Sunteți pe pagina 1din 4

APPROVED CHECKED PREPARED

OPERATIONAL CONTROL GUIDE MS. L. SASAKI MR. R. ULATAN

EQUIPT. DESC. GRINDING MACHINE PROCESS


SECTION MAINTENANCE ILLUSTRATION/PICTURE : page 1/1
PERSONAL PROTECTIVE
PROCESS EQUIPMENT OPERATIONAL CONTROL DETAILS EQUIPT (PPE) / other
necessary materials
1
1. Materials / Process - Grinding Machine (see illustration 2).
Preparation a. Prepare necessary materials.
b. Ensure that the user's manual of this machine is clearly understood
before the start of operation. 2
2. Machining - Switch on and set-up the machine.
a. Wear appropriate PPE's (see illustration 1). mask,eye protection,gloves,apron,safety shoes
grinding wheel
b. Prepare all necessary materials for the process.
c. No matches/lighters & cellphones are brought inside the working area
to avoid fire and/or other possible accidents.
d. Ensure that the materials (cleaning agent, etc.) to be used does not MSDS
contain any hazardous substances.
e. Never touch the movable (grinding wheel) parts of the machine to
avoid cut and other possible accident. Observe proper distance
of finger from the machine to avoid burn due to spark and eye irritation
due to dust particle. (see illustration 2.a).
Note : Properly dispose dust particle accordingly.
f. Perform cleaning / preventive maintenance as scheduled to avoid PPE's, tools & other cleaning materials
machine breakdown that may cause injury or accident to employee
and contamination to environment.
e. Ensure that there will be no oil (and other chemical) spillage when
operating the machine. In case of spillage, immediately take action.
Use saw dust / rug to contain the spill to avoid accident and
contamination.

f. Dispose the contaminated rug/saw dust properly. Observe proper


waste segregation (refer to Waste Segregation Guidelines).

ensure proper wearing


GRINDING MACHINE
appropriate PPE's

REVISION DETAILS:
CONTROL NO : REMINDERS / SPECIAL INSTRUCTIONS :

REV
MARK DESCRIPTION ISSUED BY : APPROVED BY : DATE : OCG-005
0 Initial issue. MR. R. ULATAN MS. L. SASAKI 06/13/10 DCC STAMP:
ZPI-AD.Form-035.R0
PREPARED

MR. R. ULATAN

page 1/1
ZPI-AD.Form-035.R0

S-ar putea să vă placă și