Pile Mark

1P1
1P2
1P3
1P4
1ARP1
1ARP2
1ARP3
1ARP4
1ARP5
1ARP6
*1BRP1
1BRP2
*1BRP3
1BRP4
1BRP5
1BRP6
2RP1
2RP2
2RP3
2RP4
2RP5
2RP6
2RP7
2RP8
2ARP1
2ARP2

Existing
Date of Drilling Date of Drilling Date of Re-bar
Ground
to RHL
to FL
installation
Level (mPD)

20.90
20.20
20.20
20.20
20.20
20.20
20.20
20.20
20.10
20.10
20.10
20.10
20.30
20.30
20.30
20.30
20.30
20.30
20.30
20.30
20.20
20.20
20.30
20.30
20.30
20.30

27-Jun-11
########
########
########
########
########
########
########
########
########
########
########
########
########
########
########
13-Jun-11
13-Jun-11
13-Jun-11
14-Jun-11
4-Jun-11
4-Jun-11
3-Jun-11
3-Jun-11
8-Jun-11
8-Jun-11

27-Jun-11
24-May-11
24-May-11
24-May-11
24-May-11
20-May-11
20-May-11
25-May-11
19-May-11
19-May-11
11-Jun-11
28-May-11
27-May-11
28-May-11
20-May-11
25-May-11
11-Jun-11
13-Jun-11
11-Jun-11
13-Jun-11
4-Jun-11
7-Jun-11
7-Jun-11
7-Jun-11
10-Jun-11
10-Jun-11

29-Jun-11
1-Jun-11
1-Jun-11
1-Jun-11
1-Jun-11
1-Jun-11
20-Jun-11
1-Jun-11
1-Jun-11
1-Jun-11
20-Jun-11
1-Jun-11
1-Jun-11
1-Jun-11
1-Jun-11
1-Jun-11
29-Jun-11
21-Jun-11
29-Jun-11
21-Jun-11
21-Jun-11
21-Jun-11
21-Jun-11
21-Jun-11
21-Jun-11
21-Jun-11

Date of
Grouting

Pile Cutoff level


(mPD)

Casing
Head
Level
(mPD)

Length of
Casing

Tentative
Rockhead
Level
(mPD)

Actual
Rockhead
Level
(mPD)

Casing
Bottom
Level

Design Rock
Socket
Length (m)

design
socket
length

30-Jun-11
2-Jun-11
2-Jun-11
2-Jun-11
2-Jun-11
2-Jun-11
21-Jun-11
2-Jun-11
2-Jun-11
2-Jun-11
21-Jun-11
2-Jun-11
2-Jun-11
2-Jun-11
2-Jun-11
2-Jun-11
30-Jun-11
21-Jun-11
30-Jun-11
21-Jun-11
21-Jun-11
21-Jun-11
21-Jun-11
21-Jun-11
21-Jun-11
21-Jun-11

19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90

21.50
20.44
20.42
20.43
20.45
20.30
20.35
20.41
20.16
20.29
20.36
20.30
20.52
20.39
20.34
20.51
20.44
20.39
20.46
20.55
20.35
20.26
20.37
20.33
20.39
20.40

12.00
9.12
9.10
9.20
12.20
11.50
11.48
11.80
11.29
11.40
12.22
14.01
13.10
13.52
12.30
12.75
13.70
16.03
13.50
18.10
12.09
15.02
12.13
15.06
12.03
13.02

13.7
13.4
13.7
13.2
14.0
13.5
13.0
13.5
13.0
12.0
13.4
11.7
13.4
11.4
13.4
12.4
12.5
10.5
12.0
10.0
12.0
9.0
11.5
8.5
12.1
11.6

9.8
11.6
11.6
11.5
8.9
9.4
9.5
9.3
9.5
9.5
8.8
6.9
8.0
7.5
8.7
8.4
7.5
5.1
7.7
3.3
8.9
6.0
8.9
6.0
9.0
8.1

9.50
11.32
11.32
11.23
8.62
9.15
9.21
8.96
9.21
9.23
8.51
6.63
7.73
7.19
8.41
8.14
7.15
4.84
7.37
2.99
8.62
5.69
8.60
5.72
8.72
7.77

4000
4000
4000
4000
11000
11000
11000
16600
16100
15100
6500
6500
6500
6500
6500
6500
6000
6000
6000
6000
6000
6000
6000
6000
8000
8000

4.0
4.0
4.0
4.0
11.0
11.0
11.0
15.4
14.2
13.9
6.5
6.5
6.5
6.5
6.5
6.5
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
8.0
8.0

Pile Mark

2ARP3
2ARP4
2ARP5
2ARP6
2ARP7
2ARP8
3P1
3RP1
*3RP2
3RP3
3RP4
3ARP1
3ARP2
3ARP3
3ARP4
3ARP5
3ARP6
3ARP7
3ARP8
8P1
8P2
8P3
8P4
8P5
8P6
9RP1

Existing
Date of Drilling Date of Drilling Date of Re-bar
Ground
to RHL
to FL
installation
Level (mPD)

20.30
20.30
20.30
20.30
20.30
20.30
20.30
20.30
20.30
20.30
20.30
20.30
20.30
20.30
20.30
20.30
20.30
20.30
20.30
5.50
5.50
5.50
5.50
5.50
6.60
5.20

########
########
9-Jun-11
9-Jun-11
########
########
########
17-Jun-11
########
18-Jun-11
########
22-Jun-11
23-Jun-11
########
########
22-Jun-11
23-Jun-11
########
########
27-Apr-11
27-Apr-11
27-Apr-11
3-Jun-11
27-Apr-11
3-Mar-11
7-May-11

1-Jun-11
1-Jun-11
10-Jun-11
10-Jun-11
11-Jun-11
2-Jun-11
24-May-11
18-Jun-11
20-Jun-11
18-Jun-11
28-May-11
24-Jun-11
24-Jun-11
25-May-11
25-May-11
25-Jun-11
25-Jun-11
25-May-11
25-May-11
3-May-11
3-May-11
3-May-11
4-Jun-11
3-May-11
3-Mar-11
7-May-11

21-Jun-11
29-Jun-11
21-Jun-11
21-Jun-11
21-Jun-11
21-Jun-11
10-Jun-11
29-Jun-11
29-Jun-11
29-Jun-11
10-Jun-11
29-Jun-11
29-Jun-11
10-Jun-11
10-Jun-11
29-Jun-11
29-Jun-11
10-Jun-11
10-Jun-11
4-May-11
4-May-11
4-May-11
9-Jun-11
4-May-11
4-Mar-11
12-May-11

Date of
Grouting

Pile Cutoff level


(mPD)

Casing
Head
Level
(mPD)

Length of
Casing

Tentative
Rockhead
Level
(mPD)

Actual
Rockhead
Level
(mPD)

Casing
Bottom
Level

Design Rock
Socket
Length (m)

design
socket
length

21-Jun-11
30-Jun-11
21-Jun-11
21-Jun-11
21-Jun-11
21-Jun-11
11-Jun-11
30-Jun-11
30-Jun-11
30-Jun-11
11-Jun-11
30-Jun-11
30-Jun-11
11-Jun-11
11-Jun-11
30-Jun-11
30-Jun-11
11-Jun-11
11-Jun-11
4-May-11
4-May-11
4-May-11
9-Jun-11
4-May-11
4-Mar-11
12-May-11

19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
19.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90

20.34
20.30
20.36
20.51
20.38
20.40
20.40
20.42
20.38
20.50
20.52
20.50
20.63
20.56
20.40
20.55
20.63
20.55
20.48
5.56
5.60
5.63
5.60
5.58
6.80
5.35

14.52
16.00
12.08
12.13
12.50
13.40
18.18
16.30
17.79
16.43
19.99
16.03
15.99
18.90
21.01
15.30
15.50
19.59
20.19
3.08
3.05
4.20
4.11
3.10
5.03
3.09

10.8
10.5
11.0
10.3
8.8
8.6
10.0
10.5
8.5
10.0
8.0
10.5
10.5
10.0
9.5
7.0
7.0
6.5
6.5
2.8
2.8
2.6
2.6
2.5
2.5
2.0

6.6
5.1
8.9
9.0
8.6
7.7
2.5
4.8
3.3
4.8
1.3
5.3
5.4
2.5
0.3
6.0
5.9
1.8
1.2
2.8
2.9
1.7
1.8
2.8
2.1
2.7

6.26
4.78
8.64
8.74
8.26
7.40
2.22
4.51
3.02
4.46
1.01
4.95
5.12
2.23
0.02
5.71
5.60
1.55
0.90
2.48
2.55
1.43
1.49
2.48
1.77
2.35

8000
8000
14100
13400
11900
11700
4000
6500
6500
6500
6500
8000
8000
8000
8000
10100
10100
9500
11400
4000
4000
4000
4000
4000
4000
5500

8.0
8.0
13.65
13.45
12.25
11.45
4.0
6.5
6.5
6.5
6.5
8.0
8.0
8.0
8.0
10.45
8.95
9.50
8.25
4.0
4.0
4.0
4.0
4.0
4.0
5.5

Pile Mark

9RP2
9ARP1
9ARP2
9ARP3
9ARP4
14P1
14P2
14P3
14P4
14RP5
14RP6
14P7
14P8
14P9
14P10
14ARP1
14ARP2
14ARP3
14ARP4
14ARP5
14ARP6
15RP1
15RP2
15RP3
15RP4
15RP5

Existing
Date of Drilling Date of Drilling Date of Re-bar
Ground
to RHL
to FL
installation
Level (mPD)

5.20
5.40
5.40
5.40
5.40
6.30
6.30
6.30
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.40
6.30
6.30
5.30
5.30
5.30
5.30
5.30

5-May-11
27-Apr-11
########
7-Jun-11
########
18-Mar-11
18-Mar-11
18-Mar-11
17-Mar-11
2-Apr-11
22-Mar-11
21-Mar-11
21-Mar-11
21-Mar-11
21-Mar-11
2-Apr-11
2-Apr-11
2-Apr-11
22-Mar-11
22-Mar-11
21-Mar-11
9-May-11
26-Apr-11
9-May-11
26-Apr-11
9-May-11

7-May-11
3-May-11
27-May-11
7-Jun-11
16-May-11
28-Mar-11
28-Mar-11
28-Mar-11
28-Mar-11
14-Apr-11
28-Mar-11
28-Mar-11
28-Mar-11
28-Mar-11
28-Mar-11
14-Apr-11
14-Apr-11
14-Apr-11
28-Mar-11
28-Mar-11
28-Mar-11
12-May-11
3-May-11
12-May-11
3-May-11
16-May-11

12-May-11
4-May-11
9-Jun-11
9-Jun-11
17-May-11
29-Mar-11
29-Mar-11
29-Mar-11
29-Mar-11
15-Apr-11
29-Mar-11
29-Mar-11
29-Mar-11
29-Mar-11
29-Mar-11
15-Apr-11
15-Apr-11
15-Apr-11
29-Mar-11
29-Mar-11
29-Mar-11
12-May-11
4-May-11
12-May-11
4-May-11
17-May-11

Date of
Grouting

Pile Cutoff level


(mPD)

Casing
Head
Level
(mPD)

Length of
Casing

Tentative
Rockhead
Level
(mPD)

Actual
Rockhead
Level
(mPD)

Casing
Bottom
Level

Design Rock
Socket
Length (m)

design
socket
length

12-May-11
4-May-11
9-Jun-11
9-Jun-11
17-May-11
30-Mar-11
30-Mar-11
30-Mar-11
30-Mar-11
16-Apr-11
30-Mar-11
30-Mar-11
30-Mar-11
30-Mar-11
30-Mar-11
16-Apr-11
16-Apr-11
16-Apr-11
30-Mar-11
30-Mar-11
30-Mar-11
12-May-11
4-May-11
12-May-11
4-May-11
17-May-11

4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90

5.34
5.57
5.68
5.53
5.55
6.64
6.42
6.34
6.91
6.54
6.64
6.65
6.61
6.50
6.60
6.74
6.67
6.67
6.43
6.35
6.53
5.40
5.60
5.48
5.60
5.53

3.11
3.02
3.57
3.45
3.12
9.05
8.97
5.98
6.73
9.11
12.03
9.03
9.05
9.00
7.50
9.81
9.12
9.00
11.04
12.03
10.60
3.05
3.02
3.11
3.03
3.04

0.0
1.5
0.5
0.0
-1.0
2.0
1.5
1.3
0.8
2.0
0.5
1.7
1.0
0.8
0.0
1.0
1.0
2.0
-1.0
-1.5
-2.0
0.0
-1.5
0.0
-2.0
0.0

2.6
2.9
2.5
2.5
2.8
-2.1
-2.3
0.7
0.5
-2.0
-4.7
-2.1
-2.1
-2.2
-0.6
-2.5
-1.9
-1.8
-4.0
-5.0
-3.5
2.7
3.0
2.8
3.0
2.9

2.32
2.64
2.22
2.18
2.52
-2.41
-2.55
0.36
0.18
-2.30
-5.03
-2.38
-2.44
-2.50
-0.90
-2.78
-2.18
-2.06
-4.28
-5.32
-3.75
2.44
2.67
2.46
2.66
2.58

5500
7500
7500
7500
7500
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
6500
6500
6500
6500
6500
6500
4000
4000
4000
4000
4000

5.5
7.5
7.5
7.5
7.5
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
6.5
6.5
6.5
6.5
6.5
6.5
4.0
4.0
4.0
4.0
4.0

Pile Mark

15RP6
17P1
17P2
17ARP1
17ARP2
17ARP3
17ARP4
17ARP5
17ARP6
17ARP7
17ARP8
17ARP9
17ARP10
17ARP11
17ARP12
17BRP1
17BRP2
18P1
18P2
18P3
18P4
18ARP1
18ARP2
18ARP3
18ARP4
19RP1

Existing
Date of Drilling Date of Drilling Date of Re-bar
Ground
to RHL
to FL
installation
Level (mPD)

5.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30
7.00

7-Jun-11
13-Apr-11
12-Apr-11
2-Apr-11
2-Apr-11
1-Apr-11
1-Apr-11
7-May-11
7-May-11
24-Mar-11
24-Mar-11
24-Mar-11
23-Mar-11
27-Apr-11
27-Apr-11
5-May-11
9-May-11
20-Apr-11
20-Apr-11
20-Apr-11
20-Apr-11
7-May-11
6-May-11
27-Apr-11
27-Apr-11
21-Jun-11

8-Jun-11
15-Apr-11
15-Apr-11
12-Apr-11
12-Apr-11
12-Apr-11
12-Apr-11
12-May-11
12-May-11
28-Mar-11
28-Mar-11
28-Mar-11
28-Mar-11
3-May-11
3-May-11
5-May-11
11-May-11
3-May-11
3-May-11
3-May-11
3-May-11
12-May-11
12-May-11
3-May-11
3-May-11
22-Jun-11

9-Jun-11
16-Apr-11
16-Apr-11
13-Apr-11
13-Apr-11
13-Apr-11
13-Apr-11
12-May-11
12-May-11
30-Mar-11
30-Mar-11
30-Mar-11
30-Mar-11
4-May-11
4-May-11
6-May-11
12-May-11
4-May-11
4-May-11
4-May-11
4-May-11
12-May-11
12-May-11
4-May-11
4-May-11
24-Jun-11

Date of
Grouting

Pile Cutoff level


(mPD)

Casing
Head
Level
(mPD)

Length of
Casing

Tentative
Rockhead
Level
(mPD)

Actual
Rockhead
Level
(mPD)

Casing
Bottom
Level

Design Rock
Socket
Length (m)

design
socket
length

9-Jun-11
16-Apr-11
16-Apr-11
13-Apr-11
13-Apr-11
13-Apr-11
13-Apr-11
12-May-11
12-May-11
30-Mar-11
30-Mar-11
30-Mar-11
30-Mar-11
4-May-11
4-May-11
6-May-11
12-May-11
4-May-11
4-May-11
4-May-11
4-May-11
12-May-11
12-May-11
4-May-11
4-May-11
24-Jun-11

4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90

5.57
6.40
6.75
6.60
6.51
6.49
6.46
6.83
6.80
6.40
6.37
6.48
6.45
6.50
6.48
6.54
6.42
6.70
6.80
6.74
6.94
6.70
6.64
6.35
6.47
6.96

3.02
6.08
6.10
7.18
7.12
7.10
9.05
9.22
9.15
11.00
11.03
10.50
10.50
9.10
9.09
4.63
9.82
9.10
9.08
9.22
9.11
9.16
9.23
9.03
9.12
11.50

-2.0
-1.8
-1.8
-1.3
-1.4
-1.5
-1.6
-1.8
-2.5
-3.0
-3.0
-3.0
-3.0
-3.0
-3.0
-2.5
-2.5
-3.2
-3.2
-3.2
-3.2
-3.2
-3.2
-4.0
-4.0
-3.8

2.9
0.6
1.0
-0.1
-0.1
-0.1
-2.0
-1.8
-1.8
-4.0
-4.0
-3.4
-3.4
-2.0
-2.0
2.3
-2.8
-2.1
-2.0
-2.2
-1.9
-1.9
-2.0
-2.1
-2.1
-3.9

2.64
0.32
0.65
-0.36
-0.40
-0.40
-2.32
-2.11
-2.08
-4.27
-4.33
-3.71
-3.74
-2.33
-2.34
2.05
-3.11
-2.40
-2.28
-2.48
-2.17
-2.19
-2.31
-2.41
-2.38
-4.20

4000
4000
4000
8000
8000
8000
8000
8000
8000
8000
8000
8000
8000
8000
8000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000

4.0
4.0
4.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0

Pile Mark

19RP2
19P3
19P4
19ARP1
19ARP2
19ARP3
19ARP4
20RP1
20RP2
20ARP1
20ARP2
24RP1
24RP2
24RP3
24RP4
24ARP1
24ARP2
24ARP3
24ARP4
24ARP5
24ARP6
24ARP7
24ARP8
25RP1
25RP2
25RP3

Existing
Date of Drilling Date of Drilling Date of Re-bar
Ground
to RHL
to FL
installation
Level (mPD)

6.80
6.80
6.80
6.80
6.80
6.80
6.80
7.40
7.20
6.50
6.50
6.50
6.50
6.50
6.50
6.30
6.30
6.30
6.30
6.30
6.30
6.50
6.50
6.50
6.00
6.00

########
30-Apr-11
30-Apr-11
########
########
4-May-11
29-Apr-11
29-Apr-11
########
16-Mar-11
29-Mar-11
29-Mar-11
17-Mar-11
29-Mar-11
16-Mar-11
19-Mar-11
19-Mar-11
29-Mar-11
30-Mar-11
30-Mar-11
31-Mar-11
17-Mar-11
17-Mar-11
15-Apr-11
4-Apr-11
4-Apr-11

27-May-11
5-May-11
5-May-11
14-May-11
14-May-11
5-May-11
5-May-11
5-May-11
14-May-11
24-Mar-11
6-Apr-11
6-Apr-11
24-Mar-11
6-Apr-11
24-Mar-11
24-Mar-11
24-Mar-11
6-Apr-11
6-Apr-11
6-Apr-11
6-Apr-11
24-Mar-11
24-Mar-11
19-Apr-11
12-Apr-11
12-Apr-11

28-May-11
6-May-11
6-May-11
14-May-11
14-May-11
6-May-11
6-May-11
6-May-11
14-May-11
25-Mar-11
8-Apr-11
8-Apr-11
25-Mar-11
8-Apr-11
25-Mar-11
25-Mar-11
25-Mar-11
7-Apr-11
7-Apr-11
7-Apr-11
7-Apr-11
26-Mar-11
26-Mar-11
20-Apr-11
12-Apr-11
12-Apr-11

Date of
Grouting

Pile Cutoff level


(mPD)

Casing
Head
Level
(mPD)

Length of
Casing

Tentative
Rockhead
Level
(mPD)

Actual
Rockhead
Level
(mPD)

Casing
Bottom
Level

Design Rock
Socket
Length (m)

design
socket
length

28-May-11
6-May-11
6-May-11
14-May-11
14-May-11
6-May-11
6-May-11
6-May-11
14-May-11
26-Mar-11
8-Apr-11
8-Apr-11
26-Mar-11
8-Apr-11
26-Mar-11
26-Mar-11
26-Mar-11
8-Apr-11
8-Apr-11
8-Apr-11
8-Apr-11
26-Mar-11
26-Mar-11
21-Apr-11
13-Apr-11
13-Apr-11

4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90

6.97
7.10
7.09
6.82
7.06
7.07
7.06
7.68
7.30
6.65
6.83
6.82
6.80
6.84
6.57
6.46
6.62
6.66
6.68
6.49
6.50
6.56
6.66
6.68
6.22
6.32

14.87
13.20
13.12
12.19
12.22
10.60
10.51
13.50
13.51
13.05
13.21
12.03
12.95
12.05
13.05
13.05
15.05
13.53
13.56
12.05
12.06
12.03
12.05
9.02
7.02
7.03

-5.0
-4.0
-4.2
-4.0
-4.2
-4.0
-4.0
-4.5
-6.2
-5.5
-5.5
-4.6
-6.2
-4.6
-6.0
-5.0
-5.2
-5.6
-5.8
-4.0
-4.0
-4.5
-4.5
-4.5
-4.0
-4.0

-7.2
-5.8
-5.7
-4.7
-4.5
-2.9
-2.8
-5.1
-5.5
-5.7
-5.7
-4.5
-5.5
-4.5
-5.8
-5.9
-7.7
-6.2
-6.2
-4.9
-4.9
-4.8
-4.7
-1.8
-0.3
-0.2

-7.45
-6.10
-6.03
-5.00
-4.79
-3.21
-3.13
-5.42
-5.80
-6.01
-5.98
-4.85
-5.76
-4.85
-6.09
-6.20
-7.98
-6.46
-6.47
-5.20
-5.20
-5.11
-5.03
-2.07
-0.59
-0.50

4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
5000
5000
5000
5000
5000
5000
5000
5000
4000
4000
4000

4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
4.0
4.0
4.0

Pile Mark

25P4
25P5
25RP6
25RP7
25RP8
25ARP1
25ARP2
29P1
29P2
29P3
29P4
29P5
29P6
29P7
29P8
30P1
30P2
30P3
30P4
30RP5
30RP6
30P7
30P8
30P9
30P10
31P1

Existing
Date of Drilling Date of Drilling Date of Re-bar
Ground
to RHL
to FL
installation
Level (mPD)

6.50
6.30
6.30
6.30
6.30
6.50
6.50
6.80
6.80
6.80
6.80
6.80
6.80
6.70
6.70
6.70
6.70
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50
6.50

7-Apr-11
4-Apr-11
15-Apr-11
15-Apr-11
6-Apr-11
15-Apr-11
8-Apr-11
29-Mar-11
29-Mar-11
29-Mar-11
29-Mar-11
28-Mar-11
28-Mar-11
28-Mar-11
28-Mar-11
4-Apr-11
4-Apr-11
31-Mar-11
31-Mar-11
14-Apr-11
1-Apr-11
6-Apr-11
6-Apr-11
31-Mar-11
31-Mar-11
7-Apr-11

12-Apr-11
12-Apr-11
19-Apr-11
19-Apr-11
12-Apr-11
19-Apr-11
12-Apr-11
1-Apr-11
1-Apr-11
1-Apr-11
1-Apr-11
1-Apr-11
1-Apr-11
1-Apr-11
1-Apr-11
14-Apr-11
14-Apr-11
14-Apr-11
12-Apr-11
15-Apr-11
12-Apr-11
14-Apr-11
14-Apr-11
14-Apr-11
12-Apr-11
12-Apr-11

12-Apr-11
12-Apr-11
19-Apr-11
19-Apr-11
12-Apr-11
20-Apr-11
12-Apr-11
2-Apr-11
2-Apr-11
2-Apr-11
2-Apr-11
2-Apr-11
2-Apr-11
2-Apr-11
2-Apr-11
15-Apr-11
15-Apr-11
15-Apr-11
12-Apr-11
15-Apr-11
12-Apr-11
15-Apr-11
15-Apr-11
15-Apr-11
12-Apr-11
12-Apr-11

Date of
Grouting

Pile Cutoff level


(mPD)

Casing
Head
Level
(mPD)

Length of
Casing

Tentative
Rockhead
Level
(mPD)

Actual
Rockhead
Level
(mPD)

Casing
Bottom
Level

Design Rock
Socket
Length (m)

design
socket
length

13-Apr-11
13-Apr-11
21-Apr-11
21-Apr-11
13-Apr-11
21-Apr-11
13-Apr-11
2-Apr-11
2-Apr-11
2-Apr-11
2-Apr-11
2-Apr-11
2-Apr-11
2-Apr-11
2-Apr-11
16-Apr-11
16-Apr-11
16-Apr-11
13-Apr-11
16-Apr-11
13-Apr-11
16-Apr-11
16-Apr-11
16-Apr-11
13-Apr-11
13-Apr-11

4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90

6.80
6.45
6.61
6.60
6.37
6.64
6.61
7.09
7.04
6.92
6.63
7.25
7.01
6.94
6.85
6.91
6.86
6.71
6.72
6.83
6.65
6.77
6.78
6.69
6.69
6.79

7.53
7.52
7.50
9.10
7.04
9.09
7.13
6.11
6.05
6.07
7.05
6.02
6.03
6.05
7.02
10.05
11.02
7.56
12.04
10.14
12.53
12.03
11.32
11.03
12.05
11.02

-4.5
-4.5
-5.0
-4.8
-4.3
-5.0
-4.2
2.0
1.0
1.0
0.0
2.0
1.0
1.0
0.0
-2.0
-2.5
-3.0
-3.5
-2.0
-3.8
-2.0
-2.8
-3.0
-3.8
-4.6

-0.4
-0.8
-0.4
-1.9
-0.2
-1.9
0.0
1.3
1.3
1.2
-0.1
1.5
1.3
1.2
0.1
-2.8
-3.9
-0.6
-5.0
-2.7
-5.2
-5.0
-4.2
-4.0
-5.1
-3.9

-0.73
-1.07
-0.66
-2.23
-0.46
-2.18
-0.31
0.98
0.99
0.85
-0.42
1.23
0.98
0.89
-0.17
-3.14
-4.16
-0.85
-5.32
-3.01
-5.50
-5.26
-4.54
-4.34
-5.36
-4.23

4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4500

4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.5

Pile Mark

31P2
31P3
32P1
32P2
32P3
33P1
33P2
33P3
33P4
34ARP1
34ARP2
34ARP3
34ARP4
35P1
35P2
35P3
35P4
36P1
36P2
36P3
36P4
37P1
37P2
37P3
37P4
38RP1

Existing
Date of Drilling Date of Drilling Date of Re-bar
Ground
to RHL
to FL
installation
Level (mPD)

6.50
6.50
6.20
6.20
6.50
6.50
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.50
6.50
6.50
6.50
6.50
6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30

7-Apr-11
7-Apr-11
4-Apr-11
4-Apr-11
6-Apr-11
12-Apr-11
12-Apr-11
12-Apr-11
12-Apr-11
21-Mar-11
31-Mar-11
21-Mar-11
1-Apr-11
14-Apr-11
14-Apr-11
14-Apr-11
14-Apr-11
12-Apr-11
13-Apr-11
12-Apr-11
13-Apr-11
14-Apr-11
14-Apr-11
14-Apr-11
14-Apr-11
13-Apr-11

12-Apr-11
12-Apr-11
12-Apr-11
12-Apr-11
12-Apr-11
19-Apr-11
19-Apr-11
19-Apr-11
16-Apr-11
24-Mar-11
6-Apr-11
24-Mar-11
6-Apr-11
16-Apr-11
16-Apr-11
16-Apr-11
16-Apr-11
19-Apr-11
19-Apr-11
19-Apr-11
19-Apr-11
19-Apr-11
19-Apr-11
19-Apr-11
19-Apr-11
19-Apr-11

12-Apr-11
12-Apr-11
12-Apr-11
12-Apr-11
12-Apr-11
20-Apr-11
20-Apr-11
20-Apr-11
20-Apr-11
26-Mar-11
7-Apr-11
26-Mar-11
7-Apr-11
16-Apr-11
16-Apr-11
16-Apr-11
16-Apr-11
20-Apr-11
20-Apr-11
20-Apr-11
20-Apr-11
20-Apr-11
20-Apr-11
20-Apr-11
20-Apr-11
20-Apr-11

Date of
Grouting

Pile Cutoff level


(mPD)

Casing
Head
Level
(mPD)

Length of
Casing

Tentative
Rockhead
Level
(mPD)

Actual
Rockhead
Level
(mPD)

Casing
Bottom
Level

Design Rock
Socket
Length (m)

design
socket
length

13-Apr-11
13-Apr-11
13-Apr-11
13-Apr-11
13-Apr-11
21-Apr-11
21-Apr-11
21-Apr-11
21-Apr-11
26-Mar-11
8-Apr-11
26-Mar-11
8-Apr-11
16-Apr-11
16-Apr-11
16-Apr-11
16-Apr-11
21-Apr-11
21-Apr-11
21-Apr-11
21-Apr-11
21-Apr-11
21-Apr-11
21-Apr-11
21-Apr-11
21-Apr-11

4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90

6.78
6.72
6.49
6.38
6.57
6.67
6.49
6.55
6.42
6.39
6.51
6.44
6.39
6.81
6.82
6.69
6.77
6.62
6.54
6.50
6.44
6.50
6.49
6.51
6.48
6.59

11.12
11.15
7.52
6.49
6.51
7.72
9.11
9.09
9.10
11.00
12.05
11.50
12.04
12.01
11.52
12.12
11.50
7.32
7.49
7.31
7.35
9.05
9.12
9.02
9.03
9.02

-4.6
-4.6
-4.2
-4.2
-4.2
-4.0
-4.0
-4.0
-4.0
-4.0
-4.0
-4.8
-4.5
-5.0
-5.0
-5.0
-5.0
-4.5
-4.5
-4.5
-4.5
-4.2
-4.0
-4.0
-4.0
-3.2

-4.0
-4.1
-0.7
0.2
0.4
-0.8
-2.3
-2.2
-2.4
-4.0
-4.9
-4.4
-5.0
-4.9
-4.4
-5.1
-4.4
-0.4
-0.7
-0.5
-0.6
-2.3
-2.3
-2.2
-2.3
-1.9

-4.34
-4.43
-1.03
-0.11
0.06
-1.05
-2.62
-2.54
-2.68
-4.28
-5.18
-4.72
-5.29
-5.20
-4.70
-5.43
-4.73
-0.70
-0.95
-0.81
-0.91
-2.55
-2.63
-2.51
-2.55
-2.16

4500
4500
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000

4.6
5.1
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0

Pile Mark

38RP2
38RP3
38RP4
38ARP1
38ARP2
42P1
42P2
42P3
42P4
42ARP1
42ARP2
42ARP3
42ARP4
43P1
43P2
43RP3
43RP4
43ARP1
43ARP2
43ARP3
43ARP4
44P1
44P2
44P3
44P4
44ARP1

Existing
Date of Drilling Date of Drilling Date of Re-bar
Ground
to RHL
to FL
installation
Level (mPD)

6.00
6.30
6.00
6.00
6.00
5.60
5.80
5.50
5.50
6.50
6.50
6.80
6.80
6.00
6.00
5.50
5.50
6.20
6.20
6.20
6.20
6.20
6.20
5.70
5.70
6.00

11-Mar-11
13-Apr-11
11-Mar-11
1-Apr-11
21-Mar-11
15-Mar-11
15-Mar-11
15-Mar-11
15-Mar-11
25-Mar-11
25-Mar-11
9-Apr-11
9-Apr-11
14-Mar-11
14-Mar-11
15-Mar-11
15-Mar-11
26-Mar-11
26-Mar-11
11-Apr-11
11-Apr-11
12-Mar-11
11-Mar-11
10-Mar-11
10-Mar-11
25-Mar-11

6-Apr-11
19-Apr-11
6-Apr-11
6-Apr-11
24-Mar-11
22-Mar-11
22-Mar-11
22-Mar-11
22-Mar-11
31-Mar-11
31-Mar-11
14-Apr-11
14-Apr-11
30-Mar-11
30-Mar-11
30-Mar-11
30-Mar-11
31-Mar-11
31-Mar-11
14-Apr-11
14-Apr-11
15-Apr-11
15-Apr-11
19-Apr-11
19-Apr-11
31-Mar-11

7-Apr-11
20-Apr-11
7-Apr-11
7-Apr-11
26-Mar-11
23-Mar-11
23-Mar-11
23-Mar-11
23-Mar-11
2-Apr-11
2-Apr-11
15-Apr-11
15-Apr-11
30-Mar-11
30-Mar-11
30-Mar-11
30-Mar-11
2-Apr-11
2-Apr-11
15-Apr-11
15-Apr-11
16-Apr-11
16-Apr-11
20-Apr-11
20-Apr-11
2-Apr-11

Date of
Grouting

Pile Cutoff level


(mPD)

Casing
Head
Level
(mPD)

Length of
Casing

Tentative
Rockhead
Level
(mPD)

Actual
Rockhead
Level
(mPD)

Casing
Bottom
Level

Design Rock
Socket
Length (m)

design
socket
length

8-Apr-11
21-Apr-11
8-Apr-11
7-Apr-11
26-Mar-11
23-Mar-11
23-Mar-11
23-Mar-11
23-Mar-11
2-Apr-11
2-Apr-11
16-Apr-11
16-Apr-11
30-Mar-11
30-Mar-11
30-Mar-11
30-Mar-11
2-Apr-11
2-Apr-11
16-Apr-11
16-Apr-11
16-Apr-11
16-Apr-11
21-Apr-11
21-Apr-11
2-Apr-11

4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90

6.21
6.55
6.13
6.32
6.29
5.79
6.01
5.88
5.83
6.77
6.81
7.10
7.02
6.02
6.17
5.59
5.72
6.57
6.53
6.82
6.82
6.37
6.44
5.90
5.86
6.19

9.48
9.03
9.00
12.03
11.00
3.05
3.35
3.95
5.20
6.03
6.03
6.10
6.08
9.02
10.00
10.14
10.44
12.10
12.11
11.55
12.10
12.05
13.04
12.52
12.50
12.10

-3.8
-3.2
-3.8
-4.5
-3.5
2.5
2.0
1.5
0.5
1.5
0.0
2.0
0.5
-3.0
-3.0
-2.0
-5.0
-2.5
-3.5
-2.5
-3.5
-6.0
-6.0
-6.0
-6.0
-5.0

-2.7
-1.9
-2.3
-5.0
-4.1
3.0
3.0
2.2
0.9
1.2
1.3
1.5
1.4
-2.7
-3.5
-3.9
-4.1
-4.9
-4.9
-4.1
-4.6
-5.4
-6.3
-6.3
-6.3
-5.2

-2.99
-2.21
-2.60
-5.35
-4.38
2.74
2.66
1.93
0.63
0.92
0.96
1.18
1.12
-3.00
-3.83
-4.25
-4.41
-5.17
-5.22
-4.38
-4.92
-5.68
-6.60
-6.62
-6.64
-5.55

4000
4000
4000
4000
4000
4000
4000
4000
4000
6000
6000
6000
6000
4000
4000
4000
5000
5000
5000
5000
5000
4000
4000
4000
4000
6000

4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
6.0
6.0
6.0
6.0
4.0
4.0
4.0
5.0
5.0
5.0
5.0
5.0
4.0
4.0
4.0
4.0
6.0

Pile Mark

44ARP2
44ARP3
44ARP4
44ARP5
44ARP6
44ARP7
44ARP8
44ARP9
44ARP10
45P1
45P2
45P3
45P4
45ARP1
45ARP2
45ARP3
45ARP4
45ARP5
45ARP6
45ARP7
45ARP8
45ARP9
45ARP10
46P1
46P2
46RP3

Existing
Date of Drilling Date of Drilling Date of Re-bar
Ground
to RHL
to FL
installation
Level (mPD)

6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
5.54
5.54
5.54
5.54
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
5.50
5.50
5.50

25-Mar-11
25-Mar-11
26-Mar-11
26-Mar-11
16-Mar-11
16-Mar-11
16-Mar-11
16-Mar-11
15-Mar-11
9-Mar-11
9-Mar-11
9-Mar-11
8-Mar-11
28-Mar-11
28-Mar-11
28-Mar-11
1-Jun-11
7-Apr-11
15-Mar-11
15-Mar-11
14-Mar-11
########
14-Mar-11
9-Mar-11
9-Mar-11
10-Mar-11

31-Mar-11
31-Mar-11
31-Mar-11
31-Mar-11
22-Mar-11
22-Mar-11
22-Mar-11
22-Mar-11
22-Mar-11
19-Apr-11
19-Apr-11
19-Apr-11
19-Apr-11
31-Mar-11
31-Mar-11
31-Mar-11
1-Jun-11
19-Apr-11
22-Mar-11
22-Mar-11
22-Mar-11
25-May-11
21-Mar-11
18-Mar-11
18-Mar-11
8-Apr-11

2-Apr-11
2-Apr-11
1-Apr-11
1-Apr-11
22-Mar-11
22-Mar-11
22-Mar-11
22-Mar-11
22-Mar-11
19-Apr-11
19-Apr-11
19-Apr-11
19-Apr-11
1-Apr-11
1-Apr-11
1-Apr-11
3-Jun-11
21-Apr-11
22-Mar-11
22-Mar-11
22-Mar-11
26-May-11
22-Mar-11
19-Mar-11
19-Mar-11
9-Apr-11

Date of
Grouting

Pile Cutoff level


(mPD)

Casing
Head
Level
(mPD)

Length of
Casing

Tentative
Rockhead
Level
(mPD)

Actual
Rockhead
Level
(mPD)

Casing
Bottom
Level

Design Rock
Socket
Length (m)

design
socket
length

2-Apr-11
2-Apr-11
2-Apr-11
2-Apr-11
23-Mar-11
23-Mar-11
23-Mar-11
23-Mar-11
23-Mar-11
21-Apr-11
21-Apr-11
21-Apr-11
21-Apr-11
2-Apr-11
2-Apr-11
2-Apr-11
4-Jun-11
21-Apr-11
23-Mar-11
23-Mar-11
23-Mar-11
27-May-11
23-Mar-11
19-Mar-11
19-Mar-11
9-Apr-11

4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90

6.20
6.16
6.29
6.37
6.35
6.29
6.24
6.22
6.21
5.86
6.04
5.96
6.12
6.20
6.13
6.11
6.41
6.06
6.25
6.39
6.12
6.69
6.10
6.02
5.90
5.96

12.16
12.20
12.04
9.40
12.05
11.93
11.92
11.98
12.05
11.21
11.01
10.47
10.51
8.22
8.12
8.13
9.04
7.03
9.04
8.98
8.85
9.02
8.76
9.54
9.50
10.44

-5.0
-5.0
-5.0
-5.0
-6.0
-6.0
-6.0
-6.0
-6.0
-5.0
-4.5
-4.2
-4.0
-4.8
-4.6
-4.4
-4.2
-4.0
-5.0
-4.8
-4.4
-4.0
-4.0
-3.0
-3.0
-3.5

-5.3
-5.4
-5.1
-2.4
-5.0
-5.0
-5.0
-5.1
-5.2
-5.1
-4.7
-4.2
-4.1
-1.5
-1.4
-1.5
-2.1
-0.5
-2.2
-2.0
-2.2
-1.8
-2.1
-3.2
-3.3
-3.9

-5.60
-5.67
-5.39
-2.75
-5.34
-5.28
-5.32
-5.40
-5.48
-5.35
-4.97
-4.51
-4.39
-1.77
-1.75
-1.78
-2.36
-0.76
-2.52
-2.32
-2.46
-2.06
-2.40
-3.52
-3.60
-4.17

6000
6000
6000
6000
6000
6000
6000
6000
6000
4000
4000
4000
4000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
4000
4000
4000

6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
4.0
4.0
4.0
4.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
4.0
4.0
4.0

Pile Mark

46RP4
46ARP1
46ARP2
46ARP3
46ARP4
46ARP5
46ARP6
46ARP7
46ARP8
46ARP9
46ARP10
47P1
47P2
51P1*
51P2*
51P3
51ARP1
51ARP2
51ARP3
51ARP4
51ARP5
51ARP6
51BRP1
51BRP2
51BRP3
51BRP4

Existing
Date of Drilling Date of Drilling Date of Re-bar
Ground
to RHL
to FL
installation
Level (mPD)

5.50
6.00
6.00
6.00
6.00
6.00
6.00
5.90
5.90
5.80
5.80
5.64
5.64
12.10
12.10
12.10
12.10
12.10
12.10
12.00
11.90
11.90
11.90
11.80
11.90
11.90

10-Mar-11
7-Apr-11
22-Mar-11
22-Mar-11
23-Mar-11
23-Mar-11
15-Mar-11
12-Mar-11
12-Mar-11
12-Mar-11
12-Mar-11
8-Mar-11
8-Mar-11
11-Mar-11
11-Mar-11
11-Mar-11
12-Mar-11
12-Mar-11
12-Mar-11
15-Mar-11
15-Mar-11
15-Mar-11
16-Apr-11
15-Apr-11
15-Apr-11
15-Apr-11

18-Mar-11
8-Apr-11
8-Apr-11
8-Apr-11
8-Apr-11
8-Apr-11
30-Mar-11
18-Mar-11
17-Mar-11
16-Mar-11
16-Mar-11
15-Mar-11
15-Mar-11
27-Apr-11
27-Apr-11
27-Apr-11
27-Apr-11
27-Apr-11
27-Apr-11
27-Apr-11
27-Apr-11
27-Apr-11
27-Apr-11
27-Apr-11
9-May-11
27-Apr-11

19-Mar-11
9-Apr-11
9-Apr-11
9-Apr-11
9-Apr-11
9-Apr-11
30-Mar-11
19-Mar-11
19-Mar-11
19-Mar-11
19-Mar-11
26-Mar-11
26-Mar-11
29-Apr-11
29-Apr-11
29-Apr-11
29-Apr-11
29-Apr-11
29-Apr-11
29-Apr-11
29-Apr-11
29-Apr-11
29-Apr-11
29-Apr-11
9-May-11
29-Apr-11

Date of
Grouting

Pile Cutoff level


(mPD)

Casing
Head
Level
(mPD)

Length of
Casing

Tentative
Rockhead
Level
(mPD)

Actual
Rockhead
Level
(mPD)

Casing
Bottom
Level

Design Rock
Socket
Length (m)

design
socket
length

19-Mar-11
9-Apr-11
9-Apr-11
9-Apr-11
9-Apr-11
9-Apr-11
30-Mar-11
19-Mar-11
19-Mar-11
19-Mar-11
19-Mar-11
26-Mar-11
26-Mar-11
30-Apr-11
30-Apr-11
30-Apr-11
30-Apr-11
30-Apr-11
30-Apr-11
30-Apr-11
30-Apr-11
30-Apr-11
30-Apr-11
30-Apr-11
9-May-11
30-Apr-11

4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90

5.97
6.18
6.26
6.16
6.20
6.15
6.20
6.00
6.00
5.92
5.93
6.07
6.26
12.46
12.21
12.12
12.33
12.20
12.23
12.11
12.04
12.00
12.02
11.90
12.23
11.94

10.40
7.08
9.02
9.04
9.03
10.02
8.91
8.87
8.94
8.86
8.95
9.53
9.61
4.70
4.68
8.71
4.60
4.65
4.65
4.65
4.59
5.80
5.89
7.59
6.23
6.10

-3.0
-3.5
-3.5
-3.5
-3.5
-3.5
-3.0
-3.0
-3.0
-3.0
-3.0
-3.0
-3.0
11.5
11.5
11.5
11.5
11.5
11.3
11.5
11.5
11.3
11.5
10.5
11.5
10.8

-3.8
-0.4
-2.2
-2.3
-2.3
-3.3
-2.1
-2.3
-2.4
-2.4
-2.5
-3.2
-3.1
8.1
7.8
3.7
8.2
8.0
8.0
7.9
7.9
6.7
6.6
4.8
6.5
6.3

-4.12
-0.69
-2.49
-2.61
-2.56
-3.57
-2.44
-2.60
-2.67
-2.67
-2.75
-3.46
-3.35
7.76
7.53
3.41
7.87
7.69
7.72
7.60
7.59
6.37
6.31
4.54
6.19
6.02

4000
6000
6000
6000
6000
6000
6000
6000
6000
6000
6000
4000
4000
4000
4000
4000
18400
18400
18200
14000
14000
14000
9500
9500
9500
9500

4.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
4.0
4.0
4.0
4.0
4.0
18.4
18.4
18.2
14.0
14.0
14.0
9.5
9.5
9.5
9.5

Pile Mark

51BRP5
51BRP6
52RP1
52RP2
52RP3
52RP4
52RP5
52RP6
52RP7
52RP8
52ARP1
52ARP2
52ARP3
52ARP4
52ARP5
52ARP6
52ARP7
52ARP8
53P1
53P2
53P3
53P4
53P5
53ARP1
53ARP2

Existing
Date of Drilling Date of Drilling Date of Re-bar
Ground
to RHL
to FL
installation
Level (mPD)

11.90
11.90
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.60
12.00
12.00
12.20
12.50
12.50
12.50
12.50
12.50
14.00
14.00
14.00
14.00
14.00
14.00
14.00

14-Mar-11
14-Mar-11
########
########
24-Mar-11
24-Mar-11
########
########
9-May-11
7-May-11
16-Apr-11
16-Apr-11
26-Mar-11
########
########
########
########
########
28-Apr-11
3-May-11
27-Apr-11
30-Apr-11
30-Apr-11
########
########

27-Apr-11
27-Apr-11
20-May-11
18-May-11
9-May-11
27-Apr-11
19-May-11
20-May-11
17-May-11
21-May-11
27-Apr-11
27-Apr-11
27-Apr-11
17-May-11
25-May-11
25-May-11
24-May-11
23-May-11
9-May-11
9-May-11
9-May-11
9-May-11
9-May-11
26-May-11
28-May-11

29-Apr-11
29-Apr-11
26-May-11
26-May-11
9-May-11
29-Apr-11
26-May-11
26-May-11
26-May-11
26-May-11
29-Apr-11
29-Apr-11
29-Apr-11
26-May-11
26-May-11
26-May-11
26-May-11
26-May-11
9-May-11
9-May-11
9-May-11
9-May-11
9-May-11
13-Jun-11
13-Jun-11

Date of
Grouting

Pile Cutoff level


(mPD)

Casing
Head
Level
(mPD)

Length of
Casing

Tentative
Rockhead
Level
(mPD)

Actual
Rockhead
Level
(mPD)

Casing
Bottom
Level

Design Rock
Socket
Length (m)

design
socket
length

30-Apr-11
30-Apr-11
27-May-11
27-May-11
9-May-11
30-Apr-11
27-May-11
27-May-11
27-May-11
27-May-11
30-Apr-11
30-Apr-11
30-Apr-11
27-May-11
27-May-11
27-May-11
27-May-11
27-May-11
9-May-11
9-May-11
9-May-11
9-May-11
9-May-11
13-Jun-11
13-Jun-11

11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90

12.18
11.93
12.54
12.54
12.76
12.50
12.52
12.55
12.58
12.85
12.18
12.21
12.45
12.87
12.69
12.64
12.63
12.68
14.15
14.30
14.27
14.47
14.09
14.25
14.22

4.59
6.24
6.55
6.20
8.23
7.58
6.65
6.53
7.54
7.56
6.21
5.84
6.20
6.57
9.09
8.30
8.31
9.02
8.09
8.09
8.05
8.12
8.11
9.55
9.92

11.5
11.2
10.5
10.5
9.5
9.5
10.5
10.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
8.2
8.0
8.7
8.5
8.0
8.0
7.5

8.0
6.2
6.5
6.8
5.1
5.4
6.4
6.5
5.6
5.8
6.5
6.8
6.7
6.8
4.2
4.9
4.9
4.2
6.4
6.5
6.5
6.7
6.3
5.3
4.9

7.73
5.88
6.19
6.53
4.78
5.15
6.07
6.22
5.27
5.52
6.16
6.55
6.44
6.50
3.87
4.59
4.57
3.93
6.06
6.21
6.22
6.35
5.98
4.99
4.60

9500
9500
7000
7000
7000
7000
7000
7000
7000
7000
12600
12600
12600
12600
11000
11000
11000
11000
4000
4000
4000
4000
4000
12000
12000

9.5
9.5
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
12.6
12.6
12.6
12.6
11.0
11.0
11.0
11.0
4.0
4.0
4.0
4.0
4.0
12.0
12.0

Pile Mark

Existing
Date of Drilling Date of Drilling Date of Re-bar
Ground
to RHL
to FL
installation
Level (mPD)

53ARP3
53ARP4
53ARP5
53ARP6
53ARP7
53ARP8
53BRP1
53BRP2
53BRP3
53BRP4
55RP1
55RP2
55ARP1
55ARP2
56RP1
56RP2
56ARP1
56ARP2
57RP1
57RP2
57ARP1
57ARP2
W5P1
W5P2

14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
10.00
10.00
10.00
10.00
10.00
9.80
10.00
10.00
10.00
10.00
10.00
10.00
7.00
7.00

65RP1

25

########
########
########
########
########
########
5-May-11
########
4-May-11
########
13-Jun-11
25-Jun-11
15-Jun-11
25-Jun-11
2-Jun-11
########
1-Jun-11
########
########
########
########
########
18-Mar-11
18-Mar-11
9-Jun-11

28-May-11
28-May-11
17-May-11
17-May-11
17-May-11
17-May-11
17-May-11
31-May-11
9-May-11
31-May-11
23-Jun-11
27-Jun-11
23-Jun-11
27-Jun-11
2-Jun-11
23-May-11
1-Jun-11
24-May-11
30-May-11
24-May-11
24-May-11
31-May-11
19-Apr-11
19-Apr-11
13-Jun-11

13-Jun-11
13-Jun-11
17-May-11
17-May-11
17-May-11
17-May-11
17-May-11
13-Jun-11
9-May-11
13-Jun-11
24-Jun-11
27-Jun-11
24-Jun-11
27-Jun-11
3-Jun-11
28-May-11
3-Jun-11
28-May-11
3-Jun-11
28-May-11
28-May-11
3-Jun-11
21-Apr-11
21-Apr-11
15-Jun-11

Date of
Grouting

13-Jun-11
13-Jun-11
17-May-11
17-May-11
17-May-11
17-May-11
17-May-11
13-Jun-11
9-May-11
13-Jun-11
24-Jun-11
27-Jun-11
24-Jun-11
27-Jun-11
4-Jun-11
28-May-11
4-Jun-11
28-May-11
4-Jun-11
28-May-11
28-May-11
4-Jun-11
21-Apr-11
21-Apr-11
15-Jun-11

Pile Cutoff level


(mPD)

11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
11.90
8.75
8.75
8.75
8.75
8.75
8.75
8.75
8.75
8.75
8.75
8.75
8.75
9.05
9.05

25

Casing
Head
Level
(mPD)

Length of
Casing

14.11
14.13
14.31
14.29
14.17
14.07
14.05
14.18
14.39
14.37
10.08
10.32
10.47
10.70
10.26
9.95
10.36
10.09
10.33
10.45
10.45
10.60
9.18
9.28
25.15

9.93
9.75
9.11
9.08
9.13
9.09
9.80
8.72
9.12
8.05
13.43
14.82
17.03
15.60
17.12
16.12
17.20
18.30
15.70
16.10
18.40
17.40
14.63
14.45
4.50

Tentative
Rockhead
Level
(mPD)

Actual
Rockhead
Level
(mPD)

Casing
Bottom
Level

Design Rock
Socket
Length (m)

design
socket
length

7.0
6.7
8.6
8.5
7.8
7.5
9.5
8.5
9.5
8.5
-3.5
-3.5
-5.5
-3.5
-4.0
-2.0
-4.0
-3.5
-2.5
-2.5
-4.5
-2.0
-5.0
-4.5

4.8
5.0
5.8
5.8
5.6
5.6
4.8
6.0
5.8
6.9
-2.6
-3.8
-5.7
-4.1
-6.0
-5.4
-6.0
-7.4
-4.6
-4.9
-7.1
-6.0
-5.2
-4.9
21.1

4.48
4.67
5.47
5.48
5.31
5.25
4.54
5.72
5.54
6.56
-2.95
-4.06
-6.05
-4.43
-6.35
-5.69
-6.32
-7.66
-4.90
-5.17
-7.40
-6.28
-5.45
-5.17
20.79

12000
12000
12000
12000
12000
12000
6000
6000
6000
6000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000

12.0
12.0
12.0
12.0
12.0
12.0
6.0
6.0
6.0
6.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0

22

Pile Mark

65RP2
65RP3
65RP4
65RP5
65RP6
*65RP7
65RP8
65RP8a
66RP1
66RP2
66RP3
66RP4
66RP5
66RP6
66RP7
66RP8
67RP1
67RP2
67ARP1
67ARP2
67ARP3
67ARP4
*2ARP3
*2ARP4

Existing
Date of Drilling Date of Drilling Date of Re-bar
Ground
to RHL
to FL
installation
Level (mPD)

25
25
25
25
25
25
25
25
19.3
19.3
19.3
19.3
19.3
19.3
19.3
19.3
17.3
17.3
17.3
17.3
17.3
17.3
20
20

10-Jun-11
9-Jun-11
10-Jun-11
9-Jun-11
10-Jun-11
9-Jun-11
10-Jun-11
2-Jul-11
########
########
########
########
########
########
########
########
########
########
########
########
########
########
########
########

11-Jun-11
13-Jun-11
11-Jun-11
13-Jun-11
11-Jun-11
13-Jun-11
11-Jun-11
2-Jul-11
19-May-11
19-May-11
21-May-11
21-May-11
23-May-11
21-May-11
23-May-11
23-May-11
17-May-11
18-May-11
17-May-11
17-May-11
14-May-11
14-May-11

15-Jun-11
15-Jun-11
15-Jun-11
15-Jun-11
15-Jun-11
15-Jun-11
15-Jun-11
2-Jul-11
7-Jun-11
7-Jun-11
7-Jun-11
7-Jun-11
7-Jun-11
7-Jun-11
7-Jun-11
7-Jun-11
7-Jun-11
7-Jun-11
7-Jun-11
7-Jun-11
7-Jun-11
7-Jun-11

Date of
Grouting

15-Jun-11
15-Jun-11
15-Jun-11
15-Jun-11
15-Jun-11
15-Jun-11
15-Jun-11
2-Jul-11
8-Jun-11
8-Jun-11
8-Jun-11
8-Jun-11
8-Jun-11
8-Jun-11
8-Jun-11
8-Jun-11
8-Jun-11
8-Jun-11
8-Jun-11
8-Jun-11
8-Jun-11
8-Jun-11

Pile Cutoff level


(mPD)

25
25
25
25
25
25
25
25
19.3
19.3
19.3
19.3
19.3
19.3
19.3
19.3
17.3
17.3
17.3
17.3
17.3
17.3
19.9
19.9

Casing
Head
Level
(mPD)

Length of
Casing

25.12
25.24
25.25
25.21
25.11
25.32
25.28
25.28
19.58
19.58
19.57
19.59
19.54
19.52
19.55
19.60
17.57
17.58
17.57
17.51
17.61
17.53
20.30

5.50
4.50
5.50
4.50
5.50
4.50
3.08
4.50
2.40
2.61
4.40
4.49
4.81
4.78
4.52
4.70
5.12
5.10
4.90
5.03
4.40
4.77
12.00

20.25

10.00

3183.87

Tentative
Rockhead
Level
(mPD)

Actual
Rockhead
Level
(mPD)

21.1
21.5
21.1
24.8
24.8
22.8
22.5
23.5
18.5
17.4
18
17.7
18
17.7
18.5
17.5
13.8
14.2
15.5
14.8
16
15.2

20.1
21.2
20.2
21.1
20.1
21.3
22.6
21.2
17.6
17.3
15.6
15.5
15.2
15.2
15.5
15.3
12.9
12.9
13.1
12.9
13.6
13.2

Casing
Bottom
Level

Design Rock
Socket
Length (m)

design
socket
length

19.79
20.88
19.92
20.85
19.78
20.96
22.29
20.92
17.25
17.05
15.30
15.23
14.87
14.88
15.17
15.04
12.60
12.63
12.82
12.63
13.34
12.90
20.30

4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000

4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0

20.25

Pile Mark

Existing
Date of Drilling Date of Drilling Date of Re-bar
Ground
to RHL
to FL
installation
Level (mPD)

PP45
########
PP44
########
PP43
########
PP42
########
PP37
########
PP38
########
PP39
########
PP40
########
PP41
########
*PP37- 41 using 1.5m connection

7.8m
10m
10m
10
10
10
10
10
10

Date of
Grouting

6/13/2011
6/13/2011
6/13/2011
6/13/2011
6/22/2011
6/22/2011
6/22/2011
6/22/2011
6/22/2011

Pile Cutoff level


(mPD)

Casing
Head
Level
(mPD)

Length of
Casing

PP59
PP60
PP61
PP62
PP63
PP64
PP65
PP66
PP67
PP68

Tentative
Rockhead
Level
(mPD)

7.3m
7.3m
7.3m
7.3m
7.3m
7.3m
7.3m
7.3m
7.3m
7.3m
0

Actual
Rockhead
Level
(mPD)

Casing
Bottom
Level

Design Rock
Socket
Length (m)

design
socket
length

Calculated total Pile


Length (m)

Reduce Level

Required
Founding
Level (mPD)

Actual
Founding
Level (mPD)

Raking
Factor
(cos14.
036)

Actual total
length of pile
(m)

16.05
13.17
13.15
13.25
23.59
22.89
22.87
27.73
25.98
25.78
18.97
20.72
19.81
20.23
19.05
19.50
19.94
22.27
19.74
24.34
18.33
21.26
18.37
21.30
20.33
21.32

16.35
15.99
15.97
16.58
22.47
22.84
23.71
24.60
24.34
24.47
18.26
20.65
18.31
20.23
16.18
19.44
19.89
22.41
19.19
22.37
18.76
21.56
18.27
21.32
21.90
22.53

5.15
4.45
4.45
3.85
-1.35
-1.85
-2.65
-3.45
-3.45
-3.45
2.65
0.15
2.65
0.65
4.65
1.65
1.15
-1.35
1.85
-1.15
2.15
-0.65
2.65
-0.35
-0.85
-1.45

4.82
4.26
4.15
3.80
-2.64
-1.94
-2.68
-6.71
-7.01
-5.95
1.71
-0.16
0.86
0.50
1.87
1.39
0.94
-1.37
1.04
-3.38
1.96
-0.68
2.44
-0.53
-0.92
-1.49

16.68
16.18
16.27
16.63
23.8
22.93
23.74
27.96
28.01
27.05
19.23
20.96
20.14
20.38
19.04
19.71
20.1
22.43
19.9
24.41
18.96
21.59
18.5
21.58
21.97
22.57

1
1
1
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.976
0.976
0.976
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97

4.68
7.06
7.17
7.43
11.60
11.43
12.26
16.16
16.72
15.65
7.01
6.95
7.04
6.86
6.74
6.96
6.40
6.40
6.40
6.31
6.87
6.57
6.37
6.52
9.94
9.55

0.68
3.06
3.17
3.43
0.25
0.09
0.89
0.28
2.02
1.28
0.30
0.28
0.37
0.20
0.04
0.25
0.21
0.21
0.21
0.12
0.66
0.37
0.18
0.32
1.64
1.26

0.33
0.19
0.30
0.05
1.29
0.09
0.03
3.26
3.56
2.50
0.94
0.31
1.79
0.15
2.78
0.26
0.21
0.02
0.81
2.23
0.19
0.03
0.22
0.18
0.07
0.04

Calculated total Pile


Length (m)

Reduce Level

Required
Founding
Level (mPD)

Actual
Founding
Level (mPD)

Raking
Factor
(cos14.
036)

Actual total
length of pile
(m)

22.82
24.30
26.20
26.05
25.18
25.25
22.23
23.01
24.50
23.14
26.70
24.33
24.29
27.20
29.31
26.12
24.78
29.43
28.75
7.13
7.10
8.25
8.16
7.15
9.08
8.81

23.80
24.18
24.55
24.70
24.57
24.59
20.25
22.61
24.01
22.39
24.46
24.59
25.03
25.47
25.31
24.74
24.82
25.57
26.53
7.11
7.15
7.38
7.35
7.43
8.65
10.52

-2.75
-3.15
-3.45
-3.45
-3.45
-3.45
0.15
-1.65
-3.05
-1.35
-3.35
-3.35
-3.65
-4.15
-4.15
-3.45
-3.45
-4.25
-5.25
-1.55
-1.55
-1.75
-1.75
-1.85
-1.85
-4.85

-2.92
-3.47
-5.18
-4.87
-4.24
-4.24
-2.00
-2.23
-3.68
-2.24
-5.74
-3.48
-3.84
-5.99
-8.22
-5.00
-3.75
-8.23
-7.52
-1.75
-1.70
-2.77
-2.70
-2.05
-4.66
-5.25

0.97

23.98
24.51
26.33
26.16
25.38
25.4
22.4
23.21
24.65
23.3
26.91
24.72
25.23
27.37
29.5
26.34
25.13
29.67
28.87
7.31
7.3
8.4
8.3
7.63
11.46
10.93

0.97
0.97
0.97
0.97
0.97
1
0.976
0.976
0.976
0.976
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
1
1
1
1
1
1
0.97

9.46
8.51
14.25
14.03
12.88
12.00
4.22
6.91
6.86
6.87
6.92
8.69
9.24
8.47
8.49
11.04
9.63
10.08
8.68
4.23
4.25
4.20
4.19
4.53
6.43
7.84

1.18
0.25
0.17
0.16
0.24
0.19
0.22
0.24
0.20
0.21
0.25
0.43
0.96
0.22
0.24
0.26
0.39
0.28
0.17
0.23
0.25
0.20
0.19
0.53
2.43
2.10

0.17
0.32
1.73
1.42
0.79
0.79
2.15
0.58
0.63
0.89
2.39
0.13
0.19
1.84
4.07
1.55
0.30
3.98
2.27
0.20
0.15
1.02
0.95
0.20
2.81
0.40

drillingrig:601

601

Calculated total Pile


Length (m)

Reduce Level

Required
Founding
Level (mPD)

Actual
Founding
Level (mPD)

Raking
Factor
(cos14.
036)

Actual total
length of pile
(m)

8.83
10.80
11.35
11.23
10.90
13.10
13.02
10.03
10.78
13.28
16.20
13.08
13.10
13.05
11.55
16.56
15.87
15.75
17.79
18.78
17.35
7.22
7.19
7.28
7.20
7.21

11.54
13.01
13.43
13.79
14.85
11.99
11.77
11.69
12.26
12.26
12.36
13.00
12.96
12.85
12.95
17.10
17.03
17.03
16.78
16.70
16.89
11.08
11.91
11.16
12.32
11.22

-5.85
-7.05
-7.35
-7.85
-8.85
-5.35
-5.35
-5.35
-5.35
-5.35
-5.35
-6.35
-6.35
-6.35
-6.35
-9.85
-9.85
-9.85
-9.85
-9.85
-9.85
-5.35
-5.95
-5.35
-6.35
-5.35

-5.98
-7.14
-7.53
-7.92
-8.94
-6.54
-6.75
-5.45
-5.64
-6.56
-9.29
-6.63
-6.62
-6.80
-6.54
-10.02
-10.03
-10.05
-11.00
-12.09
-10.52
-5.45
-6.05
-5.42
-6.55
-5.56

0.97

11.67
13.1
13.62
13.87
14.94
13.18
13.17
11.79
12.55
13.5
16.42
13.28
13.23
13.3
13.14
17.28
17.22
17.24
17.97
19.01
17.58
11.19
12.01
11.24
12.53
11.43

0.97
0.97
0.97
0.97
1
1
1
1
0.97
0.97
1
1
1
1
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97

8.56
10.08
10.05
10.42
11.82
4.13
4.20
5.81
5.82
4.39
4.39
4.25
4.18
4.30
5.64
7.47
8.10
8.24
6.93
6.98
6.98
8.14
8.99
8.13
9.50
8.39

2.80
2.28
2.25
2.61
3.97
0.13
0.20
1.81
1.82
0.26
0.26
0.25
0.18
0.30
1.64
0.75
1.36
1.49
0.22
0.27
0.27
3.90
4.72
3.89
5.22
4.14

0.13
0.09
0.18
0.07
0.09
1.19
1.40
0.10
0.29
1.21
3.94
0.28
0.27
0.45
0.19
0.17
0.18
0.20
1.15
2.24
0.67
0.10
0.10
0.07
0.20
0.21

Calculated total Pile


Length (m)

Reduce Level

Required
Founding
Level (mPD)

Actual
Founding
Level (mPD)

Raking
Factor
(cos14.
036)

Actual total
length of pile
(m)

7.19
10.13
10.15
15.48
15.42
15.40
17.35
17.52
17.45
19.30
19.33
18.80
18.80
17.40
17.39
8.80
13.99
13.15
13.13
13.27
13.16
13.33
13.40
13.20
13.29
15.67

12.29
13.25
13.90
17.99
17.90
17.88
17.85
18.23
18.20
19.85
19.30
18.90
18.35
18.40
18.38
13.29
13.68
14.25
14.35
14.29
14.49
14.69
14.63
15.15
15.28
15.58

-6.35
-6.85
-7.15
-10.85
-10.85
-10.85
-10.85
-10.85
-10.85
-12.85
-12.35
-11.85
-11.35
-11.35
-11.35
-6.35
-6.85
-7.55
-7.55
-7.55
-7.55
-7.55
-7.55
-8.35
-8.35
-8.15

-6.58
-6.97
-7.22
-11.12
-11.02
-11.20
-11.22
-11.01
-10.95
-12.99
-12.44
-11.96
-12.02
-11.65
-11.41
-6.40
-7.38
-7.96
-8.00
-7.83
-7.83
-7.57
-7.76
-8.47
-8.59
-8.55

0.97

12.53
13.37
13.97
18.27
18.07
18.24
18.23
18.39
18.3
19.99
19.39
19.01
19.04
18.71
18.44
13.34
14.23
14.66
14.8
14.57
14.77
14.71
14.85
15.28
15.53
15.99

1
1
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
1
1
1
1
0.97
0.97
0.97
0.97
0.97

9.51
7.29
7.87
11.09
10.95
11.14
9.18
9.17
9.15
8.99
8.36
8.51
8.54
9.61
9.35
8.71
4.41
5.56
5.72
5.35
5.66
5.55
5.62
6.25
6.41
4.49

5.22
3.29
3.87
2.76
2.62
2.81
0.90
0.89
0.88
0.72
0.11
0.25
0.28
1.32
1.07
4.45
0.28
1.56
1.72
1.35
1.66
1.38
1.45
2.06
2.22
0.36

drilling rig 601


0.23
0.12
0.07
0.27
0.17
0.35
0.37
0.16
0.10
0.14
0.09
0.11
0.67
0.30
0.06
0.05
0.53
0.41
0.45
0.28
0.28
0.02
0.21
0.12
0.24
0.40 601 and 1.5m connection

Calculated total Pile


Length (m)

Reduce Level

Required
Founding
Level (mPD)

Actual
Founding
Level (mPD)

Raking
Factor
(cos14.
036)

Actual total
length of pile
(m)

19.04
17.25
17.17
16.36
16.39
14.77
14.68
17.67
17.68
17.22
17.38
16.20
17.12
16.22
17.22
18.25
20.25
18.73
18.76
17.25
17.26
17.23
17.25
13.19
11.19
11.20

19.92
16.45
16.94
15.64
16.92
15.90
15.89
19.62
20.26
19.59
18.23
17.19
18.71
16.69
17.96
18.36
18.53
19.08
19.10
16.85
16.86
16.92
17.02
16.01
15.02
15.12

-12.35
-9.35
-9.85
-8.35
-9.35
-8.35
-8.35
-11.35
-12.35
-12.35
-10.85
-9.85
-11.35
-9.35
-10.85
-11.35
-11.35
-11.85
-11.85
-9.85
-9.85
-9.85
-9.85
-8.85
-8.35
-8.35

-12.42
-10.27
-10.30
-9.08
-9.86
-8.48
-8.50
-11.53
-12.46
-12.47
-11.11
-9.99
-11.45
-9.53
-11.01
-11.51
-13.12
-11.91
-11.87
-10.86
-10.88
-10.31
-10.18
-9.19
-8.62
-8.57

0.97

19.99
17.37
17.39
16.39
17.44
16.03
16.04
19.8
20.37
19.71
18.49
17.33
18.81
16.88
18.12
18.53
20.35
19.15
19.12
17.89
17.92
17.39
17.36
16.36
15.3
15.35

1
1
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97

5.12
4.17
4.27
4.20
5.22
5.43
5.53
6.30
6.86
6.66
5.28
5.30
5.86
4.83
5.07
5.48
5.30
5.62
5.56
5.84
5.86
5.36
5.31
7.34
8.28
8.32

0.97
0.17
0.27
0.07
1.06
1.27
1.36
2.11
2.65
2.46
1.12
1.14
1.68
0.69
0.92
0.32
0.14
0.45
0.39
0.66
0.68
0.20
0.15
3.12
4.03
4.07

0.07
0.92
0.45
0.73
0.51
0.13
0.15
0.18
0.11
0.12
0.26
0.14
0.10
0.18
0.16
0.16
1.77
0.06
0.02
1.01
1.03
0.46
0.33
0.34
0.27
0.22

601

Calculated total Pile


Length (m)

Reduce Level

Required
Founding
Level (mPD)

Actual
Founding
Level (mPD)

Raking
Factor
(cos14.
036)

Actual total
length of pile
(m)

11.58
11.57
11.67
13.27
11.21
13.26
11.30
10.16
10.10
10.12
11.10
10.07
10.08
10.10
11.07
14.10
15.07
11.61
16.09
14.31
16.70
16.08
15.37
15.08
16.10
15.57

15.65
15.30
16.45
16.24
15.48
16.48
15.63
9.44
10.39
10.27
10.98
9.60
10.36
10.29
11.20
14.26
15.21
16.06
17.07
14.62
17.53
14.12
15.13
16.04
17.04
16.64

-8.85
-8.85
-9.35
-9.15
-8.65
-9.35
-8.55
-2.35
-3.35
-3.35
-4.35
-2.35
-3.35
-3.35
-4.35
-7.35
-8.35
-9.35
-10.35
-7.35
-10.35
-7.35
-8.35
-9.35
-10.35
-9.85

-9.01
-9.00
-9.55
-9.41
-8.90
-9.61
-8.63
-3.76
-3.62
-3.67
-4.51
-3.02
-3.52
-3.45
-4.83
-7.55
-8.69
-9.55
-10.51
-7.48
-10.64
-9.45
-8.91
-9.61
-10.52
-10.26

15.81
15.45
16.66
16.5
15.74
16.75
15.71
10.85
10.66
10.59
11.14
10.27
10.53
10.39
11.68
14.46
15.55
16.26
17.23
14.75
17.82
16.22
15.69
16.3
17.21
17.05

1
0.97
0.97
0.97
0.97
0.97
1
1
1
1
1
1
1
1
1
1
1
1
0.97
0.97
1
1
1
1
1

8.28
7.93
9.16
7.40
8.70
7.66
8.58
4.74
4.61
4.52
4.09
4.25
4.50
4.34
4.66
4.41
4.53
8.70
5.19
4.61
5.29
4.19
4.37
5.27
5.16
6.03

4.28
3.93
4.89
3.18
4.44
3.43
4.32
0.74
0.61
0.52
0.09
0.25
0.50
0.34
0.66
0.41
0.53
4.70
1.19
0.47
1.13
0.19
0.37
1.27
1.16
1.53

0.16
0.15
0.20
0.25
0.25
0.26
0.08
1.41
0.27
0.32
0.16
0.67
0.17
0.10
0.48
0.20
0.34
0.20
0.16
0.13
0.29
2.10
0.56
0.26
0.17
0.41

Calculated total Pile


Length (m)

Reduce Level

Required
Founding
Level (mPD)

Actual
Founding
Level (mPD)

Raking
Factor
(cos14.
036)

Actual total
length of pile
(m)

15.77
16.30
11.57
10.54
10.56
11.77
13.16
13.14
13.15
15.17
16.22
15.67
16.21
16.06
15.57
16.17
15.55
11.37
11.54
11.36
11.40
13.10
13.17
13.07
13.08
13.19

16.23
16.17
15.04
14.93
15.12
15.02
14.84
14.90
14.77
15.20
16.35
16.07
15.71
16.16
16.17
16.04
16.12
15.47
15.39
15.35
15.29
14.85
14.84
14.86
14.83
14.89

-9.45
-9.45
-8.55
-8.55
-8.55
-8.35
-8.35
-8.35
-8.35
-8.35
-9.35
-9.15
-8.85
-9.35
-9.35
-9.35
-9.35
-8.85
-8.85
-8.85
-8.85
-8.35
-8.35
-8.35
-8.35
-7.85

-9.77
-9.70
-8.67
-8.72
-8.72
-8.49
-8.51
-8.52
-8.42
-8.63
-9.61
-9.69
-9.60
-9.53
-9.48
-9.68
-9.57
-9.00
-9.03
-9.05
-9.08
-8.50
-8.51
-8.51
-8.54
-8.03

16.55
16.42
15.16
15.10
15.29
15.16
15
15.07
14.84
15.48
16.62
16.63
16.48
16.34
16.3
16.37
16.34
15.62
15.57
15.55
15.52
15
15
15.02
15.02
15.07

1
1
1
1
1
1
1
1
0.97
0.97
0.97
0.97
1
1
1
1
1
1
1
1
1
1
1
1
0.97

5.43
5.27
7.64
8.61
8.78
7.44
5.89
5.98
5.74
4.48
4.57
5.13
4.44
4.33
4.78
4.25
4.84
8.30
8.08
8.24
8.17
5.95
5.88
6.00
5.99
6.05

0.83
0.17
3.64
4.61
4.78
3.44
1.89
1.98
1.74
0.35
0.43
0.98
0.31
0.33
0.78
0.25
0.84
4.30
4.08
4.24
4.17
1.95
1.88
2.00
1.99
1.87

0.32
0.25
0.12
0.17
0.17
0.14
0.16
0.17
0.07
0.28
0.26
0.54
0.75
0.18
0.13
0.33
0.22
0.15
0.18
0.20
0.23
0.15
0.16
0.16
0.19
0.18

Calculated total Pile


Length (m)

Reduce Level

Required
Founding
Level (mPD)

Actual
Founding
Level (mPD)

Raking
Factor
(cos14.
036)

Actual total
length of pile
(m)

13.65
13.20
13.17
16.20
15.17
7.10
7.40
8.00
9.25
12.27
12.27
12.34
12.32
13.07
14.05
14.31
15.64
17.30
17.31
16.75
17.30
16.10
17.09
16.57
16.55
18.34

14.80
14.85
14.72
15.64
14.58
7.64
8.36
8.73
9.68
12.49
13.57
11.80
13.27
13.37
13.52
12.31
15.54
15.38
17.40
15.64
16.67
16.72
16.79
16.25
16.21
19.11

-8.15
-7.85
-8.15
-8.85
-7.85
-1.85
-2.35
-2.85
-3.85
-5.35
-6.35
-4.35
-5.85
-7.35
-7.35
-6.35
-9.35
-8.35
-10.35
-8.35
-9.35
-10.35
-10.35
-10.35
-10.35
-12.35

-8.38
-8.01
-8.16
-9.68
-8.56
-1.97
-2.45
-3.01
-5.03
-5.54
-6.53
-5.01
-6.03
-7.47
-8.09
-8.89
-9.56
-10.49
-10.46
-9.56
-10.05
-10.53
-10.84
-11.20
-11.24
-12.55

0.97

15.04
15.01
14.73
16.49
15.31
7.76
8.46
8.89
10.86
12.69
13.75
12.48
13.45
13.49
14.26
14.93
15.75
17.59
17.52
16.89
17.39
16.9
17.28
17.1
17.1
19.32

0.97
0.97
0.97
0.97
1
1
1
1
0.97
0.97
0.97
0.97
1
1
0.97
0.97
0.97
0.97
0.97
0.97
1
1
1
1
0.97

5.56
5.98
5.73
4.46
4.31
4.71
5.11
4.94
5.66
6.66
7.72
6.38
7.37
4.47
4.26
4.79
5.31
5.49
5.41
5.34
5.29
4.85
4.24
4.58
4.60
7.22

1.39
1.80
1.56
0.33
0.18
0.71
1.11
0.94
1.66
0.46
1.49
0.19
1.15
0.47
0.26
0.65
0.15
0.33
0.25
0.18
0.13
0.85
0.24
0.58
0.60
1.00

0.23
0.16
0.01
0.83
0.71
0.12
0.10
0.16
1.18
0.19
0.18
0.66
0.18
0.12
0.74
2.54
0.21
2.14
0.11
1.21
0.70
0.18
0.49
0.85
0.89
0.20

Tension

Tension

Compression
Compression
Compression
Compression

Calculated total Pile


Length (m)

Reduce Level

Required
Founding
Level (mPD)

Actual
Founding
Level (mPD)

Raking
Factor
(cos14.
036)

Actual total
length of pile
(m)

18.40
18.44
18.28
15.64
18.29
18.17
18.16
18.22
18.29
15.26
15.06
14.52
14.56
13.42
13.32
13.33
14.24
12.23
14.24
14.18
14.05
14.22
13.96
13.59
13.55
14.61

18.61
18.05
18.19
18.27
19.28
19.22
19.16
19.14
19.13
15.21
14.89
14.51
14.47
16.86
16.58
16.35
16.45
15.89
17.11
17.05
16.36
16.54
15.93
13.37
13.25
14.24

-11.85
-11.35
-11.35
-11.35
-12.35
-12.35
-12.35
-12.35
-12.35
-9.35
-8.85
-8.55
-8.35
-10.15
-9.95
-9.75
-9.55
-9.35
-10.35
-10.15
-9.75
-9.35
-9.35
-7.35
-7.35
-7.85

-12.01
-11.79
-11.65
-11.44
-12.45
-12.40
-12.56
-12.56
-12.59
-10.22
-9.49
-8.95
-8.90
-10.31
-10.09
-9.88
-9.70
-9.51
-10.74
-10.46
-9.84
-9.50
-9.53
-7.84
-7.81
-8.28

0.97

18.77
18.51
18.49
18.36
19.38
19.27
19.38
19.36
19.38
16.08
15.53
14.91
15.02
17.02
16.72
16.48
16.61
16.05
17.52
17.37
16.45
16.69
16.11
13.86
13.71
14.68

0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
1
1
1
1
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
1
1
0.97

6.61
6.31
6.45
8.96
7.33
7.34
7.46
7.38
7.33
4.87
4.52
4.44
4.51
8.80
8.60
8.35
7.57
9.02
8.48
8.39
7.60
7.67
7.35
4.32
4.21
4.24

0.41
0.12
0.26
2.69
1.11
1.12
1.24
1.16
1.11
0.87
0.52
0.44
0.51
3.54
3.34
3.10
2.34
3.75
3.23
3.14
2.37
2.44
2.13
0.32
0.21
0.11

0.16
0.44
0.30
0.09
0.10
0.05
0.21
0.21
0.24
0.87
0.64
0.40
0.55
0.16
0.14
0.13
0.15
0.16
0.39
0.31
0.09
0.15
0.18
0.49
0.46
0.43

Compression
Compression
Compression
Compression
Tension
Tension
Tension
Tension
Tension
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression

Calculated total Pile


Length (m)

Reduce Level

Required
Founding
Level (mPD)

Actual
Founding
Level (mPD)

Raking
Factor
(cos14.
036)

Actual total
length of pile
(m)

14.57
13.32
15.26
15.28
15.27
16.26
15.15
15.11
15.18
15.10
15.19
13.58
13.66
8.75
8.73
12.76
23.62
23.67
23.46
19.13
19.07
20.28
15.73
17.43
16.07
15.94

13.73
16.53
16.61
16.51
16.55
16.49
16.03
15.82
15.82
15.74
15.75
13.42
13.61
6.81
6.56
6.47
20.19
20.05
20.08
16.97
16.90
16.86
13.27
15.21
12.97
14.22

-7.35
-9.85
-9.85
-9.85
-9.85
-9.85
-9.35
-9.35
-9.35
-9.35
-9.35
-7.35
-7.35
5.65
5.65
5.65
-7.25
-7.25
-7.25
-4.35
-4.35
-4.35
-0.85
-2.85
-0.35
-1.85

-9.12
-10.00
-10.01
-10.05
-10.01
-10.18
-9.43
-9.56
-9.60
-10.19
-10.08
-7.83
-7.62
2.87
0.86
-0.89
-10.62
-10.93
-10.69
-6.59
-6.54
-7.86
-3.37
-5.10
-3.55
-3.77

0.97

15.56
16.68
16.77
16.71
16.71
16.84
16.11
16.04
16.08
16.61
16.5
13.9
13.88
9.59
11.35
13.01
23.66
23.85
23.63
19.28
19.15
20.47
15.87
17.53
16.27
16.2

0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
1
1
1
1
1
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97

5.16
9.60
7.75
7.67
7.68
6.82
7.20
7.17
7.14
7.75
7.55
4.37
4.27
4.89
6.67
4.3
19.06
19.2
18.98
14.63
14.56
14.67
9.98
9.94
10.04
10.1

1.01
3.31
1.52
1.44
1.45
0.62
0.98
0.95
0.93
1.52
1.32
0.37
0.27
0.89
2.67
0.30
0.09
0.22
0.21
0.19
0.12
0.23
0.18
0.14
0.24
0.30

1.77
0.15
0.16
0.20
0.16
0.33
0.08
0.21
0.25
0.84
0.73
0.48
0.27
2.78
4.79
6.54
3.37
3.68
3.44
2.24
2.19
3.51
2.52
2.25
3.20
1.92

Compression
Tension
Tension
Tension
Tension
Tension
Compression
Compression
Compression
Compression
Compression
Compression
Compression

Calculated total Pile


Length (m)

Reduce Level

Required
Founding
Level (mPD)

Actual
Founding
Level (mPD)

Raking
Factor
(cos14.
036)

Actual total
length of pile
(m)

14.43
16.08
13.82
13.47
15.50
14.85
13.92
13.80
14.81
14.83
19.25
18.88
19.24
19.61
20.48
19.69
19.70
20.41
12.14
12.14
12.10
12.17
12.16
21.97
22.34

12.40
13.69
12.26
12.26
13.52
13.25
11.21
11.24
12.30
12.58
18.07
18.62
18.87
19.81
16.54
16.48
16.47
16.53
11.00
11.15
11.12
11.32
10.94
22.27
22.24

0.15
-1.35
0.65
0.65
-0.35
-0.35
1.65
1.65
0.65
0.65
-5.35
-5.85
-5.85
-6.35
-3.35
-3.35
-3.35
-3.35
3.15
3.15
3.15
3.15
3.15
-7.35
-7.35

-2.05
-3.83
-1.10
-0.63
-2.49
-2.17
-2.13
-1.07
-2.05
-1.85
-6.77
-6.48
-6.52
-6.52
-7.32
-6.52
-6.61
-7.30
1.95
1.93
2.04
2.21
1.83
-7.62
-7.58

0.97

14.67
16.25
14.06
13.58
15.72
15.12
15.1
14.04
15.08
15.15
19.54
19.27
19.56
19.99
20.63
19.75
19.83
20.6
12.2
12.37
12.23
12.26
12.26
22.55
22.47

0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
1
1
1
1
1
0.97
0.97

10.08
10.01
7.51
7.38
7.49
7.54
8.45
7.51
7.54
7.59
13.33
13.43
13.36
13.42
11.54
11.45
11.52
11.58
4.11
4.28
4.18
4.14
4.15
13
12.55

0.28
0.21
0.28
0.16
0.27
0.31
1.20
0.28
0.31
0.36
0.33
0.43
0.36
0.42
0.19
0.11
0.17
0.23
0.11
0.28
0.18
0.14
0.15
0.61
0.17

2.20
2.48
1.75
1.28
2.14
1.82
3.78
2.72
2.70
2.50
1.42
0.63
0.67
0.17
3.97
3.17
3.26
3.95
1.20
1.22
1.11
0.94
1.32
0.27
0.23

601
601
601
601
601
601
601

Calculated total Pile


Length (m)

Reduce Level

22.35
22.17
21.53
21.50
21.55
21.51
16.04
14.96
15.36
14.29
17.60
18.99
21.20
19.77
21.29
20.29
21.37
22.47
19.87
20.27
22.57
21.57
18.68
18.50
8.67

22.12
22.14
19.75
19.73
19.61
19.51
14.33
13.95
13.65
13.63
18.48
18.73
20.43
19.64
20.22
17.84
21.35
21.07
19.26
19.38
22.47
21.60
18.53
18.13
11.19

Required
Founding
Level (mPD)

Actual
Founding
Level (mPD)

Raking
Factor
(cos14.
036)

Actual total
length of pile
(m)

-7.35
-7.35
-4.85
-4.85
-4.85
-4.85
0.15
0.65
1.15
1.15
-7.85
-7.85
-9.35
-8.35
-9.35
-7.35
-10.35
-10.35
-8.35
-8.35
-11.35
-10.35
-9.35
-8.85

-7.62
-7.60
-6.74
-6.73
-6.92
-6.97
-2.22
-0.44
-0.64
0.36
-8.09
-8.32
-10.35
-8.57
-10.56
-9.85
-10.63
-11.74
-9.07
-9.38
-11.52
-10.39
-9.76
-9.58
14.09

0.97

22.4
22.4
21.7
21.67
21.74
21.69
16.77
15.07
15.49
14.44
18.73
19.22
21.46
19.87
21.46
20.41
21.64
22.5
20.00
20.44
22.65
21.64
18.94
18.86
11.4

14.3

0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
1
1
0.97

12.47
12.65
12.59
12.59
12.61
12.6
6.97
6.35
6.37
6.39
5.3
4.4
4.43
4.27
4.34
4.29
4.44
4.2
4.3
4.34
4.25
4.24
4.31
4.41
6.9

0.10
0.27
0.21
0.21
0.23
0.22
0.76
0.16
0.18
0.20
1.14
0.27
0.30
0.14
0.21
0.16
0.31
0.07
0.17
0.21
0.12
0.11
0.31
0.41
2.69

0.27
0.25
1.89
1.88
2.07
2.12
2.37
1.09
1.79
0.79
0.24
0.47
1.00
0.22
1.21
2.50
0.28
1.39
0.72
1.03
0.17
0.04
0.41
0.73
0.21

601
601
601
601
601
601
601
601
601
601

Calculated total Pile


Length (m)

Reduce Level

Required
Founding
Level (mPD)

Actual
Founding
Level (mPD)

Raking
Factor
(cos14.
036)

Actual total
length of pile
(m)

9.67
8.67
9.67
8.67
9.67
8.67
7.25
8.67
6.57
6.78
8.57
8.66
8.98
8.95
8.69
8.87
9.29
9.27
9.07
9.20
8.57
8.94

11.15
11.28
11.29
11.25
11.14
11.36
7.35
11.32
5.60
6.73
11.31
11.33
11.28
11.26
11.29
11.34
8.37
7.97
7.29
7.23
7.33
7.25

14.3
14.3
14.3
14.3
14.3
14.3
18.15
14.3
14.15
13.05
8.6
8.6
8.6
8.6
8.6
8.6
9.45
9.85
10.5
10.5
10.5
10.5

14.12
14.14
14.17
14.16
14.28
14.20
18.12
14.13
13.04
12.57
8.03
8.48
8.44
8.46
8.46
8.51
8.41
8.52
8.70
8.45
9.13
8.71

0.97

11.34
11.44
11.42
11.39
11.16
11.46
7.38
11.5
6.74
7.23
11.9
11.45
11.44
11.4
11.43
11.43
9.44
9.34
9.14
9.34
8.74
9.09

5.84
6.94
5.92
6.89
5.66
6.96
4.3
7
4.34
4.62
7.50
6.96
6.63
6.62
6.91
6.73
4.32
4.24
4.24
4.31
4.34
4.32

5534.39

2372.52

0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97
0.97

1.66
2.73
1.74
2.68
1.49
2.75
0.17
2.79
0.21
0.48
3.28
2.75
2.43
2.42
2.70
2.53
0.19
0.11
0.11
0.18
0.21
0.19

0.18
0.16
0.13
0.14
0.02
0.10
0.03
0.17
1.11
0.48
0.57
0.12
0.16
0.14
0.14
0.09
1.04
1.33
1.80
2.05
1.37
1.79

601
601
601
601
601
601
601
601
601
601
601
601
601
601

Calculated total Pile


Length (m)

Reduce Level

Required
Founding
Level (mPD)

Actual
Founding
Level (mPD)

Raking
Factor
(cos14.
036)

Actual total
length of pile
(m)

3/26/2011

5556.39

lk

S-ar putea să vă placă și