Manager Closing Checklist Date: Day:

CLOSING MANAGER OPENING MANAGER

Rating Options 4-- Excellent 3= Good 2 - Fair 1= Poor Labor - Post Close Labor Hrs Used
S=Satisfactory U= Unsatisfactory

Front Counter / Cash Cooks Line

Team Member Ratings as listed above Team Member Ratings as listed above

2 HOURS PRIOR TO CLOSING CLOSE OPEN 2 HOURS PRIOR TO CLOSING CLOSE OPEN
Paper, Bags, Cups & Condiments Stocked Sandwich wrap/baskets stocked
All Registers Windexed & Cleaned with Back up paper Dishes washed
Stainless wiped down (front area)
1 HOUR PRIOR TO CLOSING 1 HOUR PRIOR TO CLOSING
Dining room trash receptacles clean (inside and out) Topping Station Pans Rotated for Clean
Tables and chairs clean organized Fryers clean (top, inside doors, outside of hoods)
High chairs clean Dishes washed
Napkins and straws stocked, dispensers clean All Plates Restocked
Floor mats clean POST CLOSE
Front counter merchandiser clean Equipment turned off (Oven, Warmers, Heat Lamps Expo))
POST CLOSE Panini Grill cooled for 10 min. before cleaning
Break Down Smoothie Station (Clean/wrap/store) Cheese & condiments properly wrapped and put away
Put Down Patio Umbrellas Stove & Oven Cleaned
All door glass clean Grill Cleaned
All Front Counter Surfaces Cleaned Dump & Clean Grease Catch on Grill
All tables and chairs clean (check after pre close) Buns covered for next day usage
Condiment bar clean & stocked Specialty freezer clean
Drink station nozzles sanitized Bread Shelf Cleaned & Polished (All Bread Wrapped)
Under side of drink station clean, nozzles replaced Grill Stand Refrigerator Cleaned (inside & out)
Ice Tea Machine Cleaned & Polished Panini/Saute Unit Rotated/Filled/Cleaned (inside & out)
Restrooms Cleaned, Sanitize Baby Changers Food Warmer broken Down/Cleaned
Restroom Mirrors, Sinks, Toilets Cleaned Fry dump station and heat lamp assembly clean
Restrooms stocked, swept & Mopped Walls and hood behind equipment cleaned
Wood Floors Swept & Mopped Glass Sneeze Guard Cleaned (spotless)
All Trash Pulled and to dumpster (Cans with New liners) Hoods and filters clean
Dining room Vacuumed Dishes finished (Washed/Rinsed/Sanitized)
Bank Out your Drawer All Stainless Polished
All Utensils & Necessary Equipment restocked out front
Sandwich & Salad Station Floor scrubbed & mopped

Team Member Ratings as listed above


MANAGERS DUTIES
2 HOURS PRIOR TO CLOSING CLOSE OPEN
Sandwich wrap/baskets stocked Ratings as listed above
Trash receptacles emptied and clean 2 HOURS PRIOR TO CLOSING CLOSE OPEN
Stockrooms, walk-in cooler/freezer swept & organized Daily Labor Verified and Corrected
Condiment bottles clean and filled Do PM PULL (Bread & Chicken for Next Day)
Dishes washed Make Sure Breaks were taken
Pull Bread for Next Day Check All Pre-Closing / Pump Staff for a GOOD CLOSE
1 HOUR PRIOR TO CLOSING 1 HOUR PRIOR TO CLOSING
Clean interior of Salad Unit Check All Pre-Closing / Pump Staff for a GOOD CLOSE
Clean out interior of Sandwich Unit Review Weekly To Do Grid for any items missed and complete
Rotate to new inserts in Sandwich/Salad Units Assist Staff in closing the Restaurant
Prep Table & Prep Sink Cleaned Check Dumpster Area
Dishes at the sink washed POST CLOSE
POST CLOSE Assist staff in hosing and deck scrubbing floors
All Meats wrapped, Trays Traded for clean CHECK OUT ALL EMPLOYEES (BEFORE THEY GO)
Cheese & condiments properly wrapped and put away Restock all Change in Drawers
Sliced tomatoes discarded (counted as waste) Verify Safe Amount
Dishes finished (Washed/Rinsed/Sanitized) Verify All Drawers
Buns covered for next day, Bread Rack Cleaned Complete All Necessary Paperwork
Sandwich Unit Shelf Cleaned (over & under) Fax/Send All Necessary Paperwork (Call In Sheet, Checklist, Pre Sch)
Slicer Broken Down, Cleaned, Sanitized & reassembled Check all Refrigeration at Proper Temp
Boards and condiment well clean Check All Equipment is Shut Off
Walls and Floors behind Equipment Cleaned Do Final Walk Through Before Leaving (Check/Complete Everything)
Stations properly reassembled Check Dumpster Area & Outside Perimeter
All Stainless Polished, Walls, Machines, Oven Complete Managers Closing Checklist
Sinks clean (including ALL hand sink) Lock Safe and Doors
Mop sink area clean and cleaning tools organized/Hung Shut Off Lights (leave on Basic Lighting)
Trash Pulled and taken to Dumpster MAKE DEPOSIT
Dumpster area straightened up & Clean
Kitchen Floor deck brushed & Mopped
Server/Bar Station Dish

Team Member Ratings as listed above Team Member Ratings as listed above

2 HOURS PRIOR TO CLOSING CLOSE OPEN 2 HOURS PRIOR TO CLOSING CLOSE OPEN
Roll Silverware
Bar Rolled Silverware restocked Dishes washed
Restock Side Stands
Oil Bottles full 1 HOUR PRIOR TO CLOSING
Clean Bar POS System Organize & Clean all kitchen shelves
Dishes washed Dishes washed
1 HOUR PRIOR TO CLOSING All Plates & Glasses Restocked at stations
Clean of Bottle Beer Unit
Clean out interior of Keg Unit POST CLOSE
Restock all Beverage
Sinks Cleaned
RestockALL Glassware Dishes finished (Washed/Rinsed/Sanitized)
Bar Bottles wiped down All Stainless Polished
POST CLOSE All Utensils & Necessary Equipment restocked out front
Keg Beer Drain Cleaned Floor scrubbed & mopped
All Wine Vacuum sealed
All Stainless Polished
Dishes finished (Washed/Rinsed/Sanitized)
Front Counter Sandwich & Salad Station Cooks Line
Pre-Closing & Closing Checklist Pre-Closing & Closing Checklist Pre-Closing & Closing Checklist
The following items are listed from pre closing to post closing in the order The following items are listed from pre closing to post closing in the order The following items are listed from pre closing to post closing in the order
of completion (sequencing) Pre closing activities should only be done during of completion (sequencing) Pre closing activities should only be done during of completion (sequencing) Pre closing activities should only be done during
periods when guests are taken care of .. remember the guest comes first. periods when guests are taken care of .. remember the guest comes first. periods when guests are taken care of .. remember the guest comes first.

2 HOURS PRIOR TO CLOSING Complete 2 HOURS PRIOR TO CLOSING Complete 2 HOURS PRIOR TO CLOSING Complete
Paper, Bags, Cups & Condiments Stocked Sandwich wrap/baskets stocked Sandwich wrap/baskets stocked
All Registers Windexed & Cleaned with Back up paper Trash receptacles emptied and clean Dishes washed
Stainless wiped down (front area) Stockrooms, walk-in cooler/freezer swept & organized
1 HOUR PRIOR TO CLOSING Condiment bottles clean and filled 1 HOUR PRIOR TO CLOSING
Dining room trash receptacles clean (inside and out) Dishes washed Topping Station Pans Rotated for Clean
Tables and chairs clean organized Pull Bread for Next Day Fryers clean (top, inside doors, outside of hoods)
High chairs clean 1 HOUR PRIOR TO CLOSING Dishes washed
Napkins and straws stocked, dispensers clean Clean interior of Salad Unit All Plates Restocked
Floor mats clean Clean out interior of Sandwich Unit POST CLOSE
Front counter merchandiser clean Rotate to new inserts in Sandwich/Salad Units Equipment turned off (Oven, Warmers, Heat Lamps Expo))
POST CLOSE Prep Table & Prep Sink Cleaned Panini Grill cooled for 10 min. before cleaning
Break Down Smoothie Station (Clean/wrap/store) Dishes at the sink washed Cheese & condiments properly wrapped and put away
Put Down Patio Umbrellas POST CLOSE Stove & Oven Cleaned
All door glass clean All Meats wrapped, Trays Traded for clean Grill Cleaned
All Front Counter Surfaces Cleaned Cheese & condiments properly wrapped and put away Dump & Clean Grease Catch on Grill
All tables and chairs clean (check after pre close) Sliced tomatoes discarded (counted as waste) Buns covered for next day usage
Condiment bar clean & stocked Dishes finished (Washed/Rinsed/Sanitized) Specialty freezer clean
Drink station nozzles sanitized Buns covered for next day, Bread Rack Cleaned Bread Shelf Cleaned & Polished (All Bread Wrapped)
Under side of drink station clean, nozzles replaced Sandwich Unit Shelf Cleaned (over & under) Grill Stand Refrigerator Cleaned (inside & out)
Ice Tea Machine Cleaned & Polished Slicer Broken Down, Cleaned, Sanitized & reassembled Panini/Saute Unit Rotated/Filled/Cleaned (inside & out)
Restrooms Cleaned, Sanitize Baby Changers Boards and condiment well clean Food Warmer broken Down/Cleaned
Restroom Mirrors, Sinks, Toilets Cleaned Walls and Floors behind Equipment Cleaned Fry dump station and heat lamp assembly clean
Restrooms stocked, swept & Mopped Stations properly reassembled Walls and hood behind equipment cleaned
Wood Floors Swept & Mopped All Stainless Polished, Walls, Machines, Oven Glass Sneeze Guard Cleaned (spotless)
All Trash Pulled and to dumpster (Cans with New liners) Sinks clean (including ALL hand sink) Hoods and filters clean
Dining room Vacuumed Mop sink area clean and cleaning tools organized/Hung Dishes finished (Washed/Rinsed/Sanitized)
Bank Out your Drawer Trash Pulled and taken to Dumpster All Stainless Polished
Dumpster area straightened up & Clean All Utensils & Necessary Equipment restocked out front
Recheck pre-close/close & ask manager to check and rate close before leaving Kitchen Floor deck brushed & Mopped Floor scrubbed & mopped
Additional Items: Recheck pre-close/close & ask manager to check and rate close before leaving
Additional Items: Recheck pre-close/close & ask manager to check and rate close before leaving
Additional Items:

Team Members Name: Day


Bank Out your Drawer Team Members Name: Day
Team Member Signature of completion:
Team Members Name: Day Team Member Signature of completion:
Managers Signature: Date
Team Member Signature of completion: Managers Signature: Date

Managers Signature: Date Pull Bread for Next Day


Server / Bar Dish
Pre-Closing & Closing Checklist Pre-Closing & Closing Checklist
The following items are listed from pre closing to post closing in the order The following items are listed from pre closing to post closing in the order

of completion (sequencing) Pre closing activities should only be done during of completion (sequencing) Pre closing activities should only be done during

periods when guests are taken care of .. remember the guest comes first. periods when guests are taken care of .. remember the guest comes first.

2 HOURS PRIOR TO CLOSING Complete 2 HOURS PRIOR TO CLOSING Complete


Roll Silverware
Bar Rolled Silverware restocked Dishes washed
Restock Side Stands
Oil Bottles full 1 HOUR PRIOR TO CLOSING
Clean Bar POS System Organize & Clean all kitchen shelves
Dishes washed Dishes washed
1 HOUR PRIOR TO CLOSING All Plates & Glasses Restocked at stations
Clean of Bottle Beer Unit
Clean out interior of Keg Unit POST CLOSE
Restock all Beverage
Sinks Cleaned
RestockALL Glassware Dishes finished (Washed/Rinsed/Sanitized)
Bar Bottles wiped down All Stainless Polished
POST CLOSE All Utensils & Necessary Equipment restocked out front
Keg Beer Drain Cleaned Floor scrubbed & mopped
All Wine Vacuum sealed
All Stainless Polished Recheck pre-close/close & ask manager to check and rate close before leaving

Dishes finished (Washed/Rinsed/Sanitized) Additional Items:

Recheck pre-close/close & ask manager to check and rate close before leaving

Additional Items:

Bank Out your Drawer

Team Members Name: Day


Bank Out your Drawer
Team Member Signature of completion:
Team Members Name: Day
Managers Signature: Date
Team Member Signature of completion:

Managers Signature: Date