om
ACERGY POLARIS
INCLINING TEST REPORT
12-NOV 2006
BUREAU VETIT#S — Pantster LZW UL
Docume: ITY
purposes E don the
ATTACHED herwat ww Ol 3
roe 38 [fae 4
498
Prepared by: Antoine Fandeux
visa Tah 81 Bol
Version| Reason forlssue | Issue Date __| Prepared by ViSAby |GustoNse
Paris, 2
ns stated on the
THE IMPLICATIONS ON THE LOADING
5 CONDITIONS OF INSTALLING A NEW
gis 750 T J-LAY SYSTEM ONBOARD THE
E| 3 DLB POLARIS
g| 8
2) 3
als MSC ref P 10918-4678 rev A
Bae
=) €] 3
3 8 [Client [Acergy-group
&| S| if |Client doc nr
PL | CA} FI} Unit DLB Polaris
STATUS _|ISSUE DATE PREPARED BY | REVIEWED BY | APPROYED BY
x First 0 [May 5, 2006 WEE 1 Lco
X [Revision |A [August 17, 2006 WEE | |ic
Revision |B
Revision |C
Revision [D
Revision |E
Revision |F
DUPEA) VERITAS Registers ABW UNE
r 2 SILITY,
(MSC) bv
Marine Structure Consultants
Kare! Doormanwog 68, P 0 Box 687
$3100 AR Scniedam, the Nevierands
Telephone +31 (0)10-2320 800
Fax +31 -(0)10- 2320 601
Exmail MSC@GustoMSC.com
Weosie www. Gustet#SC.com