Sunteți pe pagina 1din 237

DATOS CONTRATISTA

CONTRATISTA

RESPONSABLE

No. DE PADRON

DOMICILIO

CIUDAD

ESTADO

TELEFONO

R.F.C.

C.M.I.C.

I.M.S.S.

FIRMAS AUTORIZADAS

DIRECTOR GENERAL

DIRECTOR TECNICO

JEFE DE DEPTO. DE SUPERVISION

JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS

SUPERVISOR

DATOS DEL CONTRATO

CONTRATO No.

PROGRAMA

FECHA DE FALLO

INICIO

TERMINACION

DIFERIMIENTO

PRORROGA

ANTICIPO 30%

IVA 11%

DATOS DE LA OBRA 1

ESCUELA

No. DE OBRA

UBICACION

MUNICIPIO

DESCRIPCION DE LA OBRA
IMPORTE $ 1,000.00

ANTICIPO $ 300.00

DATOS DE LA OBRA 2

ESCUELA

No. DE OBRA

UBICACION

MUNICIPIO

DESCRIPCION DE LA OBRA

IMPORTE

ANTICIPO

DATOS DE LA OBRA 3

ESCUELA

No. DE OBRA

UBICACION

MUNICIPIO

DESCRIPCION DE LA OBRA

IMPORTE

ANTICIPO

DATOS DE LA OBRA 4

ESCUELA

No. DE OBRA

UBICACION

MUNICIPIO

DESCRIPCION DE LA OBRA

IMPORTE

ANTICIPO

DATOS DE LA OBRA 5

ESCUELA

No. DE OBRA

UBICACION

MUNICIPIO

DESCRIPCION DE LA OBRA

IMPORTE
ANTICIPO

DATOS DE LA OBRA 6

ESCUELA

No. DE OBRA

UBICACION

MUNICIPIO

DESCRIPCION DE LA OBRA

IMPORTE

ANTICIPO
SECRETARIA DE FINANZAS DEL GOBIERNO DEL ESTADO DE TAMAULIPAS 5-Mar-11

PALACIO DE GOBIERNO PISO 1, ZONA CENTRO


VICTORIA, TAM. 87000

SFG-210216-AJ9

RECIBI DE LA SECRETARIA DE FINANZAS DEL GOBIERNO DEL ESTADO DE TAMAULIPAS


LA CANTIDAD DE $ 15.44 ( QUINCE PESOS 44/100 M.N.) POR CONCEPTO DE LA
ESTIMACION 9 DE LOS TRABAJOS DE : OBRA No. 0, 0

IMPORTE DE LA OBRA EJECUTADA $14.00


I.V.A. (11%) $1.54
SUB-TOTAL $15.54

AMORTIZACION DEL ANTICIPO $-


I.V.A. DE AMORTIZACION DEL ANTICIPO $-
SUB-TOTAL $-

AMORTIZACION DEL ANTICIPO $-


(-)0.2% DE CAPACITACION DE LA IND. DE LA CONSTRUCCION $0.03
(-) 0.5% DE INSPECCION, VIGILANCIA Y CONTROL $0.07
SUMA DE DEDUCCIONES $0.10

NETO A PAGAR $15.44

CONTRATO No. 0
CONTRATISTA No. 0

( QUINCE PESOS 44/100 M.N.)


ESTIMACION
9
###

FECHA
CARATULA DE ESTIMACION 29-Jun-09
CONTRATISTA No. DE PADRON DOMICILIO
0 0 0
CIUDAD ESTADO TELEFONO
0 0 0
R.F.C. C.M.I.C. I.M.S.S.
0 0 0

ESCUELA: NO. DE OBRA: PERIODO DE CONTRATO


0 0 INICIO 30-Dec-99
UBICACIÓN: 0 TERMINACION 30-Dec-99
MUNICIPIO: 0
DESCRIPCION DEL CONTRATO
0 DIFERIMIENTO: 30-Dec-99

PRORROGA: 30-Dec-99

CONTRATO No. PROGRAMA FECHA DE FALLO IMPORTE ANTICIPO PERIODO ESTIMACION


30-Dec-99
30-Dec-99 30-Dec-99 $1,000.00 $300.00 DEL 21-Jun-09

AL 28-Jun-09

RECIBI DEL COMITÉ ADMINISTRADOR DEL PROGRAMA DE CONSTRUCCION DE ESCUELAS EN TAMAULIPAS LA CANTIDAD DE $ 15.44
( QUINCE PESOS 44/100 M.N. ) EN PAGO DE LA ESTIMACION No. 9
AMPARANDO LOS TRABAJOS EJECUTADOS AL 28-Jun-aa

DEDUCCIONES CALCULO DE LA ESTIMACION

AMORTIZACION ANTICIPO % $- IMPORTE DE LA OBRA


2 AL MILLAR C.M.I.C. (X) $0.03 EJECUTADA $15.54
5 AL MILLAR INSP. OBRAS (X) $0.07 MENOS DEDUCCIONES $0.10
OTROS $- SALDO A PAGAR $15.44
TOTAL $0.10
(X) DEL IMPORTE SIN I.V.A.

FORMULO REVISO REVISO

CONSTRUCTOR SUPERVISOR JEFE DE DEPTO. DE COSTOS Y


PRESUPUESTOS

0 0 0

REVISO Vo.Bo.

JEFE DE DEPTO. DE SUPERVISION DIRECTOR TECNICO

0 0

AUTORIZO

DIRECTOR GENERAL

0
ESTADO DE CUENTA DE ESTIMACION
CONTRATISTA No. DE PADRON CONTRATO NO. 30-Dec-99
0 0 PROGRAMA 30-Dec-99

ESCUELA No. DE OBRA UBICACIÓN 30-Dec-99


0 0 MUNICIPIO 0
IMPORTE DE CONTRATO PERIODO DE CONTRATO IMPORTE DE ANTICIPO FECHA
$1,000.00 28 de Tevet de Shabbat al 28 de Tevet de Shabbat $300.00 29-Jun-09
ESTIMACION PERIODO IMPORTE I.V.A. 2 AL MILLAR 5 AL MILLAR AMORTIZACION OTROS TOTAL DE LIQUIDO A
Num. ESTIMACION C.M.I.C. INSP. OBRAS ANTICIPO DEDUCCIONES PAGAR

1 (UNO) 10/04/AA-25/04/AA $14.00 $1.54 $0.03 $0.07 $300.00 $- $300.10 -$284.56


2 26/04/AA-03/05/AA $1.00 $0.11 $- $0.01 $- $- $0.01 $1.10
3 04/05/AA-11/05/AA $1.00 $0.11 $- $0.01 $- $- $0.01 $1.10
4 12/05/AA-19/05/AA $2.00 $0.22 $- $0.01 $- $- $0.01 $2.21
5 20/05/AA-27/05/AA $1.00 $0.11 $- $0.01 $- $- $0.01 $1.10
6 28/05/AA-04/06/AA $1.00 $0.11 $- $0.01 $- $- $0.01 $1.10
7 05/06/AA-12/06/AA $4.00 $0.44 $0.01 $0.02 $- $- $0.03 $4.41
8 13/06/AA-20/06/AA $10.00 $1.10 $0.02 $0.05 $- $- $0.07 $11.03
9 21/06/AA-28/06/AA $14.00 $1.54 $0.03 $0.07 $- $- $0.10 $15.44

TOTALES $48.00 $5.28 $0.09 $0.26 $300.00 $- $300.35 -$247.07


SALDO $946.72 SALDO POR AMORTIZAR: $0.00

FORMULO REVISO REVISO REVISO Vo.Bo.

0 0 0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE SUPERVISION JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS DIRECTOR TECNICO
ESTADO DE CUENTA DE ESTIMACION
CONTRATISTA No. DE PADRON CONTRATO NO. 30-Dec-99
0 0 PROGRAMA 30-Dec-99

ESCUELA No. DE OBRA UBICACIÓN VARIAS (SEGÚN ANEXO K)


VARIAS (SEGÚN ANEXO K) VARIAS (SEGÚN ANEXO K) MUNICIPIO 0
IMPORTE DE CONTRATO PERIODO DE CONTRATO IMPORTE DE ANTICIPO FECHA
$1,000.00 30 de December al 30 de December $300.00 29-Jun-09
ESTIMACION PERIODO IMPORTE I.V.A. 2 AL MILLAR 5 AL MILLAR AMORTIZACION OTROS TOTAL DE LIQUIDO A
Num. ESTIMACION C.M.I.C. INSP. OBRAS ANTICIPO DEDUCCIONES PAGAR

1 (UNO) 10/04/AA-25/04/AA $14.00 $1.54 $0.03 $0.07 $4.66 $- $4.76 $10.78


2 26/04/AA-03/05/AA $1.00 $0.11 $- $0.01 $0.33 $- $0.34 $0.77
3 04/05/AA-11/05/AA $1.00 $0.11 $- $0.01 $0.33 $- $0.34 $0.77
4 12/05/AA-19/05/AA $2.00 $0.22 $- $0.01 $0.67 $- $0.68 $1.54
5 20/05/AA-27/05/AA $1.00 $0.11 $- $0.01 $0.33 $- $0.34 $0.77
6 28/05/AA-04/06/AA $1.00 $0.11 $- $0.01 $0.33 $- $0.34 $0.77
7 05/06/AA-12/06/AA $4.00 $0.44 $0.01 $0.02 $1.33 $- $1.36 $3.08
8 13/06/AA-20/06/AA $10.00 $1.10 $0.02 $0.05 $3.33 $- $3.40 $7.70
9 21/06/AA-28/06/AA $14.00 $1.54 $0.03 $0.07 $4.66 $- $4.76 $10.78

TOTALES $48.00 $5.28 $0.09 $0.26 $15.97 $- $16.32 $36.96


SALDO $946.72 SALDO POR AMORTIZAR: $284.03

FORMULO REVISO REVISO REVISO Vo.Bo.

0 0 0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE SUPERVISION JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS DIRECTOR TECNICO
4

ESTIMACION POR PARTIDAS Y/O CAPITULOS No. EST. 9


CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: AL 28-Jun-09
HOJA 9 DE 237 .
MUNICIPIO:
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

RESUMEN
CLAVE PARTIDA
I.- CONSTRUCCION DE EDIFICIO DE VINCULACION
C01 CAPITULO 1, CIMENTACION $624.00
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
4

ESTIMACION POR PARTIDAS Y/O CAPITULOS No. EST. 9


CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: AL 28-Jun-09
HOJA 10 DE 237 .
MUNICIPIO:
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

RESUMEN
CLAVE PARTIDA
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
4

ESTIMACION POR PARTIDAS Y/O CAPITULOS No. EST. 9


CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: AL 28-Jun-09
HOJA 11 DE 237 .
MUNICIPIO:
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

RESUMEN
CLAVE PARTIDA

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
4

ESTIMACION POR PARTIDAS Y/O CAPITULOS No. EST. 9


CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: AL 28-Jun-09
HOJA 12 DE 237 .
MUNICIPIO:
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

RESUMEN
CLAVE PARTIDA
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
4

ESTIMACION POR PARTIDAS Y/O CAPITULOS No. EST. 9


CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: AL 28-Jun-09
HOJA 13 DE 237 .
MUNICIPIO:
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

RESUMEN
CLAVE PARTIDA
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM.
ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA
COMUN Y CRUCES DE VAR.

SUBTOTAL: $624.00
IVA: $68.64
TOTAL: $692.64
4

ESTIMACION POR PARTIDAS Y/O CAPITULOS No. EST. 9


CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: AL 28-Jun-09
HOJA 14 DE 237 .
MUNICIPIO:
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

RESUMEN
CLAVE PARTIDA

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 15 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

I.- CONSTRUCCION DE EDIFICIO DE VINCULACION


C01 CAPITULO 1, CIMENTACION
11061 LIMPIA, TRAZO Y NIVELACION DE TERRENO (AREA DE M2 $1.00 10.00 8.00 1.00 9.00 0.00 $1.00
EDIFICIOS). INCLUYE DESPALME A MANO HASTA 10 CM EN
MATERIAL INVESTIGADO EN OBRA. Y RETIRO DEL MATERIAL
PROD. DEL DESPALME FUERA DE LA OBRA.

11074 EXCAVACION A MAQUINA EN TERRENO INVESTIGADO EN M3 $1.00 10.00 4.00 1.00 5.00 0.00 $1.00
OBRA. CUALQUIER PROFUNDIDAD INCLUYE AFINE DE
TALUDES .
11101 PLANTILLA DE CONCRETO HECHO EN OBRA F'C= M2 $1.00 10.00 3.00 1.00 4.00 0.00 $1.00
100KG/CM2DE 6CM.DE ESPESOR.
11121 RELLENO Y COMPACT.D/MAT/PROD/D/EXC.C/PISON Y M3 $1.00 10.00 3.00 1.00 4.00 0.00 $1.00
AGUA,EN CAPAS DE 2OCM,ESP.INCL.ACARREO DENTRO DE
LA OBRA,MEDIR COMPACTO.
11131 SUM.Y RELLENO D/MAT. INERTE, COMPACTADO C/PISON Y M3 $1.00 10.00 2.00 1.00 3.00 0.00 $1.00
AGUA, EN CAPAS DE 2O CM. ESP. INCL. ACARREO DENTRO
DE LA OBRA, MEDIR COMPACTO.
11131-4 BASE HIDRAULICA EN ZANJAS DE CIMENTACION MATERIAL M3 $1.00 10.00 2.00 1.00 3.00 0.00 $1.00
TRITURADO DE 1 1/2" A FINOS COMPACTADA AL 100%
PORTER, EN CAPAS DE 20 CM. INCL. SUMINISTRO,
ACARREOS, EQUIPO DE COMPACTACION Y MANO DE OBRA.

11146 ACARREO DE TIERRA O ESCOMBRO EN CAMION HACIA M3 $1.00 10.00 2.00 1.00 3.00 0.00 $1.00
FUERA DE LA OBRA.INCLUYE CARGA Y DESCARGA.
12015 CONCRETO PREMEZCLADO F'C=250KG/CM2 EN M3 $1.00 10.00 2.00 1.00 3.00 0.00 $1.00
CIMENTACION INCLUYE NIVELADO, VIBRADO Y CURADO
SUBTOTAL: $8.00

ELABORO REVISO REVISO

0 0 0
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 16 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 17 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12021 CIMBRA PARA CIMENTACION CON MADERA DE PINO DE 3A, M2 $1.00 10.00 2.00 1.00 3.00 0.00 $1.00
ACABADO COMUN, INCLUYE CIMBRADO Y DESCIMBRADO .
12034 ACERO REFUERZO DIAMETRO #3 F'Y=4200 KG/CM2 INCLUYE KG $1.00 10.00 2.00 1.00 3.00 0.00 $1.00
SUMINISTRO, HABILITADO, ARMADO, TRASLAPES, SILLETAS,
GANCHOS Y DESPERDICIOS
12035 ACERO REFUERZO DIAMETRO #4 F'Y=4200 KG/CM2 INCLUYE KG $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
SUMINISTRO, HABILITADO, ARMADO, TRASLAPES, SILLETAS,
GANCHOS Y DESPERDICIOS
12037 ACERO REFUERZO DIAMTERO #6 AL 12 F'Y=4200KG/CM2 KG $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
INCLUYE SUM. HABILITADO, ARMADO, TRASLAPES, SILLETAS,
GANCHOS Y DESPERDICIOS.
12076 MURETE DE ENRASE EN CIMENTACION CON BLOCK DE M2 $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
CONCRETO 15X20X40CM., RELLENO CON CONCR. POBRE F'C
= 100 KG/CM2; ASENTADO CON MORTERO CEMENTO-ARENA
1:5.

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $9.00

ELABORO REVISO REVISO


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 18 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 19 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 20 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $6.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 21 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $4.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 22 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 23 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $9.00

ELABORO REVISO REVISO


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 24 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 25 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 26 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 27 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $4.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 28 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 29 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $6.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 30 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $6.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 31 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 32 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 33 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 34 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 35 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 36 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $2.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 37 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 38 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $4.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 39 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $6.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 40 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $4.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 41 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 42 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 43 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 44 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $6.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 45 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 46 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 47 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 48 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 49 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 50 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 51 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

SUBTOTAL: $9.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 52 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $10.00
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 53 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 54 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 55 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 56 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 57 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $1.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 58 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $1.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 59 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $2.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 60 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 61 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 62 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $8.00

ELABORO REVISO REVISO

0 0 0
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 63 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 64 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $8.00

ELABORO REVISO REVISO

0 0 0
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 65 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 66 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $6.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 67 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $6.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 68 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 69 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $8.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 70 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 71 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 72 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $9.00

ELABORO REVISO REVISO

0 0 0
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 73 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 74 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $9.00
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 75 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 76 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $8.00

ELABORO REVISO REVISO

0 0 0
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 77 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 78 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $9.00

ELABORO REVISO REVISO


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 79 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 80 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $9.00

ELABORO REVISO REVISO


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 81 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 82 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $9.00

ELABORO REVISO REVISO

0 0 0
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 83 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 84 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $8.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 85 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $6.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 86 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 87 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 88 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 89 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $9.00

ELABORO REVISO REVISO


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 90 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 91 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 92 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 93 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $4.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 94 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 95 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $6.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 96 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $6.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 97 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 98 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 99 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 100 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 101 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 102 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $2.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 103 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 104 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $4.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 105 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $6.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 106 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $4.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 107 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 108 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 109 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 110 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $6.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 111 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 112 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 113 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 114 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 115 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 116 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 117 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

SUBTOTAL: $9.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 118 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $10.00
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 119 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 120 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 121 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 122 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 123 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $1.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 124 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $1.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 125 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $2.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 126 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 127 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $3.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 128 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $8.00

ELABORO REVISO REVISO

0 0 0
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 129 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 130 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $8.00

ELABORO REVISO REVISO

0 0 0
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 131 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 132 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $6.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 133 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $6.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 134 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $5.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 135 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $8.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 136 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 137 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $7.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 138 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $9.00

ELABORO REVISO REVISO

0 0 0
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 139 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 140 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $9.00
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 141 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 142 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $8.00

ELABORO REVISO REVISO

0 0 0
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 143 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 144 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $9.00

ELABORO REVISO REVISO


ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 145 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
ESTIMACION POR CONCEPTO DE OBRA No. EST. 9
CONTRATISTA: No. DE PADRON DOMICILIO TELEFONO PERIODO
0 0 0 0 DEL: 21-Jun-09
ESCUELA No. DE OBRA UBICACIÓN: 0 AL 28-Jun-09
HOJA 146 DE 237 .
0 0 MUNICIPIO: 0
PROGRAMA: FECHA
No. DE CONTRATO: 29-Jun-09

VOLUMEN IMPORTE
CLAVE CONCEPTO U P.U. PRESUPUESTO ACUM. ANT. PRESENTE ACUMULADO EXCEDENTE ESTIMACION

12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.
12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS CM. ARM. ML $1.00 10.00 1.00 1.00 2.00 0.00 $1.00
C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL. CIMBRA COMUN
Y CRUCES DE VAR.

SUBTOTAL: $4.00

ELABORO REVISO REVISO

0 0 0
0 SUPERVISOR JEFE DE DEPTO. DE COSTOS Y PRESUPUESTOS
el TIPO debe ser
palabras no. progr. Est. 1 2
completas y sin
acentos: Capitulo,
Subcapitulo, Nivel
insertar obra 1 1
3 o Concepto(con concepto no. estimacion 1 (UNO) 2
mayusc. Inicial), entre líneas finiquito (si o no) si
según corresponda
inicio 10-Apr-09 26-Apr-09
tener cant. de conc. a insertar y debajo de que línea termino 25-Apr-09 3-May-09
fecha 27-Apr-09 4-May-09
TIPO CLAVE DESCRIPCION U. CANT. P. UNIT. IMPORTE 14.00 1.00
Capitulo I.- - CONSTRUCCION DE EDIFICIO DE VINCULACION 1 150.00 150.00 1 1
Subcapitulo C01 - CAPITULO 1, CIMENTACION 1 150.00 150.00 1 1
Concepto 11061 LIMPIA, TRAZO Y NIVELACION DE TERRENO (AREA
DE EDIFICIOS). INCLUYE DESPALME A MANO HASTA 10
CM EN MATERIAL INVESTIGADO EN OBRA. Y RETIRO
DEL MATERIAL PROD. DEL DESPALME FUERA DE LA
OBRA. M2 10 1.00 10.00 1 1
Concepto 11074 EXCAVACION A MAQUINA EN TERRENO
INVESTIGADO EN OBRA. CUALQUIER PROFUNDIDAD
INCLUYE AFINE DE TALUDES . M3 10 1.00 10.00 1
Concepto 11101 PLANTILLA DE CONCRETO HECHO EN OBRA F'C=
100KG/CM2DE 6CM.DE ESPESOR. M2 10 1.00 10.00 1
Concepto 11121
RELLENO Y COMPACT.D/MAT/PROD/D/EXC.C/PISON
Y AGUA,EN CAPAS DE 2OCM,ESP.INCL.ACARREO
DENTRO DE LA OBRA,MEDIR COMPACTO. M3 10 1.00 10.00 1
Concepto 11131 SUM.Y RELLENO D/MAT. INERTE, COMPACTADO
C/PISON Y AGUA, EN CAPAS DE 2O CM. ESP. INCL.
ACARREO DENTRO DE LA OBRA, MEDIR COMPACTO. M3 10 1.00 10.00 1
Concepto 11131-4 BASE HIDRAULICA EN ZANJAS DE CIMENTACION
MATERIAL TRITURADO DE 1 1/2" A FINOS COMPACTADA
AL 100% PORTER, EN CAPAS DE 20 CM. INCL.
SUMINISTRO, ACARREOS, EQUIPO DE COMPACTACION
Y MANO DE OBRA. M3 10 1.00 10.00 1
Concepto 11146 ACARREO DE TIERRA O ESCOMBRO EN CAMION
HACIA FUERA DE LA OBRA.INCLUYE CARGA Y
DESCARGA. M3 10 1.00 10.00 1
Concepto 12015 CONCRETO PREMEZCLADO F'C=250KG/CM2 EN
CIMENTACION INCLUYE NIVELADO, VIBRADO Y
CURADO M3 10 1.00 10.00 1
Concepto 12021 CIMBRA PARA CIMENTACION CON MADERA DE PINO
DE 3A, ACABADO COMUN, INCLUYE CIMBRADO Y
DESCIMBRADO . M2 10 1.00 10.00 1
Concepto 12034
ACERO REFUERZO DIAMETRO #3 F'Y=4200 KG/CM2
INCLUYE SUMINISTRO, HABILITADO, ARMADO,
TRASLAPES, SILLETAS, GANCHOS Y DESPERDICIOS KG 10 1.00 10.00 1
Concepto 12035
ACERO REFUERZO DIAMETRO #4 F'Y=4200 KG/CM2
INCLUYE SUMINISTRO, HABILITADO, ARMADO,
TRASLAPES, SILLETAS, GANCHOS Y DESPERDICIOS KG 10 1.00 10.00 1
Concepto 12037
ACERO REFUERZO DIAMTERO #6 AL 12
F'Y=4200KG/CM2 INCLUYE SUM. HABILITADO, ARMADO,
TRASLAPES, SILLETAS, GANCHOS Y DESPERDICIOS. KG 10 1.00 10.00 1
Concepto 12076 MURETE DE ENRASE EN CIMENTACION CON BLOCK
DE CONCRETO 15X20X40CM., RELLENO CON CONCR.
POBRE F'C = 100 KG/CM2; ASENTADO CON MORTERO
CEMENTO-ARENA 1:5. M2 10 1.00 10.00 1
Concepto 12111-UT CADENA CONCRETO F'C=150 KG/CM2 15 X 40 CMS
CM. ARM. C/ 4 VAR. # 3, Y ESTRIBOS # 2 @ 20 CM. INCL.
CIMBRA COMUN Y CRUCES DE VAR. ML 10 1.00 10.00 1
Concepto 145 cimbra barata m2 10 1.00 10.00
3 4 5 6 7 8 9 10 11 12 13

1 1 1 1 1 1 1
3 4 5 6 7 8 9

4-May-09 12-May-09 20-May-09 28-May-09 5-Jun-09 13-Jun-09 21-Jun-09


11-May-09 19-May-09 27-May-09 4-Jun-09 12-Jun-09 20-Jun-09 28-Jun-09
12-May-09 20-May-09 28-May-09 5-Jun-09 13-Jun-09 21-Jun-09 29-Jun-09
1.00 2.00 1.00 1.00 4.00 10.00 14.00 0.00 0.00 0.00 0.00
1 1 1 1 1 1 1
1 1 1 1 1 1 1

1 1 1 1 1 1 1

1 1 1 1

1 1 1

1 1 1

1 1

1 1

1 1

1 1

1 1

1 1

1
14 15 16 17 18 19 20 21 22 23 24

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 2 3 4 5 6 7 8 9 10 11 12

14.00 1.00 1.00 2.00 1.00 1.00 4.00 10.00 14.00 0.00 0.00 0.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00

1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00

1.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00

1.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00

1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00

1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00

1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00

1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00

1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00

1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00

1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00

1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00

1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00

1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13 14 15 16 17 18 19 20 21 22 23 24

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 0 1
CONCEPTO
CONC. USADO V. AC. ANT. V. AC. ACT. CONCEPTO CON
VOL. ESTA EST. FUECA DE CAT. CAPITULO SUBCAPITULO NIVEL 3 CONCEPTO
ESTA EST. TOTAL TOTAL EXC. ESTA EST.
ESTA EST.

1 1 1 0 1
2 2 1 0 1

3 8 9 1 1 1 1

4 4 5 1 2 2 1

5 3 4 1 3 3 1

6 3 4 1 4 4 1

7 2 3 1 5 5 1

8 2 3 1 6 6 1

9 2 3 1 7 7 1

10 2 3 1 8 8 1

11 2 3 1 9 9 1

12 2 3 1 10 10 1

13 1 2 1 11 11 1

14 1 2 1 12 12 1

15 1 2 1 13 13 1

16 1 2 1 14 14 1
0 0 0 15 15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
15 1
1 0

0 0 0 0.00 0.00
1 0 0 0.00 0.00 0.00

1 0 1 1.00 1.00 1.00

1 0 2 1.00 2.00 2.00

1 0 3 1.00 3.00 3.00

1 0 4 1.00 4.00 4.00

1 0 5 1.00 5.00 5.00

1 0 6 1.00 6.00 6.00

1 0 7 1.00 7.00 7.00

1 0 8 1.00 8.00 8.00

1 0 9 1.00 9.00 9.00

1 0 10 1.00 10.00 10.00

1 0 11 1.00 11.00 11.00

1 0 12 1.00 12.00 12.00

1 0 13 1.00 13.00 13.00

1 0 14 1.00 14.00 14.00


1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00
1 0 15 0.00 14.00 14.00

S-ar putea să vă placă și