Sunteți pe pagina 1din 2
om ACERGY POLARIS INCLINING TEST REPORT 12-NOV 2006 BUREAU VETIT#S — Pantster LZW UL Docume: ITY purposes E don the ATTACHED herwat ww Ol 3 roe 38 [fae 4 498 Prepared by: Antoine Fandeux visa Tah 81 Bol Version| Reason forlssue | Issue Date __| Prepared by ViSAby | GustoNse Paris, 2 ns stated on the THE IMPLICATIONS ON THE LOADING 5 CONDITIONS OF INSTALLING A NEW gis 750 T J-LAY SYSTEM ONBOARD THE E| 3 DLB POLARIS g| 8 2) 3 als MSC ref P 10918-4678 rev A Bae =) €] 3 3 8 [Client [Acergy-group &| S| if |Client doc nr PL | CA} FI} Unit DLB Polaris STATUS _|ISSUE DATE PREPARED BY | REVIEWED BY | APPROYED BY x First 0 [May 5, 2006 WEE 1 Lco X [Revision |A [August 17, 2006 WEE | |ic Revision |B Revision |C Revision [D Revision |E Revision |F DUPEA) VERITAS Registers ABW UNE r 2 SILITY, (MSC) bv Marine Structure Consultants Kare! Doormanwog 68, P 0 Box 687 $3100 AR Scniedam, the Nevierands Telephone +31 (0)10-2320 800 Fax +31 -(0)10- 2320 601 Exmail MSC@GustoMSC.com Weosie www. Gustet#SC.com

S-ar putea să vă placă și