Sunteți pe pagina 1din 4

STRESSING REPORT

Client DLF PROJECTS LTD Location:HORIZON BLOCK-V - GURGAON


Project:HORIZON

RFI Number: G A Identification:


Cube strength:

STRESSING EQUIPMENT
Type of Jack:MONO Ram area of Jack(cm2):
Jack sl number:
Hydraulic pump: Po Pump Number:
Stressing record:
Pressure applied
Kg/Cm2 ELONGATION IN STRAND NO

1 2 3 4 5

Load equivalent-
tons 10.4 10.4 10.4 10.4 10.4
0-50 52 7 38 9 38 7 40 9 36 6
50-100 59 14 45 16 45 14 49 18 41 11
100-150 66 22 51 22 49 18 55 24 50 20

150-200 77 29 59 30 54 23 64 33 55 25
200-250 8`1 38 69 40 60 29 74 43 63 33

250-310 90 45 83 54 72 41 85 54 73 43

slip 4.0 6.0 5.0 6.0 5.0

net elongation 39 48 36 42 38

average 42.4
ON BLOCK-V - GURGAON
DATE:

Remarks

total
load
applied 52 ton
PULL OUT TEST - STRESSING REPORT

Client DLF PROJECTS LTD Location:HORIZON BLOCK-V


Project:HORIZON

RFI Number: G A Identification:


Cube strength:
DESIGN LOAD: 52 TONS ; MAXIMUM LOAD : 69.16 TONS
STRESSING EQUIPMENT
Type of Jack:MONO Ram area of Jack(cm2): 33.7 sq-cm
Jack sl number:
Hydraulic pump: Power/hand p Pump Number:
Stressing record:

ELONGATION IN STRAND NO

1 2 3 4 5
Load equivalent- Load in
tons tons
Pressure applied
0-00 0

77 2.6

154 5.2

231 7.8

309 10.4

410 13.832

NET ELONGATION

For Tech9 For DLFPL


T

ocation:HORIZON BLOCK-V - GURGAON


oject:HORIZON DATE:

16 TONS

Remarks

S-ar putea să vă placă și