Electrical Inspection Report 1) Shri Dilip Kumar 2) Shri B.K.Jha 3).Shri K.V.L.N.

Sastry 4) Shri Rahul Singh

Date:01-03-11

S. No. 1.

Equipment Coiler 1

Observation a) Bottom pinch roll inspection cover open. b) No ventilation of motor and MTB found open. c) Wrapper roll-2 has abnormal sound from coupling and inspection cover of motor is open. a) B/roll MTB cover found open. b) Cable exposed to heat near top pinch roll. c) Wrappers roll 1 coupling guard missing. a) Top pinch roll DE side inspection cover is open. b) Wrapper roll 1 coupling guard is missing. Recirculation pump motor is getting hot. Oil leakage at floor. Recirculation pump motor is getting hot. a) Top pinch roll MTB cover is open. b) Wrapper roll 1 coupling guard is missing.

Remarks

2.

Coiler 2

3.

Coiler 3

4. 5. 6. 7.

210 bar Coiler 1-3 130 bar Coiler 1-3 210 bar Coiler 4 Coiler 4

CC: 1) ED (W) 2) GM (M&U) 3) DGM (T) 4) HOD (HSM)