Sunteți pe pagina 1din 79

LG Air Conditioner Technical Solutions (LATS)

Multi V Model Selection Program


User Guide
Ver 1.7.11.26
LATS User Guide

Table of Contents
1. LATS OVERVIEW 4
LATS Introduction ..................................................................4
LATS Multi V Model Selection Program ........................................5
System Requirements for LATS .................................................6

2. LATS MULTI V MODEL SELECTION PROGRAM 7

Introduction ....................................................................... 7

Installation ......................................................................... 9

Usage Description : Tree Mode .............................................. 11

■ Step 1. Create Project ························································ 12

■ Step 2. Select Model··························································· 23

■ Step 3. Modify the length of pipe arrangement ·························· 29

■ Step 4. Check System ························································· 30

■ Step 5. Write the report ······················································ 32

Usage Description : CAD Mode............................................... 39

■ Step 1. Create Project ························································ 40

■ Step 2. Select Model··························································· 48

■ Step 3. Draw System and Design Piping ···································· 59

■ Step 4. Check System ························································· 70


LATS Overview

■ Step 5. Write the report ······················································ 73

3. TIPS FOR USING MULTI V MODEL SELECTION PROGRAM 74

Set Scale in Multi V Model selection program ............................74

Assign one load for one indoor unit in Multi V Model selection program75

Draw orthogonal pipes in Multi V Model selection program ..........76

4. CONTACT INFORMATION 78


1. LATS Overview
 LATS Introduction
 LATS Multi V Model Selection Program
 System Requirements for LATS

LATS Introduction

LATS (LG Air Conditioner Technical Solution) program is a total design solution for LG system air conditioners. It consists of load calculation
program and model selection program for system air conditioners. Load calculation program and model selection program can be selectively used.
Although users use different load calculation program other than LATS, they can use LATS model selection program.

Note : System air conditioners mean the devices that can operate multiple indoor units
with one outdoor unit. It is referred as system air conditioners or multi v air
conditioners. Each indoor unit can be operated separately and independently.

Note : LG provides various technical data like products, architecture information,


maintenance information, etc by the homepage, www.lgeaircon.com. LATS programs
and user guides are automatically updated on this site.
LATS Overview

LATS Multi V Model Selection Program

LATS Multi V Model Selection program selects the specific model for system air conditioners. It can select products, pipe arrangements, electric
design by using AutoCAD. This program is classified as Tree Mode and Cad Mode. For simple piping work, Tree Mode is used. Users can select
models even they do not have CAD drawings for building, because they have Tree Mode in a program.

Note : LATS provides auto update feature. When users start LATS program, an auto
update notification message appears to guide you a new version of a program.

5
LATS Overview

System Requirements for LATS

This is the hardware requirements for using LATS.

Item Description
CPU Intel PII,500MHz
Chip Set Intel
Main Memory 128 MB
Disk capacity/speed > 40 GB / 5400rpm / < 15ms access
Graphics Integrated / PCI based
Audio Integrated / PCI based

This is the software requirements for using LATS.

Item Description
Windows 98 SE, Windows NT, Windows XP & Windows
OS
2000
Web Browser Above Internet Expiorer 5.0
Application Software MS Excel, MS Access

Caution:
To get an output as a report form, Micosoft Excel program should be
installed on users’ computers before they use LATS program.

6
2. LATS Multi V Model Selection Program
 Introduction
 Installation
 Usage Description

Introduction

LATS Multi V Model Selection program can be operated in two types of modes. Tree Mode is displayed as a tree form, for a simple piping work.
When there is no CAD drawing for a building, this program can provide the proper quantity of indoor/outdoor air conditioners, cutoff, additional
refrigerant amounts, etc. However, sometimes users should rearrange the drawing to be transformed by CAD. To do so, users should manage the
drawing work on CAD Mode at first.

Caution:
Drawings that were managed at CAD Mode at first can be transformed
into Tree Mode. However, the drawings that were managed at Tree Mode
at first cannot be transformed into CAD Mode. In this case, users should
select new CAD Mode to design the piping work. The file that is designed
at CAD Mode can be outputted as .dxf file. It can be opend and edited in
AutoCAD.

1. Create Project
Enter the location information and design condition. Psychrometric chart automatically calculates a dry bulb temperature, wet bulb temperature,
and relative humidity of current air. Then load information related to cooling and heating is entered. If users have already used LATS Load program,
the result value can be simply loaded by a button. It there is no result, users can manually insert the cooling and heating load as a KW unit.

2. Select Model
Outdoor unit automatically sets its entire heat load value. Proper indoor units for each room can be selected by dragging indoor icon or double
clicking the box. After indoor air conditioners are chosen, outdoor air conditioners can be chosen by double clicking the outdoor unit icon. Basically,
Auto Select Mode is recommended for this.
LATS Multi V Model Selection Program

3. Modify the length of pipe arrangement


Users should modify the default length of pipe into an actual length. Users can directly insert the length by double clicking the line. Elbow or curve
line should be considered. Combination rate and total length can be checked at any time during the design. After this work is completed, Auto
Piping button should be clicked. A meesage that tells the success of auto selection feature appears.

The size of pipe and model name of branch are automatically decided based on EPDB (Engineering Product Data Book) data that
http://www.lgeaircon.com provides. EPDB is a PDF file that contains the specification information, piping information, etc of products.

4. Check System
Click System Check button to check the entire system including model selection, piping work, validation, cooling/heating simulation, etc. Schematic
Diagram provides the wire connection picture of indoor/outdoor air conditioners. The quantity of an additional refrigerants that users should install
according to the quantity and information for cutoff devices on electric leakage is calculated automatically.

5. Write the report


The result is outputted as a Microsoft Excel file. Comments, customer information, title, table of contents, system selection, product lists, piping
drawings, wire connection picture, etc are covered. For a written estimate, the product price and installation cost can be inserted by vendors.

Note:
Tree Mode is based on a system, while CAD Mode is based on a floor. One system
matches with one outdoor unit. Tree mode has one outdoor unit and its related
hierarchy.


LATS Multi V Model Selection Program

Installation

1. Access www.lgeaircon.com to download LATS-Multi V program. Execute the


LATS-Multi V program on your local computer. InstallShield Wizard for LATS-
MultiV appears. Click Next.

2. License Agreement window appears. Read it carefully and click Yes. .


LATS Multi V Model Selection Program

3. Customer Information window appears. Enter your User Name and Company
Name. For Serial Number, enter latsmultiv. Then click Next.

4. Installation is completed. Click Finish.

10
LATS Multi V Model Selection Program

Usage Description : Tree Mode

LATS Multi V Model Selection program can be operated in two types of modes. Tree Mode is displayed as a tree form, for a simple piping work.
When there is no CAD drawings for a building, this program can provide the proper quantity of indoor/outdoor air conditioners, cutoff, additional
refrigerants, etc. However, sometimes users should rearrange the drawing to be transformed by CAD. For CAD Mode, users can manage the
drawing work on CAD at first. Following introduces how to use LATS Multi V Model selection program in Tree Mode. This is the main flow of using
LATS Multi V model selection program.

11
LATS Multi V Model Selection Program

■ Step 1. Create Project

1
1. Click icon or click “Start  Programs  LGE ” LATS-
MultiV” to run LATS Multi v model selection program. Then the
program runs and this screen shot appears.
2
This is the initial screen display of LATS Multi v model selection
1
program. Following explains each menu and button.
2

1 Menu

File

Menu Description
New Project This menu creates a new project.
Open Project This menu opens a project that users select.
Close Project This menu closes a project. If you want to open a new project, you
should close the previous one first.
View Project This menu shows a project.
12
LATS Multi V Model Selection Program

Save Project This menu saves a project.


Save Project As This menu saves a project as a specific name.
Delete Project This menu deletes a project
Export This menu exports a project as a GCSI file.
Exit This menu closes a project and finishes a program.

System

Menu Description
Create System This menu creates a system.
Copy System This menu copies a system.
Delete System This menu deletes a system.
System setting This menu sets a system.
Space Load Summary This menu shows a space load summary.
Auto Piping This menu automatically selects Y branch, header and
pipe diameter automatically.
System check System Check supports validation check and
performance simulation.
- Validation check : It check total piping length, longest
pipe length after 1st branch, each pipe length and all the
validation in PDB.
- Performance simulation : It simulates system’s
performance from combination, design condition, pipe
length and defrosting factor.
System Invalidation property This menu checks the proper connectivity and number of
included sub items.
Generate reports This menu generates the final report as a Micosoft excel
file.

13
LATS Multi V Model Selection Program

View

Menu Description
Tool Bar This menu shows Tool bar on your program display.
Status Bar This menu shows Status bar on your program display.
System Log Viewer This menu positions a window on your program display that
shows a system log.
Project Navigator This menu shows the left panel on
your program display. You can control
the size of this part with and closes
this part with .

System View This menu shows System panel, Indoor Units List and
System Information.
Schematic Diagram This menu shows a hierarchical diagram among outdoor unit,
indoor unit, brances and pipes.
System preview This menu shows a current system in a full view to help users
watch the entire system easily.
Option This menu sets the term of
project auto save period.
Selected box size is also set
at CAD Option.

14
LATS Multi V Model Selection Program

Language

Menu Description
English This menu shows the current display in English.
Korean This menu shows the current display in Korean.
Spanish This menu shows the current display in Spanish.
French This menu shows the current display in French.
German This menu shows the current display in German.
Italian This menu shows the current display in Italian.
User Setting Users can set their own language that is provided at the above menu.

Help

Menu Description
LATS Help This menu shows the help contents for LATS.
About LATS This menu shows the version and information of LATS.
View Update Info This menu shows the updated information of view.

2 LATS-Multi V
fg

Menu Description
Project Information This menu shows project information.
Model Selection This menu is selected when users select models in a
program.
Generate Report This menu generates final report that is created after users
use LATS-Multi V program.

15
LATS Multi V Model Selection Program

3 Project
fg

Menu Description
Create Project This menu creates a new project.
View Project Info This menu shows a project information.
Open Project This menu opens a
popup window to select
a project to open, which
is already made.

Delete Project This menu deletes a project.


Close Project This menu closes a project. If you want to open a new
project, you should close the current one first.

2. Press Create Project button to see this window.

1
tha
2
t
tha
th 3
4 t
e fg
fg th
pr
oje 5e
pr
ct
oje
6
is
ct
cre
is
ate
7 cre
d
ate
Pat
d
h
Pat
of
h
1 Date that the project is created th
of
e
tha
2 Project Name th
pr
t
tha e
3 Path of the project to save it
th oje
pr
t
fg ct
e
th oje
to 16
pr
e ct
sav
oje
pr to
ct e
oje sav
it
is
ct e
LATS Multi V Model Selection Program

4 Project Unit
fg SI/IP:
For heat load calculation unit, LATS includes SI, which is an international standard and IP, which is an English standard. US and middle east
use IP while Europe uses SI. Some countries use IP for quantity and SI for length. This kind of mixed usage is also possible.
Simulation Mode:
Users select Cooling mode to make their projects based on cooling operation. In this case, the usage is focused on cooling. Users select
Heating mode to make their projects based on heating operation. In this case, the usage is focused on heating.

5 Outdoor Unit Type


Users can decide the outdoor unit type that they want from the drop down button.

6 Detailed Comments for the project


Users enter their detailed comments on this blank. Users check the checkbox of Use CAD to use CAD Mode.

7 Direction button
User can move next step.

Note :

<Tree mode> <CAD mode>


Tree mode shows the design as a tree shape.

Cad mode shows the design on an existing CAD drawuing.


Output can be transformed as a DXF file and opened at Auto CAD to be editted.

17
LATS Multi V Model Selection Program

Caution:
Be sure to active Use CAD option if you are using CAD drawing for model
selection. To Use Tree mode, do not check it.

From this Create Project window, enter the project information. Then click Next.
- Date that the project is created
- Project Name
- Path of the project to save it
- Project Unit
- Simulatino Mode
- Outdoor Unit Type
- Detailed Comments for the project

3. Select country and city. Then input design condition.

1 Change the design condition if the given values do not satisfy your requirements.
tha If you change one of the following air property (DBT,WBT,RH), psychometric process will be
t executed. Other related values will be found.
th
e
pr Click Next.
oje
2 ct
tha is
t cre
th ate
e d
pr Pat
oje h
ct of
is th
cre
e
1 Insert the country, State/Province and City information.
ate pr
tha
2 d Dry bulb temperature, Wet bulb temperature and Relative humidity should be inserted. This information should be inserted for each indoor and
t oje
tha outdoor
Pat also in Cooling and Heating condition.
th ct
t h
e to
th of
pr sav
e th
oje e
pr e
ct it
oje pr
is Pr
ct oje
cre oje 18
is ct
ate ct
cre to
d Na
ate sav
Pat me
d e
LATS Multi V Model Selection Program

4. When selecting Open Load, you can load the result calculated by LATS-LOAD. Clik Open load
button.

- Open load
You can open the load information that was previously calculated by LATS Load program.
- Add floor/Add space
If you do not use the previously calculated value of LATS Load program, you can manually insert
the floor information with this button.
- Remove row, Remove all
These row buttons are activated only when floors are added manually in advance. This button
removes the currently added row or removes all rows. After you complete your setting, click
Next.

5. From this window you can select the pre-calculated heat load of Load program. Select one
and click OK.

19
LATS Multi V Model Selection Program

6. The pre-calculated information is displayed as follows.

If you do not have the pre-defined value, click Add floor or Add space to add a new row. To
remove it, click Remove all button. If LATS LOAD values are not available, manual load entry
can also be done simply by adding values in columns

Click Next.

7. Input Customer & contractor Information. It will be printed out on your final report. After
filling all data, click Finish.

Then model selection window appears.

20
LATS Multi V Model Selection Program

This is the initial display of Tree


mode. Following is a description
for menus and icons.

21
LATS Multi V Model Selection Program

Icon Description

Save project, Ctrl + S

System setting, Ctrl + 4

New system, Ctrl + 1

Copy system, Ctrl + 2

Delete system, Ctrl + 3

Auto piping sets the pipe arrangement automatically. F5

System Check checks if the current system is available to be installed and designed. F6

System Validation property checks if the outdoor unit, indoor unit and brances has proper relation and hierarchy. F7

Toggle description

System load summary sees the system load entirely. Ctrl + 5

View reports, F8

System preview

Open/Close, Toggle Navigator, Ctrl + P

System panel that shows a window that you work on currently

Control line

Power cable

Pipe line

22
LATS Multi V Model Selection Program

■ Step 2. Select Model

From this window, you can start selecting outdoor units, indoor units, branch pipes and header pipes according to our design. Initial window for
Multi V program looks like this.

1. Double click on stand-by box. Then this window appears. Choose the type of equipments that you want and click
OK.

Following is a description for these types.

Menu Description
Indoor Units Indoor Units
Y branch This equipment is used for large volume of systems. Pipe can have two brances. Numbers are
set before a specific model name is assigned. Specific model is assigned after auto piping.
4 header Pipe has 4 branches.
7 header Pipe has 7 branches.
10 header Pipe has 10 branches. Header is rarely used because of the difficulty in installation. This is
used for small volume system.

2. If you choose Indoor Unit, this window appears to view the detailed information. Then click
OK.

Following is an example of choosing an indoor unit and 4 header.

23
LATS Multi V Model Selection Program

At this display, select equipment and design pipes. By simply double clicking an item, you can add or modify the hierarchy of the system.

24
LATS Multi V Model Selection Program

3. At this screen, if you double click Outdoor unit, Y-Branch or indoor unit, a window that displays detailed
information of an item is shown. Following is an example of the result after you double click Y-Branch. After
viewing it, click OK.

4. Double click room to assign load. This window appears.


Select room load and click OK. Then room load is assigned.

25
LATS Multi V Model Selection Program

Then as you see below, the room that you double clicked turned to have Floor-001(room1) information. Like this, choose other rooms to assign
heat load.

26
LATS Multi V Model Selection Program

5. Double click Indoor Unit or Drag & Drop Indoor Unit from Toolbar to select indoor unit.
This popup window appears.

Check the ratio (IDU capacity over Design load). If you want to select accessory, click
accessory button.

Like this, finish assigning undoor unit selection. Then click OK.

6. Double click Outdoor unit icon after finishing indoor units selection.

Outdoor unit window appears. Outdoor unit information supports these types:.

- Search Model : It lists models according to a category.


- Full Model : It lists all models in same ODU type.
- Auto Selection : It lists the supporting model to designed system. (below 100%
combination)

We recommend you using auto selection. If you use defrosting factor, check Defrosting
factor

27
LATS Multi V Model Selection Program

Then as you see below, the outdoor unit icon has its model name.

28
LATS Multi V Model Selection Program

■ Step 3. Modify the length of pipe arrangement

1. If you want to change pipe length, double click pipe length value. This window
appear. Change pipe length as you want. Pipe length should be the equivalent length.
You have to check system property window which is notified at the next window.
(Combination, total pipe length)

2. Click Auto Piping button at the left part of initial window, to select Y branch, Header and pipe diameter automatically.
Firstly, pipe’s diameter will be decided according to pipe length that is after 1st branch and capadity of indoor units, and then Auto piping will select
a appreciate branch models or Header models

More detailed information, limitation and rules are documented in PDB.

3. This window appears to confirm your selection. Click OK.

If any problem is not occurred, All branch and header models are selected
automatically. If Y branch or Header do not exists, you have to change pipe
design or check branch or header in PDB

29
LATS Multi V Model Selection Program

■ Step 4. Check System

1. Click System Check to simulate the system. System Check supports


validation check and performance simulation.

Menu Description
Validation check It checks total piping length, the longest pipe length after 1st branch, each pipe length and all
validation in PDB. It checks the combination ratio, which should be within 50 ~ 130%. The indoor unit
and outdoor unit should be maximum 130 percentage. (if Model type is PLUS II, Any model can be
combinated by 200%)

(PLUS I) If the position of outdoor unit is higher than indoor unit, it can be maximum 40 meters. For
the opposite case, it should be 50 meters.
(PLUS II) If the position of outdoor unit is higher than indoor unit, it can be maximum 100 meters.
For the opposite case, it should be 100 meters.

More detailed information, limitation and rules are documented in EPDB.


Performance simulation It simulates system’s performance from combination, design condition, pipe length and defrosting
factor.

Caution:
* We can guarantee the operatoin only within 130% Combination. (PLUS II Models only)
If you want to connect more than 130% combination, please contact us and discuss the requirement like below.
1) If the operation of indoor unit is more than 130%, low airflow operation is recommended in all the indoor units.
2) If the operation of indoor unit is more than 130%, additional refrigerant is needed according to the headquarter guidance.

Each indoor unit capacity is simulated and changed. After system is checked, this window appears. Click OK.

30
LATS Multi V Model Selection Program

2. Press Schematic Diagram


button to see this display.

Check Additional refrigerant


amounts and Wiring design. If
you want to go back to Tree
mode, you can press Tree
button of the left part of initial
window.

31
LATS Multi V Model Selection Program

■ Step 5. Write the report

1. Click Generate Report on the left part of initial window. Select the sheet
of reports to make. Then click OK.

32
LATS Multi V Model Selection Program

These are the examples of final report.

This is the cover of final report.

33
LATS Multi V Model Selection Program

This is the air conditioning proposal. It covers the proposal This is the table of contents.
information and costs including installation, accessories, etc.

34
LATS Multi V Model Selection Program

This is the load output. It contains building location, design conditions, This is the model selection summary. Outdoor units, Indoor units, pipes and
cooling and heating loads, etc. accessories are included.

35
LATS Multi V Model Selection Program

This is the result of system check. It includes design condition, outdoor/indoor information, pipes, etc.

36
LATS Multi V Model Selection Program

This is the pipe design tree illustration and schematic diagram for electric wires.

37
LATS Multi V Model Selection Program

This is the model selection cost analysis sheet. It totally covers outdoor units,
indoor units, pipes and branch/header common pipes.
This document can be used as an estimation sheet.

38
LATS Multi V Model Selection Program

Usage Description : CAD Mode

LATS Multi V Model Selection program can be operated in two types of modes. Tree Mode is displayed as a tree form, for a simple piping work.
When there is no CAD drawings for a building, this program can provide the proper quantity of indoor/outdoor air conditioners, cutoff, additional
refrigerants, etc. However, sometimes users should rearrange the drawing to be transformed by CAD. For CAD Mode, users can manage the
drawing work on CAD at first. Following introduces how to use LATS Multi V Model selection program in CAD mode. This is the main flow of using
LATS Multi V model selection program.

39
LATS Multi V Model Selection Program

■ Step 1. Create Project

1
1. Click icon or click “Start  Programs  LGE ” LATS-MultiV”
to run LATS Multi V model selection program. Then the program runs
and this screen shot appears.
2
This is the initial screen display of LATS Multi V model selection program.
1
Following explains each menu and button.
2

1 Menu

File

Menu Description
New Project This menu creates a new project.
Open Project This menu opens a project that users select.
Close Project This menu closes a project. If you want to open a new project, you
should close the previous one first.
View Project This menu shows a project.
Save Project This menu saves a project.
40
LATS Multi V Model Selection Program

Save Project As This menu saves a project as a specific name.


Delete Project This menu deletes a project
Export This menu exports a project as a GCSI file.
Exit This menu closes a project and finishes a program.

System

Menu Description
Create System This menu creates a system.
Copy System This menu copies a system.
Delete System This menu deletes a system.
System setting This menu sets a system.
Space Load Summary This menu shows a space load summary.
Auto Piping This menu automatically selects Y branch, header and
pipe diameter automatically.
System check System Check supports validation check and
performance simulation.
- Validation check : It checks total piping length, the
longest pipe length after 1st branch, each pipe length
and all validation in PDB.
- Performance simulation : It simulates system’s
performance from combination, design condition, pipe
length and defrosting factor.
System Invalidation property This menu checks the proper connectivity and number of
included sub items.
Generate reports This menu generates the final report as a Micosoft excel
file.

41
LATS Multi V Model Selection Program

View

Menu Description
Tool Bar This menu shows Tool bar on your program display.
Status Bar This menu shows Status bar on your program display.
System Log Viewer This menu positions a window on your program display that
shows a system log.
Project Navigator This menu shows the left panel on
your program display. You can control
the size of this part with and
closes his part with .

System View This menu shows System panel, Indoor Units List and
System Information.
Schematic Diagram This menu shows a hierarchical diagram among outdoor unit,
indoor unit, brances and pipes.
System preview This menu shows a current system in a full view to help users
watch the entire system easily.
Option This menu sets the term of
project auto save period.
Selected box size is also set
at CAD Option.

42
LATS Multi V Model Selection Program

Language

Menu Description
English This menu shows the current display in English.
Korean This menu shows the current display in Korean.
Spanish This menu shows the current display in Spanish.
French This menu shows the current display in French.
German This menu shows the current display in German.
Italian This menu shows the current display in Italian.
User Setting Users can set their own language that is provided at the above menu.

Help

Menu Description
LATS Help This menu shows the help contents for LATS.
About LATS This menu shows the version and information of LATS.
View Update Info This menu shows the updated information of view.

2 LATS-Multi V
fg

Menu Description
Project Information This menu shows project information.
Model Selection This menu is selected when users select models in a
program.
Generate Report This menu generates final report that is created after users
use LATS-Multi V program.

43
LATS Multi V Model Selection Program

3 Project
fg

Menu Description
Create Project This menu create a new project.
View Project Info This menu shows a project information.
Open Project This menu opens a
popup window to select
a project to open, which
is already made.

Delete Project This menu deletes a project.


Close Project This menu closes a project. If you want to open a new
project, you have to close the previous one first.

2. Press Create Project button to see this window.

1
tha
2
t
tha
th 3
4 t
e fg
fg th
pr
oje 5e
pr
ct
oje
6
is
ct
cre
is
ate
cre
d
ate
Pat
d
h
Pat
of
h
th
1 Date that the project is created e
of
tha
2 Project Name th
t pr
tha e
3
th Path of the project to save it oje
pr
t
fg ct
4
e
th Project Unit oje
pr
fg to
e ct
oje sav
pr to 44
e
ct
oje sav
it
is
ct e
cre Pr
is it
oje
LATS Multi V Model Selection Program

SI/IP:
For heat load calculation unit, LATS includes SI, which is an international standard and IP, which is an English standard. US and middle east
use IP while Europe uses SI. Some countries use IP for quantity and SI for length. This kind of mixed usage is also possible.
Simulation Mode:
Users select Cooling mode to make their projects based on cooling operation. In this case, the usage is focused on cooling. Users select
Heating mode to make their project based on heating operation. In this case, the usage is focused on heating.

5 Outdoor Unit Type


Users can decide the outdoor unit type that they want from the drop down button.

6 Detailed Comments for the project


Users enter their detailed comments on this blank. Users check the checkbox of Use CAD to use CAD Mode.

Note :

<Tree mode> <CAD mode>


Tree mode shows the design as a tree shape.

Cad mode shows the design on an existing CAD drawuing.


Output can be transformed as a DXF file and opened at Auto CAD to be editted.

Caution:
Be sure to active Use CAD option if you are using CAD drawing for model
selection. To Use Tree mode, do not check it.

45
LATS Multi V Model Selection Program

From this Create Project window, enter the project information. Then click Next.
- Date that the project is created
- Project Name
- Path of the project to save it
- Project Unit
- Simulatino Mode
- Outdoor Unit Type
- Detailed Comments for the project

3. Select country and city. Then input design condition.

1 Change design condition if the given values do not satisfy your requirements.
tha If you change one of the following air property (DBT,WBT,RH), psychometric process will be
t executed. Other related values will be found.
th
e
pr Click Next.
oje
2 ct
tha is
t cre
th ate
e d
pr Pat
oje h
ct of
is th
cre e
ate 1 Insert the country, State/Province and City information.
pr
d tha
Dry2 bulb temperature, Wet bulb temperature and Relative humidity should be inserted. This
oje t
Pat ct tha
information should be inserted for each indoor and outdoor both in Cooling and Heating
h th
t
of
to condition.
e
sav th
th pr
e
e oje
e it pr
pr ct
oje
Pr
oje is
ct
oje cre
ct ct is
to Na 4.
ate
creWhen selecting Open Load, you can load the result calculated by LATS-LOAD. Click Open load
sav d
me button.
ate
e Pat
d
Pr h
it oje Pat
Pr - of
Open
h load
ct
oje th
You
of can open the load information that was previously calculated by LATS Load program.
Un e
ct it th
Na pr
e 46
SI :
me oje
pr
IP: ct
Pr De oje
oje to
ct
tail
LATS Multi V Model Selection Program

- Add floor/Add space


If you do not use the previously calculated value of LATS Load program, you can manually insert the floor information with this button.

- Remove row, Remove all


These two buttons are activated only when floors are added manually in advance. This button removes the currently added row or removes all
rows. After you complete your setting, click Next.

5. From this window you can select the pre-calculated heat load of Load program. Select one
and click OK.

6. The pre-calculated information is displayed as follows.

If you do not have the pre-defined value, click Add floor or Add space to add a new row. To
remove it, click Remove all button. If LATS LOAD values are not available, manual load entry
can also be done simply by adding values in columns.

Click Next.

47
LATS Multi V Model Selection Program

7. Input Customer & contractor Information. It will be printed out on your final report. After
filling all data, click Finish.

Then model selection window appears.

■ Step 2. Select Model

From this window, you can start selecting outdoor


units, indoor units, branch pipes and header pipes
according to our design. Initial window for Multi V
program looks like this.

1. Click icon to import CAD files, DWG files,


onto this initial window for CAD Mode.

48
LATS Multi V Model Selection Program

This is the description for icons in CAD drawing tool bar.

Icon Description Icon Description

Undo Delete units

Redo Insert Climb

Zoom in Insert Y Brances and headers

Zoom out Create network

Zoom zone Rotate units in 90 degrees.

Fit for the screen Rotate units

Pan Unit Selection

Grid Insert Outdoor unit

Orthogonal Insert Indoor unit

Import AutoCAD drawing, dxf file Insert Space

Export Drawing to dxf file Insert pipes

Unit Selection Lef Arrow

Top Arrow Y-Branch Auto Arrow

49
LATS Multi V Model Selection Program

2. From the popup window, choose a dwg file that you want. Then click Open.

This will open CAD drawing with message “CAD file is successfully open.” Click on this
pop-up window.

Then following CAD file is loaded.

50
LATS Multi V Model Selection Program

3. It would support 2 scale modes.


To input text directly, you should know the drawing scale. Choose proper scale for opening CAD drawing and then click Set. To use drawing line,
after inputting line length, click Draw scale line and you should draw the line equal to the length you inputted in CAD drawing. After finishing the
scaling, click Exit. You can see the imported CAD drawing like this. If it is out of screen area, click Fit Window icon for resizing it.

4. Click the New Room icon for specifying load to different location. Then this
window appears.

When selecting Open Load, You can load the result calculated by LATS-LOAD program.
Add floor or Add space as required. For adding and removing Floor or Space, first click on
the row and then click Add or Remove. If LATS LOAD values are not available, manual
load entry can also be done simply by adding values in columns. Click on one row and
double click the blank to insert the value. Then click OK.

51
LATS Multi V Model Selection Program

5. Click your cursor on a specific location (in CAD drawing) where you want to locate this load information. Likewise choose other locations by
repeating the above step.

52
LATS Multi V Model Selection Program

6. Click the New Indoor Unit icon. This window appears.

Choose indoor unit type and model. Click Accessory (if any required)

7. This window appears. Choose accessories if it is required. Then click OK.

53
LATS Multi V Model Selection Program

8. Then click your cursor at the specific location where you want to locate your indoor unit. Repeat the same steps to locate other indoor units.
You can use copy paste command also for locating other indoor units.

54
LATS Multi V Model Selection Program

9. Click to connect room information and IDU.

55
LATS Multi V Model Selection Program

Caution:
You have to connect the middle of Room to the middle of IDU,
with your mouse. (marked “X” in middle point).

10. Adjust indoor unit direction by clicking Indoor Unit and then

Rotate Angle icon. This window appears. Fill in the


required rotation angle and then click OK. You can see pipe
connecting point (as dash) at this location of indoor unit.

Caution:
All rotation will be taken place by considering initial position as reference.

56
LATS Multi V Model Selection Program

11. Click outdoor unit icon. This window will appear

Outdoor unit window appears. Outdoor unit information supports these types:.

- Search Model : It lists models according to a category


- Full Model : It lists all models in same ODU type
- Auto Selection : It lists supporting model to designed system. (below 100% combination)

We recommend you using auto selection. If you use defrosting factor, check Defrosting
factor

Other optional accessories can also be chosen by clicking Accessories button. After selecting
above value, click OK.

57
LATS Multi V Model Selection Program

12. Click your cursor at a specific location where you want to locate your outdoor unit. You can see outdoor unit icon like the sign on this picture.

Caution:
One outdoor unit should have only one system.

58
LATS Multi V Model Selection Program

■ Step 3. Draw System and Design Piping

1. Click New Equipment icon to see this window. Select Y-branch or Header if it is required. Then click OK.

Menu Description
Indoor Units Indoor Units
Y branch This equipment is used for large volume of systems. Pipe can have two brances. Numbers are
set before a specific model name is assigned. Specific model is assigned after auto piping.
4 header Pipe has 4 branches.
7 header Pipe has 7 branches.
10 header Pipe has 10 branches. Header is rarely used because of the difficulty in installation. This is
used for small volume system.

Caution:
Assigning heat load for room, indoor unit, outdoor unit and pipes has no
specific fixed order. You can start assigning any of them first.

59
LATS Multi V Model Selection Program

2. Then click your cursor at a specific location where you want to locate your new equipment unit, Y-Branch. You can adjust Y-branch direction by
clicking Y-branch and then Rotate Angle icon.

You can adjust Y-branch direction by clicking Y-branch and then Rotate Angle icon. This window appears. Fill in the required rotation
angle and then click OK. You can see pipe connecting point (as dash) at this location of indoor unit. All rotation will be taken place by considering
initial position as reference.

60
LATS Multi V Model Selection Program

3. Click New Pipe icon. Then click & drag left button of your mouse on the drawing and finally release this button at indoor/Y-branch, which
is the end point of that pipe.

You can see drawn pipe between outdoor and Y-branch or Y-branch and Indoor units like the above sample. Connect pipes between various unit,
outdoor unit, Y-branch/header and indoor units.

61
LATS Multi V Model Selection Program

When you connect the indoor units, Y- branch and outdoor units, they should be connected with line, which starts from the red dot and ends at the
red dot.

Caution:
Use Ortho On/Off option for drawing orthogonal pipe. After drawing pipes, right
click on the pipe (on white color indenter in the middle of pipe) and drag it slightly
with Shift Key pressed for locating your pipe orthogonally.

You have to connect the object to the object clearly. If you move your pointer near
to the connection mark, the pointer would be attached to the connection point.

62
LATS Multi V Model Selection Program

Note:

<Original> <After rotation>


Outer line of indoor unit has small white rectangle, when it is clicked. Left click a mouse and move the mouse to move

indoor units. Or click to insert an exact angle value for rotation.

4. In the Floor Viewer panel on your initial window, you can add new floor. Right click on Floor0 and choose
Add Floor.

63
LATS Multi V Model Selection Program

5. After adding floor, right click on the same floor (Floor1 icon) and click Edit icon to see a popup window. Fill in the floor height from outdoor unit
and then click Ok. To import CAD drawing, repeat the above step.

After adding floor, perform the same operation like the above explanation. Add Room, Indoor Units, Y-branch/Header and Pipes on the new floor
like the explanation above.

6. Click New Climb icon for connecting added floor (Floor1)


to the previous floor (Floor0). This popup window appears. Select
the floor to link with work floor by climb and click Ok.

64
LATS Multi V Model Selection Program

7. Click your cursor at a


specific location where you
want to locate Climb piping
and connect line. You can
see this Icon and message
“Connected to Floor1”
which shows the
connected floor.

“Connected to Floor1” is
connected with an indoor
unit. Then this indoor unit
is connected to the
ourdoor unit at the Floor1
through the “Connected
from Floor0” part.

Outdoor unit should have


only one connection line.

65
LATS Multi V Model Selection Program

As you see, the other floor


has the same icon, which
says “Connected from
Floor0.”

Then this two floors are


connected well.

8. Click Create Network icon for connecting network. If the connection between pipe and Indoor unit, Y-branch or Outdoor unit is not proper
you can see an Error message in your Log Viewer with Error Icon located on wrong connection. Reconnect Error Pipe for further processing. You
can see a message “Start Creating Network” in your System Log Viewer.

After correcting pipe connection, click Create Network icon again. If pipes are connected properly then Network Completion message will appear in
Log Viewer.

66
LATS Multi V Model Selection Program

Note:

Pipe and Indoor unit are not connected tightly. Branch and pipe are not connected well.
Pipe is not positioned at the red line of an indoor unit. Select a pipe to connect it to the branch tightly.
Select a pipe again to connect it to the red point of an
indoor unit.

67
LATS Multi V Model Selection Program

9. Click Auto Piping icon from the left part of an initial window. Auto Piping command automatically selects Y-branch/Header branch name, pipe
diameter and pipe length.

68
LATS Multi V Model Selection Program

10. The this window appears to confirm your selection. Click OK.

If any problem is not occurred, All branches and header models are selected
automatically. If Y branch or Header exists, you have to change pipe design or
check branch or Header in PDB.

69
LATS Multi V Model Selection Program

■ Step 4. Check System

1. Click System Check to simulate the system. System Check supports


validation check and performance simulation.
- Validation check : It checks total piping length, the longest pipe length after
1st branch, each pipe length and all validation in PDB.
- Performance simulation : It simulates system’s performance from
combination, design condition, pipe length and defrosting factor.

Each indoor unit capacity is simulated and changed. After system is checked, this window appears. Click OK.
If there is an error message. Fix the error and perform these steps again.
1. Create Network
2. Auto piping
3. System Check

2. Click Tree icon for


seeing line diagram of this
system

Pipe length in Tree Mode is


equivalent length.
So pipe length in CAD
mode is not same with that
of Tree Mode.
Pipe length in CAD mode is
real length.

70
LATS Multi V Model Selection Program

This is the interpretation for this result, marked on the above picture.

Menu Description
Indoor Units 6 indoor units were installed among 8 available units.
Combination Combination ratio is 98%.
Total Pipe 39.2 m of total 220.0 m pipes are installed for the outdoor unit.

Caution:
If the combination ratio does not meet the rule of PDB, the design process
stops here and does not move to the next step.

If you try to change the information of units or pipes in this Tree Mode, this
message appears. Once you start your project from CAD Mode, you have to
modify it and finish it in CAD Mode. In CAD Mode, you can only read the
information at Tree Mode.

Caution:
Once you click Tree Mode button and enter into the Tree Mode display,
you have to click “Create Network” button again to go back to CAD mode.

71
LATS Multi V Model Selection Program

3. Press Schematic
Diagram button to see this
display.

Check Additional refrigerant


and Wiring design. If you
want to go back to Tree
Mode, you can press Tree
button of the left part of
initial window.

Click either of these icons


for seeing control wire,
power line and pipe line.

CL: shows Communication


Line
PC: shows Power Line
Communication
PL shows Pipe Line

4. Click Drawing Export icon . Input the name of exporting file and click Save. You can
save your drawing file as a DXF file.

72
LATS Multi V Model Selection Program

■ Step 5. Write the report

1. Click Generate Report on the left part of initial window. This window
appears. Select the sheet of reports to make. Then click OK.

Finally press OK for viewing the above chosen report on excel sheet.

You can see the final report at the Tree Mode description part of this User
Guide.

Caution:
You need MS Excel program installed on your computer to get your
output as a report form.

73
3. Tips for using Multi V Model selection program
 Set Scale
 Assign one load for one indoor unit
 Draw orthogonal pipes

Set Scale in Multi V Model selection program

When you open a CAD drawing from AUTO CAD, scale is changed. After you handle your CAD file on LATS, maginify it 10 times to be well fitted for
proper scale.

Original CAD file CAD file Exported from LATS


Tips for using Multi V Model selection program

Assign one load for one indoor unit in Multi V Model selection program

When there is two indoor units for one heat load for a room, devide one heat load into two parts. Connect only one heat load for one indoor unit.

Wrong example Right example

75
Tips for using Multi V Model selection program

Draw orthogonal pipes in Multi V Model selection program

Click Grid On/Off icon from the initial window. Then an window appears for you to insert a gap value between grid. Inser the number and you
can see the grid on your display.

Click Grid On/Off icon Grid Display

Click Orthogonal icon from the initial window.


When you move units or draw pipes, you can do your work in horizontal or vertical direction by activating Orthogonal function. You can use
Orthogonal and Grid function simultaneously.

1. Click Orthogonal button in the Drawing toolbar.


2-1. During moving unit(s), You can move them only in horizontal or vertical direction.
2-2. During drawing pipes. You can draw them only in horizontal or vertical direction.
3. To deactivate Orthogonal function, Click Orthogonal button again.

76
Tips for using Multi V Model selection program

Click Pan icon to pan CAD work window at an arbitrary direction.

1. Click Pan button in the Drawing toolbar.


2. Click and hold left-button of mouse in the CAD window.
3. Move your mouse point in the CAD window.
4. You can see CAD window moves to the direction that a mouse point moves.
5. Release left-button of mouse. So you can see the moved view position of CAD window.
6. To deactivate Pan function, Click Pan button again, hit any key or click center/right-button of mouse.

If you have a mouse with middle-button of wheel-button, you can pan CAD Work window.

1. Click middle-button or wheel-button of mouse in the CAD Work window.


2. Move your mouse point in the CAD work window.
3. Release middle-button or wheel-button of mouse.

77
4. Contact Information
 LATS program ownership
PM Group, Air conditioner Lab, Digital Appliance Company, LG Electronics.

 Question and further information


Access this site and insert your question. Then the specific local engineers or managers for each region will contact you.

http://www.lgeaircon.com/cac.cssupport.qna.qna.createQuestioner.laf
Contact Information

79