Sunteți pe pagina 1din 1

2/21/2002

PLANNED MAINTENANCE STATION #45LH


S5S PROJECT
BODY
PS0018
PS0018
"LOCKOUT PRIOR TO MAINTENANCE"
LUBRICATION
S 1 Check lubricator & fill as required with Tribol ATO-100LS. S19
ENLARGED TO SHOW MAINTENANCE POINTS
S 2 Grease robot as required with Tribol MPG-00.
VISUAL INSPECTION 13 12
S 3 Visually inspect the robot, controller, workcell and the surrounding area.
During the inspection make sure all safeguards are in place and the
work envelope is clear of personnel.
18 8
D 4 Ensure cooling valve is open.
W 5 Check teach pendant cable for excessive twisting. Unwind as required.
W 6 Check ventilation port on controller for dust and clean as required.
D 7 Check hoses and fittings for tightness and cracks. Repair as required.
11
D 8 Check tip dresser cutter blade for wear and repair or replace as required.
D 9 Check battery case cap to ensure it is secure and for prevention of contamination. TIP
CRITICAL TOOLING DRESSER S18

10 3
S 10 Inspect all flex cables in workcell for fatigue.
W 11 Physically check wrist for excessive play. HOUR
METER

W 12 Check weld gun for wear & cracks or other evidence of thermal breakdown or damage. 2 15 2
S 13 Dress tips as schedule dictates. FAULT REMOTE
BATTERY
ALARM
ON

OFF
S 14 Record all information on master cell maintenance sheet. FAULT
RESET REMOTE
CYCLE
START
LOCAL

CLEANING 7
TEACH PENDANT RS-232-C EMERGENCY STOP

D 15 Clean any residue that may accumulate on robot.


W 16 Clean all visual containers, i.e.; air, oil. 16 TEACH PENDANT
HANGING BRACKET

W 17 Clean teach pendants. 17


4
D 18 Clean tip dressers.
9 2 1

14 5

6
S5S45LH
( WELDER )

TM

Setting The Standard For A Safer Workplace = Shift = Daily = Weekly

For Repairs or Replacements, Please Contact Premier Autoworkers, Inc. at (800) 266-7361

S-ar putea să vă placă și