Analisa EI-736 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KEGIATAN No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 7.3. (6) : Wire Mesh : M2

No.

KOMPONEN

SAT.

PERKIRAAN KUANTITAS

HARGA SATUAN ( Rp. )

JUMLAH HARGA ( Rp. )

A. 1 2 3

TENAGA Pekerja Tukang Mandor (L01) (L02) (L03) Jam Jam Jam 0.1750 0.0700 0.0350 10,714.29 12,857.14 15,714.29 1,875.00 900.00 550.00 3,325.00

JUMLAH HARGA TENAGA B. 1 2 3 BAHAN Wire Mesh Plastik Poliethillene 0,3mm Bahan Lainnya (M39a) M2 M2 Ls 1.1000 1.1000 1.0000 36,190.00 1,600.00 3,000.00

39,809.00 1,760.00 3,000.00

JUMLAH HARGA BAHAN C. 1 PERALATAN Alat Bantu Ls 1.0000 1,000.00

44,569.00

1,000.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2 3 4

1,000.00

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 48,894.00 OVERHEAD & PROFIT 10.0 % x D 4,889.40 HARGA SATUAN PEKERJAAN ( D + E ) 53,783.40 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.