Sunteți pe pagina 1din 11

m 

 

Fast Forward Program Assurance

15th April 2011


2     

Page 2 Presentation title


á  
     

Highlights:
Ź The Projects, the corresponding project areas and
the respective solutions along with Solution ID
Ź Assurance type for each solution i.e.
Centralized/Decentralized
Ź Location / circle where the assurance plan for a
solution was executed.
Ź An overview of Compliance: Solution Vs Circles

Page 3 Presentation title


  

Highlights:
Ź The Key Risk associated with each Solution and the work steps
to be performed for checking the existence for these risk
Ź The Data required for carrying out each work step
Ź Queries to be clarified during the Workshop for the solutions
Ź The appropriate Sample size and type considered for the
execution of work steps
Ź An estimation of Man-Hours required
Ź The Observations after performing the work steps
Ź Issues or problems faced while carrying out the work steps
Ź Point of Non Compliance :To Identify the entity responsible for
Non compliance in the process step

Page 4 Presentation title



     

The Compliance calculation of a Solution will depend on the assurance


type of the solution:

Ź Centralized

Ź Decentralized

Page 5 Presentation title



         

Total Solution compliance will be the simple average of the


compliance value of all the risks corresponding to the
solution.

The Risk compliance will be assigned Binary Values


Ź Risk = 100 % Compliance ÿ Value = 1
Ź Risk = 100 % Compliance ÿ Value = 0

Page 6 Presentation title



         

Ź Each risk is assigned a compliance parameter based on


the work step
Ź The Percentage of Compliance is calculated for each risk
with the help of this compliance parameter.
Ź Total Solution compliance will also be the simple average
of the compliance value of all the risks corresponding to
the solution.

Page 7 Presentation title



     

The compliance calculated for each risk can be extended for


analysis of

Ź Implementation in Circle for all solutions

Ź Implementation of a Solution across all circles

Ź Implementation of a particular Project Area

Page 8 Presentation title



  

Page 9 Presentation title


Page 10 Presentation title
2á

S-ar putea să vă placă și