Documente Academic
Documente Profesional
Documente Cultură
DEPARTMENT OF
AIRSPACE CONTROL
Global ATM Operational Concept
• Vision
• To achieve an interoperable global air traffic
management system for all users during all
phases of flight, that meets agreed levels of
safety, provides for optimum economic
operations, is environmentally sustainable,
and meets national security challenges.
TO INTRODUCE THE
ADS/CPDLC IMPLEMENTATION IN
BRAZILIAN OCEANIC CONTROL
CENTER
SUMMARY
1 AIRSPACE RESPONSIBILITY
2 BACKGROUND
3 PLANNING REQUIREMENTS AND
CONSTRAINTS
4 ACC-AO IMPLEMENTATION
BRAZIL
AREA: 3,300,000 SQ. MILES
POPULATION: 170,000,000
AIRFIELDS: 2,290
AIRPLANES: 11,674
CREW MEMBERS: 95,931
AREA
AREA OF
OF RESPONSIBILITY
RESPONSIBILITY
8.6
8.6 M
M Square
Square Miles
Miles 13 INTERNATIONAL FIRs
O
FIR
PARAMARIB
FIR 10º
CURACA
MAIQUETIA
OFIR
ROCHAMBEAU
FIR
FIR - COMPLEX “ATS” REGIONAL
BOGOTÁ
FIR COORDINATION . 00º
GUAYAQUIL FIR
FIR DAKAR
AMAZÔNICA
FIR 10º
FIR RECIFE
LIMA
FIR FIR FIR
LA PAZ BRASÍLIA FIR LUANDA
ATLÂNTICO 20º
RE F
SIS IR
JOANESBURGO
FIR TÊ
NC
IA FIR
ANTOFAGASTA
FIR 30º
CURITIBA
FIR
CORDOBA
FIR
SANTIAGO FIR
MONTEVIDÉO 40
FIR
PUERTO MONTT FIR
EZEIZA
50º
FIR FIR
PUNTA ARENAS COMODORO RIVADÁVIA
AIRWAYS
UPPER 76.052 NM
LOWER 26.948 NM
INTERNATIONAL FLOWS
SURINAME
VENEZUELA AT L Â N T I C O
GUIANA
G. FR. SETOR 1
FIR DAKAR
COLÔMBIA
EQUADOR
FIR
AMAZÔNICA FIR
RECIFE
BRASIL
PERU
FIR
FIR ATLÂNTICO
ATLÂNTICO FIR
LUANDA
FIR
BOLÍVIA BRASÍLIA SETOR 2
FIR JOHANNESBURG
PARAGUAI
CHILE
FIR
CURITIBA
OCEANO
ARGENTINA
PACÍFICO
URUGUAI
FIR MONTEVIDÉU
BRAZILIAN AIRSPACE CONTROL SYSTEM
SUMMARY
1 AIRSPACE RESPONSIBILITY
2 BACKGROUND
3 PLANNING REQUIREMENTS AND
CONSTRAINTS
4 ACC-AO IMPLEMENTATION
BACKGROUND
OBJECTIVES
• To optimize means of communication,
navigation and surveillance, fundamentally
RECIFE
based on satellites, centralized in a single Atlantic ACC
1 AIRSPACE RESPONSIBILITY
2 BACKGROUND
3 PLANNING REQUIREMENTS AND
CONSTRAINTS
4 ACC-AO IMPLEMENTATION
STATISTIC DATA
TOTAL MOVEMENT OF AIR TRAFFIC
500
400
300
200
100
0
1st quart. 2nd quart. 3rd quart. 4th quart.
12
10 10,04
8 7,92 8,43
6
4
2
0
1
1998 2
1999 3
2000
STATISTIC DATA
PROJECTION OF AIR TRAFFIC DEMAND - EUR/SAM CORRIDOR (IATA)
60.000
50.000
40.000
TRÁFEGO ANUAL
30.000
20.000
10.000
0
1998 1999 2000 ANO 2001 2002 2007 2012
EUR/SAM CORRIDOR
RVSM/RNP 10
AIRSPACE
ASSUMPTIONS
1 AIRSPACE RESPONSIBILITY
2 BACKGROUND
3 PLANNING REQUIREMENTS AND
CONSTRAINTS
4 ACC-AO IMPLEMENTATION
INFRASTRUCTURE
CAFSAT
Antena V-SAT
INTELSAT IS 901
Frame Relay 64 Kbps
Sal
Dakar
INMARSAT
ACC
AO
VSAT
DATACOM
RED ARINC
VHF router
F
CPDLC ADS
Tokio-Honolulu
UAL826
F350 475K
123 6 B
RED ARINC
CNS/ATM WORKSTATION X 4000 SITA
1st Stage of ACC –AO 2nd
Phase
ACC AO
Data-Link
ACFT
ADS/CPDLC
1st Stage of ACC –AO 2nd
Phase
ACC AO
ACFT
WITHOUT
ADS/CPDLC
Position Report Voice
HF
OPERATIONAL MODEL
FANS 1/A
CPDLC HF
ADS HF
CONTROL CPDLC
HF COMMUNICATIONS
ROOM
ROOM
CPDLC
EUR / SAM CORRIDOR
TRAFFIC GROWS VERY FAST
10
Fl 4
• LONGITUDINAL SEPARATION OF 50 NM
•ADS/CPDLC