING TO PRINTING TO FIX & WASH THE FLASH AGER TEMPERATURE DUPLICATE BOOK PRINTING MANAGER
FLASH AGER VAT DYES TIME OF FIXATION PRODUCTION REGISTER DYEING MANAGER
FROM ARIOLI SPEED TEMP OF WASHING DUPLICATE BOOK FILE PRINTING MANAGER
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS
PARAMETERS
INSTRUCTION
SETTING FINISHING TO ACHIVE THE REQ TEMP 70C - 180C SPEED 50-65 M/M
SURFACE
RESPONSIBILITY
QUALITY PLAN
QUALITY WORK
STAGES DEPARTMENT PROCEDURE DOCUMENTS RESPONSIBILITY
PARAMETERS
INSTRUCTION