ADC Energy Systems PROJECT NAME

RISK ASSESSMENT (RA) FOR SAADIYAT DCP 3


Reference # Work Activity : FOR MOBILIZATION WORKS DCP 3 A015-MS-CE-005 ACTIVITY RISK ASSESSEMENT WORKSHEET GUIDELINES Location : Assessment Team : Signature Prepared By DCP 3 RATHEESH KUMAR M R (HSE OFFICER) Ratheesh Kumar HSE Officer Date : 18.07.2011 Review By Approved By Thomas John Construction Manager Mr. Mohammed Aref Project Manager

RISK ASSESSMENT MATRIX (RAM)


POTENTIAL CONSEQUENCES Lost Time Injuries
RATING Harm to People Loss or Damage to Assets Effect on the Environmen t Impact on Reputation

A
Has occurred in worldwide industry

B
Has occurred in another Group Company

PROBABILITY C
Has occurred in Saadiyat

D
Occurs several times per year in Saadiyat

E
Occurs several times per year in the some location or the UAE.

Slight injury or health effect Minor injury or health effects Major injury or health effects 1-3 fatalities or permanent total disability >3fatalities

Slight < UAE Dhs.10,000

Slight

Slight

Minor<UAE Dhs 100,000

Minor

Minor

LOW MEDIUM

Major < UAE Dhs 500,000

Major

Major

Severe <UAE Dhs 10,000,000 Catastrophi c>UAE Dhs 10,000,000

Severe

National

HIGH

Catastrophi c

Internation al

Revision No. 02 ADC/PM/F/27

Page 1 of 4

ADC Energy Systems PROJECT NAME


RISK ASSESSMENT (RA) FOR SAADIYAT DCP 3

Revision No. 02 ADC/PM/F/27

Page 2 of 4

Task

Hazard

Initial Risk
Consequence Risk Rating Probability Who or What ADC Energy might be Harmed? PROJECT

Control Measures
Consequence

Residual Risk
Risk Rating Probability

Step #

Description of Task Step

Hazard Description & Effect

Control Systems Measures and / or Recovery Measures NAME

*Residual Risk Level (ALARP )

Preparation for the task

Hand, Body injuries Eye.

RISK ASSESSMENT (RA) FOR SAADIYAT DCP 3 Proper PPES like Safety Shoes, People, 3 E M 1.1
Property 3 E M helmets, Safety glass, respiratory mask, Full sleeve cover roll and hand glouse are mandatory, while working time. 1.2 Tool box talk should be given before starting the work. Ensure that the scope of work is clearly communicated to the employers and make them aware of all hazards of the activity 2.1 Certified slings using 2.2 All slings must be inspected prior to each use 3.1 Tools box talk to be given to reduce the risk 3.2 proper ppe using 3.3 planned area provided 4.1 Drivers will have their documents checked and recorded to ensure all test certificates and licenses valid 4.2 planned proper area provided 5.1Trained banks man appointed 5.2 Drivers/Operators will be given a full induction to include the site ingress, egress and including conditions pertaining to the Saadiyat island 5.3 Drivers will have their documents checked and recorded to ensure all test certificates and licenses valid 5.4 A third party certified rigger must be available for all lifting operations. 5.5 Crane entry permit 6.1 keep a safe distance from live/ energized equipments and cables. 6.2 Proper sign board provided proper areas.

2 2

A A

L L

Low Low

Low

Lifting slings and Chain block Unloading and pipe fixing Moving vehicles

Hand, Body injuries, property damage Body injury and Hand Injuries. property and equipment damages, Tripping hazardus. Uncontrolled movement resulting in the injury of people and or damage to equipment/ property Uncontrolled movement resulting in the injury of people and or damage to equipment / property.

People Property People Property People Property People, Property

3 3 3 3 3 3 3 3

D D E E E E E E

M M M M M M M M

2 2 2 2 2 2 2 2 2

A A A A A A A A A

L L L L L L L L L

Low Low Low Low Low Low Low Low Low

Using mobile cranes

Low

Low

Electric Tools, Light fittings, Power cables Revision No. 02 ADC/PM/F/27

Electric Shock

People Property

3 3

D D

M M

2 2

A A

Low

L Low Page 3 of 4

ADC Energy Systems PROJECT NAME


RISK ASSESSMENT (RA) FOR SAADIYAT DCP 3 REMARKS: All people at site shall attend the Saadiyat island HSE Induction All above activites will be under the control of ADC Energy Systems. Full supervision by ADC Energy Systems. Emergency Numbers Saadiyat Island/paragon ABD Cooling/ADC Energy Systems. Will be posted & Know to all personnel. Abnormal working conditions:- Work shall be stopped and Contact made with the ADC Energy Systems HSE Officer Ratheesh Kumar M R by Telephone. +971 55747 6033.NidalSaleh (Supervisor) +971 -507818190, 6. The number of people on site should be limited to the minimum, control by entry passes & monitor by security. 7. Four wheel drive vehicle shall be available at site during the activity. 8. Escape route must be kept clear of any obstacle. 1. 2. 3. 4. 5.

Revision No. 02 ADC/PM/F/27

Page 4 of 4