ANALYSIS OF RATES

3:16 PM4/14/2012

R,C,C WORK IN BEAMS,SLABS,ETC 1:2:4 R,C,C 1:2:4 Particulars Quantity or No's Rate Materials cum Rs/cum Stoneballast 20mm 8.8 Cum 812.72 sand 4.4 Cum 1060.07 Cement 2.2 Cum 8250 total Labours Mistri 0.5 no. 400 Mason 1 nos. 300 Mazdoor 15 nos. 200 bhishti 6 nos. 150 sundaries t&p lumsum L,S 300 total labour = c.c 4" th 711.2 Rate/Brass labour = c.c 4.5" th 800.1 Rate/Brass labour = c.c 5" th 889 Rate/Brass labour = c.c 6" th 1066.8 Rate/Brass Bending black smith 8 200 mazdoor 8 180 T .and P lumsum L,S 250 total Labour Bending = 8.38 Rate/Kg Centring timber planks lumsum L,S 3500 Carpenter 10 nos. 250 mazdoor 10 nos. 180 Nails lumsum L,S 400 T and P lumsum L,S 400 total Labour Centring 860 Rate/Brass T ,labour for 4.0" th slab 1990.31 Rate/Brass T ,labour for 4.5" th slab 2079.21 Rate/Brass T ,labour for 5.0" th slab 2168.11 Rate/Brass Total of the material and labour Add Water charges 2% Add contractor's profit 10% Grand total Rate per cu m if concrete mixer+lift used Rate per cu m mixer rent in Rs = 2500

Cost /Cum /Cum /Bag 7151.943463 4600 4664.310954 7500 18150 275 29966.25442 200 300 3000 900 300 4700

/day /day /day /day L,S

/day /day L,S

1600 1440 250 3290

L,S /day /day L,S L,S

3500 2500 1800 400 400 8600

46556.25 698.34 4655.63 51910.22 5191.02 /cum 5441.02 /cum Rate/day/ 10 Cum 1111.1 Reference

P.T.O

68231252.xls.ms_office

ANALYSIS OF RATES

3:16 PM4/14/2012

dumper 2brass /3brass truck /bag