LIQUID PENETRANT EXAMINATION REPORT

Customer : M/S Indian Railway Report No. : BMEC PT-001 Date :14-05-2011

Reported to:

M/S VAISHNAV ENGINEERING,


Thiruvalam,Vellore-632515
Item: Main Girder(SAW-FILLET WELD JOINT 100% LPI)
S.NO Welder Component RESULT

01 VEW-01
LC 50-Main Girder- I Acceptable
Material :- Carbon Steel Welding
SURFACE CONDITION-AS WELDED(CLEANED)
Process: SAW

Penetrant System :- SOLVENT REMOVABLE


CHECKMA
CLEANER -- ACCEPTANCE AWS D 1.1
TE

CHECKMA Dwell Time-10


PENETRANT Minutes
PROCEDURE ASME SEC V
TE

CHECKMA
DEVELOPER AS PER PROCEDURE Specification AWS D 1.1
TE

Note:LPI Test was Carried out 100% on SAW- Main Girder fillet weld Joint as advised by the
Customer

For Inspection Company For M/S VAISHNAV ENGINEERING WITNESSED BY


QC

E.ELAVARASAN Er.V.MURUGANANDAM

ASNT- MT,PT,RT,UT Level II SENIOR SECTION ENGINEER

INDIAN RAILWAY

NO-1/C M.B.T Road, Sivanandha Nagar, Thiruvalam, Katpadi Taluk, Vellore DT, Pin 632515, Mobile
00919488651346

0099488651346, E-mail: iyan7681@yahoo.co.in & iyan7681@gmail.com,iyan7681@hotmail.com