Sunteți pe pagina 1din 64

Dongah

g Geological
g
Engineering
g g Co.

Since 1971 in Busan,, Korea


Contents

I C
Company P
Profile
fil

II Accreditation

III Business Activities

IV Performance in Overseas

Page  2
I Company Profile

Key
y Organization
g

Global Network

Human Resources

 Major Fields of Services

 Major Construction Equipment Owned

Page  3
I. Company Profile

Key Organization

CEO CEO CEO

DOMESTIC OVERSEAS
ENGINEERING
DIVISION DIVISION

Page  4
I. Company Profile

Global Network

Egypt Korea
Abu Dhabi
Libya
y
Cambodia
Philippines
Nigeria
Palau
Qatar India Vietnam

Singapore

:Completed Projects

: Ongoing Projects & Overseas offices

Page  5
I. Company Profile

Major Fields of Services


Construction
Trenchless Tunneling Work
Drill & Blast Works
Ground Improvement
Ground Support
pp & Structure Foundation
Existing Road Crossing Passage

Engineering
g g
Geotechnical Investigation
Design
g

Water Engineering
W t Engineering
Water E i i
Page  6
I. Company Profile

Human Resources( 443 Persons)

E
Expertise
i Q lifi i
Qualification H d( )
Head(s)
PROFESSIONAL GEOTECHNICAL & CIVIL ENG
7
ENGINEER GEOLOGICAL SCIENCE

PH. DR ENGINEERING SCIENCE 6

ENGINEER & STAFF CIVIL AND ENVIRONMENT ETC. 167

TECHNICIAN SURVEY, LAB. 63

OPERATOR VARIOUS TYPES OF EQUIPMENT


Q 200

Page  7
I. Company Profile

Major Construction Equipment


Trenchless Tunneling Works

Equipment Specification Unit(s)


( )

SEMI-SHIELD MACHINE SLURRY TYPE(Φ400~2400) 30

SEMI-SHIELD MACHINE OPEN TYPE(Φ2600) 1

SHIELD MACHINE SLURRY TYPE(Φ3.53/7.83) 3

SHIELD MACHINE EPB(Φ 4.34/


4 34/ 7
7.83/
83/ 7
7.93)
93) 3

DOUBLE SHIELD MACHINE OPEN (Φ3.55/4.55) 3

Page  8
I. Company Profile

Major Construction Equipment


Drill & Blast Works

Equipment
i S
Specification
ii i Unit(s)
i( )

JUMBO DRILL 2-BOOM/3-BOOM 3

CHARGING CAR 1~2-BOOM BASKET 3

SHOTCRETE MACHINE 25㎥/HR 1

COMPRESSOR 600~825 cfm 3

Page  9
I. Company Profile

Major Construction Equipment


Ground Improvement

Equipment Specification Unit(s)


( )

PILE DRIVER 135 P 7

PILE DRIVER 170 P 1

OFF SHORE
67×32×5m/66×23×3.5m 2
PILE DRIVER

EARTH AUGER 300 250


300, 250, 240
240, 200 HP 25

UJS MACHINE PILE MAN 1

Page  10
I. Company Profile

Major Construction Equipment


Ground Support & Structure Foundation

E i
Equipment S
Specification
ifi i U i( )
Unit(s)
DRILLING RIG BG 28,36,40/SD515/DBM18S 6

CASING ROTATOR SCR-1500/RT 2

OSCILLATOR MAX 3,000


3 000 mm 6

RCD MACHINE MAX 3,000 mm 5

Wide : 650~1,900 mm
TRENCH CUTTER 5
Depth : 80~100m
Wide : 600~1200 mm
HYDROLIC GRAB 2
Depth : 60m
Page  11
I. Company Profile

Major Construction Equipment


Existing Road Crossing Passage

Equipment Specification Unit(s)


( )

JES MACHINE □ 850~1,200 mm 1

Page  12
I. Company Profile

Major Construction Equipment


Geotechnical Investigation

Equipment Specification Unit(s)


( )

S.E.P BARGE 163 / 120 TON 2

TEST APPARATUS Fully Equipped 1

TEST INSTRUMENT Fully Equipped 1

Page  13
II Accreditation

Lloyd’s
y

Singapore BCA

Safety Award

Page  14
II. Accreditation

Lloyd’s Singapore BCA Safety Award

Page  15
III Business Activities
Construction
Trenchless Tunneling Work
Drill & Blast Works
Ground Improvement
G
Ground
d Support
S t & Structure
St t Foundation
F d ti
Existing Road Crossing Passage
E i
Engineering
i
Geotechnical Investigation
D i
Design

Water Engineering
Water Engineering
Page  16
III. Business Activities

Trenchless Tunneling Works

1. Shielded TBM (EPB/Slurry)

2 Pipe Jacking (EPB/Slurry)


2.

Page  17
III. Business Activities
Shield TBM

Seoul Subway Line 909 Seoul Subway Line 704

Page  18
Yong-Ho Sewage Treatment Line DTSS- Kimchun (Singapore)
III. Business Activities
Pipe Jacking

Page  19
III. Business Activities

Drill & Blast Works

 NATM
Including
 Fore
Fore-Poling
Poling

 Pipe Roof – Under Pinning

 Probing
g

Page  20
III. Business Activities

Drill & Blast Works

Page  21
III. Business Activities

Ground Improvement

1. DSM (DCM)

2. JGP / UJS

3. Chemical Grouting

4. Vacuum Consolidation

5. PVD

Page  22
III. Business Activities
DSM

Page  23
III. Business Activities
Jet Grouting Ultra Jetting System

Prefabricated Vertical Drain Vacuum Consolidation

Page  24
III. Business Activities

Ground Support & Structure Foundation


◆ Diaphragm Wall

◆ Soil Nailing

◆ Sheet Piling

◆ Secant Pile : CBP

◆ Case In-situ Pile

◆ DSM

◆ Geopier
Page  25
III. Business Activities
Diaphragm Wall Soil Nailing

Contiguous Bored Pile Deep Soil Mixing

Page  26
III. Business Activities
Geopier

Cast In-Situ Pile

Page  27
III. Business Activities

Existing Road Crossing Passage

1. JES (Joint Element System)

2 Divided
2. Di id d Shi
Shield
ld M
Method
th d (DSM)

Page  28
III. Business Activities

JES Method Divided Shield


M h d
Method

Page  29
III. Business Activities

Geotechnical Investigation

1. Boring and Laboratory Test

2. Exploratory Investigation

3. Pile Load Test & Integrity Test

4. Instrumentation & Monitoring

Page  30
III. Business Activities
On Shore Exploration Off Shore Exploration

Horizontal Boring

Page  31
III. Business Activities
Static Pile Load Test Lateral Load Test

Osterberg Cell Dynamic Pile load test

Page  32
III. Business Activities

Design

1. Ground Support

2. Ground Improvement

3. Slope Stability Assessment

4. Structure Foundation

5. Trenchless Tunneling
Page  33
III. Business Activities

Water Engineering: DAF SYSTEM

1. RO System

2 Sewage Treatment
2.

3. Potable Water Treatment

Page  34
III. Business Activities

Desalination Process

RO Intake

Desalination
MF/UF DMF
Micro Filter/Ultra Filter Dual Media Filter

H.E DAF
High Efficiency

Page  35
III. Business Activities

High Rate DAF System: Sewage Treatment


 Q : 10,000㎥/day
10 000㎥/d
 Hydraulic Loading Rate : 20m/hr

Page  36
III. Business Activities

High Rate DAFFilterTM System


Backwash
Sludge Scraper Blower

Effl
Effluent
t

Fl
Flocculation
l i Flotation Fiber Filter

Influent Saturator
Recycle Pump

Air Compressor

Page  37
IV Performance in Overseas

On Going Project

Completed Project

Page  38
IV. Performance in Overseas

On Going Project

Qatar Korea

India

Cambodia

Singapore

Page  39
IV. Performance in Overseas

Singapore Downtown Line Stage2 Contract 915


 Scope of work : Shield TBM
 Client : Land Transport Authority
 Main Contractor : SK E&C

Page  40
IV. Performance in Overseas

Singapore Downtown Line Stage2 Contract 913


 Scope of work : Shield TBM
 Client : Land Transport Authority
 Main Contractor : GS E&C

C 912

C 913
C913用
TBM
Cashew Launching
Station Shaft

C915用
TBM Retrieval Shaft Hillview
Station
C 915

Page  41
IV. Performance in Overseas

Qatar Doha North Sewerage Treatment & Associated Works


 Scope of work : Pipe Jacking
 Client : Public Works Authority
 Main Contractor : Ultra E&C

Page  42
IV. Performance in Overseas

India Rampur Hydroelectric Project (412MW)


 Scope of work : NATM
 Client : Satlaj Jal Vidyutnigam Ltd.
 Main Contractor : Gammon India Pte., Ltd.

Page  43
IV. Performance in Overseas

Singapore Marina Costal Expressway C 485


 Scope of work : Ground Improvement Work(DSM)
 Client : Land Transport Authority
 Main Contractor : Penta Ocean

C 487
Contract 481

C486

C 482
C 483 C485

Page  44
IV. Performance in Overseas

Singapore Marina Costal Expressway C 486


 Scope of work : Ground Improvement Work(DSM)
 Client : Land Transport Authority
 Main Contractor : Samsungg E&C

Page  45
IV. Performance in Overseas

Singapore Marina Costal Expressway C 487


 Scope of work : Ground Improvement Work(DSM)
 Client : Land Transport Authority
 Main Contractor : Daelim E&C

Page  46
IV. Performance in Overseas

Singapore Marina Costal Expressway C 482


 Scope of work : Ground Improvement Work(DSM)
 Client : Land Transport Authority
 Main Contractor : Ssanyong
y g E&C

Page  47
IV. Performance in Overseas

Cambodia The Star River Project


 Scope of work : CBP and Earth Works
 Client : Land Transport Authority
 Main Contractor : Ssanyong
y g E&C

Page  48
I. Company Profile

Completed Project

Korea
Egypt
Libya India
Philippine
Vietnam
Nigeria Cambodia Palau

Singapore

Page  49
IV. Performance in Overseas

Singapore DTSS Kim Chuan Link Sewers Contract-01


 Scope of work : Micro Tunneling & NATM
 Client : Public Utilities Board
 Main Contractor : Tiong
g Seng g & Dongah
g JV

Page  50
IV. Performance in Overseas

Philippines Davao International Airport Development,PKG1


 Scope of work : Pipe Jacking
 Client : Davao Airport Consultant
 Main Contractor : Hanjin
j Heavyy Industry
y Co.

Page  51
IV. Performance in Overseas

India Dhauliganga Hydroelectric Project Stage-1 Lot 1&2


 Scope of work : NATM
 Client : National Hydroelectric Power C/L
 Main Contractor : Daewoo E&C

Page  52
IV. Performance in Overseas

Singapore Business and Financial Centre Development


 Scope of work : DSM & Secant Pile
 Client : BFC Development
 Main Contractor : Tiong
g Seng
g P/L

Page  53
IV. Performance in Overseas

Singapore Marina Bay Financial Centre Phase -T3


 Scope of work : DSM & JGP
 Client : Central Boulevard Development Pte Ltd
 Main Contractor : L&M Foundation Specialist Pte Ltd

Page  54
IV. Performance in Overseas

Singapore Downtown Line Stage 1 C907


 Scope of work : DSM
 Client : Land Transport Authority
 Main Contractor : Taisei Co.

Page  55
IV. Performance in Overseas

Singapore Amber Residences Project


 Scope of work : DSM
 Client : Voda Land P/L
 Main Contractor : Lian Beng
g / L.S. JV

Page  56
IV. Performance in Overseas

Egypt Damietta Port-Extension of Grand Berth No.13


 Scope of work : JGP
 Client : Damietta Port Authority
 Main Contractor : Samsungg E&C

Page  57
IV. Performance in Overseas

Singapore Pharos Condominium Development


 Scope of work : Diaphragm Wall
 Client : Guan Realty P/L
 Main Contractor : Tiong
g Seng
g P/L

Page  58
IV. Performance in Overseas
Singapore Redevelopment of Overseas Union & Change Alley Aerial Plaza
 Scope of work : Diaphragm wall and Bored Pile
 Client : Clifford Development P/L
 Main Contractor : Hyun
y Dai E&C

Page  59
IV. Performance in Overseas

Singapore CAPELLA Hotel Resort Development


 Scope of work : Soil Nailing
 Client : Millenia Hotel P/L
 Main Contractor : Tiongg Sengg P/L

Page  60 Initially After


IV. Performance in Overseas

Cambodia Gold Tower 42 Project


 Scope of work : CBP and Earth Works
 Client : Yon Woo Cambodia Co.
 Main Contractor : Hanil E&C

Page  61
IV. Performance in Overseas

Vietnam Hanoi City Complex of 65 Stories Tower


 Scope of work : CBP & Diaphragm Wall
 Client : Corails Vietnam Co.
 Main Contractor : Daewoo Motor Sales Co.

Page  62
IV. Performance in Overseas

Palau Compact Road Project


 Scope of work : Cast In-Situ Pile
 Client : U.S.Army Corps of Engineers
 Main Contractor : Daewoo E&C

Page  63
Thank you
www.dage.co.kr

Page  64

S-ar putea să vă placă și