Sunteți pe pagina 1din 323

1

TRANSMISSION STATUS :

APPROVAL RETURN STATUS :

P. BHATT

GUIOT

DELAGE

30/04/2010

UPDATED

P.SAINI

GUIOT

DELAGE

18/12/2009

UPDATED ACCORDING TO FACTORY TEST

PRANAV

GUIOT

DELAGE

20/02/2009

GOOD FOR SUBMISSION

CHECKED

APPROVED

DATE

REV ESTABLISHED

STAT.

MODIFICATIONS

GOVERNMENT OF UGANDA
TRANSMISSION STATUS :

BUJAGALI ENERGY LIMITED

APPROVAL RETURN STATUS :

EMPLOYER:

BUJAGALI HYDROELECTRIC POWER PROJECT


UGANDA
MAIN CONTRACTOR:

salini
ENGINEERING CONSULTANT:

HYDRO

HEM SUBCONTRACTOR:

FICHTNER
REV

ESTABLISHED

CHECKED

APPROVED

DATE

MODIFICATIONS

AUXILIARY
CONTROLLER
EQUIPMENT / ELECTRICAL AND WIRING DRAWING

STAT.

INTERNAL REVISION PROCESS

PROJECT NUMBER :

SCALE :

SH :

1104

N. OF SH :

A001

PROJECT DOCUMENT NUMBER :

323

ALSTOM INTERNAL NUMBER :

MAIN CONTRACTOR:

salini
F

ENGINEERING CONSULTANT:

HYDRO

HEM SUBCONTRACTOR:

COMPANY

PHASE

ZONE

DOCUMENT

AS

PH

EO

HEP BUJ 20CBA FS00 001

NUMBER

4 0 0 1

FILE NAME :

AS-D-PH-EO-4001-2.e3s

FICHTNER
We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

path

REVISION INDEX
A

Revision

Description of Revision

0
1

Date

Established

Checked

Approved

GOOD FOR SUBMISSSION

20/02/2009

PRANAV

GUIOT

DELAGE

UPDATED ACCORDING TO FACTORY TEST

18/12/2009

P.SAINI

GUIOT

DELAGE

UPDATED AFTER CABLE CONNECTING

30/04/2010

P. BHATT

GUIOT

DELAGE

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

REVISION SHEET

AS-D-PH-EO-4001

02_Revision sheet

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
B001
Sheet
A002

DRAWING INDEX
A

Sheet

Title

Function

Revision
0

=20CBA

SUMMARY

=20CBA

B003

SUMMARY

=20CBA

B004

SUMMARY

=20CBA

B005

SUMMARY

=20CBA

B006

SUMMARY

=20CBA

B007

SUMMARY

=20CBA

B008

SUMMARY

=20CBA

B009

SUMMARY

=20CBA

D001

POLARITY CODING

(ALSTOM STANDARD)

=20CBA

D002

KEYS TO READING

(ALSTOM STANDARD)

=20CBA

D003

REFERENCE DRAWING

=20CBA

E001

MARKING OF EQUIPMENT FACES

=20CBA

E002

GENERAL VIEW

=20CBA

E003

SECTION A-A

=20CBA

E004

VIEW A & I

SUPERVISION & COMMU. CUBICLE

=20CBA +00GH001

E005

VIEW D & J

SUPERVISION & COMMU. CUBICLE

=20CBA +00GH001

E006

VIEW B & E

SUPERVISION & COMMU. CUBICLE

=20CBA +00GH001

E007

VIEW C & F

SUPERVISION & COMMU. CUBICLE

=20CBA +00GH001

E008

VIEW A & I

CONTROLLER CUBICLE

=20CBA +00GH002

E009

VIEW D & J

CONTROLLER CUBICLE

=20CBA +00GH002

E010

VIEW B & E

CONTROLLER CUBICLE

=20CBA +00GH002

E011

VIEW C & F

CONTROLLER CUBICLE

=20CBA +00GH002

E012

VIEW A & I

I/O INTERFACE CUBICLE

=20CBA +00GH003

E013

VIEW D & J

I/O INTERFACE CUBICLE

=20CBA +00GH003

E014

VIEW B & E

I/O INTERFACE CUBICLE

=20CBA +00GH003

E015

VIEW C & F

I/O INTERFACE CUBICLE

=20CBA +00GH003

E016

CONTROLLER MODULES LOCATION

AND INTERFACE MODULES WIRING

=20CBA +00GH003

E017

INTERFACE MODULES LOCATION

AND CONTROLLER MODULES WIRING

=20CBA +00GH003

E018

POLARITIES DISTRIBUTION FOR

INTERFACE MODULES WITH ITS LABLES

=20CBA +00GH003

F101

MATERIAL LIST

=20CBA +00GH001

F102

MATERIAL LIST

=20CBA +00GH001

F201

MATERIAL LIST

=20CBA +00GH002

F202

MATERIAL LIST

=20CBA +00GH002

TITLE SHEET

=20CBA

A002

REVISION SHEET

=20CBA

B001

SUMMARY

B002

Date

2
First Issue

A001

revision

30/04/2010

OPENING FOR CABLES

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

SUMMARY

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

03_Drawing Index

Repl. by

path

323 sheets
next sheet
B002
Sheet
B001

DRAWING INDEX
A

Title

F203

MATERIAL LIST

=20CBA +00GH002

0
x

1
x

F301

MATERIAL LIST

=20CBA +00GH003

F302

MATERIAL LIST

=20CBA +00GH003

F303

MATERIAL LIST

=20CBA +00GH003

J001

SELECTOR SWITCHES,PUSH BUTTON

=20CBA

J002

RS20 0800-M2M2 SWITCHES

=20CBA

J003

INTERFACE CONTROLLER MODULES

=20CBA

J004

INTERFACE CONTROLLER MODULES

=20CBA

J005

INTERFACE CONTROLLER MODULES

=20CBA

J006

INTERFACE CONTROLLER MODULES

=20CBA

J007

INTERFACE CONTROLLER MODULES

=20CBA

K001

110V DC

POLARITIES DISTRIBUTION (+00GH001)

=20CBA

K002

110V DC

POLARITIES DISTRIBUTION (+00GH001)

=20CBA

K003

24V DC

POLARITIES DISTRIBUTION (+00GH001)

=20CBA

K004

24V DC

POLARITIES DISTRIBUTION (+00GH001)

=20CBA

K005

24V DC

POLARITIES DISTRIBUTION (+00GH001)

=20CBA

K006

110V DC

POLARITIES DISTRIBUTION (+00GH002)

=20CBA

K007

110V DC

POLARITIES DISTRIBUTION (+00GH002)

=20CBA

K008

110V DC

POLARITIES DISTRIBUTION (+00GH002)

=20CBA

K009

24V DC

POLARITIES DISTRIBUTION (+00GH002)

=20CBA

K010

24V DC

POLARITIES DISTRIBUTION (+00GH002)

=20CBA

K012

24V DC

POLARITIES DISTRIBUTION (+00GH002)

=20CBA

K013

110V DC

POLARITIES DISTRIBUTION +00GH003

=20CBA

K014

110V DC

POLARITIES DISTRIBUTION +00GH003

=20CBA

K015

24V DC

POLARITIES DISTRIBUTION (+00GH003)

=20CBA

K016

24V DC

POLARITIES DISTRIBUTION (+00GH003)

=20CBA

K017

24V DC

POLARITIES DISTRIBUTION (+00GH003)

=20CBA

K018

24V DC

POLARITIES DISTRIBUTION (+00GH003)

=20CBA

K019

AC DISTRIBUTION LIGHTING

FAN & HEATING RESISTOR (+00GH001)

=20CBA

K020

AC DISTRIBUTION LIGHTING

FAN & HEATING RESISTOR (+00GH002)

=20CBA

K021

AC DISTRIBUTION LIGHTING

FAN & HEATING RESISTOR(+00GH003)

=20CBA

K022

24V DC

EQUIPMENT SUPPLY

=20CBA

K023

24V DC

EQUIPMENT SUPPLY

=20CBA

K024

24V DC

EQUIPMENT SUPPLY

=20CBA

K025

24V DC

EQUIPMENT SUPPLY

=20CBA

K026

24V DC

EQUIPMENT SUPPLY

=20CBA

Date

2
First Issue

Sheet

revision

Function

30/04/2010

AND OPTICAL CONNECTION RACK

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

2
x

B
x
x

D
x

=20CBA

SUMMARY

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

03_Drawing Index

Repl. by

Revision

path

323 sheets
next sheet
B003
Sheet
B002

DRAWING INDEX
A

Sheet

Title

Function

Revision
0

24V DC

K028

110V DC

M001

MAIN RACK 1 & 2

M002

MAIN RACK 3 &4

M003

24V DC POLARITY DISTRIBUTION

M004

24V DC POLARITY DISTRIBUTION

M005

110V DC POLARITY DISTRIBUTION

M006

110V DC POLARITY DISTRIBUTION

M101

RACK-0 SLOT 3 MDL655

M102

revision

=20CBA

IHR CONTROLLER

=20CBA

IHR &FIELD CONTROLLER

=20CBA

ON INTERFACE MODULES

=20CBA

ON INTERFACE MODULES

=20CBA

ON INTERFACE MODULES

=20CBA

ON INTERFACE MODULES

=20CBA

LOGICAL INPUTS

=20CBA

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M103

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M104

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M105

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M106

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M107

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M108

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M109

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M110

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M111

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M112

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M113

RACK-0 SLOT 5 MDL655

LOGICAL INPUTS

=20CBA

M114

RACK-0 SLOT 5 MDL655

LOGICAL INPUTS

=20CBA

M115

RACK-0 SLOT 5 MDL655

LOGICAL INPUTS

=20CBA

M116

RACK-0 SLOT 5 MDL655

LOGICAL INPUTS

=20CBA

M117

RACK-0 SLOT 5 MDL655

LOGICAL INPUTS

=20CBA

M118

RACK-0 SLOT 5 MDL655

LOGICAL INPUTS

=20CBA

M119

RACK-0 SLOT 6 MDL655

LOGICAL INPUTS

=20CBA

M120

RACK-0 SLOT 6 MDL655

LOGICAL INPUTS

=20CBA

M121

RACK-0 SLOT 6 MDL655

LOGICAL INPUTS

=20CBA

M122

RACK-0 SLOT 6 MDL655

LOGICAL INPUTS

=20CBA

M123

RACK-0 SLOT 6 MDL655

LOGICAL INPUTS

=20CBA

M124

RACK-0 SLOT 6 MDL655

LOGICAL INPUTS

=20CBA

M125

RACK-0 SLOT 7 MDL655

LOGICAL INPUTS

=20CBA

M126

RACK-0 SLOT 7 MDL655

LOGICAL INPUTS

=20CBA

M127

RACK-0 SLOT 7 MDL655

LOGICAL INPUTS

=20CBA

M128

RACK-0 SLOT 7 MDL655

LOGICAL INPUTS

=20CBA

Date

EQUIPMENT SUPPLY

=20CBA

First Issue

K027

EQUIPMENT SUPPLY

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

SUMMARY

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

03_Drawing Index

Repl. by

path

323 sheets
next sheet
B004
Sheet
B003

DRAWING INDEX
A

Sheet

Title

Function

Revision
0

LOGICAL INPUTS

=20CBA

M130

RACK-0 SLOT 7 MDL655

LOGICAL INPUTS

=20CBA

M131

RACK-0 SLOT 8 MDL655

LOGICAL INPUTS

=20CBA

M132

RACK-0 SLOT 8 MDL655

LOGICAL INPUTS

=20CBA

M133

RACK-0 SLOT 8 MDL655

LOGICAL INPUTS

=20CBA

M134

RACK-0 SLOT 8 MDL655

LOGICAL INPUTS

=20CBA

M135

RACK-0 SLOT 8 MDL655

LOGICAL INPUTS

=20CBA

M136

RACK-0 SLOT 8 MDL655

LOGICAL INPUTS

=20CBA

M137

RACK-0 SLOT 9 MDL655

LOGICAL INPUTS

=20CBA

M138

RACK-0 SLOT 9 MDL655

LOGICAL INPUTS

=20CBA

M139

RACK-0 SLOT 9 MDL655

LOGICAL INPUTS

=20CBA

M140

RACK-0 SLOT 9 MDL655

LOGICAL INPUTS

=20CBA

M141

RACK-0 SLOT 9 MDL655

LOGICAL INPUTS

=20CBA

M142

RACK-0 SLOT 9 MDL655

LOGICAL INPUTS

=20CBA

M143

RACK-0 SLOT 10 MDL655

LOGICAL INPUTS

=20CBA

M144

RACK-0 SLOT 10 MDL655

LOGICAL INPUTS

=20CBA

M145

RACK-0 SLOT 10 MDL655

LOGICAL INPUTS

=20CBA

M146

RACK-0 SLOT 10 MDL655

LOGICAL INPUTS

=20CBA

M147

RACK-0 SLOT 10 MDL655

LOGICAL INPUTS

=20CBA

M148

RACK-0 SLOT 10 MDL655

LOGICAL INPUTS

=20CBA

M149

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M150

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M151

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M152

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M153

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M154

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M155

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M156

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M157

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M158

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M159

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M160

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M161

RACK-0 SLOT 5 MDL655

LOGICAL INPUTS

=20CBA

M162

RACK-0 SLOT 5 MDL655

LOGICAL INPUTS

=20CBA

M163

RACK-0 SLOT 5 MDL655

LOGICAL INPUTS

=20CBA

M164

RACK-0 SLOT 5 MDL655

LOGICAL INPUTS

=20CBA

Date

revision

RACK-0 SLOT 7 MDL655

First Issue

M129

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

SUMMARY

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

03_Drawing Index

Repl. by

path

323 sheets
next sheet
B005
Sheet
B004

DRAWING INDEX
A

Sheet

Title

Function

Revision
0

LOGICAL INPUTS

=20CBA

M166

RACK-0 SLOT 5 MDL655

LOGICAL INPUTS

=20CBA

M167

RACK-0 SLOT 6 MDL655

LOGICAL INPUTS

=20CBA

M168

RACK-0 SLOT 6 MDL655

LOGICAL INPUTS

=20CBA

M169

RACK-0 SLOT 6 MDL655

LOGICAL INPUTS

=20CBA

M170

RACK-0 SLOT 6 MDL655

LOGICAL INPUTS

=20CBA

M171

RACK-0 SLOT 6 MDL655

LOGICAL INPUTS

=20CBA

M172

RACK-0 SLOT 6 MDL655

LOGICAL INPUTS

=20CBA

M173

RACK-0 SLOT 7 MDL655

LOGICAL INPUTS

=20CBA

M174

RACK-0 SLOT 7 MDL655

LOGICAL INPUTS

=20CBA

M175

RACK-0 SLOT 7 MDL655

LOGICAL INPUTS

=20CBA

M176

RACK-0 SLOT 7 MDL655

LOGICAL INPUTS

=20CBA

M177

RACK-0 SLOT 7 MDL655

LOGICAL INPUTS

=20CBA

M178

RACK-0 SLOT 7 MDL655

LOGICAL INPUTS

=20CBA

M179

RACK-0 SLOT 8 MDL655

LOGICAL INPUTS

=20CBA

M180

RACK-0 SLOT 8 MDL655

LOGICAL INPUTS

=20CBA

M181

RACK-0 SLOT 8 MDL655

LOGICAL INPUTS

=20CBA

M182

RACK-0 SLOT 8 MDL655

LOGICAL INPUTS

=20CBA

M183

RACK-0 SLOT 8 MDL655

LOGICAL INPUTS

=20CBA

M184

RACK-0 SLOT 8 MDL655

LOGICAL INPUTS

=20CBA

M185

RACK-0 SLOT 9 MDL655

LOGICAL INPUTS

=20CBA

M186

RACK-0 SLOT 9 MDL655

LOGICAL INPUTS

=20CBA

M187

RACK-0 SLOT 9 MDL655

LOGICAL INPUTS

=20CBA

M188

RACK-0 SLOT 9 MDL655

LOGICAL INPUTS

=20CBA

M189

RACK-0 SLOT 9 MDL655

LOGICAL INPUTS

=20CBA

M190

RACK-0 SLOT 9 MDL655

LOGICAL INPUTS

=20CBA

M191

RACK-0 SLOT 10 MDL655

LOGICAL INPUTS

=20CBA

M192

RACK-0 SLOT 10 MDL655

LOGICAL INPUTS

=20CBA

M193

RACK-0 SLOT 10 MDL655

LOGICAL INPUTS

=20CBA

M194

RACK-0 SLOT 10 MDL655

LOGICAL INPUTS

=20CBA

M195

RACK-0 SLOT 10 MDL655

LOGICAL INPUTS

=20CBA

M196

RACK-0 SLOT 10 MDL655

LOGICAL INPUTS

=20CBA

M197

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M198

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M199

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M200

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

Date

revision

RACK-0 SLOT 5 MDL655

First Issue

M165

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

SUMMARY

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

03_Drawing Index

Repl. by

path

323 sheets
next sheet
B006
Sheet
B005

DRAWING INDEX
A

Sheet

Title

Function

Revision
0

LOGICAL INPUTS

=20CBA

M202

RACK-0 SLOT 3 MDL655

LOGICAL INPUTS

=20CBA

M203

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M204

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M205

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M206

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M207

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M208

RACK-0 SLOT 4 MDL655

LOGICAL INPUTS

=20CBA

M209

RACK-0 SLOT 4 MDL645

LOGICAL INPUTS

=20CBA

M210

RACK-0 SLOT 4 MDL645

LOGICAL INPUTS

=20CBA

M211

RACK-0 SLOT 4 MDL645

LOGICAL INPUTS

=20CBA

M501

RACK-01 SLOT 5 MDL753

LOGICAL OUTPUTS

=20CBA

M502

RACK-01 SLOT 5 MDL753

LOGICAL OUTPUTS

=20CBA

M503

RACK-01 SLOT 5 MDL753

LOGICAL OUTPUTS

=20CBA

M504

RACK-01 SLOT 5 MDL753

LOGICAL OUTPUTS

=20CBA

M505

RACK-01 SLOT 5 MDL753

LOGICAL OUTPUTS

=20CBA

M506

RACK-01 SLOT 5 MDL753

LOGICAL OUTPUTS

=20CBA

M507

RACK-0 SLOT 6 MDL753

LOGICAL OUTPUTS

=20CBA

M508

RACK-0 SLOT 6 MDL753

LOGICAL OUTPUTS

=20CBA

M509

RACK-0 SLOT 6 MDL753

LOGICAL OUTPUTS

=20CBA

M510

RACK-0 SLOT 6 MDL753

LOGICAL OUTPUTS

=20CBA

M511

RACK-0 SLOT 6 MDL753

LOGICAL OUTPUTS

=20CBA

M512

RACK-0 SLOT 6 MDL753

LOGICAL OUTPUTS

=20CBA

M513

RACK-0 SLOT 7 MDL753

LOGICAL OUTPUTS

=20CBA

M514

RACK-0 SLOT 7 MDL753

LOGICAL OUTPUTS

=20CBA

M515

RACK-0 SLOT 7 MDL753

LOGICAL OUTPUTS

=20CBA

M516

RACK-0 SLOT 7 MDL753

LOGICAL OUTPUTS

=20CBA

M517

RACK-0 SLOT 7 MDL753

LOGICAL OUTPUTS

=20CBA

M518

RACK-0 SLOT 7 MDL753

LOGICAL OUTPUTS

=20CBA

M601

RACK-0 SLOT 8 ALG223

ANALOG INPUTS

=20CBA

M602

RACK-0 SLOT 8 ALG223

ANALOG INPUTS

=20CBA

M603

RACK-0 SLOT 8 ALG223

ANALOG INPUTS

=20CBA

M604

RACK-0 SLOT 8 ALG223

ANALOG INPUTS

=20CBA

M605

RACK-0 SLOT 9 ALG223

ANALOG INPUTS

=20CBA

M606

RACK-0 SLOT 9 ALG223

ANALOG INPUTS

=20CBA

M607

RACK-0 SLOT 9 ALG223

ANALOG INPUTS

=20CBA

Date

revision

RACK-0 SLOT 3 MDL655

First Issue

M201

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

x
=20CBA

SUMMARY

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

03_Drawing Index

Repl. by

path

323 sheets
next sheet
B007
Sheet
B006

DRAWING INDEX
A

Sheet

Revision
0

=20CBA

ANALOG INPUTS

=20CBA

RACK-0 SLOT 10 ALG223

ANALOG INPUTS

=20CBA

M611

RACK-0 SLOT 10 ALG223

ANALOG INPUTS

=20CBA

M612

RACK-0 SLOT 10 ALG223

ANALOG INPUTS

=20CBA

M701

S8000 ETHERNET

=20CBA

M702

F8000 OPTICAL NETWORK

=20CBA

M703

F8000 OPTICAL NETWORK

TO DRAINAGE PIT-1 LCC

=20CBA

M704

F8000 OPTICAL NETWORK

TO DRAINAGE PIT-2 LCC

=20CBA

M705

F8000 FIP

=20CBA

M706

F8000 FIP

=20CBA

M707

F8000 FIP

=20CBA

M708

MODBUS NETWORK DISPATCHER

CHANNEL-1

=20CBA

M709

MODBUS NETWORK DISPATCHER

CHANNEL-1

=20CBA

M710

MODBUS NETWORK DISPATCHER

CHANNEL-2

=20CBA

M711

MODBUS NETWORK DISPATCHER

CHANNEL-2

=20CBA

M712

MODBUS NETWORK DISPATCHER

CHANNEL-2

=20CBA

M712A

MODBUS NETWORK DISPATCHER

CHANNEL-2

=20CBA

M713

C10 & VIDEO TOUCH SCREEN

=20CBA

M714

1 MINUTE

=20CBA

M715

5 SECOND

CLOCK PULSE DISTRIBUTION

=20CBA

M716

5 SECOND

CLOCK PULSE DISTRIBUTION

=20CBA

Q101

SST1 INCOMING BREAKER

20BFA00GS101

=20BFA +00GH101

Q102

SST2 INCOMING BREAKER

20BFA00GS102

=20BFA +00GH101

Q103

BUS TIE BREAKER

=20BFA +00GH101

Q104

MAIN SWITCHBOARD

OUTGOING BREAKER 20BFA00GS113

=20BFA +00GH101

Q105

MAIN SWITCHBOARD

OUTGOING BREAKER 20BFA00GS116

=20BFA +00GH101

Q106

MAIN SWITCHBOARD

OUTGOING BREAKER 20BFA00GS111

=20BFA +00GH101

Q107

MAIN SWITCHBOARD

OUTGOING BREAKER 20BFA00GS114

=20BFA +00GH101

Q108

MAIN SWITCHBOARD

OUTGOING BREAKER 20BFA00GS112

=20BFA +00GH101

Q109

MAIN SWITCHBOARD

OUTGOING BREAKER 20BFA00GS115

=20BFA +00GH101

Q110

MAIN SWITCHBOARD

OUTGOING BREAKER 20BFA00GS119

=20BFA +00GH101

Q111

MAIN SWITCHBOARD

OUTGOING BREAKER 20BFA00GS118

=20BFA +00GH101

Q112

MAIN SWITCHBOARD

OUTGOING BREAKER 20BFA00GS121

=20BFA +00GH101

Q113

MAIN SWITCHBOARD

OUTGOING BREAKER 20BFA00GS120

=20BFA +00GH101

Q114

MAIN SWITCHBOARD

OUTGOING BREAKER 20BFA00GS123

=20BFA +00GH101

RACK-0 SLOT 9 ALG223

M609

RACK-0 SLOT 10 ALG223

M610

Date

revision

Function

M608

First Issue

Title
ANALOG INPUTS

CLOCK PULSE DISTRIBUTION

30/04/2010

20BFA00GS301

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

x
x

D
x

=20CBA

SUMMARY

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

03_Drawing Index

Repl. by

path

323 sheets
next sheet
B008
Sheet
B007

DRAWING INDEX
A

Sheet

Title

Function

Revision
0

COMMON AUXILIARIES BOARD

INCOMING BREAKER 20BFA01GS301

=20BFA +01GH101

Q116

COMMON AUXILIARIES BOARD

INCOMING BREAKER 20BFA01GS302

=20BFA +01GH101

Q117

ESSENTIAL AUXILIARIES BOARD

INCOMING BREAKER 20BFA02GS301

=20BFA +02GH101

Q118

ESSENTIAL AUXILIARIES BOARD

INCOMING BREAKER 20BFA02GS301

=20BFA +02GH101

Q119

ESSENTIAL AUXILIARIES BOARD

INCOMING BREAKER 20BFA02GS302

=20BFA +02GH101

Q120

ESSENTIAL AUXILIARIES BOARD

INCOMING BREAKER 20BFA02GS302

=20BFA +02GH101

Q121

ESSENTIAL AUXILIARIES BOARD

DG INCOMING BREAKER 20BFA02GS103

=20BFA +02GH101

Q122

ESSENTIAL AUXILIARIES BOARD

DG INCOMING BREAKER 20BFA02GS103

=20BFA +02GH101

Q123

ESSENTIAL AUXILIARIES BOARD

BUS TIE BREAKER 20BFA02GS303

=20BFA +02GH101

Q123A

ESSENTIAL AUXILIARIES BOARD

BUS TIE BREAKER 20BFA02GS303

=20BFA +02GH101

Q124

HVAC BOARD

INCOMING BREAKER 20SAA01GS301

=20SAA +01GH101

Q125

HVAC BOARD

INCOMING BREAKER 20SAA01GS302

=20SAA +01GH101

Q126

CHILLER BOARD

INCOMING BREAKER 20SAA02GS301

=20SAA +02GH101

Q127

CHILLER BOARD

INCOMING BREAKER 20SAA02GS302

=20SAA +02GH101

Q128

INTERFACE

STEP DOWN TRANSFORMERS

=.20BFT

Q129

INTERFACE

STEP DOWN TRANSFORMERS

=.20BFT

Q130

INTERFACE

DG TO CB (20BFA02GH101)

=.20BFT

Q131

INTERFACE

DG EMERGENCY STOP EXTERNAL

=.20BFT

W001

INTERNAL WIRE LISTS

=20CBA

W002

INTERNAL WIRE LISTS

=20CBA

W003

INTERNAL WIRE LISTS

=20CBA

W004

INTERNAL WIRE LISTS

=20CBA

W005

INTERNAL WIRE LISTS

=20CBA

W006

INTERNAL WIRE LISTS

=20CBA

W007

INTERNAL WIRE LISTS

=20CBA

W008

INTERNAL WIRE LISTS

=20CBA

W009

INTERNAL WIRE LISTS

=20CBA

W010

INTERNAL WIRE LISTS

=20CBA

W011

INTERNAL WIRE LISTS

=20CBA

W012

INTERNAL WIRE LISTS

=20CBA

W013

INTERNAL WIRE LISTS

=20CBA

W014

INTERNAL WIRE LISTS

=20CBA

W015

INTERNAL WIRE LISTS

=20CBA

W016

INTERNAL WIRE LISTS

=20CBA

W017

INTERNAL WIRE LISTS

=20CBA

W018

INTERNAL WIRE LISTS

=20CBA

Date

2
First Issue

Q115

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

x
x

=20CBA

SUMMARY

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

03_Drawing Index

Repl. by

path

323 sheets
next sheet
B009
Sheet
B008

DRAWING INDEX
A

Sheet

Revision
0

INTERNAL WIRE LISTS

=20CBA

W020

INTERNAL WIRE LISTS

=20CBA

W021

INTERNAL WIRE LISTS

=20CBA

W022

INTERNAL WIRE LISTS

=20CBA

W023

INTERNAL WIRE LISTS

=20CBA

W024

INTERNAL WIRE LISTS

=20CBA

X101

TERMINAL PLAN

=20CBA +00GH001

X102

TERMINAL PLAN

=20CBA +00GH001

X103

TERMINAL PLAN

=20CBA +00GH001

X104

TERMINAL PLAN

=20CBA +00GH001

X105

TERMINAL PLAN

=20CBA +00GH001

X106

TERMINAL PLAN

=20CBA +00GH001

X107

TERMINAL PLAN

=20CBA +00GH001

X108

TERMINAL PLAN

=20CBA +00GH001

X109

TERMINAL PLAN

=20CBA +00GH001

X110

TERMINAL PLAN

=20CBA +00GH001

X201

TERMINAL PLAN

=20CBA +00GH002

X202

TERMINAL PLAN

=20CBA +00GH002

X203

TERMINAL PLAN

=20CBA +00GH002

X204

TERMINAL PLAN

=20CBA +00GH002

X205

TERMINAL PLAN

=20CBA +00GH002

X206

TERMINAL PLAN

=20CBA +00GH002

X207

TERMINAL PLAN

=20CBA +00GH002

X208

TERMINAL PLAN

=20CBA +00GH002

X209

TERMINAL PLAN

=20CBA +00GH002

X210

TERMINAL PLAN

=20CBA +00GH002

X211

TERMINAL PLAN

=20CBA +00GH002

X212

TERMINAL PLAN

=20CBA +00GH002

X213

TERMINAL PLAN

=20CBA +00GH002

X301

TERMINAL PLAN

=20CBA +00GH003

X302

TERMINAL PLAN

=20CBA +00GH003

X303

TERMINAL PLAN

=20CBA +00GH003

X304

TERMINAL PLAN

=20CBA +00GH003

X305

TERMINAL PLAN

=20CBA +00GH003

X306

TERMINAL PLAN

=20CBA +00GH003

Date

revision

Function

W019

First Issue

Title

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

SUMMARY

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

03_Drawing Index

Repl. by

path

323 sheets
next sheet
D001
Sheet
B009

POLARITIES CODING
A

5/12

24

48

110/125

220/250

CODE

CODE
CONTROLLER POLARITY
LOGICAL INPUTS AND OUTPUTS DATAS
ANALOGICAL INPUTS AND OUTPUTS DATAS

CHARACTER

POWER SUPPLY POLARITY


PCX
8035 IHR
8035 UC,EXTENSION AND DELOCALIZATED

8 P 1 A IS 230VAC FOR ELECTRICAL PROTECTIONS, WAY 1, PHASE A

4
X
H
H

110/125

230

380/400

A
B

PROCESS CONTROL POLARITY


SENSORS,ACTUATORS
CONTROLLER INPUTS
PUSH-BUTTONS/CONTROL SWITCHES
RELAYING
CHECK RELAY
AUTOMATIC SYNCHRONIZER

C
C
C
C
C
C

EMERGENCY POLARITY
MASTER TRIP RELAY
SECURITY LOCAL RELAY

E
E

ALARMS SIGNALLING POLARITY


SIGNALLING+NORMAL ALARM
SOUND ALARM+EMERGENCY SIGNALLING

S
K

COMMON

N
9

ALTERNATING CURRENT
DIRECT PHASES

ALTERNATING
CURRENT

5
6

24

THE POLARITIES ARE CODED WITH 4 CHARACTERS


EXAMPLES:
2 C 1 + IS 24V FOR PROCESS CONTROL POSITIVE POLARITY

1
D
A

POLARITY MARK

D
POLARITY MARK

DIRECT
CURRENT

WAY
BUSBARS...
CODE

WAY

UTILIZATION

POLARITIES CODING PRINCIPLE

UTILIZATION

VOLTAGE LEVEL

VOLTAGE LEVEL

DIRECT
CURRENT

R
Y
B

U
V
W

P
P

MEASURES POLARITY
ELECTRICAL
MECHANICAL
TEMPERATURE

M
M
M

C10/MMI SCREEN POLARITY

TRANSFORMER OUTPUT
OR INVERTER

PROTECTIONS POLARITY
NORMAL
EMERGENCY

COMMUNICATION NETWORK POLARITY


ETHERNET (S8000)
MODBUS
F8000 (OPTICAL)

N
N
N

COUNTING POLARITY

CLOCK POLARITY

24VDC NEGATIVE COMMON POLARITY

F
G

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

POLARITY CODING
(ALSTOM STANDARD)

AS-D-PH-EO-4001

04_Explanation & Symbols

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
D002
Sheet
D001

+GH002

Location

Pin number
Higher Level Assignment
name
Location
Sheet-map
Geo. mark

+GH002 P
A- B 02

2S1+
+GH001
/3.A3
A- C 02

Internal equipment reference

ORDER

Pin number
Pin number

=1CJA01
-K051
+GH001
/2.E2
A- B 04

3s

-X004
=1CHA01

INTERFACE MODULE
16DO
+GH002

-X004
=1CHA01

Location

+GH002

Location

3.3

Geo. mark

1.8

+GH002
B- C 01

GN

THE DIAGRAM IS SHOWN WITH:

Pin number

A2

+GH001
/1.B3
A- B 04

=1CJA01
-S015

2.8

A1

Pin number
Higher Level Assignment
name
Location

No control voltage, apparatuses out of operation, fluid without flow,


tank empty, at atmospheric pressure 1.013 bar,
ambient temperature 20C.
Signal name
11
21
31
41

Date

1
First Issue

revision

30/04/2010

Signal name
14
/2.A2
12
24
22
34
32
44
/2.B3
42

Sheet-map

Sheet-map
REFERENCE TAKEN BY DEFAULT FOR ANY SYMBOL REPRESENTED IN THE ELECTRICAL DIAGRAM SHEET

Customer

GOVERNMENT OF UGANDA

Established P.SAINI

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

2Z1-

5C1-

Pin number

NOTES:
1) ALL DIMENTIONS INDICATED IN DOCUMENT ARE IN MILLIMETER.

B1

name
Location
Sheet-map
Geo. mark

S16

C10

Pin number

=1CJA01
-K051

FU16 1A

D10

MANU

+GH001
/3.B1
A- C 03

NO

Terminal number
name
Higher Level Assignment

+GH001

2C-

NC

-X001
=1CJA01

Location

Terminal number
name
Higher Level Assignment

+GH001

4.3

=1CJA01
-S015

-X001
=1CJA01

Pin number
Higher Level Assignment
name
Location
Sheet-map
Geo. mark

Pin number
Pin number
Higher Level Assignment

Location
R16

Terminal number
name
Higher Level Assignment

ALL SWITCHES IN OUTPUT INTERFACE CARDS (ex. S16 in below fig.) ARE CONFIGURED AS
"NO" IN STANDARD EXCEPT IF "NC" INDICATED IN THE DRAWING.

Terminal number
name
Higher Level Assignment

Marshalling Box

Pin number
Pin number

External equipment reference

Shorting Link

=1CJA01
-B013

Geo. mark

=1CJA01
-S003

Pin number

Pin number
Higher Level Assignment
name
Location

Location

2
3

-X004
=1CHA01

+GH001

11

Terminal number
name
Higher Level Assignment

Pin number
Higher Level Assignment
name
Location
Sheet-map
Geo. mark

-X001
=1CJA01

12
14

Terminal number
name
Higher Level Assignment

Signal name

Signal name

SIGNALISATION

5C1+

RELAYING

01

Repl. f.

=20CBA

KEYS TO READING
(ALSTOM STANDARD)

AS-D-PH-EO-4001

04_Explanation & Symbols

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
D003
Sheet
D002

DRAWING

CONNECTING DIAGRAM

FUNCTIONAL ANALYSIS

I/O LIST

FILE NAME

ALSTOM INTERNAL NO.

AS D PH EO 4003

HEP BUJ 20CBA MA 00001

AS D PH FE 4000

HEP BUJ 20CBA FE 00001

AS D PH EO 4000

HEP BUJ 20CBA FP 00001

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

REFERENCE DRAWING

AS-D-PH-EO-4001

04_Explanation & Symbols

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
E001
Sheet
D003

MARKING OF EQUIPMENT FACES


A

TOP VIEW

GH00X

D
REAR

FRONT

E
EQUIPMENT FACE

LEGEND
MARK OF FACE

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

MARKING OF EQUIPMENT FACES

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

path

323 sheets
next sheet
E002
Sheet
E001

FRONT VIEW

SIDE VIEW

CONTROLLER
CUBICLE
20CBA00GH002

SUPERVISION &
COMMUNICATION CUBICLE
20CBA00GH001

I/O INTERFACE
CUBICLE
20CBA00GH003

2100

C
A

900

900

900

900

TOP VIEW
D

Opening door
843

NOTES:
900

PROTECTION : IP 55
COLOUR

: RAL7032

: 2mm

Opening door
843

THICKNESS

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

GENERAL VIEW

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
E003
Sheet
E002

SECTION VIEW A-A

STUD BOLT5

PLATE SIZE
(760X330)

PLATE SIZE
(760X330)

PLATE SIZE
(760X250)

PLATE SIZE
(760X250)

PLATE SIZE
(760X250)

125

250

PLATE SIZE
(760X180)

PLATE SIZE
(760X180)

PLATE SIZE
(760X180)

80

180

330

PLATE SIZE
(760X330)

720
760
900

720
760
900

720
760
900

60

155

310

720

900

90

FRONT SIDE

OPENING FOR CABLES (720 X 720)

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

SECTION A-A
OPENING FOR CABLES

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
E004
Sheet
E003

FRONT VIEW , FACE I

FRONT VIEW , FACE A


A

A
B

01
01

-B1
1

01

C 1630

MMI

-P1

01

D
-S2

02

GEO
MARK

DESCRIPTION

A-D01

LOCAL/OFF/ REMOTE

A-D02

FAULT RESET

-S1

01

2100

2100

-V1

E
01

900

900

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

VIEW A & I
SUPERVISION & COMMU. CUBICLE

=20CBA

323 sheets

+00GH001

next sheet
E005
Sheet
E004

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

HEP BUJ 20CBA FS00 001

path

REAR VIEW , FACE D

REAR VIEW , FACE J

GR

-F2

-G1

01

01

01

-F1

2100

2100

-GH1

01

-B2

02

-F3

01

-E1

03

900

900

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

VIEW D & J
SUPERVISION & COMMU. CUBICLE

=20CBA

323 sheets

+00GH001

next sheet
E006
Sheet
E005

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

HEP BUJ 20CBA FS00 001

path

SIDE VIEW , FACE E

FRONT VIEW , FACE B


A

-B3

-F4

-F5

03

01

01
O

-T2

03

02

05

01

-T1

01

-F7
-R1

02

-F6

-X401

04 -K2

-X402

02 -K1

04

B
O

-F8

-F9

04

-R3
-R4

-T7

-K4
-K5
-K6
-K7
-K8
-K9

16
17

06

CABLES TRAY

02

10
11
12
13
14
15

-T5

08
09

-T4

-F13

07

-T3

-F12

05

01

-F11

03

-F10

-T6

KEYBOARD

CABLE DUCT 80x80

02

2100

2100

OO
O

03

-K3

01

-X1

02

-X2

-F15

-F17
-T11

08

05

-T10

04

03
02

-F16
-T9

01

-T8

07

-F14

06

01

150 X 30

EARTHING BAR

315

900

Date

1
First Issue

revision

30/04/2010

415

900

Customer

GOVERNMENT OF UGANDA

Established P.SAINI

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

170

Repl. f.

VIEW B & E
SUPERVISION & COMMU. CUBICLE

=20CBA

323 sheets

+00GH001

next sheet
E007
Sheet
E006

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

HEP BUJ 20CBA FS00 001

path

REAR VIEW , FACE C

SIDE VIEW , FACE F

A
-E2

01
-B4
-R2

02

CABLE DUCT 80X80

N3

P1

N1

-X431

-X432

01

02

01

-X231 -X232 -X233 -X234 -X291

B
03

05

04

07

06

CABLE DUCT 80X80

-K10

01

OOO

CABLE DUCT 80x80

2100

2100

03

-X901

D
150 X 30

CABLES TRAY

-F18

GND

01

CABLE DUCT 80X80

-X3

02
EARTHING BAR

900

Date

0
First Issue

revision

30/04/2010

900

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

VIEW C & F
SUPERVISION & COMMU. CUBICLE

=20CBA

323 sheets

+00GH001

next sheet
E008
Sheet
E007

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

HEP BUJ 20CBA FS00 001

path

FRONT VIEW , FACE I

FRONT VIEW , FACE A

01

01

A
-B5
1

01

2100

2100

-V3

C
E

01

900

900

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

VIEW A & I
CONTROLLER CUBICLE

=20CBA

323 sheets

+00GH002

next sheet
E009
Sheet
E008

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

HEP BUJ 20CBA FS00 001

path

REAR VIEW , FACE D

REAR VIEW , FACE J

01

GR

-F20

-G2

01

01

01

-F19

-GH2

2100

2100

01

-B6

-F21

02

D
2

01

-E3

03

900

900

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

VIEW D & J
CONTROLLER CUBICLE

=20CBA

323 sheets

+00GH002

next sheet
E010
Sheet
E009

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

HEP BUJ 20CBA FS00 001

path

FRONT VIEW , FACE B

SIDE VIEW , FACE E

-B7

01

-F22

-F23

-F24
O

OO
O

-F33

01

-X233

-K13

02

J1+

P1
J1-

-T14
P2

OO
O

02

03

-X4

03

01

CABLE DUCT
80x80

-F26

-F25

04

05

03

04 -K12

02 -K11

01

02

03

04

05

06

07

08

09

10

-K23

-K22

-K21

-K20

-K18

-K19

-K17

04

05

06

-K31

-K30

-K29

-K28

-K27

-K26

08

09

10

J1+

P1

01

-K25

07

-K35

03

-K34

02

-K33

01

-K32

PWR 00

-F30

J1-

2100

02

P2

-K24

03
04
05
06
07
08
09
10
11
12
13

-A1

-K16

-K14

-K15

01

2100

01

04

06

PWR 00

-F29

05

07

02

-T13

03

-T15

OO
O
O

-X5

-T12

05

-R6

01

-F28

-X6

-F27

03
04
05
06
07
08
09
10
11
12
13

-A2

05

06

07

08

09

10

-K40

-K36
-A3

04

02

CABLES TRAY

03

03
04
05
06
07

01

02

-K39

01

-K38

PWR 00

-F31

-K37

02

10

-K51

09

-K50

08

-K49

07

-K48

06

-K47

05

-K46

04

-K45

-K44

-K42

-K41

03

-K52

14

-A4

02

02

03
04
05
06
07
08
09
10
11
12
13

01

01

-K43

PWR 00

-F32

150 X 30

-X8

-X9

01

02
O

EARTHING BAR

315

900

Date

0
First Issue

revision

30/04/2010

415

900

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

170

Repl. f.

VIEW B & E
CONTROLLER CUBICLE

=20CBA

323 sheets

+00GH002

next sheet
E011
Sheet
E010

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

HEP BUJ 20CBA FS00 001

path

REAR VIEW , FACE C

SIDE VIEW , FACE F

-E4

01
-B8

02

01

N1

P1

N3

CABLE DUCT 80X80

O
OOO

-X401

-X402

-X431

-X432

01

02

03

04

-R5

-X492

02

OOO

CABLE DUCT 80X80

-X231

-X232

-X234

-X291

-X292

01

02

03

04

05

OOOO

C
CABLE DUCT 80X80

-X293

2100

2100

D
O

-X901

01

D
150 X 30

CABLES TRAY

01

-F34

01

GND

-X7

02

CABLE DUCT 80X80

EARTHING BAR

900

Date

2
First Issue

revision

30/04/2010

900

Customer

GOVERNMENT OF UGANDA

Established P.SAINI

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

VIEW C & F
CONTROLLER CUBICLE

=20CBA

323 sheets

+00GH002

next sheet
E012
Sheet
E011

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

HEP BUJ 20CBA FS00 001

path

FRONT VIEW , FACE I

FRONT VIEW , FACE A


A

A
B

01
01

-B9
1

01

2100

2100

-V4

B
01

900

Date

0
First Issue

revision

30/04/2010

900

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

VIEW A & I
I/O INTERFACE CUBICLE

=20CBA

323 sheets

+00GH003

next sheet
E013
Sheet
E012

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

HEP BUJ 20CBA FS00 001

path

REAR VIEW , FACE D


A

REAR VIEW , FACE J


A

-F35

-F36

-G3

01

01

01

2100

2100

-GH3

01

-B10

02

-F37

01

-E5

03

900

900

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

VIEW D & J
I/O INTERFACE CUBICLE

=20CBA

323 sheets

+00GH003

next sheet
E014
Sheet
E013

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

HEP BUJ 20CBA FS00 001

path

FRONT VIEW , FACE B

SIDE VIEW , FACE E

-B11

01

-K53 -K54-K55 -K56 -K57 -K58 -K59 -K60 -K61-K62 -K63 -K64 -K65-K66
O

-K67 -K68 -K69 -K70 -K71-K72 -K73 -K74 -K75 -K76 -K77 -K78 -K79-K80
O

2100

2100

-K81 -K82 -K83 -K84 -K85 -K86 -K87 -K88 -K89 -K90 -K91-K92 -K93-K94

CABLES TRAY

200 X 30

-K95 -K96 -K97 -K98 -K99 -K100-K101-K102-K103-K104-K105-K106-K107-K108


O

EARTHING BAR

355

900

Date

0
First Issue

revision

30/04/2010

415

900

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

130

Repl. f.

VIEW B & E
I/O INTERFACE CUBICLE

=20CBA

323 sheets

+00GH003

next sheet
E015
Sheet
E014

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

HEP BUJ 20CBA FS00 001

path

REAR VIEW , FACE C

SIDE VIEW , FACE F

A
-E6

01
-B12

02
CABLE TRAY 90X60
O

-K66 -K65

-K64

-K63

-K62

-K61

-K60

-K59

-K58

-K57

-K56

-K55

-K54

-X431

-K53

A
01

-F38

02

B
B

-X432

12

12

11

11

10

10

09

09

08

08

07

07

06

05

06

05

04

04

03

03

02

02

01

01

03

CABLE TRAY 90X60

-K80 -K79

-K78

-K77

-K76

-K75

-K74

-K73

-K72

-X231

-K71

-K70

-K69

-K68

-K67

2100

13

13

12

12

11

11

10

10

09

09

08

08

07

07

06

05

06

05

04

04

03

02

03

02

01

01

CABLE TRAY 90X60

-K94 -K93

-K92

-K91

-K90

-K89

-K88

-K87

-K86

-K85

-K84

-K83

-K82

-K81

-F39

-X232

06

-F40

07

14

2100

14

04

05

14

13

CABLE DUCT 60x80

13

14

-X233

08

D
14

14

13

13

12

12

11

11

10

10

09

09

08

08

07

07

06

05

06

05

04

04

03

02

03

02

01

01
O

-K96

-K95

B
E

D
01

-K97

-X901

-K98

200 X 30

-K108 -K107 -K106 -K105 -K104 -K103 -K102 -K101 -K100 -K99

CABLES TRAY

CABLE TRAY 90X60

-F41

14

13

13

12

12

11

11

10

10

09

09

08

08

07

07

06

05

06

05

04

04

03

02

03

02

01

01

GND

01

14

-X7

02

CABLE TRAY 90X60

EARTHING BAR

900

Date

1
First Issue

revision

30/04/2010

900

Customer

GOVERNMENT OF UGANDA

Established P.SAINI

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

VIEW C & F
I/O INTERFACE CUBICLE

=20CBA

323 sheets

+00GH003

next sheet
E016
Sheet
E015

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

HEP BUJ 20CBA FS00 001

path

CONTROLLER - FRONT VIEW


FACE B
-A1

CONTROLLER

MODULE
FUNCTION
ROW

MODULE

REFERENCE

01

02

POWER SUPPLY

CPU

COMF900

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

IC693
PWR 330

IC693
CPU 350

IC693
BEM340

IC693

IC693

IC693

IC693

IC693

IC693

IC693

IC693

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

PLATE
RUT 35.2

K15

K16

K17

K18

K19

K20

K21

K22

K23

K24

INTERFACE TYPE

+00GH003

FACE

-A1

CONTROLLER

MODULE
FUNCTION
ROW

MODULE

REFERENCE

FACE

ROW

+00GH003

First Issue

revision

AB

CD

AB

CD

AB

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

K54 J1

K55 J1

K56 J1

K57 J1

K58 J1

K59 J1

K60 J1

K61 J1

K62 J1

K63 J1

K64 J1

K65 J1

K68 J1

K69 J1

K70 J1

K71 J1

L.I.

L.I.

IC693
PWR 330

IC693
CPU 350

IC693
BEM340

IC693

IC693

IC693

IC693

IC693

IC693

IC693

IC693

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

PLATE
RUT 35.2

K26

K27

K28

K29

K30

K31

K32

K33

K34

K35

04

06

05

09

08

07

10

CD

AB

CD

AB

CD

AB

CD

AB

CD

AB

CD

AB

CD

AB

CD

AB

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

16DI

K72 J1

K73 J1

K74 J1

K75 J1

K76 J1

K77 J1

K78 J1

K79 J1

K82 J1

K83 J1

K84 J1

K85 J1

K86 J1

K87 J1

K88 J1

K89 J1

03

00

01

02

POWER SUPPLY

CPU

COMF900

IC693
PWR 330

IC693
CPU 350

IC693
BEM340

IC693

IC693

MDL655

MDL655

PLATE
RUT 35.2

K37

K38

K39

K40

04

L.I.

06

07

08

09

SPARE

SPARE

SPARE

SPARE

05

10

L.I.

CD

AB

CD

AB

2000

2000

2000

2000

16DI

16DI

16DI

16DI

K90 J1

K91 J1

K92 J1

K93 J1

00

01

02

03

POWER SUPPLY

CPU

COMF900

MODBUS

IC693
PWR 330

IC693
CPU 363

IC693
BEM340

PLATE
RUT 35.2

K42

K43

SPARE

SPARE

04

05

06

07

08

09

10

11

L.I.

L.O.

L.O.

L.O.

A.I

A.I

A.I

IC693

IC693

IC693

IC693

IC693

IC693

IC693

IC693

PCM 301

MDL645

MDL753

MDL753

MDL753

ALG223

ALG223

ALG223

K45

K46

K47

K48

K49

K50

K51

P1

P1

P1

K44

AB

CD

AB

CABLE LENGTH

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

INTERFACE TYPE

16DO

16DO

16DO

16DO

16DO

16DO

8AI

8AI

8AI

8AI

8AI

8AI

K96 J1

K97 J1

K98 J1

K99 J1 K100 J1 K101 J1 K102 J1 K103 J1 K104 J1 K105 J1 K106 J1 K107 J1

B
Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

CONTROLLER MODULES LOCATION


AND INTERFACE MODULES WIRING

HEP BUJ 20CBA FS00 001

=20CBA

323 sheets

+00GH003

next sheet
E017
Sheet
E016

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

11

CD

30/04/2010

B
11

AB

Date

CD

CD

FACE

AB

L.I.

REFERENCE

CUBICLE

CD

L.I.

MODULE

AB

L.I.

-A1

ROW

CD

L.I.

MODULE
FUNCTION

AB

L.I.

INTERFACE TYPE

CONTROLLER

CD

L.I.

CABLE LENGTH

FACE

AB

COMF900

+00GH003

CD

CPU

REFERENCE

CUBICLE

AB

POWER SUPPLY

MODULE

11

CD

03

MODULE
FUNCTION

10

02

-A1

CONTROLLER

09

08

07

01

INTERFACE TYPE

+00GH003

06

05

00

CABLE LENGTH

CUBICLE

04

CABLE LENGTH

CUBICLE

03

00

path

INTERFACES - FRONT VIEW


FACE B
CONTROLLER

-A1
INTERFACE
FUNCTION

01

02

03

04

05

06

07

08

09

10

11

12

POLARITIES
DISTRIBUTION

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

POLARITIES
DISTRIBUTION

-K53

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

-K66

K54 J1

K55 J1

K56 J1

K57

J1

K58 J1

K59

J1

K60 J1

K61 J1

K62 J1

K63

J1

K64 J1

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

17 - 32

01 - 16

17 - 32

01 - 16

17 - 32

01 - 16

17 - 32

01 - 16

17 - 32

01 - 16

17 - 32

K17

K17

K21

K21

INTERFACE
REFERENCE

14

13

SEE SH.

SEE SH.

E018

CUBICLE

+00GH002

CONTROLLER
MODULE TYPE
INPUTS/OUTPUTS

FACE

CONTROLLER

-A2
INTERFACE
FUNCTION

CD

AB

CD

K18

K18

AB

K19

CD

K19

K20

AB

CD

K20

AB

CD

AB

CD

K22

J1

K65

MDL655
01 - 16
K22

AB

03

04

05

06

07

08

09

10

11

12

POLARITIES
DISTRIBUTION

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

POLARITIES
DISTRIBUTION

-K67

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

-K80

14

13

SEE SH.

E018

+00GH002

SEE SH.

K68 J1

CONTROLLER
MODULE TYPE
INPUTS/OUTPUTS
FACE

CONTROLLER

J1

K70 J1

MDL655

MDL655

17 - 32

01 - 16

CD

K23

-A3
INTERFACE
FUNCTION

K69

AB

K23

J1

K72 J1

MDL655

MDL655

17 - 32

01 - 16

CD

K24

K71

AB

K24

J1

K74 J1

MDL655

MDL655

17 - 32

01 - 16

CD

K28

K73

AB

K28

J1

K76 J1

MDL655

MDL655

17 - 32

01 - 16

K29

CD

K75

K29

AB

J1

K78 J1

MDL655

MDL655

MDL655

MDL655

17 - 32

01 - 16

17 - 32

01 - 16

K77

CD

K30

AB

K30

CD

K31

J1

K79

AB

K31

03

04

05

06

07

08

09

10

11

12

POLARITIES
DISTRIBUTION

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

L.I.

POLARITIES
DISTRIBUTION

-K81

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

16DI
110VDC

-K94

K82 J1

K83 J1

K84 J1

K85 J1

K86 J1

K87 J1

K88 J1

K89 J1

K90 J1

K91 J1

K92 J1

K93 J1

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

MDL655

17 - 32

01 - 16

17 - 32

01 - 16

17 - 32

01 - 16

17 - 32

01 - 16

17 - 32

01 - 16

17 - 32

K33

K33

14

13

SEE SH.

E018
CONTROLLER
MODULE TYPE
INPUTS/OUTPUTS
FACE

CONTROLLER

-A4

CD

K32

AB

CD

K34

AB

CD

K34

AB

CD

K35

AB

K35

CD

K39

AB

K39

K40

01 - 16

CD

K40

AB

02

03

04

05

06

07

08

09

10

11

12

POLARITIES
DISTRIBUTION

L.O.

L.O.

L.O.

L.O.

L.O.

L.O.

A.I.

A.I.

A.I.

A.I.

A.I.

A.I.

POLARITIES
DISTRIBUTION

-K95

16DO
110VDC

16DO
110VDC

16DO
110VDC

16DO
110VDC

16DO
110VDC

16DO
110VDC

8AI
110VDC

8AI
110VDC

8AI
110VDC

8AI
110VDC

8AI
110VDC

8AI
110VDC

-K108

REFERENCE

14

13

SEE SH.

E018

CUBICLE

+00GH002

CONTROLLER
MODULE TYPE
INPUTS/OUTPUTS
FACE

Date

0
First Issue

revision

E
SEE SH.

K102

K96 J1

K97 J1

K98 J1

K99 J1

K100 J1

K101 J1

MDL753

MDL753

MDL753

MDL753

MDL753

MDL753

17 - 32

01 - 16

17 - 32

01 - 16

17 - 32

01 - 16

K46

30/04/2010

E018

01

INTERFACE

SEE SH.

K32

INTERFACE
FUNCTION

02

REFERENCE

+00GH002

E018

01

INTERFACE

CUBICLE

02

REFERENCE

CUBICLE

E018

01

INTERFACE

CD

K46

AB

K47

CD

K47

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

AB

K48

K48

ALG223
08-15
K49 P1

AB

K103

J1

K104

ALG223

ALG223

00-07
K49

J1

08-15
K50
P1

P1

INTERFACE MODULES LOCATION


AND CONTROLLER MODULES WIRING

K105

J1

K106

J1

K107

J1

ALG223

ALG223

ALG223

00-07

08-15

00-07

K50

P1

K51

P1

HEP BUJ 20CBA FS00 001

E018

P1

K51

=20CBA

323 sheets

+00GH003

next sheet
E018
Sheet
E017

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

CD

J1

path

14

4C+

4C-

01

C-D14

C-D01

-K94

-K53
4C-

2D+

2D-

2D+

2D-

-K81

4C+

4C-

4C+

4C-

4C+

4C-

2D+

2D-

2D+

2D-

POLARITIES DISTRIBUTION
WITH ITS LABELS

POLARITIES DISTRIBUTION
WITH ITS LABELS

ROW D

-K66
4C+

14

C-B01

01
ROW B

C-B14

2D+

2D-

4C+

4C-

2D+

2D-

14

01
C-C01

-K80

4C+

01
ROW E

ROW C

C-C14

14
C-E14

-K67
4C-

2D+

C-E01

-K108
2D-

4C+

-K95
4C-

2D+

2D-

4C+

4C-

2D+

2D-

4C+

4C-

POLARITIES DISTRIBUTION
WITH ITS LABELS

4C+

4C-

2D+

2D-

2A+

2A-

POLARITIES DISTRIBUTION
WITH ITS LABELS

2D+

2D-

4C+

4C-

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

POLARITIES DISTRIBUTION FOR


HEP BUJ 20CBA FS00 001
INTERFACE MODULES WITH ITS LABLES

323 sheets

+00GH003

next sheet
F101
Sheet
E018

AS-D-PH-EO-4001

05_Internal equipment

Repl. by

=20CBA

path

PARTS LIST
A

Item

Device designation

Location

Sheet-map

Geo. mark

Manufactuer

=20CBA

-X231 (8)

+00GH001

K026.D1

C-B03

ABB ENTRELEC

=20CBA

-X232 (6)

+00GH001

M714.B6

C-B04

ABB ENTRELEC

=20CBA

-X233 (6)

+00GH001

M716.D4

C-B05

ABB ENTRELEC

=20CBA

-X234 (8)

+00GH001

M715.B4

C-B06

ABB ENTRELEC

=20CBA

-X291 (6)

+00GH001

M716.E3

C-B07

ABB ENTRELEC

=20CBA

-X401 (8)

+00GH001

K001.B2

E-A01

ABB ENTRELEC

=20CBA

-X402 (8)

+00GH001

K001.B3

E-A02

=20CBA

-X431 (8)

+00GH001

K001.D5

=20CBA

-X432 (12)

+00GH001

10

=20CBA

-X901 (12)

11

=20CBA

12

SAP Number

Type

Description

D2.5/5.4L

TERMINAL BLOCK SPRING CLAMP FOR POLARITY DISTRIBUTION

1153152

M4/6

TERMINAL SCR/SCR M4/6

1153152

M4/6

TERMINAL SCR/SCR M4/6

D2.5/5.4L

TERMINAL BLOCK SPRING CLAMP FOR POLARITY DISTRIBUTION

1153152

M4/6

TERMINAL SCR/SCR M4/6

1153152

M4/6

TERMINAL SCR/SCR M4/6

ABB ENTRELEC

M4/6

TERMINAL SCR/SCR M4/6

C-B01

ABB ENTRELEC

D2.5/5.4L

TERMINAL BLOCK SPRING CLAMP FOR POLARITY DISTRIBUTION

K003.D4

C-B02

ABB ENTRELEC

D2.5/5.4L

TERMINAL BLOCK SPRING CLAMP FOR POLARITY DISTRIBUTION

+00GH001

K019.B2

F-B03

ABB ENTRELEC

M10/10

TERMINAL SCR/SCR M10/10

-P1

+00GH001

K024.D5

A-C01

ALSTOM

MMI

VIDEO TOUCH SCREEN DISPLAY

=20CBA

-S1

+00GH001

J001.A1

A-D01

SCHNEIDER

K1F003UZ4

3 POLE KEY OPERATED SELECTOR SWITCH WITH BLANK LEGEND

13

=20CBA

-S2

+00GH001

J001.A3

A-D02

SCHNEIDER

K1E023W+KAC1H

3 POLE SPRING RETURN SELECTOR SWITCH WITH BLANK LEGEND

14

=20CBA

-V1

+00GH001

15

=20CBA

-B3

+00GH001

16

=20CBA

-F4

17

=20CBA

18

1153167

A-E01

VENTILATOR WITH GRID & FILTER 250x250

K019.D3

B-A01

DOOR SWITCH

+00GH001

K001.B2

B-B01

Merlin Gerin

-K1

+00GH001

K001.C1

B-B02

PHOENIX

=20CBA

-F5

+00GH001

K001.B3

B-B03

Merlin Gerin

19

=20CBA

-K2

+00GH001

K001.D4

B-B04

PHOENIX

20

=20CBA

-F6

+00GH001

K001.E6

B-C01

Merlin Gerin

21

=20CBA

-T1

+00GH001

K003.B2

B-C02

PHOENIX

22

=20CBA

-R1

+00GH001

K003.C2

B-C03

23

=20CBA

-T2

+00GH001

K003.B3

24

=20CBA

-F7

+00GH001

25

=20CBA

-F8

26

=20CBA

27

C60H

2 POLES CB 16A/D (DC) WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

PLC-RSC

STD:INSTANTANEOUS RELAY 120VAC/DC

C60H

2 POLES CB 16A/D (DC) WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

PLC-RSC

STD:INSTANTANEOUS RELAY 120VAC/DC

C60H 2P 6 A/D

2 POLES CB 6A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

1176710

QUINT PS-100

STD:POWER SUPPLY 100-240VAC/24VDC 20A

PHOENIX

1176327

QUINT DIODES

STD:COUPLING DIODES 24VDC

B-C04

PHOENIX

1176710

QUINT PS-100

STD:POWER SUPPLY 100-240VAC/24VDC 20A

K001.E7

B-C05

Merlin Gerin

C60H 2P 6 A/D

2 POLES CB 6A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

+00GH001

K024.B5

B-D01

Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

-K3

+00GH001

K024.D4

B-D02

ALSTOM

C10 PC IND

CENTRALOG 10 STATION ON INDUSTRIAL PC 2U

=20CBA

-F9

+00GH001

K024.B4

B-D03

Merlin Gerin

C60H 2P 10 A/D

2 POLES CB 10A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

28

=20CBA

-F10

+00GH001

K022.C2

B-E01

Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

29

=20CBA

-T3

+00GH001

K022.E2

B-E02

ALSTOM

RS20-0800M2M2

RAIL SWITCH ETHERNET 6xFE TX + 2xFE MM/ST

30

=20CBA

-F11

+00GH001

K022.C4

B-E03

Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

31

=20CBA

-T4

+00GH001

K022.E4

B-E04

ALSTOM

RS20-0800M2M2

RAIL SWITCH ETHERNET 6xFE TX + 2xFE MM/ST

32

=20CBA

-F12

+00GH001

K022.C6

B-E05

Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

33

=20CBA

-T5

+00GH001

K022.E6

B-E06

ALSTOM

RS20-0800M2M2

RAIL SWITCH ETHERNET 6xFE TX + 2xFE MM/ST

34

=20CBA

-F13

+00GH001

K026.B1

B-E07

Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

35

=20CBA

-T6

+00GH001

M714.D4

B-E08

ACEB ELECTRONIQUE

AE4821B

OPTIC FIBER MULTIMODE RECEIVING BOX

36

=20CBA

-T7

+00GH001

M715.C3

B-E09

ACEB ELECTRONIQUE

AE4821B

OPTIC FIBER MULTIMODE RECEIVING BOX

Date

0
First Issue

Higher Level Assignment

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

1179975

MATERIAL LIST

HEP BUJ 20CBA FS00 001

=20CBA

323 sheets

+00GH001

next sheet
F102
Sheet
F101

AS-D-PH-EO-4001

06_Parts List

Repl. by

1179975

path

PARTS LIST
A

Item

Device designation

Location

Sheet-map

Geo. mark

Manufactuer

SAP Number

Type

Description

37

=20CBA

-K4

+00GH001

M714.C5

B-E10

PHOENIX

PLC-OSP

OPTO ISOLATOR : PLC-OSP-24DC/110DC/3RW

38

=20CBA

-K5

+00GH001

M715.B5

B-E11

PHOENIX

PLC-OSP

OPTO ISOLATOR : PLC-OSP-24DC/110DC/3RW

39

=20CBA

-K6

+00GH001

M715.B6

B-E12

PHOENIX

PLC-OSP

OPTO ISOLATOR : PLC-OSP-24DC/110DC/3RW

40

=20CBA

-K7

+00GH001

M715.B7

B-E13

PHOENIX

PLC-OSP

OPTO ISOLATOR : PLC-OSP-24DC/110DC/3RW

41

=20CBA

-K8

+00GH001

M716.C2

B-E14

PHOENIX

PLC-OSP

OPTO ISOLATOR : PLC-OSP-24DC/110DC/3RW

42

=20CBA

-K9

+00GH001

M716.C3

B-E15

PHOENIX

PLC-OSP

OPTO ISOLATOR : PLC-OSP-24DC/110DC/3RW

43

=20CBA

-R3

+00GH001

M714.B6

B-E16

R 1.2k/0.5W

RESISTOR

44

=20CBA

-R4

+00GH001

M716.D4

B-E17

R 1.2k/0.5W

RESISTOR

45

=20CBA

-X1

+00GH001

J001.A5

B-F01

NEXANS

24 OPTICAL CONNECTORS RACK

46

=20CBA

-X2

+00GH001

J001.A6

B-F02

NEXANS

24 OPTICAL CONNECTORS RACK

47

=20CBA

-F14

+00GH001

K023.C2

B-G01

Merlin Gerin

48

=20CBA

-T8

+00GH001

M703.B6

B-G02

ALSTOM

49

=20CBA

-F15

+00GH001

K023.C4

B-G03

Merlin Gerin

50

=20CBA

-T9

+00GH001

M703.C7

B-G04

ALSTOM

51

=20CBA

-F16

+00GH001

K023.C6

B-G05

Merlin Gerin

52

=20CBA

-T10

+00GH001

M704.B6

B-G06

ALSTOM

53

=20CBA

-F17

+00GH001

K023.C8

B-G07

Merlin Gerin

54

=20CBA

-T11

+00GH001

M704.C7

B-G08

ALSTOM

55

=20CBA

-E2

+00GH001

K019.E3

C-A01

LIGHTING LAMP 250VAC

56

=20CBA

-B4

+00GH001

K019.D3

C-A02

DOOR SWITCH

57

=20CBA

-K10

+00GH001

M714.C7

C-C01

58

=20CBA

-G1

+00GH001

K019.E5

D-B01

59

=20CBA

-R2

+00GH001

K001.C2

F-A01

ARCEL

60

=20CBA

-F18

+00GH001

K019.C4

F-C01

Merlin Gerin

61

=20CBA

-X3

+00GH001

K019.E4

F-C02

LEGRAND

62

=20CBA

-B1

+00GH001

M118.B6

I-A01

63

=20CBA

-F1

+00GH001

K019.C3

J-A01

Merlin Gerin

C60H 2P 1 A/D

2 POLES CB 1A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

64

=20CBA

-F2

+00GH001

K019.C5

J-B01

Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

65

=20CBA

-GH1

+00GH001

J-C01

REPUTED

DOCUMENT CASE

DOCUMENT CASE

66

=20CBA

-B2

+00GH001

K019.D2

J-D01

67

=20CBA

-F3

+00GH001

K019.C2

J-D02

68

=20CBA

-E1

+00GH001

K019.E2

J-D03

Date

1
First Issue

Higher Level Assignment

revision

Customer

GOVERNMENT OF UGANDA

Established P.SAINI

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

ALSTOM

1183203

1183203

1183203

1180434

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

IR186-1 24VDC

STD:REPEATER FIP / OPTICAL MULTIMODE

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

IR186-1 24VDC

STD:REPEATER FIP / OPTICAL MULTIMODE

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

IR186-1 24VDC

STD:REPEATER FIP / OPTICAL MULTIMODE

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

IR186-1 24VDC

STD:REPEATER FIP / OPTICAL MULTIMODE

CL412 A-M

STD:CURRENT/RS232 CONVERTER

ELECTRICAL FAN 230VAC WITH GRID & FILTER


1176871

IRK 236

STD:COUPLING DIODES 230A

C60H 2P 20 A/D

2 POLES CB 20A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

1153121

STD:SOCKET OUTLET 10/16A


TEMPERATURE SENSOR

MOISTURE SENSOR
Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA


HEATING RESISTOR 230VAC FOR CUBICLE

MATERIAL LIST

HEP BUJ 20CBA FS00 001

=20CBA

323 sheets

+00GH001

next sheet
F201
Sheet
F102

AS-D-PH-EO-4001

06_Parts List

Repl. by

1183203

path

PARTS LIST
A

Item

Device designation

Location

Sheet-map

Geo. mark

Manufactuer

SAP Number

Type

Description

=20CBA

-X231 (8)

+00GH002

K009.D4

C-C01

ABB ENTRELEC

D2.5/5.4L

TERMINAL BLOCK SPRING CLAMP FOR POLARITY DISTRIBUTION

=20CBA

-X232 (6)

+00GH002

K012.C1

C-C02

ABB ENTRELEC

D2.5/5.4L

TERMINAL BLOCK SPRING CLAMP FOR POLARITY DISTRIBUTION

=20CBA

-X233 (6)

+00GH002

K025.C1

E-A01

ABB ENTRELEC

D2.5/5.4L

TERMINAL BLOCK SPRING CLAMP FOR POLARITY DISTRIBUTION

=20CBA

-X234 (21)

+00GH002

M209.B1

C-C03

ABB ENTRELEC

1153152

M4/6

TERMINAL SCR/SCR M4/6

=20CBA

-X291 (6)

+00GH002

K012.D2

C-C04

ABB ENTRELEC

1153152

M4/6

TERMINAL SCR/SCR M4/6

=20CBA

-X292 (6)

+00GH002

M716.E2

C-C05

ABB ENTRELEC

1153152

M4/6

TERMINAL SCR/SCR M4/6

=20CBA

-X293 (6)

+00GH002

K012.D2

F-D01

ABB ENTRELEC

1153152

M4/6

TERMINAL SCR/SCR M4/6

=20CBA

-X401 (8)

+00GH002

K006.B2

C-B01

ABB ENTRELEC

1153152

M4/6

TERMINAL SCR/SCR M4/6

=20CBA

-X402 (8)

+00GH002

K006.B3

C-B02

ABB ENTRELEC

1153152

M4/6

TERMINAL SCR/SCR M4/6

10

=20CBA

-X431 (10)

+00GH002

K006.D5

C-B03

ABB ENTRELEC

D2.5/5.4L

TERMINAL BLOCK SPRING CLAMP FOR POLARITY DISTRIBUTION

11

=20CBA

-X432 (6)

+00GH002

C-B04

ABB ENTRELEC

D2.5/5.4L

TERMINAL BLOCK SPRING CLAMP FOR POLARITY DISTRIBUTION

12

=20CBA

-X492 (8)

+00GH002

Q131.D4

F-A02

ABB ENTRELEC

1153152

M4/6

TERMINAL SCR/SCR M4/6

13

=20CBA

-X901 (12)

+00GH002

K020.B2

F-B01

ABB ENTRELEC

1153167

M10/10

TERMINAL SCR/SCR M10/10

14

=20CBA

-V3

+00GH002

15

=20CBA

-B7

+00GH002

16

=20CBA

-F22

17

=20CBA

18

A-C01

VENTILATOR WITH GRID & FILTER 250x250

K020.D3

B-A01

DOOR SWITCH

+00GH002

K006.B2

B-B01

Merlin Gerin

-K11

+00GH002

K006.C1

B-B02

PHOENIX

=20CBA

-F23

+00GH002

K006.B3

B-B03

Merlin Gerin

19

=20CBA

-K12

+00GH002

K006.C4

B-B04

PHOENIX

20

=20CBA

-F24

+00GH002

K012.B1

B-B05

21

=20CBA

-F25

+00GH002

K024.B1

22

=20CBA

-K13

+00GH002

23

=20CBA

-F26

24

=20CBA

25

C60H

2 POLES CB 16A/D (DC) WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

PLC-RSC

STD:INSTANTANEOUS RELAY 120VAC/DC

C60H

2 POLES CB 16A/D (DC) WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

PLC-RSC

STD:INSTANTANEOUS RELAY 120VAC/DC

Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

B-C01

Merlin Gerin

C60H

2 POLES CB 16A/D (DC) WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

K024.D1

B-C02

ALSTOM

PCX-R2

PCX-R2_002

+00GH002

K024.B2

B-C03

Merlin Gerin

C60H

2 POLES CB 16A/D (DC) WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

-F27

+00GH002

K006.E6

B-D01

Merlin Gerin

C60H 2P 6 A/D

2 POLES CB 6A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

=20CBA

-T12

+00GH002

K009.B2

B-D02

PHOENIX

1176710

QUINT PS-100

STD:POWER SUPPLY 100-240VAC/24VDC 20A

26

=20CBA

-R6

+00GH002

K009.C2

B-D03

PHOENIX

1176327

QUINT DIODES

STD:COUPLING DIODES 24VDC

27

=20CBA

-T13

+00GH002

K009.B3

B-D04

PHOENIX

1176710

QUINT PS-100

STD:POWER SUPPLY 100-240VAC/24VDC 20A

28

=20CBA

-F28

+00GH002

K006.E7

B-D05

Merlin Gerin

C60H 2P 6 A/D

2 POLES CB 6A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

29

=20CBA

-F29

+00GH002

K006.E8

B-E01

Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

30

=20CBA

-A1

+00GH002

M001.A2

B-E02

ALSTOM

1153726

IC693CHS391

C80-35 MFC CPU-baseplate, 10 slots

31

=20CBA

-K14

+00GH002

M001.A2

B-E03

ALSTOM

1153733

IC693PWR330

C80-35 High capacity AC/DC power supply module

32

=20CBA

-K15

+00GH002

M001.A3

B-E04

ALSTOM

1153737

IC693CPU350

C80-35 CPU 350 module - Processing Unit

33

=20CBA

-K16

+00GH002

M001.A3

B-E05

ALSTOM

1153741

IC693BEM340

C80-35 BEM340 FIP bus controller

34

=20CBA

-K17

+00GH002

J003.B1

B-E06

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

35

=20CBA

-K18

+00GH002

J003.B2

B-E07

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

36

=20CBA

-K19

+00GH002

J003.B4

B-E08

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

Date

2
First Issue

Higher Level Assignment

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

1179975

MATERIAL LIST

HEP BUJ 20CBA FS00 001

=20CBA

323 sheets

+00GH002

next sheet
F202
Sheet
F201

AS-D-PH-EO-4001

06_Parts List

Repl. by

1179975

path

PARTS LIST
A

Item

Device designation

Location

Sheet-map

Geo. mark

Manufactuer

SAP Number

Type

Description

37

=20CBA

-K20

+00GH002

J003.B6

B-E09

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

38

=20CBA

-K21

+00GH002

J003.B7

B-E10

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

39

=20CBA

-K22

+00GH002

J004.B1

B-E11

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

40

=20CBA

-K23

+00GH002

J004.B2

B-E12

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

41

=20CBA

-K24

+00GH002

J004.B4

B-E13

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

42

=20CBA

-F30

+00GH002

K007.D2

B-F01

Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

43

=20CBA

-A2

+00GH002

M001.D2

B-F02

ALSTOM

1153726

IC693CHS391

C80-35 MFC CPU-baseplate, 10 slots

44

=20CBA

-K25

+00GH002

M001.D2

B-F03

ALSTOM

1153733

IC693PWR330

C80-35 High capacity AC/DC power supply module

45

=20CBA

-K26

+00GH002

M001.D3

B-F04

ALSTOM

1153737

IC693CPU350

C80-35 CPU 350 module - Processing Unit

46

=20CBA

-K27

+00GH002

M001.D3

B-F05

ALSTOM

1153741

IC693BEM340

C80-35 BEM340 FIP bus controller

47

=20CBA

-K28

+00GH002

J004.B6

B-F06

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

48

=20CBA

-K29

+00GH002

J004.B7

B-F07

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

49

=20CBA

-K30

+00GH002

J005.B1

B-F08

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

50

=20CBA

-K31

+00GH002

J005.B2

B-F09

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

51

=20CBA

-K32

+00GH002

J005.B4

B-F10

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

52

=20CBA

-K33

+00GH002

J005.B6

B-F11

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

53

=20CBA

-K34

+00GH002

J005.B7

B-F12

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

54

=20CBA

-K35

+00GH002

J006.B1

B-F13

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

55

=20CBA

-F31

+00GH002

K007.D3

B-G01

Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

56

=20CBA

-A3

+00GH002

M002.A2

B-G02

ALSTOM

1153726

IC693CHS391

C80-35 MFC CPU-baseplate, 10 slots

57

=20CBA

-K36

+00GH002

M002.A2

B-G03

ALSTOM

1153733

IC693PWR330

C80-35 High capacity AC/DC power supply module

58

=20CBA

-K37

+00GH002

M002.A3

B-G04

ALSTOM

1153737

IC693CPU350

C80-35 CPU 350 module - Processing Unit

59

=20CBA

-K38

+00GH002

M002.A3

B-G05

ALSTOM

1153741

IC693BEM340

C80-35 BEM340 FIP bus controller

60

=20CBA

-K39

+00GH002

J006.B2

B-G06

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

61

=20CBA

-K40

+00GH002

J006.B4

B-G07

ALSTOM

1153750

IC693MDL655

DIGITAL INPUT CARD MDL655, 32 INPUTS

62

=20CBA

-F32

+00GH002

K007.D4

B-H01

Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

63

=20CBA

-A4

+00GH002

M002.D2

B-H02

ALSTOM

1153726

IC693CHS391

C80-35 MFC CPU-baseplate, 10 slots

64

=20CBA

-K41

+00GH002

M002.D2

B-H03

ALSTOM

1153733

IC693PWR330

C80-35 High capacity AC/DC power supply module

65

=20CBA

-K42

+00GH002

M002.D3

B-H04

ALSTOM

1153738

IC693CPU363

C80-35 CPU 363 module - Processing Unit

66

=20CBA

-K43

+00GH002

M002.D3

B-H05

ALSTOM

1153741

IC693BEM340

C80-35 BEM340 FIP bus controller

67

=20CBA

-K44

+00GH002

M002.D3

B-H06

ALSTOM

1153745

IC693PCM301

STD:PCM301-PROGRAMMABLE COPROCESSOR

68

=20CBA

-K45

+00GH002

J006.B6

B-H07

ALSTOM

IC693MDL645

DIGITAL INPUT CARD MDL645, 16 INPUTS

69

=20CBA

-K46

+00GH002

J006.B7

B-H08

ALSTOM

1153753

IC693MDL753

DIGITAL OUTPUT CARD MDL753, 32 OUTPUTS

70

=20CBA

-K47

+00GH002

J007.B1

B-H09

ALSTOM

1153753

IC693MDL753

DIGITAL OUTPUT CARD MDL753, 32 OUTPUTS

71

=20CBA

-K48

+00GH002

J007.B2

B-H10

ALSTOM

1153753

IC693MDL753

DIGITAL OUTPUT CARD MDL753, 32 OUTPUTS

72

=20CBA

-K49

+00GH002

J007.B4

B-H11

ALSTOM

1153756

IC693ALG223

ANALOG INPUT CARD ALG223, 16 INPUTS

Date

2
First Issue

Higher Level Assignment

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MATERIAL LIST

=20CBA

323 sheets

+00GH002

next sheet
F203
Sheet
F202

AS-D-PH-EO-4001

06_Parts List

Repl. by

HEP BUJ 20CBA FS00 001

path

PARTS LIST
A

Item

Higher Level Assignment

Device designation

Location

Sheet-map

Geo. mark

Manufactuer

SAP Number

Type

Description

73

=20CBA

-K50

+00GH002

J007.B6

B-H12

ALSTOM

1153756

IC693ALG223

ANALOG INPUT CARD ALG223, 16 INPUTS

74

=20CBA

-K51

+00GH002

J007.B7

B-H13

ALSTOM

1153756

IC693ALG223

ANALOG INPUT CARD ALG223, 16 INPUTS

75

=20CBA

-K52

+00GH002

M716.E2

B-H14

ALSTOM

1164888

MZ295

STD:MZ295-SYNCHRO KIT FOR BEM340 FIP

76

=20CBA

-X8

+00GH002

M707.B2

B-I01

ABB ENTRELEC

1184962

TAP2

STD:F8000 BUS TAP PASSIVE DERIVATION

77

=20CBA

-X9

+00GH002

M707.B4

B-I02

ABB ENTRELEC

1184962

TAP2

STD:F8000 BUS TAP PASSIVE DERIVATION

78

=20CBA

-E4

+00GH002

K020.E3

C-A01

LIGHTING LAMP 250VAC

79

=20CBA

-B8

+00GH002

K020.D3

C-A02

DOOR SWITCH

80

=20CBA

-G2

+00GH002

K020.E5

D-B01

ELECTRICAL FAN 230VAC WITH GRID & FILTER

81

=20CBA

-F33

+00GH002

K025.B1

E-A02

Merlin Gerin

82

=20CBA

-T14

+00GH002

M708.B4

E-A03

ABB ENTRELEC

83

=20CBA

-X4

+00GH002

M709.B1

E-A04

84

=20CBA

-T15

+00GH002

M710.B4

85

=20CBA

-X5

+00GH002

86

=20CBA

-X6

87

=20CBA

88

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

1180343

ILPH

STD:SERIAL LINK RS232/RS485 INTERFACE 24-48VDC

PHOENIX

1153134

PSM-PTK-4

STD:RS485 SHARING OUT MODULE

E-A05

ABB ENTRELEC

1180343

ILPH

STD:SERIAL LINK RS232/RS485 INTERFACE 24-48VDC

M711.B2

E-A06

PHOENIX

1153134

PSM-PTK-4

STD:RS485 SHARING OUT MODULE

+00GH002

M712.B2

E-A07

PHOENIX

1153134

PSM-PTK-4

STD:RS485 SHARING OUT MODULE

-R5

+00GH002

K006.C2

F-A01

ARCEL

1176871

IRK 236

STD:COUPLING DIODES 230A

=20CBA

-F34

+00GH002

K020.C4

F-C01

Merlin Gerin

C60H 2P 20 A/D

2 POLES CB 20A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

89

=20CBA

-X7

+00GH002

K020.E4

F-C02

LEGRAND

90

=20CBA

-B5

+00GH002

M111.B8

I-A01

91

=20CBA

-F19

+00GH002

K020.C3

J-A01

Merlin Gerin

C60H 2P 1 A/D

2 POLES CB 1A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

92

=20CBA

-F20

+00GH002

K020.C5

J-B01

Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

93

=20CBA

-GH2

+00GH002

J-C01

REPUTED

DOCUMENT CASE

DOCUMENT CASE

94

=20CBA

-B6

+00GH002

K020.D2

J-D01

95

=20CBA

-F21

+00GH002

K020.C2

J-D02

96

=20CBA

-E3

+00GH002

K020.E2

J-D03

1153121

STD:SOCKET OUTLET 10/16A


TEMPERATURE SENSOR

MOISTURE SENSOR
Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA


HEATING RESISTOR 230VAC FOR CUBICLE

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MATERIAL LIST

=20CBA

323 sheets

+00GH002

next sheet
F301
Sheet
F203

AS-D-PH-EO-4001

06_Parts List

Repl. by

HEP BUJ 20CBA FS00 001

path

PARTS LIST
A

Item

Device designation

Location

Sheet-map

Geo. mark

Manufactuer

SAP Number

Type

Description

=20CBA

-X231 (6)

+00GH003

K015.B1

F-A04

ABB ENTRELEC

D2.5/5.4L

TERMINAL BLOCK SPRING CLAMP FOR POLARITY DISTRIBUTION

=20CBA

-X232 (8)

+00GH003

K016.D1

F-A06

ABB ENTRELEC

D2.5/5.4L

TERMINAL BLOCK SPRING CLAMP FOR POLARITY DISTRIBUTION

=20CBA

-X233 (6)

+00GH003

K018.D1

F-A08

ABB ENTRELEC

D2.5/5.4L

TERMINAL BLOCK SPRING CLAMP FOR POLARITY DISTRIBUTION

=20CBA

-X431 (6)

+00GH003

K013.B1

F-A01

ABB ENTRELEC

D2.5/5.4L

TERMINAL BLOCK SPRING CLAMP FOR POLARITY DISTRIBUTION

=20CBA

-X432 (8)

+00GH003

K013.D2

F-A03

ABB ENTRELEC

D2.5/5.4L

TERMINAL BLOCK SPRING CLAMP FOR POLARITY DISTRIBUTION

=20CBA

-X901 (12)

+00GH003

K021.B2

F-B01

ABB ENTRELEC

M10/10

TERMINAL SCR/SCR M10/10

=20CBA

-V4

+00GH003

=20CBA

-B11

+00GH003

=20CBA

-E6

10

=20CBA

11

1153167

A-B01

VENTILATOR WITH GRID & FILTER 250x250

K021.D3

B-A01

DOOR SWITCH

+00GH003

K021.E3

C-A01

LIGHTING LAMP 250VAC

-B12

+00GH003

K021.D3

C-A02

DOOR SWITCH

=20CBA

-K53

+00GH003

M003.A2

C-B01

PHOENIX

12

=20CBA

-K54

+00GH003

M104.D1

C-B02

ALSTOM

13

=20CBA

-K55

+00GH003

M101.C1

C-B03

14

=20CBA

-K56

+00GH003

M110.C1

15

=20CBA

-K57

+00GH003

16

=20CBA

-K58

17

=20CBA

18

FLKM-PDP-SO1100

POLARITIES DISTRIBUTION MODULE FOR INTERFACE CARDS

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

C-B04

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

M107.C1

C-B05

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

+00GH003

M116.C1

C-B06

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

-K59

+00GH003

M113.C1

C-B07

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

=20CBA

-K60

+00GH003

M122.C1

C-B08

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

19

=20CBA

-K61

+00GH003

M119.C1

C-B09

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

20

=20CBA

-K62

+00GH003

M128.C1

C-B10

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

21

=20CBA

-K63

+00GH003

M125.C1

C-B11

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

22

=20CBA

-K64

+00GH003

M134.C1

C-B12

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

23

=20CBA

-K65

+00GH003

M131.C1

C-B13

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

24

=20CBA

-K66

+00GH003

M005.A2

C-B14

PHOENIX

FLKM-PDP-SO1100

POLARITIES DISTRIBUTION MODULE FOR INTERFACE CARDS

25

=20CBA

-K67

+00GH003

M003.D2

C-C01

PHOENIX

FLKM-PDP-SO1100

POLARITIES DISTRIBUTION MODULE FOR INTERFACE CARDS

26

=20CBA

-K68

+00GH003

M140.C1

C-C02

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

27

=20CBA

-K69

+00GH003

M137.C1

C-C03

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

28

=20CBA

-K70

+00GH003

M146.C1

C-C04

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

29

=20CBA

-K71

+00GH003

M143.C1

C-C05

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

30

=20CBA

-K72

+00GH003

M152.C1

C-C06

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

31

=20CBA

-K73

+00GH003

M149.C1

C-C07

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

32

=20CBA

-K74

+00GH003

M158.C1

C-C08

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

33

=20CBA

-K75

+00GH003

M155.C1

C-C09

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

34

=20CBA

-K76

+00GH003

M164.C1

C-C10

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

35

=20CBA

-K77

+00GH003

M161.C1

C-C11

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

36

=20CBA

-K78

+00GH003

M170.C1

C-C12

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

Date

1
First Issue

Higher Level Assignment

revision

Customer

GOVERNMENT OF UGANDA

Established P.SAINI

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MATERIAL LIST

=20CBA

323 sheets

+00GH003

next sheet
F302
Sheet
F301

AS-D-PH-EO-4001

06_Parts List

Repl. by

HEP BUJ 20CBA FS00 001

path

PARTS LIST
A

Item

Device designation

Location

Sheet-map

Geo. mark

Manufactuer

SAP Number
1165154

37

=20CBA

-K79

+00GH003

M167.C1

C-C13

ALSTOM

38

=20CBA

-K80

+00GH003

M005.D2

C-C14

39

=20CBA

-K81

+00GH003

M004.A2

40

=20CBA

-K82

+00GH003

41

=20CBA

-K83

42

=20CBA

43

Type

Description

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

PHOENIX

FLKM-PDP-SO1100

POLARITIES DISTRIBUTION MODULE FOR INTERFACE CARDS

C-D01

PHOENIX

FLKM-PDP-SO1100

POLARITIES DISTRIBUTION MODULE FOR INTERFACE CARDS

M176.C1

C-D02

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

+00GH003

M173.C1

C-D03

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

-K84

+00GH003

M182.C1

C-D04

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

=20CBA

-K85

+00GH003

M179.C1

C-D05

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

44

=20CBA

-K86

+00GH003

M188.C1

C-D06

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

45

=20CBA

-K87

+00GH003

M185.C1

C-D07

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

46

=20CBA

-K88

+00GH003

M194.C1

C-D08

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

47

=20CBA

-K89

+00GH003

M191.C1

C-D09

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

48

=20CBA

-K90

+00GH003

M200.C1

C-D10

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

49

=20CBA

-K91

+00GH003

M197.C1

C-D11

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

50

=20CBA

-K92

+00GH003

M206.C1

C-D12

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

51

=20CBA

-K93

+00GH003

M203.C1

C-D13

ALSTOM

1165154

16DI 110VDC

16 LOGIC INPUTS OPTO-ISOLATED PROCESS INTERFACE CARD

52

=20CBA

-K94

+00GH003

M006.A2

C-D14

PHOENIX

FLKM-PDP-SO1100

POLARITIES DISTRIBUTION MODULE FOR INTERFACE CARDS

53

=20CBA

-K95

+00GH003

M004.D2

C-E01

PHOENIX

FLKM-PDP-SO1100

POLARITIES DISTRIBUTION MODULE FOR INTERFACE CARDS

54

=20CBA

-K96

+00GH003

M504.B1

C-E02

ALSTOM

1165168

16DO 24VDC

16 RELAY LOGIC OUTPUTS PROCESS INTERFACE CARD

55

=20CBA

-K97

+00GH003

M501.B1

C-E03

ALSTOM

1165168

16DO 24VDC

16 RELAY LOGIC OUTPUTS PROCESS INTERFACE CARD

56

=20CBA

-K98

+00GH003

M510.B1

C-E04

ALSTOM

1165168

16DO 24VDC

16 RELAY LOGIC OUTPUTS PROCESS INTERFACE CARD

57

=20CBA

-K99

+00GH003

M507.B1

C-E05

ALSTOM

1165168

16DO 24VDC

16 RELAY LOGIC OUTPUTS PROCESS INTERFACE CARD

58

=20CBA

-K100

+00GH003

M516.B1

C-E06

ALSTOM

1165168

16DO 24VDC

16 RELAY LOGIC OUTPUTS PROCESS INTERFACE CARD

59

=20CBA

-K101

+00GH003

M513.B1

C-E07

ALSTOM

1165168

16DO 24VDC

16 RELAY LOGIC OUTPUTS PROCESS INTERFACE CARD

60

=20CBA

-K102

+00GH003

M603.C1

C-E08

ALSTOM

1165169

8AI 24VDC

8 ANALOG INPUTS PROCESS INTERFACE CARD

61

=20CBA

-K103

+00GH003

M601.C1

C-E09

ALSTOM

1165169

8AI 24VDC

8 ANALOG INPUTS PROCESS INTERFACE CARD

62

=20CBA

-K104

+00GH003

M607.C1

C-E10

ALSTOM

1165169

8AI 24VDC

8 ANALOG INPUTS PROCESS INTERFACE CARD

63

=20CBA

-K105

+00GH003

M605.C1

C-E11

ALSTOM

1165169

8AI 24VDC

8 ANALOG INPUTS PROCESS INTERFACE CARD

64

=20CBA

-K106

+00GH003

M611.C1

C-E12

ALSTOM

1165169

8AI 24VDC

8 ANALOG INPUTS PROCESS INTERFACE CARD

65

=20CBA

-K107

+00GH003

M609.C1

C-E13

ALSTOM

1165169

8AI 24VDC

8 ANALOG INPUTS PROCESS INTERFACE CARD

66

=20CBA

-K108

+00GH003

M006.D2

C-E14

PHOENIX

FLKM-PDP-SO1100

POLARITIES DISTRIBUTION MODULE FOR INTERFACE CARDS

67

=20CBA

-G3

+00GH003

K021.E5

D-B01

68

=20CBA

-F38

+00GH003

K013.C2

F-A02

Merlin Gerin

C60H 2P 6 A/D

2 POLES CB 6A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

69

=20CBA

-F39

+00GH003

K015.C2

F-A05

Merlin Gerin

C60H 2P 10 A/D

2 POLES CB 10A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

70

=20CBA

-F40

+00GH003

K015.C3

F-A07

Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

71

=20CBA

-F41

+00GH003

K021.C4

F-C01

Merlin Gerin

C60H 2P 20 A/D

2 POLES CB 20A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

72

=20CBA

-X7

+00GH003

K021.E4

F-C02

LEGRAND

Date

1
First Issue

Higher Level Assignment

revision

Customer

GOVERNMENT OF UGANDA

Established P.SAINI

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

ELECTRICAL FAN 230VAC WITH GRID & FILTER

1153121

STD:SOCKET OUTLET 10/16A

MATERIAL LIST

HEP BUJ 20CBA FS00 001

=20CBA

323 sheets

+00GH003

next sheet
F303
Sheet
F302

AS-D-PH-EO-4001

06_Parts List

Repl. by

path

PARTS LIST
A

Item

Higher Level Assignment

Device designation

Location

Sheet-map

Geo. mark

Manufactuer

SAP Number

Type

Description

73

=20CBA

-B9

+00GH003

M118.B7

I-A01

TEMPERATURE SENSOR

74

=20CBA

-F35

+00GH003

K021.C3

J-A01

Merlin Gerin

C60H 2P 1 A/D

2 POLES CB 1A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

75

=20CBA

-F36

+00GH003

K021.C5

J-B01

Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA

76

=20CBA

-GH3

+00GH003

J-C01

REPUTED

DOCUMENT CASE

DOCUMENT CASE

77

=20CBA

-B10

+00GH003

K021.D2

J-D01

78

=20CBA

-F37

+00GH003

K021.C2

J-D02

79

=20CBA

-E5

+00GH003

K021.E2

J-D03

MOISTURE SENSOR
Merlin Gerin

C60H 2P 2 A/D

2 POLES CB 2A/D WITH 2 (OF + SD/OF ) C/O CONTACT + MGLA


HEATING RESISTOR 230VAC FOR CUBICLE

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MATERIAL LIST

=20CBA

323 sheets

+00GH003

next sheet
J001
Sheet
F303

AS-D-PH-EO-4001

06_Parts List

Repl. by

HEP BUJ 20CBA FS00 001

path

LOCAL/REMOTE SELECTOR SW

FAULT RESET

-S1
+00GH001

OPTICAL CONNECTION RACK

-S2

A- D01

+00GH001

A- D02

OPTICAL CONNECTION RACK

-X1
+00GH001

B- F 01

-X2
+00GH001

B- F 02

A
0

1 = LOCAL
0 = OFF
2 = REMOTE

1 0 2
C
C

C
C
C
C

/M702.B2 A1

B1

/M703.B4 /M702.C2 A1

B1

/M702.B2 A2

B2

/M703.C4 /M702.C2 A2

B2

A3

B3

/M702.B6 /M702.D2 A3

B3

/M702.C6

A4

B4

/M702.B6 /M702.E2 A4

B4

/M702.C6

2 0 4
C

/M210.B3

/M210.B1

10

11

12

A5

B5

A5

B5

/M702.D6

A6

B6

A6

B6

/M702.E6

8
A7

B7

A7

B7

/M703.D4

10

A8

B8

A8

B8

/M703.D4

A9

B9

/M704.B4

A9

B9

/M704.D4

A10

B10 /M704.C4

A10

B10 /M704.D4

A11

B11

A11

B11 /M714.B2

A12

B12

A12

B12 /M715.B1

/M209.B7

C
C = Closing

C = Closing

Date

1
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P.SAINI

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

SELECTOR SWITCHES,PUSH BUTTON


AND OPTICAL CONNECTION RACK

AS-D-PH-EO-4001

08_Contact References of Complex Devices

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
J002
Sheet
J001

RS20 0800M2M2

RS20 0800M2M2

+00GH001

-T4

B- E 02

RS20 0800M2M2

-T3

+00GH001

-T5

B- E 04

+00GH001

B- E 06

A
POWER

POWER

POWER

SUPPLY

SUPPLY

SUPPLY

ON

RM
0V(3)

V1(1)
V2(6)

0V(4)
18-32VDC
271mA/24VDC

STANDBY

0V(4)
18-32VDC
271mA/24VDC

ON

FAULT

ON

RM
0V(3)

V1(1)
V2(6)

/K022.E2

/K022.E4
STANDBY

ON

0V(4)
18-32VDC
271mA/24VDC

FAULT

/M211.B1

0V(3)

V1(1)
V2(6)

RM

ON

STANDBY

ON

/K022.E6

FAULT

/M211.B3

/M211.B4

OPTICAL

ETHERNET

OPTICAL

ETHERNET

/M701.B2

/M701.B3

6R

7R

/M702.C3

E2

/M701.B4

7E

E3

/M702.B3

6E

/M701.B5

6E

7E

6R

7R

/M702.D4

/M701.B7

E4

7R

E1

FIBER

E1
6R

E2

7E

E3

/M701.B2

6E

E4

E4

E3

E2

OPTICAL

ETHERNET

FIBER

E1

FIBER

/M701.B5

D
E5

E5

E5

E6

E6

E6

Date

1
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P.SAINI

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

RS20 0800-M2M2 SWITCHES

AS-D-PH-EO-4001

08_Contact References of Complex Devices

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
J003
Sheet
J002

IC693MDL655

IC693MDL655

+00GH002

IC693MDL655

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K17

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K18

03

/M113.F4
/M113.F5
/M113.F6
/M113.F7
/M114.F2
/M114.F3
/M114.F4
/M114.F5

07

IA006.00
IA006.01
IA006.02
IA006.03
IA006.04
IA006.05
IA006.06
IA006.07

/M119.F4
/M119.F5
/M119.F6
/M119.F7
/M120.F2
/M120.F3
/M120.F4
/M120.F5

IA007.00
IA007.01
IA007.02
IA007.03
IA007.04
IA007.05
IA007.06
IA007.07

/M125.F4
/M125.F5
/M125.F6
/M125.F7
/M126.F2
/M126.F3
/M126.F4
/M126.F5

/M107.F1
/M108.F6
/M108.F7
/M109.F2
/M109.F3
/M109.F4
/M109.F5
/M109.F6
/M109.F7

A-24VDC/ACOM:
IA005.08
IA005.09
IA005.10
IA005.11
IA005.12
IA005.13
IA005.14
IA005.15

/M113.F1
/M114.F6
/M114.F7
/M115.F2
/M115.F3
/M115.F4
/M115.F5
/M115.F6
/M115.F7

A-24VDC/ACOM:
IA006.08
IA006.09
IA006.10
IA006.11
IA006.12
IA006.13
IA006.14
IA006.15

/M119.F1
/M120.F6
/M120.F7
/M121.F2
/M121.F3
/M121.F4
/M121.F5
/M121.F6
/M121.F7

A-24VDC/ACOM:
IA007.08
IA007.09
IA007.10
IA007.11
IA007.12
IA007.13
IA007.14
IA007.15

/M125.F1
/M126.F6
/M126.F7
/M127.F2
/M127.F3
/M127.F4
/M127.F5
/M127.F6
/M127.F7

B-24VDC/BCOM:

/M101.F2

B-24VDC/BCOM:

/M107.F2

B-24VDC/BCOM:

/M113.F2

B-24VDC/BCOM:

/M119.F2

B-24VDC/BCOM:

/M125.F2

/M104.F4
/M104.F5
/M104.F6
/M104.F7
/M105.F2
/M105.F3
/M105.F4
/M105.F5

IA004.16
IA004.17
IA004.18
IA004.19
IA004.20
IA004.21
IA004.22
IA004.23

/M104.F1

Date
First Issue

/M105.F6
/M105.F7
/M106.F2
/M106.F3
/M106.F4
/M106.F5
/M106.F6
/M106.F7

30/04/2010

/M110.F4
/M110.F5
/M110.F6
/M110.F7
/M111.F2
/M111.F3
/M111.F4
/M111.F5

C-24VDC/CCOM:

IA005.16
IA005.17
IA005.18
IA005.19
IA005.20
IA005.21
IA005.22
IA005.23

/M110.F1

IA004.24
IA004.25
IA004.26
IA004.27
IA004.28
IA004.29
IA004.30
IA004.31

D-24VDC/DCOM: /M104.F2
Rack:
/M001.C4

revision

IA005.00
IA005.01
IA005.02
IA005.03
IA005.04
IA005.05
IA005.06
IA005.07

06

A-24VDC/ACOM:
IA004.08
IA004.09
IA004.10
IA004.11
IA004.12
IA004.13
IA004.14
IA004.15

IA003.24
IA003.25
IA003.26
IA003.27
IA003.28
IA003.29
IA003.30
IA003.31

/M107.F4
/M107.F5
/M107.F6
/M107.F7
/M108.F2
/M108.F3
/M108.F4
/M108.F5

Controller 8035
IC693MDL655
Digital inputs

-K21

/M101.F1
/M102.F6
/M102.F7
/M103.F2
/M103.F3
/M103.F4
/M103.F5
/M103.F6
/M103.F7

C-24VDC/CCOM:

05

IA004.00
IA004.01
IA004.02
IA004.03
IA004.04
IA004.05
IA004.06
IA004.07

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K20

A-24VDC/ACOM:
IA003.08
IA003.09
IA003.10
IA003.11
IA003.12
IA003.13
IA003.14
IA003.15
IA003.16
IA003.17
IA003.18
IA003.19
IA003.20
IA003.21
IA003.22
IA003.23

/M101.F4
/M101.F5
/M101.F6
/M101.F7
/M102.F2
/M102.F3
/M102.F4
/M102.F5

IC693MDL655

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K19

04

IA003.00
IA003.01
IA003.02
IA003.03
IA003.04
IA003.05
IA003.06
IA003.07

IC693MDL655

C-24VDC/CCOM:

/M111.F6
/M111.F7
/M112.F2
/M112.F3
/M112.F4
/M112.F5
/M112.F6
/M112.F7

IA005.24
IA005.25
IA005.26
IA005.27
IA005.28
IA005.29
IA005.30
IA005.31

D-24VDC/DCOM: /M110.F2
Rack:
/M001.C4

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

/M116.F1

/M122.F4
/M122.F5
/M122.F6
/M122.F7
/M123.F2
/M123.F3
/M123.F4
/M123.F5

C-24VDC/CCOM:

/M117.F6
/M117.F7
/M118.F2
/M118.F3
/M118.F4
/M118.F5
/M118.F6
/M118.F7

IA006.24
IA006.25
IA006.26
IA006.27
IA006.28
IA006.29
IA006.30
IA006.31

IA007.16
IA007.17
IA007.18
IA007.19
IA007.20
IA007.21
IA007.22
IA007.23

/M122.F1

IA007.24
IA007.25
IA007.26
IA007.27
IA007.28
IA007.29
IA007.30
IA007.31

D-24VDC/DCOM: /M122.F2
Rack:
/M001.C5

/M129.F6
/M129.F7
/M130.F2
/M130.F3
/M130.F4
/M130.F5
/M130.F6
/M130.F7

D-24VDC/DCOM: /M128.F2
Rack:
/M001.C6

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001
6

/M128.F1

=20CBA

08_Contact References of Complex Devices

/M128.F4
/M128.F5
/M128.F6
/M128.F7
/M129.F2
/M129.F3
/M129.F4
/M129.F5

C-24VDC/CCOM:

/M123.F6
/M123.F7
/M124.F2
/M124.F3
/M124.F4
/M124.F5
/M124.F6
/M124.F7

INTERFACE CONTROLLER MODULES

Repl. by

IA006.16
IA006.17
IA006.18
IA006.19
IA006.20
IA006.21
IA006.22
IA006.23

D-24VDC/DCOM: /M116.F2
Rack:
/M001.C5

Established PRANAV

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

/M116.F4
/M116.F5
/M116.F6
/M116.F7
/M117.F2
/M117.F3
/M117.F4
/M117.F5

path

323 sheets
next sheet
J004
Sheet
J003

IC693MDL655

IC693MDL655

+00GH002

IC693MDL655

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K22

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K23

08

/M143.F4
/M143.F5
/M143.F6
/M143.F7
/M144.F2
/M144.F3
/M144.F4
/M144.F5

04

IB003.00
IB003.01
IB003.02
IB003.03
IB003.04
IB003.05
IB003.06
IB003.07

/M149.F4
/M149.F5
/M149.F6
/M149.F7
/M150.F2
/M150.F3
/M150.F4
/M150.F5

IB004.00
IB004.01
IB004.02
IB004.03
IB004.04
IB004.05
IB004.06
IB004.07

/M155.F4
/M155.F5
/M155.F6
/M155.F7
/M156.F2
/M156.F3
/M156.F4
/M156.F5

/M137.F1
/M138.F6
/M138.F7
/M139.F2
/M139.F3
/M139.F4
/M139.F5
/M139.F6
/M139.F7

A-24VDC/ACOM:
IA010.08
IA010.09
IA010.10
IA010.11
IA010.12
IA010.13
IA010.14
IA010.15

/M143.F1
/M144.F6
/M144.F7
/M145.F2
/M145.F3
/M145.F4
/M145.F5
/M145.F6
/M145.F7

A-24VDC/ACOM:
IB003.08
IB003.09
IB003.10
IB003.11
IB003.12
IB003.13
IB003.14
IB003.15

/M149.F1
/M150.F6
/M150.F7
/M151.F2
/M151.F3
/M151.F4
/M151.F5
/M151.F6
/M151.F7

A-24VDC/ACOM:
IB004.08
IB004.09
IB004.10
IB004.11
IB004.12
IB004.13
IB004.14
IB004.15

/M155.F1
/M156.F6
/M156.F7
/M157.F2
/M157.F3
/M157.F4
/M157.F5
/M157.F6
/M157.F7

B-24VDC/BCOM:

/M131.F2

B-24VDC/BCOM:

/M137.F2

B-24VDC/BCOM:

/M143.F2

B-24VDC/BCOM:

/M149.F2

B-24VDC/BCOM:

/M155.F2

/M134.F4
/M134.F5
/M134.F6
/M134.F7
/M135.F2
/M135.F3
/M135.F4
/M135.F5

IA009.16
IA009.17
IA009.18
IA009.19
IA009.20
IA009.21
IA009.22
IA009.23

/M134.F1

Date
First Issue

/M135.F6
/M135.F7
/M136.F2
/M136.F3
/M136.F4
/M136.F5
/M136.F6
/M136.F7

30/04/2010

/M140.F4
/M140.F5
/M140.F6
/M140.F7
/M141.F2
/M141.F3
/M141.F4
/M141.F5

C-24VDC/CCOM:

IA010.16
IA010.17
IA010.18
IA010.19
IA010.20
IA010.21
IA010.22
IA010.23

/M140.F1

IA009.24
IA009.25
IA009.26
IA009.27
IA009.28
IA009.29
IA009.30
IA009.31

D-24VDC/DCOM: /M134.F2
Rack:
/M001.C6

revision

IA010.00
IA010.01
IA010.02
IA010.03
IA010.04
IA010.05
IA010.06
IA010.07

03

A-24VDC/ACOM:
IA009.08
IA009.09
IA009.10
IA009.11
IA009.12
IA009.13
IA009.14
IA009.15

IA008.24
IA008.25
IA008.26
IA008.27
IA008.28
IA008.29
IA008.30
IA008.31

/M137.F4
/M137.F5
/M137.F6
/M137.F7
/M138.F2
/M138.F3
/M138.F4
/M138.F5

Controller 8035
IC693MDL655
Digital inputs

-K29

/M131.F1
/M132.F6
/M132.F7
/M133.F2
/M133.F3
/M133.F4
/M133.F5
/M133.F6
/M133.F7

C-24VDC/CCOM:

10

IA009.00
IA009.01
IA009.02
IA009.03
IA009.04
IA009.05
IA009.06
IA009.07

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K28

A-24VDC/ACOM:
IA008.08
IA008.09
IA008.10
IA008.11
IA008.12
IA008.13
IA008.14
IA008.15
IA008.16
IA008.17
IA008.18
IA008.19
IA008.20
IA008.21
IA008.22
IA008.23

/M131.F4
/M131.F5
/M131.F6
/M131.F7
/M132.F2
/M132.F3
/M132.F4
/M132.F5

IC693MDL655

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K24

09

IA008.00
IA008.01
IA008.02
IA008.03
IA008.04
IA008.05
IA008.06
IA008.07

IC693MDL655

C-24VDC/CCOM:

/M141.F6
/M141.F7
/M142.F2
/M142.F3
/M142.F4
/M142.F5
/M142.F6
/M142.F7

IA010.24
IA010.25
IA010.26
IA010.27
IA010.28
IA010.29
IA010.30
IA010.31

D-24VDC/DCOM: /M140.F2
Rack:
/M001.C6

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

/M146.F1

/M152.F4
/M152.F5
/M152.F6
/M152.F7
/M153.F2
/M153.F3
/M153.F4
/M153.F5

C-24VDC/CCOM:

/M147.F6
/M147.F7
/M148.F2
/M148.F3
/M148.F4
/M148.F5
/M148.F6
/M148.F7

IB003.24
IB003.25
IB003.26
IB003.27
IB003.28
IB003.29
IB003.30
IB003.31

IB004.16
IB004.17
IB004.18
IB004.19
IB004.20
IB004.21
IB004.22
IB004.23

/M152.F1

IB004.24
IB004.25
IB004.26
IB004.27
IB004.28
IB004.29
IB004.30
IB004.31

D-24VDC/DCOM: /M152.F2
Rack:
/M001.E4

/M159.F6
/M159.F7
/M160.F2
/M160.F3
/M160.F4
/M160.F5
/M160.F6
/M160.F7

D-24VDC/DCOM: /M158.F2
Rack:
/M001.E4

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001
6

/M158.F1

=20CBA

08_Contact References of Complex Devices

/M158.F4
/M158.F5
/M158.F6
/M158.F7
/M159.F2
/M159.F3
/M159.F4
/M159.F5

C-24VDC/CCOM:

/M153.F6
/M153.F7
/M154.F2
/M154.F3
/M154.F4
/M154.F5
/M154.F6
/M154.F7

INTERFACE CONTROLLER MODULES

Repl. by

IB003.16
IB003.17
IB003.18
IB003.19
IB003.20
IB003.21
IB003.22
IB003.23

D-24VDC/DCOM: /M146.F2
Rack:
/M001.C7

Established PRANAV

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

/M146.F4
/M146.F5
/M146.F6
/M146.F7
/M147.F2
/M147.F3
/M147.F4
/M147.F5

path

323 sheets
next sheet
J005
Sheet
J004

IC693MDL655

IC693MDL655

+00GH002

IC693MDL655

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K30

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K31

05

/M173.F4
/M173.F5
/M173.F6
/M173.F7
/M174.F2
/M174.F3
/M174.F4
/M174.F5

09

IB008.00
IB008.01
IB008.02
IB008.03
IB008.04
IB008.05
IB008.06
IB008.07

/M179.F4
/M179.F5
/M179.F6
/M179.F7
/M180.F2
/M180.F3
/M180.F4
/M180.F5

IB009.00
IB009.01
IB009.02
IB009.03
IB009.04
IB009.05
IB009.06
IB009.07

/M185.F4
/M185.F5
/M185.F6
/M185.F7
/M186.F2
/M186.F3
/M186.F4
/M186.F5

/M167.F1
/M168.F6
/M168.F7
/M169.F2
/M169.F3
/M169.F4
/M169.F5
/M169.F6
/M169.F7

A-24VDC/ACOM:
IB007.08
IB007.09
IB007.10
IB007.11
IB007.12
IB007.13
IB007.14
IB007.15

/M173.F1
/M174.F6
/M174.F7
/M175.F2
/M175.F3
/M175.F4
/M175.F5
/M175.F6
/M175.F7

A-24VDC/ACOM:
IB008.08
IB008.09
IB008.10
IB008.11
IB008.12
IB008.13
IB008.14
IB008.15

/M179.F1
/M180.F6
/M180.F7
/M181.F2
/M181.F3
/M181.F4
/M181.F5
/M181.F6
/M181.F7

A-24VDC/ACOM:
IB009.08
IB009.09
IB009.10
IB009.11
IB009.12
IB009.13
IB009.14
IB009.15

/M185.F1
/M186.F6
/M186.F7
/M187.F2
/M187.F3
/M187.F4
/M187.F5
/M187.F6
/M187.F7

B-24VDC/BCOM:

/M161.F2

B-24VDC/BCOM:

/M167.F2

B-24VDC/BCOM:

/M173.F2

B-24VDC/BCOM:

/M179.F2

B-24VDC/BCOM:

/M185.F2

/M164.F4
/M164.F5
/M164.F6
/M164.F7
/M165.F2
/M165.F3
/M165.F4
/M165.F5

IB006.16
IB006.17
IB006.18
IB006.19
IB006.20
IB006.21
IB006.22
IB006.23

/M164.F1

Date
First Issue

/M165.F6
/M165.F7
/M166.F2
/M166.F3
/M166.F4
/M166.F5
/M166.F6
/M166.F7

30/04/2010

/M170.F4
/M170.F5
/M170.F6
/M170.F7
/M171.F2
/M171.F3
/M171.F4
/M171.F5

C-24VDC/CCOM:

IB007.16
IB007.17
IB007.18
IB007.19
IB007.20
IB007.21
IB007.22
IB007.23

/M170.F1

IB006.24
IB006.25
IB006.26
IB006.27
IB006.28
IB006.29
IB006.30
IB006.31

D-24VDC/DCOM: /M164.F2
Rack:
/M001.E5

revision

IB007.00
IB007.01
IB007.02
IB007.03
IB007.04
IB007.05
IB007.06
IB007.07

08

A-24VDC/ACOM:
IB006.08
IB006.09
IB006.10
IB006.11
IB006.12
IB006.13
IB006.14
IB006.15

IB005.24
IB005.25
IB005.26
IB005.27
IB005.28
IB005.29
IB005.30
IB005.31

/M167.F4
/M167.F5
/M167.F6
/M167.F7
/M168.F2
/M168.F3
/M168.F4
/M168.F5

Controller 8035
IC693MDL655
Digital inputs

-K34

/M161.F1
/M162.F6
/M162.F7
/M163.F2
/M163.F3
/M163.F4
/M163.F5
/M163.F6
/M163.F7

C-24VDC/CCOM:

07

IB006.00
IB006.01
IB006.02
IB006.03
IB006.04
IB006.05
IB006.06
IB006.07

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K33

A-24VDC/ACOM:
IB005.08
IB005.09
IB005.10
IB005.11
IB005.12
IB005.13
IB005.14
IB005.15
IB005.16
IB005.17
IB005.18
IB005.19
IB005.20
IB005.21
IB005.22
IB005.23

/M161.F4
/M161.F5
/M161.F6
/M161.F7
/M162.F2
/M162.F3
/M162.F4
/M162.F5

IC693MDL655

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K32

06

IB005.00
IB005.01
IB005.02
IB005.03
IB005.04
IB005.05
IB005.06
IB005.07

IC693MDL655

C-24VDC/CCOM:

/M171.F6
/M171.F7
/M172.F2
/M172.F3
/M172.F4
/M172.F5
/M172.F6
/M172.F7

IB007.24
IB007.25
IB007.26
IB007.27
IB007.28
IB007.29
IB007.30
IB007.31

D-24VDC/DCOM: /M170.F2
Rack:
/M001.E5

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

/M176.F1

/M182.F4
/M182.F5
/M182.F6
/M182.F7
/M183.F2
/M183.F3
/M183.F4
/M183.F5

C-24VDC/CCOM:

/M177.F6
/M177.F7
/M178.F2
/M178.F3
/M178.F4
/M178.F5
/M178.F6
/M178.F7

IB008.24
IB008.25
IB008.26
IB008.27
IB008.28
IB008.29
IB008.30
IB008.31

IB009.16
IB009.17
IB009.18
IB009.19
IB009.20
IB009.21
IB009.22
IB009.23

/M182.F1

IB009.24
IB009.25
IB009.26
IB009.27
IB009.28
IB009.29
IB009.30
IB009.31

D-24VDC/DCOM: /M182.F2
Rack:
/M001.E6

/M189.F6
/M189.F7
/M190.F2
/M190.F3
/M190.F4
/M190.F5
/M190.F6
/M190.F7

D-24VDC/DCOM: /M188.F2
Rack:
/M001.E6

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001
6

/M188.F1

=20CBA

08_Contact References of Complex Devices

/M188.F4
/M188.F5
/M188.F6
/M188.F7
/M189.F2
/M189.F3
/M189.F4
/M189.F5

C-24VDC/CCOM:

/M183.F6
/M183.F7
/M184.F2
/M184.F3
/M184.F4
/M184.F5
/M184.F6
/M184.F7

INTERFACE CONTROLLER MODULES

Repl. by

IB008.16
IB008.17
IB008.18
IB008.19
IB008.20
IB008.21
IB008.22
IB008.23

D-24VDC/DCOM: /M176.F2
Rack:
/M001.E6

Established PRANAV

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

/M176.F4
/M176.F5
/M176.F6
/M176.F7
/M177.F2
/M177.F3
/M177.F4
/M177.F5

path

323 sheets
next sheet
J006
Sheet
J005

IC693MDL655

IC693MDL655

+00GH002

IC693MDL655

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K35

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K39

10

/M203.F4
/M203.F5
/M203.F6
/M203.F7
/M204.F2
/M204.F3
/M204.F4
/M204.F5

/M197.F1
/M198.F6
/M198.F7
/M199.F2
/M199.F3
/M199.F4
/M199.F5
/M199.F6
/M199.F7

A-24VDC/ACOM:
IC004.08
IC004.09
IC004.10
IC004.11
IC004.12
IC004.13
IC004.14
IC004.15

/M203.F1
/M204.F6
/M204.F7
/M205.F2
/M205.F3
/M205.F4
/M205.F5
/M205.F6
/M205.F7

B-24VDC/BCOM:

/M191.F2

B-24VDC/BCOM:

/M197.F2

B-24VDC/BCOM:

/M203.F2

IC003.16
IC003.17
IC003.18
IC003.19
IC003.20
IC003.21
IC003.22
IC003.23

/M194.F1

Date
First Issue

/M195.F6
/M195.F7
/M196.F2
/M196.F3
/M196.F4
/M196.F5
/M196.F6
/M196.F7

30/04/2010

/M200.F4
/M200.F5
/M200.F6
/M200.F7
/M201.F2
/M201.F3
/M201.F4
/M201.F5

C-24VDC/CCOM:

IC004.16
IC004.17
IC004.18
IC004.19
IC004.20
IC004.21
IC004.22
IC004.23

/M200.F1

IC003.24
IC003.25
IC003.26
IC003.27
IC003.28
IC003.29
IC003.30
IC003.31

D-24VDC/DCOM: /M194.F2
Rack:
/M001.E7

revision

IC004.00
IC004.01
IC004.02
IC004.03
IC004.04
IC004.05
IC004.06
IC004.07

A-24VDC/ACOM:
IC003.08
IC003.09
IC003.10
IC003.11
IC003.12
IC003.13
IC003.14
IC003.15

IB010.24
IB010.25
IB010.26
IB010.27
IB010.28
IB010.29
IB010.30
IB010.31

/M197.F4
/M197.F5
/M197.F6
/M197.F7
/M198.F2
/M198.F3
/M198.F4
/M198.F5

C-24VDC/CCOM:

/M201.F6
/M201.F7
/M202.F2
/M202.F3
/M202.F4
/M202.F5
/M202.F6
/M202.F7

IC004.24
IC004.25
IC004.26
IC004.27
IC004.28
IC004.29
IC004.30
IC004.31

D-24VDC/DCOM: /M200.F2
Rack:
/M002.C4

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

FA004.00
FA004.01
FA004.02
FA004.03
FA004.04
FA004.05
FA004.06
FA004.07
FA004.08
FA004.09
FA004.10
FA004.11
FA004.12
FA004.13
FA004.14
FA004.15
Power supply
Rack:

/M209.F3
/M209.F4
/M209.F6
/M209.F7
/M210.F1
/M210.F2
/M210.F4
/M210.F5
/M210.F6
/M210.F7
/M211.F1
/M211.F2
/M211.F4
/M211.F5
/M211.F6
/M211.F7
/M209.F1
/M002.E4

FA005.00
FA005.01
FA005.02
FA005.03
FA005.04
FA005.05
FA005.06
FA005.07

/M501.A1
/M502.B5
/M502.B6
/M503.B1
/M503.B2
/M503.B3
/M503.B4
/M503.B5
/M503.B6

B-24VDC/BCOM:

/M501.A2

FA005.16
FA005.17
FA005.18
FA005.19
FA005.20
FA005.21
FA005.22
FA005.23

/M206.F1

/M501.B3
/M501.B4
/M501.B5
/M501.B6
/M502.B1
/M502.B2
/M502.B3
/M502.B4

A-24VDC/ACOM:
FA005.08
FA005.09
FA005.10
FA005.11
FA005.12
FA005.13
FA005.14
FA005.15

/M206.F4
/M206.F5
/M206.F6
/M206.F7
/M207.F2
/M207.F3
/M207.F4
/M207.F5

C-24VDC/CCOM:

/M207.F6
/M207.F7
/M208.F2
/M208.F3
/M208.F4
/M208.F5
/M208.F6
/M208.F7

FA005.24
FA005.25
FA005.26
FA005.27
FA005.28
FA005.29
FA005.30
FA005.31

/M504.B3
/M504.B4
/M504.B5
/M504.B6
/M505.B1
/M505.B2
/M505.B3
/M505.B4

/M504.A1
/M505.B5
/M505.B6
/M506.B1
/M506.B2
/M506.B3
/M506.B4
/M506.B5
/M506.B6

=20CBA

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

08_Contact References of Complex Devices

D-24VDC/DCOM: /M504.A2
Rack:
/M002.E5

INTERFACE CONTROLLER MODULES

Repl. by

05

D-24VDC/DCOM: /M206.F2
Rack:
/M002.C4

Established PRANAV

Controller 8035
IC693MDL753
Digital outputs

-K46

04

/M191.F1
/M192.F6
/M192.F7
/M193.F2
/M193.F3
/M193.F4
/M193.F5
/M193.F6
/M193.F7

C-24VDC/CCOM:

IC003.00
IC003.01
IC003.02
IC003.03
IC003.04
IC003.05
IC003.06
IC003.07

/M194.F4
/M194.F5
/M194.F6
/M194.F7
/M195.F2
/M195.F3
/M195.F4
/M195.F5

+00GH002
Controller 8035
IC693MDL645
Digital inputs

-K45

04

A-24VDC/ACOM:
IB010.08
IB010.09
IB010.10
IB010.11
IB010.12
IB010.13
IB010.14
IB010.15
IB010.16
IB010.17
IB010.18
IB010.19
IB010.20
IB010.21
IB010.22
IB010.23

/M191.F4
/M191.F5
/M191.F6
/M191.F7
/M192.F2
/M192.F3
/M192.F4
/M192.F5

IC693MDL753

+00GH002
Controller 8035
IC693MDL655
Digital inputs

-K40

03

IB010.00
IB010.01
IB010.02
IB010.03
IB010.04
IB010.05
IB010.06
IB010.07

IC693MDL645

path

323 sheets
next sheet
J007
Sheet
J006

IC693MDL753

IC693MDL753

+00GH002

IC693ALG223

+00GH002
Controller 8035
IC693MDL753
Digital outputs

-K47

+00GH002
Controller 8035
IC693MDL753
Digital outputs

-K48

06

A-24VDC/ACOM:
FA006.08
FA006.09
FA006.10
FA006.11
FA006.12
FA006.13
FA006.14
FA006.15

B-24VDC/BCOM:
FA006.16
FA006.17
FA006.18
FA006.19
FA006.20
FA006.21
FA006.22
FA006.23

C-24VDC/CCOM:
FA006.24
FA006.25
FA006.26
FA006.27
FA006.28
FA006.29
FA006.30
FA006.31

/M507.A1
/M508.B5
/M508.B6
/M509.B1
/M509.B2
/M509.B3
/M509.B4
/M509.B5
/M509.B6

Date
First Issue

revision

/M513.A2

FA007.16
FA007.17
FA007.18
FA007.19
FA007.20
FA007.21
FA007.22
FA007.23

/M510.A1

Controller 8035
IC693ALG223
Analog inputs

-K51

09
/M601.F5
/M601.F6
/M601.F7
/M602.F3
/M602.F4
/M602.F5
/M602.F6
/M602.F7
/M603.F5
/M603.F6
/M603.F7
/M604.F3
/M604.F4
/M604.F5
/M604.F6
/M604.F7

10

FA009.00
FA009.01
FA009.02
FA009.03
FA009.04
FA009.05
FA009.06
FA009.07
FA009.08
FA009.09
FA009.10
FA009.11
FA009.12
FA009.13
FA009.14
FA009.15

/M605.F5
/M605.F6
/M605.F7
/M606.F3
/M606.F4
/M606.F5
/M606.F6
/M606.F7
/M607.F5
/M607.F6
/M607.F7
/M608.F3
/M608.F4
/M608.F5
/M608.F6
/M608.F7

FA010.00
FA010.01
FA010.02
FA010.03
FA010.04
FA010.05
FA010.06
FA010.07
FA010.08
FA010.09
FA010.10
FA010.11
FA010.12
FA010.13
FA010.14
FA010.15

Power supply

Power supply

Power supply

Rack:

Rack:

Rack:

/M609.F5
/M609.F6
/M609.F7
/M610.F3
/M610.F4
/M610.F5
/M610.F6
/M610.F7
/M611.F5
/M611.F6
/M611.F7
/M612.F3
/M612.F4
/M612.F5
/M612.F6
/M612.F7

/M516.B3
/M516.B4
/M516.B5
/M516.B6
/M517.B1
/M517.B2
/M517.B3
/M517.B4

C-24VDC/CCOM:

/M511.B5
/M511.B6
/M512.B1
/M512.B2
/M512.B3
/M512.B4
/M512.B5
/M512.B6

FA008.00
FA008.01
FA008.02
FA008.03
FA008.04
FA008.05
FA008.06
FA008.07
FA008.08
FA008.09
FA008.10
FA008.11
FA008.12
FA008.13
FA008.14
FA008.15

/M513.A1
/M514.B5
/M514.B6
/M515.B1
/M515.B2
/M515.B3
/M515.B4
/M515.B5
/M515.B6

B-24VDC/BCOM:

/M510.B3
/M510.B4
/M510.B5
/M510.B6
/M511.B1
/M511.B2
/M511.B3
/M511.B4

30/04/2010

/M513.B3
/M513.B4
/M513.B5
/M513.B6
/M514.B1
/M514.B2
/M514.B3
/M514.B4

A-24VDC/ACOM:
FA007.08
FA007.09
FA007.10
FA007.11
FA007.12
FA007.13
FA007.14
FA007.15

/M507.A2

+00GH002
Controller 8035
IC693ALG223
Analog inputs

-K50

08

FA007.00
FA007.01
FA007.02
FA007.03
FA007.04
FA007.05
FA007.06
FA007.07

/M516.A1

FA007.24
FA007.25
FA007.26
FA007.27
FA007.28
FA007.29
FA007.30
FA007.31

D-24VDC/DCOM: /M510.A2
Rack:
/M002.E5

/M507.B3
/M507.B4
/M507.B5
/M507.B6
/M508.B1
/M508.B2
/M508.B3
/M508.B4

IC693ALG223

+00GH002
Controller 8035
IC693ALG223
Analog inputs

-K49

07

FA006.00
FA006.01
FA006.02
FA006.03
FA006.04
FA006.05
FA006.06
FA006.07

IC693ALG223

/M517.B5
/M517.B6
/M518.B1
/M518.B2
/M518.B3
/M518.B4
/M518.B5
/M518.B6

D-24VDC/DCOM: /M516.A2
Rack:
/M002.E5

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERFACE CONTROLLER MODULES

AS-D-PH-EO-4001

08_Contact References of Complex Devices

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
K001
Sheet
J007

110V DC

110V DC

110V DC

110V DC

TO

TO

MAIN 1 SUPPLY

MAIN 1 SUPPLY

MAIN 2 SUPPLY

MAIN 2 SUPPLY

110VDC / 24VDC CONVERTER-1

110VDC / 24VDC CONVERTER-2

SUPERVISION

4J1+/-

4J2+/-

SUPERVISION
110VDC DISTRIBUTION BOARD

GS 303
DWG : AS-D-GE-EO-3951
SHEET : 101 & 106
XP(+) XP(-) CUBICLE :20BUB02GH101

XP(+) XP(-)

GS 108
B04A

/K006.A2

4
3003

2003

GS 156
D04A

2004

3002

/K006.A2

2002

3001

+00GH001

2001

-X401 3

BUSBAR-2

BUSBAR-1

-X402
+00GH001

3004

B
-F5

16A

12
14
22
24

-K2
+00GH001
.C4
B- B 04

A2

3008
N3

PLC-RSC

A1

3007
P3 2008

3005
N2 3006

A1

2007

P2 2006

2005

A2

-K1
+00GH001
.C1
B- B 02

B- B 03
'D' CURVE
4

B- B 01
'D' CURVE

12
14
22
24

+00GH001

21

/K006.A3
11

16A

21

11

-F4
+00GH001

/K006.A3

PLC-RSC

-R2
.C1

+00GH001
.C4
F- A01
11
21

P1

21

14
/M111.B3
12
24
22

14
/M111.B4
12
24
22

N1

11

3009

2009
-X431

1 .2

1 .1

1 .4

1 .3

3 .2

/K002.D1
3 .4

3 .3

+00GH001

2 3011

-F7

6A

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

4J2- 3014 3
/K003.B3

/K003.B3

=20CBA

110V DC
POLARITIES DISTRIBUTION (+00GH001)

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

09_Polarities

Repl. by

/K003.B2

/K003.B2
Date

0
First Issue

E
4J2+ 2014 4

B- C05
'D' CURVE

4J1- 3013 3

B- C01
'D' CURVE

4J1+ 2013 4

12
14
22
24

12
14
22
24

+00GH001

21

/K002.D1
11

1
6A

+00GH001

21

-F6

11

3 .1

2 3010

-X431

2011

2010

+00GH001

path

323 sheets
next sheet
K002
Sheet K001

SPARE TB

SPARE TB

SPARE TB

SPARE TB

/K001.D8

D
-X431

2 .2

2 .1

2 .4

2 .3

+00GH001

/K001.E8
-X431

4 .2

4 .1

4 .4

4 .3

+00GH001

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

110V DC
POLARITIES DISTRIBUTION (+00GH001)

AS-D-PH-EO-4001

09_Polarities

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
K003
Sheet
K002

110VDC / 24VDC

110VDC / 24VDC

RS20 S8000 NETWORK-1

DRAINAGE PIT-1 LCC IR 186

DRAINAGE PIT-2 LCC IR 186

CONVERTER-1

CONVERTER-2

24VDC SUPPLY

24V DC SUPPLY

24V DC SUPPLY

4J1+/-

4J2+/-

4J2-

-T2
+00GH001
B- C04

110VDC
FAULT
/M210.B4

B
PE

FAULT
/M210.B5

PE

24VDC
20A

4001

5001

4002

5114

24VDC
20A

5113

110VDC

-T1
+00GH001
B- C02

/K001.F7

4J2+

/K001.F7

4J1-

/K001.F6

4J1+

/K001.F6

I2

I1

5002

-R1

+00GH001

02

O1

B- C03

4003

4004

-X432

1 .2

1 .1

1 .4

1 .3

+00GH001

/K004.C1
-X432

6 .2

6 .1

6 .4

6 .3

5005

4007

5004

4006

5003

4005

+00GH001

/K004.D1

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

/K023.B6

/K023.B6

/K023.B2

/K023.B2

=20CBA

24V DC
POLARITIES DISTRIBUTION (+00GH001)

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

09_Polarities

Repl. by

/K022.B2

/K022.B2

path

323 sheets
next sheet
K004
Sheet K003

RS20 S8000 NETWORK-2

DRAINAGE PIT-1 LCC IR 186

DRAINAGE PIT-2 LCC IR 186

RS20 SITE NETWORK

LOCAL MMI-C10 PC

MMI DISPLAY SCREEN

24VDC SUPPLY

24V DC SUPPLY

24V DC SUPPLY

24VDC SUPPLY

POWER SUPPLY

POWER SUPPLY

/K003.D7
-X432 2

2 .2

2 .1

2 .4

2 .3

3 .2

3 .1

3 .4

3 .3

+00GH001

/K003.E7

/K005.D1
-X432

7 .2

7 .1

7 .4

7 .3

8 .2

8 .1

8 .4

8 .3

+00GH001

Date

0
First Issue

revision

30/04/2010

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

AS-D-PH-EO-4001

09_Polarities

HEP BUJ 20CBA FS00 001

path

5011

/K024.B5

4013

/K024.B5

5010

/K024.B4

4012

/K024.B4

5009

/K022.B6

4011

/K022.B6

5008

=20CBA

24V DC
POLARITIES DISTRIBUTION (+00GH001)

Repl. by

/K023.B8

4010

/K023.B8

5007

/K023.B4

4009

5006

/K023.B4

/K022.B4

/K022.B4

4008

/K005.D1

323 sheets
next sheet
K005
Sheet
K004

TO

TO

COMMON

CLOCK PULSE

N/W POLARITY

DISTRIBUTION

SPARE TB

SPARE TB

SPARE TB

SPARE TB

SPARE TB

/K004.D8
-X432

4 .2

4 .1

4 .4

4 .3

5 .2

5 .1

5 .4

5 .3

+00GH001

/K004.D8

-X432

9 .2

9 .1

9 .4

9 .3

10

10.1

10.2

10.4

10.3

Date

0
First Issue

revision

30/04/2010

5013

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

24V DC
POLARITIES DISTRIBUTION (+00GH001)

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

09_Polarities

Repl. by

/K026.B1

4015

/K026.B1

5012

/K025.B1

/K025.B1

4014

+00GH001

path

323 sheets
next sheet
K006
Sheet
K005

110VDC

110VDC

110VDC

110VDC

TO

TO

IHR1

MAIN 1 SUPPLY

MAIN 1 SUPPLY

MAIN 2 SUPPLY

MAIN 2 SUPPLY

110VDC / 24VDC CONVERTER-3

110VDC / 24VDC CONVERTER-4

CONTROLLER C8035

SUPERVISION

4J3+/-

4J4+/-

4H1+/4H1-

12
14
22
24

11

A2

3023
N3

A1

2023
P3

+00GH002
.C4
B- B 04

PLC-RSC

-R5

.C4

+00GH002
14
/M111.B5 F- A01
12
24
22

11
21

P1

21

-K12

14
/M111.B6
12
24
22

N1

3021

3022

N2

3020
2021

2022

P2

A1

2020

PLC-RSC
.C1

B
4

B- B 03
'D' CURVE
3

B- B 01

A2

-K11
+00GH002
.C1
B- B 02

6
+00GH002

16A

+00GH002

'D' CURVE
4

21

-F23

11

3019

1
2019

/K001.B3

/K001.B3
-X402
3

+00GH002

16A

+00GH002

12
14
22
24

-F22

3018
2

2018

21

-X401
3

11

/K001.B2

/K001.B2

SUPERVISION

3024
2024
-X431

1 .2

1 .1

1 .4

1 .3

+00GH002

D
/K007.C1
-X431

5 .2

5 .1

5 .4

5 .3

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

12
14
22
24

21

3027
2

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

09_Polarities

11

2027
path

4H1-

3034 3

/K028.B2

2034 4

/K028.B2

4J4-

4H1+

3033 3

/K009.B3

/K009.B3

4J4+

3032 4

4J3/K009.B2

=20CBA

110V DC
POLARITIES DISTRIBUTION (+00GH002)

Repl. by

2033 4

B- E 01
'D' CURVE

2032

30/04/2010

2A

12
14
22
24

12
14
22
24

B- D05
'D' CURVE

4J3+

revision

Customer

Established PRANAV

-F29

B- D01

/K009.B2
Date

0
First Issue

/K007.D1

+00GH002

'D' CURVE
2

3026
2
6A

21

2026
1

-F28
+00GH002

11

6A

+00GH002

21

3025
3

-F27

11

2025
1

+00GH002

323 sheets
next sheet
K007
Sheet
K006

IHR2

IHR3

FIELD

TO

CONTROLLER C8035

CONTROLLER C8035

CONTROLLER C8035

20CBA00GH003

4H2+/4H2-

4H3+/4H3-

4H8+/4H8-

SPARE TB

SPARE TB

C
/K006.D8
-X431

2 .2

2 .1

2 .4

2 .3

3 .2

3 .1

3 .4

3 .3

+00GH002

/K006.D8
/K008.D1
-X431

6 .2

6 .1

6 .4

6 .3

7 .2

7 .1

7 .4

7 .3

3031

2031

3030

2030

3029

2029

3028

2028

+00GH002

/K008.D1

First Issue

revision

30/04/2010

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

21

11

4H8-

/K013.B1

/K013.B1

=20CBA

110V DC
POLARITIES DISTRIBUTION (+00GH002)

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

09_Polarities

Repl. by

/K028.B8

/K028.B8

Customer

Established PRANAV

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

4H8+

4H3/K028.B6

4H3+
/K028.B6

4H2/K028.B4

4H2+
/K028.B4
Date

2A

12
14
22
24

12
14
22
24

B- H01
'D' CURVE

3035 3

B- G01
'D' CURVE
2035 4

B- F 01
'D' CURVE

-F32
+00GH002

12
14
22
24

2A

21

-F31
+00GH002

11

1
2A

21

-F30
+00GH002

11

path

323 sheets
next sheet
K008
Sheet
K007

SPARE TB

SPARE TB

SPARE TB

SPARE TB

/K007.D8
-X431

4 .2

4 .1

4 .4

4 .3

+00GH002

/K007.D8

D
-X431

8 .2

8 .1

8 .4

8 .3

+00GH002

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

110V DC
POLARITIES DISTRIBUTION (+00GH002)

AS-D-PH-EO-4001

09_Polarities

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
K009
Sheet
K008

CONVERTER-3

CONVERTER-4

POWER SUPPLY

POWER SUPPLY

MEASUREMENT POLARITY

4J3+/-

4J4+/-

2X1+/-

2X2+/-

2M+/2M-

3032

2033

3033

4J4-

2032

4J3-

4J4+

/K006.E6
4J3+

/K006.E7

24V DC

/K006.E7

PCX2 CONTROLLER

/K006.E6

PCX1 CONTROLLER

-T13
+00GH002
B- D04
FAULT
/M210.B6

24VDC
20A

4017

4016

24VDC
20A

B
FAULT
/M210.B8

PE

5116

PE

110VDC

110VDC

5115

110VDC / 24VDC

-T12
+00GH002
B- D02

110VDC / 24VDC

I2

5015

I1

5014

-R6
+00GH002

02

O1

B- D03

4018

4019
-X231

1 .2

1 .1

1 .4

1 .3

+00GH002

D
/K010.D1

-X231

4 .2

4 .1

4 .4

4 .3

+00GH002

5018

4022

5017

4021

5016

4020

/K010.D1

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

/K012.A1

/K012.A1

/K024.B2

/K024.B2

=20CBA

24V DC
POLARITIES DISTRIBUTION (+00GH002)

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

09_Polarities

Repl. by

/K024.B1

/K024.B1

path

323 sheets
next sheet
K010
Sheet
K009

TO
SPARE TB

20CBA00GH003

SPARE TB

SPARE TB

SPARE TB

SPARE TB

SPARE TB

SPARE TB

/K009.D7
-X231

2 .2

2 .1

2 .4

2 .3

3 .2

3 .1

3 .4

3 .3

+00GH002

/K009.E7

D
-X231

5 .2

5 .1

5 .4

5 .3

6 .2

6 .1

6 .4

6 .3

Date

0
First Issue

revision

30/04/2010

5019

+00GH002

/K015.A1

/K015.A1

4023

+00GH002

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

24V DC
POLARITIES DISTRIBUTION (+00GH002)

AS-D-PH-EO-4001

09_Polarities

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
K012
Sheet
K010

24V DC

MEASUREMENT POLARITY

TO

2M+/2M-

MEASUREMENT DEVICES

SPARE TB

SPARE TB

SPARE TB

SPARE TB

SPARE TB

SPARE TB

2A

12
14
22
24

+00GH002

21

-F24

11

5018
2

/K009.E7

4022
1

/K009.E7

24V DC

B- B 05

-X232

4026

5022

'D' CURVE

1 .2

1 .1

1 .4

1 .3

2 .2

2 .1

2 .4

2 .3

+00GH002

-X232

3 .2

3 .1

3 .4

3 .3

4 .2

4 .1

4 .4

4 .3

-X293

5156

+00GH002

5154

5155

5153

1
4182

4183

4184

5152

-X291 5

2M- 5023

2M+ 4027

+00GH002

6
+00GH002

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

24V DC
POLARITIES DISTRIBUTION (+00GH002)

AS-D-PH-EO-4001

09_Polarities

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
K013
Sheet
K012

110V DC

110V DC

110V DC

110V DC

CONTROL POLARITY

CONTROL POLARITY

CONTROL POLARITY

CONTROL POLARITY

4C+/4C-

4C+/4C-

4C+/4C-

4C+/4C-

-X431

/K007.E6
3031

2031

/K007.E6

1 .2

1 .1

1 .4

1 .3

+00GH003

-X431

2 .2

2 .1

2 .4

2 .3

6A

12
14
22
24

+00GH003

21

3038
2

-F38

11

2038
1

+00GH003

F- A02

-X432

2039

3039

'D' CURVE

1 .2

1 .1

1 .4

1 .3

+00GH003

D
/K014.D1
-X432

4 .2

4 .1

4 .4

4 .3

+00GH003

Date

0
First Issue

revision

30/04/2010

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

3070

4C/M006.B3

2070

3055

4C-

4C+
/M006.A3

=20CBA

110V DC
POLARITIES DISTRIBUTION +00GH003

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

09_Polarities

Repl. by

/M005.E3

2055

/M005.D3

4C-

4C+

3040

/M005.A3

/M005.B3

4C+

2040

/K014.D1

path

323 sheets
next sheet
K014
Sheet
K013

110VDC
CONTROL POLARITY

SPARE TB

SPARE TB

SPARE TB

SPARE TB

SPARE TB

SPARE TB

4C+/4C-

/K013.D5

D
-X432

2 .2

2 .1

2 .4

2 .3

D
3 .2

3 .1

3 .4

3 .3

+00GH003

/K013.D5
-X432

5 .2

5 .1

5 .4

5 .3

6 .2

6 .1

6 .4

6 .3

3085

2085

+00GH003

Date

0
First Issue

revision

30/04/2010

4C/M006.E3

/M006.D3

4C+

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

110V DC
POLARITIES DISTRIBUTION +00GH003

AS-D-PH-EO-4001

09_Polarities

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
K015
Sheet
K014

-X231

PROCESS

PROCESS

LOGICAL 24VDC POLARITY

ANALOGICAL 24VDC POLARITY

2D+/2D-

2A+/2A-

/K010.E2

4023

5019

/K010.E2

1 .2

1 .1

1 .4

1 .3

+00GH003
-X231

2 .2

2 .1

2 .4

2 .3

21

11

4029

5025
2
2A

12
14
22
24

12
14
22
24

F- A07

'D' CURVE

'D' CURVE
3

F- A05
4

-F40
+00GH003

10A

21

5024
2

-F39
+00GH003

11

4028
1

+00GH003

5082

2A/K018.C1

4094

2A+
/K018.C1

5026

2D/K016.C1

/K016.C1

4030

2D+

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

24V DC
POLARITIES DISTRIBUTION (+00GH003)

AS-D-PH-EO-4001

09_Polarities

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
K016
Sheet
K015

PROCESS

PROCESS

PROCESS

PROCESS

PROCESS

PROCESS

PROCESS

LOGICAL 24VDC POLARITY

LOGICAL 24VDC POLARITY

LOGICAL 24VDC POLARITY

LOGICAL 24VDC POLARITY

LOGICAL 24VDC POLARITY

LOGICAL 24VDC POLARITY

LOGICAL 24VDC POLARITY

2D+/2D-

2D+ / 2D-

2D+ / 2D-

2D+ / 2D-

2D+ / 2D-

2D+ / 2D-

2D+ / 2D-

D
-X232

2D+

2D-

4030

5026

/K015.D2

/K015.D2

1 .2

1 .1

1 .4

1 .3

D
2 .2

2 .1

2 .4

2 .3

+00GH003

/K017.D1
-X232

4 .2

4 .1

4 .4

4 .3

5 .2

5 .1

5 .4

5 .3

+00GH003

Date

0
First Issue

revision

30/04/2010

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

5080

/M716.C3

2D/M209.A1

4093

2D+

5072

2D/M004.E3

4076

2D+
/M004.D3

2D-

=20CBA

24V DC
POLARITIES DISTRIBUTION (+00GH003)

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

09_Polarities

Repl. by

5057

/M004.A3

Customer

Established PRANAV

/M004.B3

4061

2D+

5042

2D/M003.E3

4046

/M003.D3

2D-

2D+

5027

/M003.A3

2D+

/M003.B3

4031

/K017.D1

path

323 sheets
next sheet
K017
Sheet
K016

SPARE TB

SPARE TB

SPARE TB

SPARE TB

/K016.D8

D
-X232

D
3 .`2

3 .1

3 .4

3 .3

+00GH003

/K016.E8
-X232

6 .`2

6 .1

6 .4

6 .3

+00GH003

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

24V DC
POLARITIES DISTRIBUTION (+00GH003)

AS-D-PH-EO-4001

09_Polarities

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
K018
Sheet
K017

PROCESS

PROCESS

ANALOGICAL 24VDC POLARITY

ANALOGICAL 24VDC POLARITY

2A+/2A-

2A+/2A-

SPARE TB

SPARE TB

SPARE TB

SPARE TB

SPARE TB

SPARE TB

2A-

2A+

/K015.D3

/K015.D3

-X233

5082

C
4094

1 .2

1 .1

1 .4

1 .3

2 .2

2 .1

2 .4

2 .3

+00GH003

D
-X233

3 .2

3 .1

3 .4

3 .3

D
4 .2

4 .1

4 .4

4 .3

+00GH003

Date

0
First Issue

revision

30/04/2010

2A-

5081

/M004.E7

/M004.D7

2A+

4095

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

24V DC
POLARITIES DISTRIBUTION (+00GH003)

AS-D-PH-EO-4001

09_Polarities

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
K019
Sheet
K018

HEATING

LIGHTING

ELECTRICAL

FAN CONTROL

CIRCUIT

CIRCUIT

SOCKET

CIRCUIT

SPARE TB

A
FROM 240VAC NON UPS
DISTRIBUTION BOARD
DWG NO:CBCL NO:SHEET NO:-

B
-X901 1

5
+00GH001

-X901

10

11

1507

12
14
22
24

21

12
14
22
24

2A

11

1505
2

1011
1

21

1009

3
1506

4
1010

1508

4
1504

'D' CURVE

1012

1503
3

12
14
22
24

-F2
+00GH001
J- B 01

1005

'D' CURVE

F- C01

'D' CURVE

1502

J- A01

'D' CURVE
2

C
20A

+00GH001

J- D02

1002

-F18

11

21

1004
1

1A

+00GH001

12
14
22
24

+00GH001

-F1

11

2A

21

1501
3

-F3

11

1001

+00GH001

1006

C- A02

-B3
+00GH001
B- A01

+00GH001

J- D01

-B4

+00GH001 H

-B2

Date

0
First Issue

revision

30/04/2010

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

E
Imax=16A

=20CBA

AC DISTRIBUTION LIGHTING
FAN & HEATING RESISTOR (+00GH001)

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

09_Polarities

Repl. by

5144

5117

Customer

Established PRANAV

GR

GND

-X3
+00GH001
F- C02

C- A01

60 WATT

+00GH001
2

+00GH001
50 WATT
J-D03

D-B 01

-E2

M
2

1008

-E1

-G1
+00GH001

1003

1007

path

323 sheets
next sheet
K020
Sheet K019

HEATING

LIGHTING

ELECTRICAL

FAN CONTROL

CIRCUIT

CIRCUIT

SOCKET

CIRCUIT

SPARE TB

A
FROM 240VAC NON UPS
DISTRIBUTION BOARD
DWG NO:CBCL NO:SHEET NO:-

B
-X901 1

5
+00GH002

-X901

10

11

1515

21

12
14
22
24

1512

1022

1514

1024

1516

J- B 01
'D' CURVE

1017

F- C01
'D' CURVE

J- A01
'D' CURVE

1510

J- D02
2

2A

11

1
21

-F20
+00GH002

'D' CURVE

1014

1023

1513
20A

11

-F34
+00GH002

12
14
22
24

12
14
22
24

21

11

1A

1021

1511

-F19
+00GH002

12
14
22
24

2A

21

1016

1509

-F21
+00GH002

11

1013

+00GH002

1018

D
1

-G2

1020

1015

1019

+00GH002

+00GH002
F- C02

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

E
Imax=16A

=20CBA

AC DISTRIBUTION LIGHTING
FAN & HEATING RESISTOR (+00GH002)

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

09_Polarities

Repl. by

-X7

C- A01

60 WATT

-E4
+00GH002

GND

-E3
+00GH002
50 WATT
J-D03

GR

5118

D-B01

5143

B- A01

C- A02

-B7
+00GH002

+00GH002
2

J- D01

-B8

+00GH002 H

-B6

path

323 sheets
next sheet
K021
Sheet
K020

HEATING

LIGHTING

ELECTRICAL

FAN CONTROL

CIRCUIT

CIRCUIT

SOCKET

CIRCUIT

SPARE TB

A
FROM 240VAC NON UPS
DISTRIBUTION BOARD
DWG NO:CBCL NO:SHEET NO:-

-X901 1

5
+00GH003

-X901

10

1523
2

21

11

1035

1520

1034

1522

1036

1524

J- B 01
'D' CURVE

1029

F- C01
'D' CURVE

J- A01
'D' CURVE

1518

J- D02
2

1
+00GH003

'D' CURVE

1026

2A

12
14
22
24

+00GH003

-F36

12
14
22
24

20A

21

1521
2

-F41

11

1033
1

1519
3

+00GH003

21

11

1028
1

1A

12
14
22
24

+00GH003

-F35

12
14
22
24

2A

21

1517
3

-F37

11

1025

+00GH003

C- A02

+00GH003
B- A01

1027

1032

1031

5119
+00GH003
F- C02

Date

1
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P.SAINI

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

E
Imax=16A

=20CBA

AC DISTRIBUTION LIGHTING
FAN & HEATING RESISTOR(+00GH003)

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

09_Polarities

Repl. by

-X7

C- A01

D- B 01

60 WATT

-E6
+00GH003

GR

GND

-E5
+00GH003
50 WATT
J-D03

5145

-G3
+00GH003

J- D01

+00GH003
2

+00GH003 H

-B11

-B12

-B10

1030

path

323 sheets
next sheet
K022
Sheet
K021

RS20 S8000 NETWORK-1

RS20 S8000 NETWORK-2

RS20 SITE NETWORK

24VDC SUPPLY

24VDC SUPPLY

24VDC SUPPLY

2N1+/2N1-

2N2+/2N2-

2N3+/2N3-

/K004.E6
12
14
22
24

21

5009
2
3

5091

5090

2N2-

2N3-

4104

2N2+

4106

5089

2N1-

2N3+

4102

B- E 05
'D' CURVE
4

B- E 03
'D' CURVE
3

B- E 01

2N1+

11

4011
1

2A

12
14
22
24

12
14
22
24

-F12
+00GH001

'D' CURVE
4

/K004.E6
2A

+00GH001

21

-F11

11

5006
2

/K004.E2

4008
1

/K004.E2
2A

21

-F10
+00GH001

11

5003
2

/K003.E5

4005

/K003.E5

D
5090A

-T3

P1

0V

0V

P2

-T4

P1

0V

0V

P2

-T5

+00GH001

+00GH001

+00GH001

/J002.B1

/J002.B3

/J002.B5

B- E02

B- E04

P1

0V

0V

4107

4105

4103

5091A

5089A

P2

B- E06

RS20 0800M2M2

RS20 0800M2M2

RS20 0800M2M2

Date

1
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P.SAINI

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

24V DC
EQUIPMENT SUPPLY

AS-D-PH-EO-4001

09_Polarities

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
K023
Sheet K022

DRAINAGE PIT-1 LCC IR 186

DRAINAGE PIT-1 LCC IR 186

DRAINAGE PIT-2 LCC IR 186

DRAINAGE PIT-2 LCC IR 186

24V DC SUPPLY

24V DC SUPPLY

24V DC SUPPLY

24V DC SUPPLY

2N4+/2N4-

2N5+/2N5-

2N6+/2N6-

2N7+/2N7-

/K004.E4

12
14
22
24

21

2A

11

5008
2

12
14
22
24

B- G07
'D' CURVE
4

B- G05
'D' CURVE
3

B- G03
'D' CURVE
4

B- G01
3

4010

-F17
+00GH001

'D' CURVE
4

/K004.E4
21

2A

11

5005
2

/K003.E7

4007

-F16
+00GH001

12
14
22
24

12
14
22
24

/K003.E7
2A

21

-F15
+00GH001

11

5007
2

/K004.E3

4009
1

/K004.E3
2A

21

-F14
+00GH001

11

5004
2

/K003.E6

4006

/K003.E6

4108

5092

4109

5093

4110

5094

4111

5095

2N4-

2N5+

2N5-

2N6+

2N6-

2N7+

2N7-

2N4+

5123
GND

-T11
+00GH001
B- G08

-T10
+00GH001
B- G06

GND 5122

5121
GND

-T9
+00GH001
B- G04

+00GH001
B- G02

-T8

GND

5120

SUPPLY

SUPPLY

SUPPLY

SUPPLY

IR186-1 24VDC

IR186-1 24VDC

IR186-1 24VDC

IR186-1 24VDC

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

24V DC
EQUIPMENT SUPPLY

AS-D-PH-EO-4001

09_Polarities

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
K024
Sheet K023

CONTROLLER

CONTROLLER

LOCAL MMI-C10 PC

MMI DISPLAY SCREEN

PCX-1(MFC)

PCX-2(MFC)

POWER SUPPLY

POWER SUPPLY

2X1+/2X1-

2X2+/2X2-

2I1+/2I1-

2I2+/2I2-

/K004.E8

21

12
14
22
24

11

5011
2
2A

B- D01
'D' CURVE
4

B- D03
'D' CURVE

B- C03
'D' CURVE
4

B- C01
3

4013

-F8
+00GH001

'D' CURVE
4

/K004.E8
21

11

5010
2

/K004.E7

4012

10A

12
14
22
24

-F9
+00GH001

/K004.E7
21

-F26
+00GH002

12
14
22
24

12
14
22
24

16A

11

5017
2

/K009.E6

4021
1

/K009.E6
16A

21

-F25
+00GH002

11

5016
2

/K009.E5

4020

/K009.E5

5097

2I2GND

-P1
+00GH001
A- C01

SUPPLY

SUPPLY

SUPPLY

PCX 1

PCX 2

C10

SLOT 1

5127

4113

2I2+

+00GH001
B- D02

GND

-K3

+00GH002
B- C02

GND

5126

5096

2I1-

5021

2X2-

4112

4025

2X2+
5124
GND

-K13

2I1+

5020

2X1-

5125

4024

2X1+

SUPPLY
DISPLAY
SCREEN

SLOT 13

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

24V DC
EQUIPMENT SUPPLY

AS-D-PH-EO-4001

09_Polarities

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
K025
Sheet
K024

TO ILPH

ILPH 1

ILPH 2

POWER SUPPLY

POWER SUPPLY

POWER SUPPLY

2N8+/2N8-

2N8+/2N8-

2N8+/2N8-

/K005.E2
5012

B
2A

12
14
22
24

+00GH002

21

-F33

11

4014

/K005.E2

E- A02

-X233

4114

5098

'D' CURVE

1 .2

1 .1

1 .4

1 .3

+00GH002

C
-X233

2 .2

2 .1

2 .4

2 .3

5100

4116

5099

4115

+00GH002

/M710.B5

/M710.C5

2N8-

2N8+

2N8/M708.C5

/M708.C5

2N8+

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

24V DC
EQUIPMENT SUPPLY

AS-D-PH-EO-4001

09_Polarities

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
K026
Sheet
K025

PROCESS CLOCK

OPTICAL TO

POLARITIES

ELECTRICAL CONVERTER

OPTO ISOLATOR

ELECTRICAL CONVERTER

OPTO ISOLATOR

2T+/2T-

AE4821B (1 MINUTE)

(1 MINUTE)

AE4821B (5 SECOND)

(5 SECOND)

OPTICAL TO
SPARE TB

SPARE TB

2A

12
14
22
24

+00GH001

21

-F13

11

5013
3

/K005.E3

4015

/K005.E3

B- E 07
4

'D' CURVE

C
4117

5101

-X231

1
1 .3

1 .2

1.1

1 .4

2 .2

2 .1

2 .4

2 .3

+00GH001

D
-X231

+00GH001

/K027.D1

4
4.2

4.1

4.3

4.4

5 .2

5 .1

5 .4

5 .3

+00GH001

+00GH001

Date

0
First Issue

revision

30/04/2010

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

5105

2T/M716.E3

4121

2T-

/M716.E3

=20CBA

24V DC
EQUIPMENT SUPPLY

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

09_Polarities

Repl. by

2T+

5104

/M715.C3

Customer

Established PRANAV

/M715.C3

4120

2T+

5103

/M714.B6

/M714.B6

2T-

4119

2T-

2T+

5102

/M714.D4

/M714.D4

2T+

4118

/K027.D1

path

323 sheets
next sheet
K027
Sheet
K026

SPARE TB

SPARE TB

SPARE TB

SPARE TB

/K026.D8
-X231

3 .2

3 .1

3 .4

3 .3

+00GH001

D
/K026.D8
-X231

6 .2

6 .1

6 .4

6 .3

+00GH001

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

24V DC
EQUIPMENT SUPPLY

AS-D-PH-EO-4001

09_Polarities

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
K028
Sheet
K027

IHR CONTROLLER C8035

IHR CONTROLLER C8035

IHR CONTROLLER C8035

FIELD CONTROLLER C8035

POWER SUPPLY

POWER SUPPLY

POWER SUPPLY

POWER SUPPLY

4H1+/4H1-

4H2+/4H2-

4H3+/4H3-

4H8+/4H8-

/K007.E4
4H8-

/K007.E4
4H8+

/K007.E3
4H3-

/K007.E3
4H3+

/K007.E2
4H2-

/K007.E2
4H2+

/K006.E8
4H1-

4H1+

/K006.E8

3037A

2037A

3036A

2036A

3035

2035

3034

2034

+00GH002

1
+

-K14

2
-

3
GND

5
+

/M001.C2

2
-

3
GND

/M001.E2

5
+
For internal
Power supply

6
-

+00GH002

1
+

-K36

2
-

5130

3
GND

/M002.C2

5
+

6
-

For internal
Power supply

+00GH002

1
+

-K41

Power supply

Power supply

Power supply

Controller 8035
IC693PWR330
Power supply
85-264VAC
or 100-300VDC

Controller 8035
IC693PWR330
Power supply
85-264VAC
or 100-300VDC

Controller 8035
IC693PWR330
Power supply
85-264VAC
or 100-300VDC

00

RS485

Date

30/04/2010

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

Serial Port

=20CBA

AS-D-PH-EO-4001
6

6
-

RS485

HEP BUJ 20CBA FS00 001

09_Polarities

5
+

Serial Port

00

RS485

110V DC
EQUIPMENT SUPPLY

Repl. by

00

RS485

Established PRANAV

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Serial Port

3
GND

For internal
Power supply

Controller 8035
IC693PWR330
Power supply
85-264VAC
or 100-300VDC

Serial Port

2
-

/M002.E2

Power supply

00

revision

1
+

-K25

For internal
Power supply

First Issue

+00GH002

6
-

5131

5129

5128

path

323 sheets
next sheet
M001
Sheet K028

MFC CPU BASEPLATE


C80-35
IC693CHS391

-A1
+00GH002
B- E 02

00

03

02

04

05

06

07

08

09

10

01
Controller 8035
IC693PWR330
Power supply
85-264VAC
or 100-300VDC

PWR

Controller 8035

PWR
OK
RUN
BATT

Controller 8035

IC693BEM340 IC693MDL655

Controller 8035
IC693CPU350
Cpu

FIP Bus Controller

CH1

Digital inputs

DI

CH2
2

Cpu

Controller 8035
IC693MDL655
Digital inputs

group C/D

Controller 8035
IC693MDL655
Digital inputs

DI
1

group A/B

group C/D

Controller 8035
IC693MDL655
Digital inputs

DI
1

group A/B

group C/D

Controller 8035
IC693MDL655
Digital inputs

DI
1

group A/B

group C/D

Controller 8035
IC693MDL655
Digital inputs

DI
1

group A/B

group C/D

Controller 8035
IC693MDL655
Digital inputs

DI
1

group A/B

group C/D

Controller 8035
IC693MDL655
Digital inputs

DI
1

group A/B

group C/D

DI
1

group A/B

group C/D

group A/B

EX1
EX2

IC693PWR330
+00GH002

GND

5133

IC693CPU350

IC693BEM340

IC693MDL655

IC693MDL655

IC693MDL655

IC693MDL655

IC693MDL655

IC693MDL655

IC693MDL655

IC693MDL655

+00GH002

+00GH002

+00GH002

+00GH002

+00GH002

+00GH002

+00GH002

+00GH002

+00GH002

-K14

+00GH002

-K16

-K17

-K18

-K19

-K20

-K21

-K22

-K23

-K24

/K028.D1

-K15

/M705.E5
/J003.E2

/J003.E3

/J003.E5

/J003.E6

/J003.E8

/J004.E2

/J004.E3

/J004.E5

03

04

05

06

07

08

09

10

MFC CPU BASEPLATE


C80-35
IC693CHS391

-A2
+00GH002
B- F 02

00

02

01
Controller 8035
IC693PWR330
Power supply
85-264VAC
or 100-300VDC

PWR

Controller 8035

PWR
OK
RUN
BATT

Controller 8035

IC693BEM340 IC693MDL655

Controller 8035
IC693CPU350
Cpu

FIP Bus Controller

CH1

Digital inputs

DI

CH2
2

Cpu

Controller 8035
IC693MDL655
Digital inputs

group C/D

Controller 8035
IC693MDL655
Digital inputs

DI
1

group A/B

group C/D

Controller 8035
IC693MDL655
Digital inputs

DI
1

group A/B

group C/D

Controller 8035
IC693MDL655
Digital inputs

DI
1

group A/B

group C/D

Controller 8035
IC693MDL655
Digital inputs

DI
1

group A/B

group C/D

Controller 8035
IC693MDL655
Digital inputs

DI
1

group A/B

group C/D

Controller 8035
IC693MDL655
Digital inputs

DI
1

group A/B

group C/D

DI
1

group A/B

group C/D

group A/B

EX1
EX2

Date

0
First Issue

revision

GND

5132

IC693PWR330

30/04/2010

IC693CPU350

+00GH002

IC693BEM340

IC693MDL655

IC693MDL655

IC693MDL655

IC693MDL655

IC693MDL655

IC693MDL655

IC693MDL655

IC693MDL655

+00GH002

+00GH002

+00GH002

+00GH002

+00GH002

+00GH002

+00GH002

+00GH002

+00GH002

-K25

+00GH002

-K27

-K28

-K29

-K30

-K31

-K32

-K33

-K34

-K35

/K028.D3

-K26

/M706.E1
/J004.E6

/J004.E8

/J005.E2

/J005.E3

/J005.E5

/J005.E6

/J005.E8

/J006.E2

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

MAIN RACK 1 & 2


IHR CONTROLLER

AS-D-PH-EO-4001

14_Controller Modules

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M002
Sheet
M001

A
-A3

MFC CPU BASEPLATE


C80-35
IC693CHS391

+00GH002
B- G02

00

03

02

04

01
Controller 8035
IC693PWR330
Power supply
85-264VAC
or 100-300VDC

PWR

Controller 8035

Controller 8035

Controller 8035
IC693CPU350
Cpu

IC693BEM340 IC693MDL655
FIP Bus Controller

CH1

PWR
OK
RUN
BATT

Digital inputs

DI

CH2
2

Cpu

Controller 8035
IC693MDL655
Digital inputs

group C/D

DI
1

group A/B

group C/D

group A/B

EX1
EX2

5134

GND

IC693PWR330
IC693CPU350

+00GH002

IC693BEM340

IC693MDL655

IC693MDL655

+00GH002

+00GH002

+00GH002

-K36

+00GH002

-K38

-K39

-K40

/K028.D5

-K37

/M706.E3
/J006.E3

/J006.E5

-A4

MFC CPU BASEPLATE


C80-35
IC693CHS391

+00GH002
B- H02

00

03

02

05

01
Controller 8035
IC693PWR330
Power supply
85-264VAC
or 100-300VDC

PWR

Controller 8035

Controller 8035
IC693CPU363
Cpu

IC693BEM340 IC693PCM301
FIP Bus Controller

CH1

PWR
OK
RUN
BATT

06

07

04

CH2

Controller 8035
IC693MDL645
Digital inputs

Controller 8035
IC693MDL753
Digital outputs

DO

OK
US1
US2

Cpu

08
Controller 8035
IC693MDL753
Digital outputs

DI

group C/D

Controller 8035
IC693MDL753
Digital outputs

DO
1

group A/B

group C/D

Controller 8035
IC693ALG223
Analog inputs

09
Controller 8035
IC693ALG223
Analog inputs

10
Controller 8035
IC693ALG223
Analog inputs

DO
1

group A/B

group C/D

AI

group A/B

AI

AI
EX1
EX2

IC693PWR330

5135

GND

IC693PCM301

IC693BEM340

IC693CPU363

+00GH002

IC693MDL645

+00GH002

+00GH002

-K41

+00GH002

-K43

-K44

+00GH002

/K028.D7

-K42

/M706.E6

/M708.D1

-K45

IC693MDL753

IC693MDL753

IC693MDL753

+00GH002

+00GH002

+00GH002

-K46

-K47

-K48

/J006.E8

/J007.E2

/J007.E3

E
IC693ALG223

IC693ALG223

IC693ALG223

+00GH002

+00GH002

+00GH002

-K49

-K50

-K51

/J006.C6

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

MAIN RACK 3 &4


IHR &FIELD CONTROLLER

AS-D-PH-EO-4001

14_Controller Modules

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M003
Sheet
M002

-K53

-K53

-K53

+00GH003
C- B 01

+00GH003
C- B 01

+00GH003
C- B 01

2
2D+

1
2
3
4
5
6
7
8

2D+

4032
4033
4034
4035

2D+
2D+
2D+
2D+

4036 2D+

B
1
2
3
4
5
6
7
8

2D-

5028
5029
5030
5031

2D2D2D2D2D-

5032 2D-

/K016.E2
/M101.A1
/M104.A1
/M107.A1
/M110.A1

2D+

/M003.A5

/K016.E2
/M101.A2
/M104.A2
/M107.A2
/M110.A2

3
1
2
3
4
5
6
7
8

2D-

/M003.B5

4037
4038
4039
4040

2D+
2D+
2D+
2D+
2D+

4041 2D+

1
2
3
4
5
6
7
8

5033
5034
5035
5036

2D2D2D2D2D-

5037 2D-

/M003.B3
/M113.A1
/M116.A1
/M119.A1
/M122.A1

2D+

/M003.A7

/M003.C3
/M113.A2
/M116.A2
/M119.A2
/M122.A2

1
2
3
4
5
6
7
8

2D-

/M003.B7

4042
4043
4044
4045

1
2
3
4
5
6
7
8

5038
5039
5040
5041

2D+
2D+
2D+
2D+
2D+

2D2D2D2D2D-

/M003.B5
/M125.A1
/M128.A1
/M131.A1
/M134.A1

B
/M003.C5
/M125.A2
/M128.A2
/M131.A2
/M134.A2

C
LOGICAL POLARITY
FOR ROW B
-K67

-K67

-K67

+00GH003
C- C 01

+00GH003
C- C 01

+00GH003
C- C 01

2
1
2
3
4
5
6
7
8

2D+

2D-

4047
4048
4049
4050

2D+
2D+
2D+
2D+
2D+

4051 2D+

1
2
3
4
5
6
7
8

5043
5044
5045
5046

2D2D2D2D2D-

5047 2D-

/K016.E3
/M137.A1
/M140.A1
/M143.A1
/M146.A1

2D+

/M003.D5

/K016.E3
/M137.A2
/M140.A2
/M143.A2
/M146.A2

3
1
2
3
4
5
6
7
8

2D-

/M003.E5

4052
4053
4054
4055

2D+
2D+
2D+
2D+
2D+

4056 2D+

1
2
3
4
5
6
7
8

5048
5049
5050
5051

5052

2D2D2D2D2D-

2D-

/M003.D3
/M149.A1
/M152.A1
/M155.A1
/M158.A1

2D+

/M003.D7

/M003.E3
/M149.A2
/M152.A2
/M155.A2
/M158.A2

1
2
3
4
5
6
7
8

2D-

/M003.E7

1
2
3
4
5
6
7
8

4057
4058
4059
4060

2D+
2D+
2D+
2D+
2D+

5053
5054
5055
5056

2D2D2D2D2D-

/M003.D5
/M161.A1
/M164.A1
/M167.A1
/M170.A1

/M003.E5
/M161.A2
/M164.A2
/M167.A2
/M170.A2

LOGICAL POLARITY
FOR ROW C

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

24V DC POLARITY DISTRIBUTION


ON INTERFACE MODULES

AS-D-PH-EO-4001

14_Controller Modules

Repl. by

=20CBA

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M004
Sheet
M003

-K81

-K81

-K81

+00GH003
C- D 01

+00GH003
C- D 01

+00GH003
C- D 01

2D+

1
2
3
4
5
6
7
8

2D-

4062
4063
4064
4065

2D+
2D+
2D+
2D+
2D+

4066 2D+

1
2
3
4
5
6
7
8

5058
5059
5060
5061

2D2D2D2D2D-

5062 2D-

/K016.E4
/M173.A1
/M176.A1
/M179.A1
/M182.A1

2D+

/M004.A5

/K016.E4
/M173.A2
/M176.A2
/M179.A2
/M182.A2

1
2
3
4
5
6
7
8

2D-

/M004.B5

4067
4068
4069
4070

2D+
2D+
2D+
2D+
2D+

4071 2D+

1
2
3
4
5
6
7
8

5063
5064
5065
5066

2D2D2D2D2D-

5067 2D-

/M004.B3
/M185.A1
/M188.A1
/M191.A1
/M194.A1

2D+

/M004.A7

/M004.C3
/M185.A2
/M188.A2
/M191.A2
/M194.A2

A
1
2
3
4
5
6
7
8

2D-

/M004.B7

1
2
3
4
5
6
7
8

4072
4073
4074
4075

2D+
2D+
2D+
2D+
2D+

5068
5069
5070
5071

2D2D2D2D2D-

/M004.B5
/M197.A1
/M200.A1
/M203.A1
/M206.A1

/M004.C5
/M197.A2
/M200.A2
/M203.A2
/M206.A2

LOGICAL POLARITY
FOR ROW D

-K95

-K95

-K95

+00GH003
C- E 01

+00GH003
C- E 01

+00GH003
C- E 01

1
2D+

2
1
2
3
4
5
6
7
8

2D-

2D+
4077 2D+
4078 2D+
4079 2D+
4080 2D+
4081 2D+
4082 2D+
4083 2D+

1
2
3
4
5
6
7
8

2D5073 2D5074 2D5075 2D5076 2D-

5077 2D-

/K016.E6
/M501.E2
/M504.E2
/M507.E2
/M510.E2
/M501.E3
/M601.A3
/M004.D5

2D+

/K016.E6
/M501.E2
/M504.E2
/M507.E2
/M510.E2

3
1
2
3
4
5
6
7
8

2D-

/M004.E5

2D+
4084 2D+
4085 2D+
4086
#160538
4087A2D+

1
2
3
4
5
6
7
8

2D5078 2D5079 2D-

/M004.D3
/M513.E2
/M516.E2
/M209.A7
/M210.A4

2D+

/M004.E3
/M513.E2
/M516.E2

1
2
3
4
5
6
7
8

2D-

1
2
3
4
5
6
7
8

4096
4097
4098
4099
4100
4101

2A+
2A+
2A+
2A+
2A+
2A+
2A+

5083
5084
5085
5086
5087
5088

2A2A2A2A2A2A2A-

/K018.E2
/M601.A2
/M603.A2
/M605.A2
/M607.A2
/M609.A2
/M611.A2

/K018.E2
/M601.A2
/M603.A2
/M605.A2
/M607.A2
/M609.A2
/M611.A2

LOGICAL & ANALOGICAL POLARITY


FOR ROW E

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

24V DC POLARITY DISTRIBUTION


ON INTERFACE MODULES

AS-D-PH-EO-4001

14_Controller Modules

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M005
Sheet
M004

-K66

-K66

-K66

+00GH003
C- B 14

+00GH003
C- B 14

+00GH003
C- B 14

1
2
3
4
5
6
7
8

4C+

4C-

2041
2042
2043
2044

4C+
4C+
4C+
4C+
4C+

2045 4C+

1
2
3
4
5
6
7
8

3041
3042
3043
3044

4C4C4C4C4C-

3045 4C-

/K013.E3
/M101.A2
/M104.A2
/M107.A2
/M110.A2

4C+

/M005.A5

/K013.E3
/M101.A3
/M104.A3
/M107.A3
/M110.A3

1
2
3
4
5
6
7
8

4C-

/M005.B5

2046
2047
2048
2049

4C+
4C+
4C+
4C+
4C+

/M005.B3
/M113.A2
/M116.A2
/M119.A2
/M122.A2

2050 4C+

1
2
3
4
5
6
7
8

3046
3047
3048
3049

1
2
3
4
5
6
7
8

4C+

/M005.C3
/M113.A3
/M116.A3
/M119.A3
/M122.A3

3050 4C-

/M005.A7

4C4C4C4C4C-

2051
2052
2053
2054

1
2
3
4
5
6
7
8

4C-

/M005.B7

3051
3052
3053
3054

4C+
4C+
4C+
4C+
4C+

4C4C4C4C4C-

/M005.B5
/M125.A2
/M128.A2
/M131.A2
/M134.A2

/M005.C5
/M125.A3
/M128.A3
/M131.A3
/M134.A3

LOGICAL POLARITY
FOR ROW B

-K80

-K80

-K80

+00GH003
C- C 14

+00GH003
C- C 14

+00GH003
C- C 14

2
1
2
3
4
5
6
7
8

4C+

4C-

2056
2057
2058
2059

4C+
4C+
4C+
4C+
4C+

2060 4C+

1
2
3
4
5
6
7
8

3056
3057
3058
3059

4C4C4C4C4C-

3060 4C-

/K013.E4
/M137.A2
/M140.A2
/M143.A2
/M146.A2

4C+

/M005.D5

/K013.E4
/M137.A3
/M140.A3
/M143.A3
/M146.A3

3
1
2
3
4
5
6
7
8

4C-

/M005.E5

2061
2062
2063
2064

4C+
4C+
4C+
4C+
4C+

2065 4C+

1
2
3
4
5
6
7
8

3061
3062
3063
3064

/M005.D3
/M149.A2
/M152.A2
/M155.A2
/M158.A2

/M005.D7

4C4C4C4C4C-

3065 4C-

/M005.E3
/M149.A3
/M152.A3
/M155.A3
/M158.A3

4C+

1
2
3
4
5
6
7
8

1
2
3
4
5
6
7
8

4C-

/M005.E7

2066
2067
2068
2069

4C+
4C+
4C+
4C+
4C+

3066
3067
3068
3069

4C4C4C4C4C-

/M005.D5
/M161.A2
/M164.A2
/M167.A2
/M170.A2

/M005.E5
/M161.A3
/M164.A3
/M167.A3
/M170.A3

LOGICAL POLARITY
FOR ROW C

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

110V DC POLARITY DISTRIBUTION


ON INTERFACE MODULES

AS-D-PH-EO-4001

14_Controller Modules

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M006
Sheet
M005

-K94

-K94

-K94

+00GH003
C- D 14

+00GH003
C- D 14

+00GH003
C- D 14

1
4C+

2
1
2
3
4
5
6
7
8

2071
2072
2073
2074

4C+
4C+
4C+
4C+
4C+

2075 4C+

B
4C-

/K013.E5
/M173.A2
/M176.A2
/M179.A2
/M182.A2

1
2
3
4
5
6
7
8

3071
3072
3073
3074

4C4C4C4C4C-

3075 4C-

4C+

/M006.A5

/K013.E5
/M173.A3
/M176.A3
/M179.A3
/M182.A3

3
1
2
3
4
5
6
7
8

4C-

/M006.B5

2076
2077
2078
2079

4C+
4C+
4C+
4C+
4C+

/M006.B3
/M185.A2
/M188.A2
/M191.A2
/M194.A2

2080 4C+

1
2
3
4
5
6
7
8

3076
3077
3078
3079

4C+

/M006.A7

4C4C4C4C4C-

/M006.C3
/M185.A3
/M188.A3
/M191.A3
/M194.A3

3080 4C-

1
2
3
4
5
6
7
8

4C-

/M006.B7

1
2
3
4
5
6
7
8

2081
2082
2083
2084

4C+
4C+
4C+
4C+
4C+

3081
3082
3083
3084

4C4C4C4C4C-

/M006.B5
/M197.A2
/M200.A2
/M203.A2
/M206.A2

B
/M006.C5
/M197.A3
/M200.A3
/M203.A3
/M206.A3

C
LOGICAL POLARITY
FOR ROW D
-K108

-K108

-K108

+00GH003
C- E 14

+00GH003
C- E 14

+00GH003
C- E 14

1
4C+

2
1
2
3
4
5
6
7
8

4C-

4C+

/K014.E2

2086 4C+

4C-

1
2
3
4
5
6
7
8

4C+

/M006.D5

/K014.E2

3086 4C-

3
2086 4C+

1
2
3
4
5
6
7
8

4C-

/M006.E5

/M006.D3

2087 4C+

1
2
3
4
5
6
7
8

3086

/M006.D7

4C-

/M006.E3

3087 4C-

4C+

2087 4C+

1
2
3
4
5
6
7
8

4C-

/M006.E7

/M006.D5

1
2
3
4
5
6
7
8

4C-

/M006.E5

LOGICAL POLARITY
FOR ROW E

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

110V DC POLARITY DISTRIBUTION


ON INTERFACE MODULES

AS-D-PH-EO-4001

14_Controller Modules

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M101
Sheet
M006

/M005.B3

/M715.C5

-K904

12
14

-K908

19 21

20

1 3

2
+01GH501

2091

2090

-X41

11

SHEET NO:-8

12
14

3041

/M715.C5

4C-

48V DC DISTRIBUTION SYSTEM


BATTERY CHARGER-1
20BUC01GH501
DWG:-AS-D-GE-EO-3963

11

/M005.A3
4C+
2041

5028

4032

2D-

2D+

/M003.B3

/M003.A3

/M102.C3

2088

C
2089

+00GH003

-K55

A1
24+

/M102.D1
/M103.D1

C- B 03

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K17
/J003.C2

-AB B8 A8 B7 A7

-K17
/J003.C2

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K17
/J003.B2

-AB A1

Date
First Issue

A1
IHR1 SLOT3 DI 1-16
validator
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K17
/J003.B2

-AB B2

IA003.02

A2
P/H. 48V IHR1 TOP
5s SYNCRO.
APPEAR
20CBA00_EN13_XZ025

-K17
/J003.B2

IA003.03

A3
P/H. 48V BAT CHGR
1 AC INPUT PWR
FAULT
20BUC01_GH501A_XM205

-K17
/J003.B2

A4
P/H. 48V CHARGER 1
MAIN FLT
DETECTED
20BUC01_GH501A_XM035

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A2

IA003.01

20CBA00_EN131_DI008

-AB B1

IA003.00

path

323 sheets
next sheet
M102
Sheet
M101

48V DC DISTRIBUTION SYSTEM


BATTERY CHARGER-1
20BUC01GH501
DWG:-AS-D-GE-EO-3963

-X941

-X41 61

63

62

67

69

-X41

68

37 39

38

11

11

12
14

-K920

12
14

-K919

12
14

-K913

12
14

-K918

11

11

11

-K917

673

-GS301

SHEET NO:-8

12
14

677

SHEET NO:-3

73 75

74

79 81

80
+01GH501

/M101.C8

/M103.C2

+00GH003

-K55

A
A13
1P+

/M101.D1

C- B 03

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655

-AB A3

-AB B3

IA003.04

+00GH002

A5

-K17

-AB A4

IA003.05

-K17

/J003.B2

/J003.B2

A6
P/H. 48V CHARGER 1
INC CB GS301
CLOSED

-K17
/J003.C2

20BUC01_GS301_XG033

Date

2
First Issue

revision

30/04/2010

20BUC01_GH501D_XM205

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K17
/J003.C2

-AB A12

IA003.08

A8
P/H. 48V CHARGER 1
RECTIFIER
ON
20BUC01_GH501_XM016

-K17
/J003.C2

IA003.09

B1
P/H. 48V CHARGER1
RECT. OVR-L
DETECTED
20BUC01_GH501E_XM035

-K17
/J003.C2

B2
P/H. 48V CHARGER 1
CURRENT LIMIT
FAULT
20BUC01_GH501B_XM205

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IA003.07

A7
P/H 48V CHARGER 1
DC OUTPUT VOLT
FAULT

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IA003.06

path

323 sheets
next sheet
M103
Sheet
M102

48V DC DISTRIBUTION SYSTEM


BATTERY CHARGER-1
20BUC01GH501
DWG:-AS-D-GE-EO-3963

-X41

7 9

704

11

-K916

-GS302

703
705

12
14

-K905

12
14

SHEET NO:-5

11

SHEET NO:-8

55 57

-X941

56

6 8

7
+01GH501

/M102.C8

+00GH003

INTERFACE MODULE
16EO+

-K55
/M101.D1

C- B 03

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10
22

23
10

23

E
IC693MDL655
+00GH002

-K17
/J003.C2

-AB B11

-AB A11

IA003.10
B3
P/H. 48V BATTERY 1
INCOMER CB
CLOSED

-K17
/J003.C2

20BUC01_GS302_XG033

Date

2
First Issue

revision

30/04/2010

-AB B10

IA003.11
B4
P/H. 48V CHARGER 1
BOOST MODE
ON

-K17
/J003.C2

20BUC01_GH501A_XM016

Customer

GOVERNMENT OF UGANDA
BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

B6

-K17

/J003.C2

IA003.15
B7

/J003.C2

-K17

B8

/J003.C2

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K17

-AB A9

IA003.14

20BUC01_GH501C_XM205

Project name

Repl. f.

-AB B9

IA003.13

B5
P/H. 48V CHARGER
1CB FUSE BLOWN
FAULT

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IA003.12

path

323 sheets
next sheet
M104
Sheet
M103

/M005.B3

/M005.A3

48V DC DISTRIBUTION SYSTEM


BATTERY CHARGER-2
20BUC02GH502
DWG:-AS-D-GE-EO-3963

4C-

4C+

2D-

2D+

/M003.B3

/M003.B3

-X41 61

63

62

67

69

68

12
14

-K919

12
14

-K913

11

11

11

-K918

12
14

3042

2042

5029

4033

-K917

12
14

11

SHEET NO:-14

37 39

38

73 75

74
+02GH502

/M105.C2

2092
2093

+00GH003

-K54

A1
24+

/M105.D1
/M106.D1

C- B 02

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K17
/J003.D2

-CD B8 A8 B7 A7

-K17
/J003.E2

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K17
/J003.D2

-CD A1

Date
First Issue

C1
IHR1 SLOT3 DI
17-32 validatr
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K17
/J003.D2

-CD B2

IA003.18

C2
P/H. 48V CHARGER 2
DC O/P VOLT
FAULT
20BUC02_GH501D_XM205

-K17
/J003.D2

IA003.19

C3
P/H. 48V CHARGER 2
RECTIFIER
ON
20BUC02_GH501_XM016

-K17
/J003.D2

C4
P/H. 48V CHARGER2
RECT. OVR-L
DETECTED
20BUC02_GH501E_XM035

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A2

IA003.17

20CBA00_EN132_DI008

-CD B1

IA003.16

path

323 sheets
next sheet
M105
Sheet
M104

48V DC DISTRIBUTION SYSTEM


BATTERY CHARGER-2
20BUC02GH502
DWG:-AS-D-GE-EO-3963

-X41

79 81

80

7 9

-X41 19

21

20

682

681

-GS301

12
14

-K904

12
14

-K908

11

11

11

-K905

12
14

-K920

12
14

SHEET NO:-9

11

SHEET NO:-14

1 3

-X941

1
+02GH502

/M104.C7

/M106.C2

+00GH003

-K54

A
A13
1P+

/M104.D1

C- B 02

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

7
19

20
7

20

E
IC693MDL655
+00GH002

-K17
/J003.D2

-CD A3

-CD B3

IA003.20
C5
P/H. 48V CHARGER 2
CURRENT LIMIT
FAULT

-K17
/J003.D2

20BUC02_GH501B_XM205

Date

2
First Issue

revision

30/04/2010

-CD A4

IA003.21
C6
P/H. 48V BATTERY 2
INCOMER CB
CLOSED

-K17
/J003.D2

20BUC02_GS302_XG033

20BUC02_GH501A_XM205

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K17
/J003.D2

-CD A12

IA003.24

C8
P/H. 48V CHARGER 2
MAIN FLT
DETECTED

-K17

IA003.25
D1

/J003.D2

-K17
/J003.D2

20BUC02_GH501A_XM035

D2
P/H. 48V CHARGER 2
INC CB GS301
CLOSED
20BUC02_GS301_XG033

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B12

IA003.23

C7
P/H. 48V BAT CHGR
2 AC INPUT PWR
FAULT

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD B4

IA003.22

path

323 sheets
next sheet
M106
Sheet
M105

48V DC DISTRIBUTION SYSTEM


BATTERY CHARGER-2
20BUC02GH502
DWG:-AS-D-GE-EO-3963

-X41

-X941

56

6 8

-X940

-GS301

12 14

13

631

636

-GS101

630

635
637

703
705

55 57

641

-GS102

640
642

-GS302

12
14

-K916

SHEET NO:-15

704

SHEET NO:-11

11

SHEET NO:-14

48V DC DISTRIBUTION SYSTEM


DISTRIBUTION CUBICLE
20BUC00GH101
DWG:-AS-D-GE-EO-3963

5 7

+02GH502

+00GH101

/M105.C8

+00GH003

INTERFACE MODULE
16EO+

-K54
/M104.D1

C- B 02

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K17
/J003.E2

-CD B11

-CD A11

IA003.26
D3
P/H. 48V CHARGER 2
BOOST MODE
ON

-K17
/J003.E2

20BUC02_GH501A_XM016

Date

2
First Issue

revision

30/04/2010

-CD B10

IA003.27
D4
P/H. 48V CHARGER 2
CB FUSE BLOWN
FAULT

-K17
/J003.E2

20BUC02_GH501C_XM205

20BUC00_GS102_XG033

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K17
/J003.E2

-CD A9

IA003.30

D6
P/H. 48V CHARGER1
BB INCOMER
CLOSED
20BUC00_GS101_XG033

-K17
/J003.E2

IA003.31

D7
P/H. 48V CHARGER1
BUSCOUPLER
CLOSED

-K17

D8

/J003.E2

20BUC00_GS301_XG033

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B9

IA003.29

D5
P/H. 48V CHARGER2
BB INCOMER
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10

IA003.28

path

323 sheets
next sheet
M107
Sheet
M106

/M005.B3

/M005.B3

110V DC
BATTERY CHARGER-1
20BUB01GH501
DWG:-AS-D-PH-EO-3904

4C-

4C+

2D-

2D+

/M003.B3

/M003.B3

21

20

11

11

55

12
14

-K918

12
14

-K917

12
14

-K904

12
14
-X41 19

11

11

-K908

3043

2043

4034

5030

SHEET NO:-7

57

56

61

63

62
+01GH501

/M108.C2

2094

C
2095

+00GH003

-K57

A1
24+

/M108.D1
/M109.D1

C- B 05

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K18
/J003.C3

-AB B8 A8 B7 A7

-K18
/J003.C3

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K18
/J003.B3

-AB A1

Date
First Issue

A1
IHR1 SLOT4 DI 1-16
validatr
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K18
/J003.B3

-AB B2

IA004.02

A2
P/H 110V.BAT CHGR
1 AC INPUT PWR
FAULT
20BUB01_GH501A_XM205

-K18
/J003.B3

IA004.03

A3
P/H 110V.CHARGER 1
MAIN FLT
DETECTED
20BUB01_GH501A_XM035

-K18
/J003.B3

A4
P/H 110V.CHARGER 1
DC O/P VOLT
FAULT
20BUB01_GH501D_XM205

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A2

IA004.01

20CBA00_EN141_DI008

-AB B1

IA004.00

path

323 sheets
next sheet
M108
Sheet
M107

110V DC
BATTERY CHARGER-1
20BUB01GH501
DWG:-AS-D-PH-EO-3904

-X941

1 3

-X41

31 33

32

67 69

68

73 75

74

704

11

-GS302

703
705

12
14

-K905

12
14

-K920

12
14

-K919

11

11

11

-K913

642
644

-GS301

12
14

SHEET NO:-7

643

SHEET NO:-3

7 9

-X941

7 9

8
+01GH501

/M107.C8

/M109.C2

+00GH003

-K57

A
A13
1P+

/M107.D1

C- B 05

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K18
/J003.B3

-AB A3

-AB B3

IA004.04
A5
P/H 110V. BAT
CHGR1 INC GS301
CLOSED

-K18
/J003.B3

20BUB01_GS301A_XG033

Date

2
First Issue

revision

30/04/2010

-AB A4

IA004.05
A6
P/H 110V.CHARGER 1
RECTIFIER
ON

-K18
/J003.C3

20BUB01_GH501_XM016

20BUB01_GH501D_XM035

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K18
/J003.C3

-AB A12

IA004.08

A8
P/H 110V.CHARGER1
CURRENT LIMIT
FAULT
20BUB01_GH501B_XM205

-K18
/J003.C3

IA004.09

B1
P/H 110V.BATTERY 1
INCOMER CB
CLOSED
20BUB01_GS302_XG033

-K18
/J003.C3

B2
P/H 110V.BATTERY 1
CB FUSE BLOWN
FAULT
20BUB01_GS302_XM205

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IA004.07

A7
P/H 110V.CHARGER1
RECTI OVR-L
DETECTED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IA004.06

path

323 sheets
next sheet
M109
Sheet
M108

110V DC
BATTERY CHARGER-1
20BUB01GH501
DWG:-AS-D-PH-EO-3904

-X943

11

632

-K100

-K916

12
14

629

-K100

SHEET NO:-7

631

630

SHEET NO:-5

-X41

49 51

50
+01GH501

/M108.C7

+00GH003

INTERFACE MODULE
16EO+

-K57
/M107.D1

C- B 05

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10
22

23
10

23

E
IC693MDL655
+00GH002

-K18
/J003.C3

-AB B11

-AB A11

IA004.10
B3
-K18
P/H 110V.CHARGER 1 /J003.C3
EARTH FAULT
FAULT
20BUB01_GH501C_XM205

Date

2
First Issue

revision

30/04/2010

-AB B10

IA004.11
B4
P/H 110V.BATTERY 1
IN BOOST
DETECTED

-K18

-AB B9

IA004.13
B5

/J003.C3

-K18

-AB A9

IA004.14
B6

-K18

/J003.C3

IA004.15
B7

/J003.C3

-K18

B8

/J003.C3

20BUB01_GH501H_XM035

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IA004.12

Repl. f.

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M110
Sheet
M109

/M005.B3

/M005.B3

CONTROL ROOM
COMMUNICATION SYSTEM
00CKA00GH001
DWG:-AS-D-GE-EO-4606

4C-

4C+

2D-

2D+

/M003.B3

/M003.B3

3044

2044

5031

4035

SHEET NO:-K119

B
-T13

-X291

-T14

-T15

2
+00GH001

2096

C
2097

+00GH003

-K56

A1
24+

/M111.D1
/M112.D1

C- B 04

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K18
/J003.D3

-CD B8 A8 B7 A7

-K18
/J003.E3

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K18
/J003.D3

-CD A1

-CD B1

IA004.16

-CD A2

IA004.17

C1
IHR1 SLOT4 DI
17-32 validatr
PRESENCE

-K18

C2

-K18

/J003.D3

IA004.19
C3

/J003.D3

Date
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

C4
PROT. CUBICLE
ETHERNET SWITCH
HEALTHY
20CKA00_GK902_XM196

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K18
/J003.D3

20CBA00_EN142_DI008

-CD B2

IA004.18

path

323 sheets
next sheet
M111
Sheet
M110

CONTROL ROOM
COMMUNICATION SYSTEM
00CKA00GH001
DWG:-AS-D-GE-EO-4606
2102

2103

2106

2124

2125

2126

-X291

10

+00GH002
/K006.C1
B- B 02

+00GH002
/K006.C4
B- B 04

2128

I- A01

1
2

I- A01

-B9
+00GH003 T

I- A01

11

11

-K12

-B5
+00GH002 T

12
14

+00GH001
/K001.D4
B- B 04

-K11

12
14

+00GH001
/K001.D1
B- B 02

-K2

12
14

11

11

-K1

12
14

-B1

-B1

-B1
+00GH001 T

SHEET NO:-K120

2127

2129

2194

2118

2117

2114

2113

+00GH001

+00GH003

-K56

A
A13
1P+

/M110.D1

C- B 04

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K18
/J003.D3

Date

2
First Issue

revision

-CD A3

-CD B3

IA004.20
C5
-K18
COMM. CUBICLE TEMP /J003.D3
HIGH
20CKA00_GH101_XM216

20CBA00_GK900_XM196

-K18
/J003.D3

20CBA00_GK901_XM196

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K18
/J003.D3

-CD A12

IA004.24

C8
AUX:CTRL CUB.
GH002_110VDC INC1
HEALTHY
20CBA00_GK904_XM196

-K18
/J003.D3

IA004.25

D1
AUX:CTRL CUB.
GH002_110VDC INC2
HEALTHY
20CBA00_GK905_XM196

-K18
/J003.D3

D2
AUX:CTRL CUBICLE
TEMP.
HIGH
20CBA00_GH000_XM216

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B12

IA004.23

C7
AUX:CTRL CUB.
GH001_110VDC INC2
HEALTHY

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD B4

IA004.22

C6
AUX:CTRL CUB.
GH001_110VDC INC1
HEALTHY

30/04/2010

-CD A4

IA004.21

path

323 sheets
next sheet
M112
Sheet
M111

CONTROL ROOM
COMMUNICATION SYSTEM
00CKA00GH001
DWG:-AS-D-GE-EO-4606

SHEET NO:-K119

LOW PRESSURE
COMPRESSOR AIR TANK
20SCA00BB002
CP005S
DWG:-AS-D-GE-PI-5900

LOW PRESSURE
COMPRESSOR AIR TANK
20SCA00BB003
CP006S
DWG:-AS-D-GE-PI-5900

SHEET NO:-K120

-X291

-T1

-T2

B
2

-XX X3

-XX X3

X1

X1

+00GH001

+00GH003

INTERFACE MODULE
16EO+

-K56
/M110.D1

C- B 04

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10
22

23
10

23

E
IC693MDL655
+00GH002

-K18
/J003.E3

-CD B11

-CD A11

IA004.26
D3
COMM. CUBICLE
ETHERNET SWITCHS
HEALTHY

-K18
/J003.E3

20CKA00_GK900_XM196

Date

2
First Issue

revision

30/04/2010

-CD B10

IA004.27
D4
COMM. CUBICLE 24V
PWR SUPPLY
HEALTHY

-K18
/J003.E3

20CKA00_GK901_XM196

20SCA00_CP005S_XM047

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K18
/J003.E3

-CD A9

IA004.30

D6
U3 STRAINER FLUSH
VLV AIR TANK
NORMAL

-K18

IA004.31
D7

/J003.E3

-K18

D8

/J003.E3

20SCA00_CP006S_XM047

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B9

IA004.29

D5
U1 STRAINER FLUSH
VLV AIR TANK
NORMAL

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10

IA004.28

path

323 sheets
next sheet
M113
Sheet
M112

4C-

110V DC
BATTERY CHARGER-2
20BUB02GH501
DWG:-AS-D-PH-EO-3904

-X941

1 3

-X41

11

12
14

-K904

12
14

651
656

-K908

11

SHEET NO:-12

655

-GS301

3046

2046

4037

5033

SHEET NO:-8

/M005.B5

/M005.A5
4C+

2D-

2D+

/M003.B5

/M003.A5

19 21

20

1 3

2
+02GH501

/M114.C2

2098

C
2099

+00GH003

-K59

A1
24+

/M114.D1
/M115.D1

C- B 07

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K19
/J003.C5

-AB B8 A8 B7 A7

-K19
/J003.C5

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K19
/J003.B5

-AB A1

Date
First Issue

A1
IHR1 SLOT5 DI 1-16
validatr
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K19
/J003.B5

-AB B2

IA005.02

A2
P/H 110V. BAT
CHGR2 INC GS301
CLOSED
20BUB02_GS301A_XG033

-K19
/J003.B5

IA005.03

A3
P/H 110V.BAT CHGR
2 AC INPUT PWR
FAULT
20BUB02_GH501A_XM205

-K19
/J003.B5

A4
P/H 110V.CHARGER 2
MAIN FLT
DETECTED
20BUB02_GH501A_XM035

=20CBA

RACK-0 SLOT 5 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A2

IA005.01

20CBA00_EN151_DI008

-AB B1

IA005.00

path

323 sheets
next sheet
M114
Sheet
M113

110V DC
BATTERY CHARGER-2
20BUB02GH501
DWG:-AS-D-PH-EO-3904

-X41 55

57

56

61

63

-X41

62

31 33

32

67 69

68

11

11

12
14

-K905

12
14

-K920

12
14

-K919

12
14

-K913

11

11

11

-K918

12
14

-K917

12
14

11

SHEET NO:-12

73 75

74

7 9

8
+02GH501

/M113.C7

/M115.C2

+00GH003

-K59

A
A13
1P+

/M113.D1

C- B 07

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K19
/J003.B5

-AB A3

-AB B3

IA005.04

-AB A4

IA005.05

A5
P/H 110V.CHARGER 2
DC O/P VOLT
FAULT

A6

-K19

-K19

/J003.B5

/J003.C5

20BUB02_GH501D_XM205

Date

2
First Issue

revision

30/04/2010

20BUB02_GH501_XM016

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K19
/J003.C5

-AB A12

IA005.08

A8
P/H 110V.CHARGER2
RECTI OVR-L
DETECTED
20BUB02_GH501D_XM035

-K19
/J003.C5

IA005.09

B1
P/H 110V.CHARGER 2
CURRENT LIMIT
FAULT
20BUB02_GH501B_XM205

-K19
/J003.C5

B2
P/H 110V.BATTERY 2
INCOMER CB
CLOSED
20BUB02_GS302_XG033

=20CBA

RACK-0 SLOT 5 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IA005.07

A7
P/H 110V.CHARGER 2
RECTIFIER
ON

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IA005.06

path

323 sheets
next sheet
M115
Sheet
M114

110V DC
BATTERY CHARGER-2
20BUB02GH501
DWG:-AS-D-PH-EO-3904

110V DC
MAIN AUXILLARY SWITCHBOARD
20BUB01GH101
Column No:-D01
DWG:-AS-D-GE-EO-3950

-X941

7 9

-X943

-X41

49 51

-X3

50

11

12
14

-X01

14

14

-QF4

11

11

11

-QF3

12
14

-XP2

12
14

-XP1

12
14
3

11

SHEET NO:-200

11

-K916

631

-K100

632

630

-K100

703
705

-GS302

629

SHEET NO:-12

704

SHEET NO:-10

15 14

13

+02GH501

+01GH101:D01

/M114.C7

+00GH003

INTERFACE MODULE
16EO+

-K59
/M113.D1

C- B 07

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K19
/J003.C5

-AB B11

-AB A11

IA005.10
B3
P/H 110V.BATTERY 2
CB FUSE BLOWN
FAULT

-K19
/J003.C5

20BUB02_GS302_XM205

Date

2
First Issue

revision

30/04/2010

-AB B10

IA005.11
B4
P/H 110V.CHARGER 2
EARTH FAULT
FAULT

-K19
/J003.C5

20BUB02_GH501C_XM205

20BUB02_GH501H_XM035

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K19
/J003.C5

-AB A9

IA005.14

B6
P/H 110V.MAIN BRD
CNTRL VOLT
PRESENCE
20BUB01_GH101_XM008

-K19
/J003.C5

IA005.15

B7
P/H 110V.MAIN BRD
MEAS MCB
CLOSED
20BUB01_GH101_XG033

-K19
/J003.C5

B8
P/H 110V.MAIN BRD
COMMON ALARM
ON
20BUB01_GH101_XM016

=20CBA

RACK-0 SLOT 5 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B9

IA005.13

B5
P/H 110V.BATTERY 2
IN BOOST
DETECTED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IA005.12

path

323 sheets
next sheet
M116
Sheet
M115

/M005.B5

/M005.A5

110V DC
COMMON AUXILLARIES SWITCHBOARD
20BUB02GH101
Column No:-C04A
DWG:-AS-D-GE-EO-3951

4C-

4C+

2D-

2D+

/M003.B5

/M003.B5

-QF4

11

-X3

14

12
14

12
14

12
14

-XP2

-X01

11

-XP1

11

11

3047

2047

5034

4038

SHEET NO:-200

13 12

11
+02GH101:C04A

2100

C
2101

+00GH003

-K58

A1
24+

/M117.D1
/M118.D1

C- B 06

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K19
/J003.D5

-CD B8 A8 B7 A7

-K19
/J003.E5

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K19
/J003.D5

-CD A1

Date
First Issue

C1
IHR1 SLOT5 DI
17-32 validatr
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K19
/J003.D5

-CD B2

IA005.18

C2
P/H 110V.COMMON
BRD CNTRL VOLT
PRESENCE
20BUB02_GH101_XM008

-K19
/J003.D5

IA005.19

C3
P/H 110V.COMMON
BRD MEAS MCB
CLOSED
20BUB02_GH101_XG033

-K19
/J003.D5

C4
P/H 110V.COMMON
BRD COMMON ALARM
ON
20BUB02_GH101_XM016

=20CBA

RACK-0 SLOT 5 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A2

IA005.17

20CBA00_EN152_DI008

-CD B1

IA005.16

path

323 sheets
next sheet
M117
Sheet
M116

POWER HOUSE FIRE DETECTION


20CYE00GH001
FIRE CONTROL PANEL
DWG:-HEPBUJ20CYEFA00001

4h

8b

7h

C24

03BX
R8
T28
11b

03BX
R7
T22

03BX
R5
T16

5b

C30

R11

03BX
R6
T22

03BX
R7

R8

C18

C24

SHEET NO:-8

10h

14b

13h

17b

16h

+00GH003

-K58

A
A13
1P+

/M116.D1

C- B 06

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655

-CD A3

-CD B3

IA005.20

+00GH002

C5

-K19

-CD A4

IA005.21

-K19

/J003.D5

/J003.D5

C6
P/H CTRL BUILDING
FIRE DETECTION
FAULT

-K19
/J003.D5

20CYE00_GH001A_XM004

Date

2
First Issue

revision

30/04/2010

20CYE00_GH001B_XM004

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K19
/J003.D5

-CD A12

IA005.24

C8
P/H SWITCHYARD
FIRE DETECTION
FAULT
20CYE00_GH001C_XM004

-K19
/J003.D5

IA005.25

D1
-K19
P/H WORKSHOP
/J003.D5
FIRE GENERAL FAULT
FAULT
20CYE00_GH001D_XM004

D2
P/H SWITCHYARD
FIRE GENERAL FLT
FAULT
20CYE00_GH001E_XM004

=20CBA

RACK-0 SLOT 5 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B12

IA005.23

C7
P/H WORKSHOP
FIRE DETECTION
FAULT

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD B4

IA005.22

path

323 sheets
next sheet
M118
Sheet
M117

POWER HOUSE FIRE DETECTION


20CYE00GH001
FIRE CONTROL PANEL
DWG:-HEPBUJ20CYEFA00001

C18

SHEET NO:-8

B
T18

03BX
R6

20b

19h

+00GH003

INTERFACE MODULE
16EO+

-K58
/M116.D1

C- B 06

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10
22

23
10

23

E
IC693MDL655
+00GH002

-K19
/J003.E5

-CD B11

-CD A11

IA005.26

-CD B10

IA005.27

D3
-K19
P/H FIRE GENERAL FLT /J003.E5

-CD A10

IA005.28
D4

-K19

-CD B9

IA005.29
D5

/J003.E5

-K19

-CD A9

IA005.30
D6

-K19

/J003.E5

IA005.31
D7

/J003.E5

-K19

D8

/J003.E5

FAULT
20CYE00_GH001F_XM004

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

RACK-0 SLOT 5 MDL655


LOGICAL INPUTS

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M119
Sheet
M118

/M005.B5

/M005.B5

230 VAC UPS BOARD


20BRU00GH101
FOR COMPUTERISED CONTROL SYSTEM
DWG:-AS-D-GE-EO-3605

4C-

4C+

2D-

2D+

/M003.B5

/M003.B5

-X41A

11

12
14

-K915

673

-GS301

SHEET NO:-7

677

3048

2048

5035

4039

SHEET NO:-3

-X41

37 39

38
+00GH101

/M120.C2

2130

C
2131

+00GH003

-K61

A1
24+

/M120.D1
/M121.D1

C- B 09

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K20
/J003.C6

-AB B8 A8 B7 A7

-K20
/J003.C6

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K20
/J003.B6

-AB A1

-AB B1

IA006.00
A1
AUX:IHR1 SLOT6 DI
1-16 validatr
PRESENCE

-K20

Date
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

A2

-K20

/J003.B6

/J003.B6

IA006.03

A3
CTRL.UPS: 400VAC
INC CB GS301
CLOSED
20BRU00_GS301_XG033

-K20
/J003.B6

A4
CTRL.UPS:CHARGR
LOAD ON RESERVE
ON
20BRU00_GH101B_XM016

=20CBA

RACK-0 SLOT 6 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B2

IA006.02

20CBA00_EN161_DI008

-AB A2

IA006.01

path

323 sheets
next sheet
M120
Sheet
M119

230 VAC UPS BOARD


20BRU00GH101
FOR COMPUTERISED CONTROL SYSTEM
DWG:-AS-D-GE-EO-3605

-X41 19

21

20

13

15

14

25

27

26

73

11

11

12
14

-K913

12
14

-K909

12
14

-K908

12
14

-K905

11

11

11

-K904

12
14

-K906

12
14

11

SHEET NO:-7

75

74

31

33

32
+00GH101

/M119.C7

/M121.C2

+00GH003

-K61

A
A13
1P+

/M119.D1

C- B 09

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K20
/J003.B6

-AB A3

-AB B3

IA006.04
A5
CTRL.UPS:CHARGR
LOAD ON INVERTER
ON

-K20
/J003.B6

20BRU00_GH101A_XM016

Date

2
First Issue

revision

30/04/2010

-AB A4

IA006.05
A6
CTRL.UPS:CHARGER
FAULT
DETECTED

-K20
/J003.C6

20BRU00_GH101A_XM035

20BRU00_GH101B_XM035

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K20
/J003.C6

-AB A12

IA006.08

A8
CTRL.UPS:INCOMING
PWR SUPPlY FLT
DETECTED
20BRU00_GH101C_XM035

-K20
/J003.C6

IA006.09

B1
CTRL.UPS:DC EARTH
FAULT
DETECTED
20BRU00_GH101D_XM035

-K20
/J003.C6

B2
CTRL.UPS:INVERTER
RUNNING
20BRU00_GH101_XM069

=20CBA

RACK-0 SLOT 6 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IA006.07

A7
CTRL.UPS:INVERTER
FAULT
DETECTED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IA006.06

path

323 sheets
next sheet
M121
Sheet
M120

230 VAC UPS BOARD


20BRU00GH101
FOR COMPUTERISED CONTROL SYSTEM
DWG:-AS-D-GE-EO-3605

-X41

43 45

44

49

51

50

55

57

56

67

69

68

11

11

12
14

-K901

12
14

-K919

12
14

-K920

12
14

-K918

11

11

11

-K917

12
14

-K916

12
14

11

SHEET NO:-7

61 63

62

1 3

2
+00GH101

/M120.C7

+00GH003

INTERFACE MODULE
16EO+

-K61
/M119.D1

C- B 09

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K20
/J003.C6

-AB B11

-AB A11

IA006.10
B3
CTRL.UPS:INVTR
OVR/UND FREQ FLT
DETECTED

-K20
/J003.C6

20BRU00_GH101E_XM035

Date

2
First Issue

revision

30/04/2010

-AB B10

IA006.11

IA006.12

B4
CTRL.UPS:INVERTER
OVERLOAD
DETECTED

-K20
/J003.C6

20BRU00_GH101F_XM035

B5
-K20
CTRL.UPS:OVER
/J003.C6
TEMPERATURE PROT
FAULT
20BRU00_GH101A_XM004

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-AB B9

-AB A9

IA006.14

B6
CTRL.UPS:BATTERY

IA006.15

FAULT

B7
CTRL.UPS:BATTERY
CHARGING
DETECTED

20BRU00_GH101B_XM004

20BRU00_GH101G_XM035

-K20
/J003.C6

-K20
/J003.C6

B8
CTRL.UPS:GENERAL
ALARM
DETECTED
20BRU00_GH101H_XM035

=20CBA

RACK-0 SLOT 6 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A10
IA006.13

path

323 sheets
next sheet
M122
Sheet
M121

230 VAC UPS BOARD


BYPASS CUBICLE
20BRU05GH101
FOR COMPUTERISED CONTROL SYSTEM
DWG:-AS-D-GE-EO-3605

-X41 79

-GS304

706
81

-X42

80

812

-GS302

12
14

-K911

710

11

3049

2049

5036

4040

SHEET NO:-10

813

4C-

230 VAC UPS BOARD


UPS 1 CUBICLE
20BRU00GH101
FOR COMPUTERISED CONTROL SYSTEM
DWG:-AS-D-GE-EO-3605

SHEET NO:-7

/M005.B5

/M005.B5
4C+

2D-

2D+

/M003.B5

/M003.B5

+00GH101

+05GH501

2132

C
2133

+00GH003

-K60

A1
24+

/M123.D1
/M124.D1

C- B 08

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K20
/J003.D6

-CD B8 A8 B7 A7

-K20
/J003.E6

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K20
/J003.D6

-CD A1
IA006.17

C1
AUX:IHR1 SLOT6 DI
17-32 validatr
PRESENCE
20CBA00_EN162_DI008

Date

2
First Issue

revision

30/04/2010

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K20
/J003.D6

-CD A2

-CD B2

IA006.18

C2
-K20
CTRL.UPS:OVERLOAD /J003.D6

IA006.19

DETECTED

C3
CTRL.UPS:BY-PASS
INCOMER GS302
OPEN

20BRU00_GH101I_XM035

20BRU00_GS302_XM073

-K20
/J003.D6

C4
CTRL.UPS:BY-PASS
FEEDER GS304
OPEN
20BRU00_GS304_XM073

=20CBA

RACK-0 SLOT 6 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B1

IA006.16

path

323 sheets
next sheet
M123
Sheet
M122

230 VAC UPS BOARD


DISTRIBUTION 1 CUBICLE
20BRU01GH101
FOR COMPUTERISED CONTROL SYSTEM
DWG:-AS-D-GE-EO-3605

230 VAC UPS BOARD


20BRU02GH101
FOR COMMUNICATIONS SYSTEM
DWG:-AS-D-GE-EO-3603

-K905

11

-K101

11

-GS101

SHEET NO:-6

657

SHEET NO:-12

718

SHEET NO:-11

-K913

-X43

-X43

-X41

7 9

-X41A

12
14

12
14

656
658

619

714

-Q001

1 3

13

15

14

+01GH101

+02GH101

/M124.C2

+00GH003

-K60

A
A13
1P+

/M122.D1

C- B 08

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655

-CD A3

-CD B3

IA006.20

+00GH002

C5
CTRL.UPS:BB
INCOMER
CLOSED

-K20
/J003.D6

-K20
/J003.D6

20BRU01_GS101_XG033

Date

2
First Issue

revision

30/04/2010

-CD A4

IA006.21
C6
CTRL.UPS:FEEDERS
N-TRP
20BRU00_GH101_XM170

20BRU01_GH101_XM004

/J003.D6

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K20

-CD A12

IA006.24
C8

-K20

/J003.D6

/J003.D6

IA006.25

D1
COMM. UPS
INVT.1 FAULT
DETECTED

-K20
/J003.D6

20BRU02_GH101A_XM035

D2
COMM. UPS INVT.
1 OVE/UND FREQ
FAULT
20BRU02_GH101A_XM004

=20CBA

RACK-0 SLOT 6 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B12

IA006.23

C7
CTRL.UPS:DISTRIB.B
OARD VOLTAGE
FAULT

-K20

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD B4

IA006.22

path

323 sheets
next sheet
M124
Sheet
M123

230 VAC UPS BOARD


20BRU02GH101
FOR COMMUNICATIONS SYSTEM
DWG:-AS-D-GE-EO-3603

-X41A 19

21

20

25

27

26

31

33

32

37

39

38

43

11

11

12
14

-K920

12
14

-K919

12
14

-K918

12
14

-K917

11

11

11

-K915

12
14

-K914

12
14

11

SHEET NO:-6

45

44

49

51

50
+02GH101

/M123.C7

+00GH003

INTERFACE MODULE
16EO+

-K60
/M122.D1

C- B 08

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K20
/J003.E6

-CD B11

-CD A11

IA006.26
D3
COMM. UPS INVT.
1 DC I/P POWER
ON

-K20
/J003.E6

20BRU02_GH101_XM016

Date

2
First Issue

revision

30/04/2010

-CD B10

IA006.27
D4
COMM. UPS
INVT.1 FEEDER
TRIP

/J003.E6

20BRU02_GH101_XM170

20BRU02_GH101_XG069

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K20
/J003.E6

-CD A9

IA006.30

D6
COMM. UPS
INVT.1 OVERLOAD
DETECTED
20BRU02_GH101B_XM035

-K20
/J003.E6

IA006.31

D7
COMM. UPS
INVT.1 DC VOL FAIL
DETECTED
20BRU02_GH101C_XM035

-K20
/J003.E6

D8
COMM. UPS INVT.
1THYRISTR TEMP
FAULT
20BRU02_GH101B_XM004

=20CBA

RACK-0 SLOT 6 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B9

IA006.29
D5
COMM. UPS
INVT.1
RUNNING

-K20

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10

IA006.28

path

323 sheets
next sheet
M125
Sheet
M124

-GS305

-X42A

12
14

-K905

809

635
637

3051

2051

5038

-GS101

SHEET NO:-10
11

SHEET NO:-4

636

230 VAC UPS BOARD


INVERTER 2 CUBICLE
20BRU04GH101
FOR COMMUNICATIONS SYSTEM
DWG:-AS-D-GE-EO-3603

810

4C-

230 VAC UPS BOARD


INVERTER 1 CUBICLE
20BRU02GH101
FOR COMMUNICATIONS SYSTEM
DWG:-AS-D-GE-EO-3603

SHEET NO:-3

4042

/M005.B7

/M005.A7
4C+

2D-

2D+

/M003.B7

/M003.A7

3 5

-X41B

+02GH101

+04GH101

/M126.C2

2134

C
2135

+00GH003

-K63
/M126.D1
/M127.D1

C- B11

A
A1
24+

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

/J003.C8

-K21
/J003.C8

IC693MDL655
+00GH002

NC
NC
0V

-K21

-AB B8 A8 B7 A7
BCOM

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K21
/J003.B8

-AB A1

Date
First Issue

A1
AUX:IHR1 SLOT7 DI
1-16 validator
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K21
/J003.B8

-AB B2

IA007.02

A2
COMM. UPS:INVT1
INCOMER GS305
CLOSED
20BRU02_GS305_XG033

-K21
/J003.B8

IA007.03

A3
COMM. UPS INVT1
FEEDER GS101
CLOSED
20BRU02_GS101_XG033

-K21
/J003.B8

A4
COMM. UPS
INVT.2 FAULT
DETECTED
20BRU04_GH101A_XM035

=20CBA

RACK-0 SLOT 7 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A2

IA007.01

20CBA00_EN171_DI008

-AB B1

IA007.00

path

323 sheets
next sheet
M126
Sheet
M125

230 VAC UPS BOARD


INVERTER 2 CUBICLE
20BRU04GH101
FOR COMMUNICATIONS SYSTEM
DWG:-AS-D-GE-EO-3603

-X41B 13

15

14

19

21

20

25

27

26

31

33

32

37

11

11

12
14

-K919

12
14

-K918

12
14

-K917

12
14

-K915

11

11

11

-K914

12
14

-K913

12
14

11

SHEET NO:-10

39

38

43

45

44
+04GH101

/M125.C7

/M127.C2

+00GH003

-K63

A
A13
1P+

/M125.D1

C- B11

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K21
/J003.B8

-AB A3

-AB B3

IA007.04
A5
COMM. UPS:INVT2
OVER/UND FREQ
FAULT

-K21
/J003.B8

20BRU04_GH101A_XM004

Date

2
First Issue

revision

30/04/2010

-AB A4

IA007.05
A6
COMM. UPS INVT.
2 DC I/P POWER
ON

-K21
/J003.C8

20BRU04_GH101_XM016

20BRU04_GH101_XM170

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K21
/J003.C8

-AB A12

IA007.08
A8
COMM. UPS
INVT.2
RUNNING

20BRU04_GH101_XG069

-K21
/J003.C8

IA007.09

B1
COMM. UPS
INVT.2 OVERLOAD
DETECTED
20BRU04_GH101B_XM035

-K21
/J003.C8

B2
COMM. UPS
INVT.2 DC VOLTAGE
DETECTED
20BRU04_GH101C_XM035

=20CBA

RACK-0 SLOT 7 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IA007.07

A7
COMM. UPS
INVT.2 FEEDER
TRIP

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IA007.06

path

323 sheets
next sheet
M127
Sheet
M126

230 VAC UPS BOARD


INVERTER 2 CUBICLE
20BRU04GH101
FOR COMMUNICATIONS SYSTEM
DWG:-AS-D-GE-EO-3603

-X41B 49

51

-X42B

50

3 5

-X42

657

814

-K101

656
658

-GS101

809

635
637

12
14

-GS102

SHEET NO:-13

813

-GS306

SHEET NO:-11

810

-K920

SHEET NO:-8

636

SHEET NO:-7

11

SHEET NO:-10

230 VAC UPS BOARD


DISTRIBUTION CUBICLE
20BRU03GH101
FOR COMMUNICATIONS SYSTEM
DWG:-AS-D-GE-EO-3603

-X43

+04GH101

+03GH101

/M126.C8

+00GH003

INTERFACE MODULE
16EO+

-K63
/M125.D1

C- B11

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K21
/J003.C8

-AB B11

-AB A11

IA007.10
B3
COMM. UPS INVT2
THYRISTR TEMP
FAULT

-K21
/J003.C8

20BRU04_GH101B_XM004

Date

2
First Issue

revision

30/04/2010

-AB B10

IA007.11
B4
COMM. UPS
INVT.2 INC. GS306
CLOSED

-K21
/J003.C8

20BRU04_GS306_XG033

20BRU04_GS102_XG033

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K21
/J003.C8

-AB A9

IA007.14

B6
COMM. UPS:BUSBAR
INC GS101
CLOSED
20BRU04_GS101_XG033

-K21
/J003.C8

IA007.15

B7
COMM. UPS:DISTR
IB.BRD VOLTAGE
FAULT

-K21

B8

/J003.C8

20BRU04_GH101_XM004

=20CBA

RACK-0 SLOT 7 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B9

IA007.13

B5
COMM. UPS INVT2
FEEDER GS102
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IA007.12

path

323 sheets
next sheet
M128
Sheet
M127

/M005.B7

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-F02
INCOMING 1 GS101
DWG:-AS-D-GE-EO-3402
SHEET NO:-103

4C-

4C+

/M003.B7
2D-

2D+

/M005.A7

/M003.B7

3052

B
11

2052

5039

4043

TYPICAL DIAGRAM
IF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-053

12
14

OF1

-X3 63

64

62
+00GH101:F02

/M129.C2

2136

C
2137

+00GH003

-K62
/M129.D1
/M130.D1

C- B10

A
A1
24+

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K21
/J003.D8

-CD B8 A8 B7 A7

-K21
/J003.E8

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K21
/J003.D8

-CD A1

-CD B1

IA007.16

-CD A2

IA007.17

C1
AUX:IHR1 SLOT7 DI
17-32 validatr
PRESENCE

-K21

C2

-K21

/J003.D8

IA007.19
C3

/J003.D8

Date
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

C4
400V.MAIN BOARD
INCOMNG1 C.B
OPEN
20BFA00_GS101_XG073

=20CBA

RACK-0 SLOT 7 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K21
/J003.D8

20CBA00_EN172_DI008

-CD B2

IA007.18

path

323 sheets
next sheet
M129
Sheet
M128

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-F02
INCOMING 1 GS101
DWG:-AS-D-GE-EO-3402
SHEET NO:-103

TYPICAL DIAGRAM
IF1
DWG:-AS-D-GE-EO-3401

-X3 66

65

114

115

113

126

127

125

132

131

105

811

54

CD1
812
814

CE1
312
314

912
914
67

-SA1

-SR
12
14

CT1

22
24

OF2

11

21

911

SHEET NO:-053
311

SHEET NO:-054

53

SHEET NO:-053

106

104

96

97

95
+00GH101:F02

/M128.C8

/M130.C2

+00GH003

-K62

A
A13
1P+

/M128.D1

C- B10

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K21
/J003.D8

-CD A3

-CD B3

IA007.20
C5
400V.MAIN BOARD
INCOMNG1 C.B
CLOSED

-K21
/J003.D8

20BFA00_GS101A_XG031

Date

2
First Issue

revision

30/04/2010

-CD A4

IA007.21
C6
400V.MAIN BOARD
INCOMNG1 C.B
TEST

-K21
/J003.D8

20BFA00_GS101_XG177

20BFA00_GS101_XG173

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K21
/J003.D8

-CD A12

IA007.24

C8
400V.MAIN BOARD
INCOMNG1 C.B
REMOTE
20BFA00_GS101_XG077

-K21
/J003.D8

IA007.25

D1
400V.MAIN BOARD
INCOMNG1 C.B
DRAW-IN
20BFA00_GS101_XG276

-K21
/J003.D8

D2
400V.MAIN BOARD
INCOMNG1 C.B
DRAW-OUT
20BFA00_GS101_XG277

=20CBA

RACK-0 SLOT 7 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B12

IA007.23

C7
400V.MAIN BRD INC1
CB SPRING
CHARGED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD B4

IA007.22

path

323 sheets
next sheet
M130
Sheet
M129

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-F02
INCOMING 1 GS101
DWG:-AS-D-GE-EO-3402
SHEET NO:-103

TYPICAL DIAGRAM
IF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-053

61

59

5 6

10

11

-FV1
K2

19

14

JDI

22
24

12
14
18

21

11

11

-QV1

12
14

-QV2

12
14

182
184

12
14

-QU2

11

11

-FV1
K1

SDE2

-X3 60

SHEET NO:-054
B

181

SHEET NO:-051

15

138

139

137

+00GH101:F02

+00GH101:F01

/M129.C8

+00GH003

INTERFACE MODULE
16EO+

-K62
/M128.D1

C- B10

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K21
/J003.E8

-CD B11

-CD A11

IA007.26
D3
400V.MAIN BOARD
INCOMNG1 C.B
TRIP

-K21
/J003.E8

20BFA00_GS101_XM170

Date

2
First Issue

revision

30/04/2010

-CD B10

IA007.27
D4
400V.MAIN BOARD
INC CB VOLT
PRESENCE

-K21
/J003.E8

20BFA00_GS101_XM008

20BFA00_GS101B_XM031

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K21
/J003.E8

-CD A9

IA007.30

D6
400V.MAIN BRD INC1
VOL RELAY W/D
NORMAL
20BFA00_GS101_XM014

-K21
/J003.E8

IA007.31

D7
400V.MAIN BRD
INC1110V CTRL MCB
CLOSED

-K21

D8

/J003.E8

20BFA00_GS101C_XM031

=20CBA

RACK-0 SLOT 7 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B9

IA007.29

D5
400V.VOLTAGE CCT
MCB
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10

IA007.28

path

323 sheets
next sheet
M131
Sheet
M130

/M005.B7

/M005.B7

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-G02
INCOMING 1 GS102
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

4C-

4C+

2D-

2D+

/M003.B7

/M003.B7

TYPICAL DIAGRAM
IF1
DWG:-AS-D-GE-EO-3401

11

21

3053

2053

4044

5040

SHEET NO:-053

-X3 63

22
24

OF2

12
14

OF1

64

-X3 66

62

67

65
+00GH101:G02

/M132.C2

2138

C
2139

+00GH003

-K65
/M132.D1
/M133.D1

C- B13

A
A1
24+

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K22
/J004.C2

-AB B8 A8 B7 A7

-K22
/J004.C2

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K22
/J004.B2

-AB A1

-AB B1

IA008.00
A1
IHR1 SLOT8 DI 1-16
validator
PRESENCE

-K22

Date
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

A2

-K22

/J004.B2

/J004.B2

IA008.03

A3
400V.MAIN BOARD
INCOMNG2 C.B
OPEN
20BFA00_GS102_XG073

-K22
/J004.B2

A4
400V.MAIN BOARD
INCOMNG2 C.B
CLOSED
20BFA00_GS102A_XG031

=20CBA

RACK-0 SLOT 8 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B2

IA008.02

20CBA00_EN181_DI008

-AB A2

IA008.01

path

323 sheets
next sheet
M132
Sheet
M131

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-G02
INCOMING 1 GS102
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

TYPICAL DIAGRAM
IF1
DWG:-AS-D-GE-EO-3401

113

126

127

125

132

131

105

181

811

SDE2

812
814

CD1

312
314

53

912
914
115

CE1

106

104

96

182
184

-SA1

-SR
12
14

CT1

-X3114

54

11

911

SHEET NO:-053
311

SHEET NO:-054

97

95

60

61

59
+00GH101:G02

/M131.C8

/M133.C3

+00GH003

-K65

A
A13
1P+

/M131.D1

C- B13

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K22
/J004.B2

-AB A3

-AB B3

IA008.04
A5
400V.MAIN BOARD
INCOMNG2 C.B
TEST

-K22
/J004.B2

20BFA00_GS102_XG177

Date

2
First Issue

revision

30/04/2010

-AB A4

IA008.05
A6
400V.MAIN BRD INC2
CB SPRING
CHARGED

-K22
/J004.C2

20BFA00_GS102_XG173

20BFA00_GS102_XG077

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K22
/J004.C2

-AB A12

IA008.08

A8
400V.MAIN BOARD
INCOMNG2 C.B
DRAW-IN
20BFA00_GS102_XG276

-K22
/J004.C2

IA008.09

B1
400V.MAIN BOARD
INCOMNG2 C.B
DRAW-OUT
20BFA00_GS102_XG277

-K22
/J004.C2

B2
400V.MAIN BOARD
INCOMNG2 C.B
TRIP
20BFA00_GS102_XM170

=20CBA

RACK-0 SLOT 8 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IA008.07

A7
400V.MAIN BOARD
INCOMNG2 C.B
REMOTE

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IA008.06

path

323 sheets
next sheet
M133
Sheet
M132

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-G02
INCOMING 1 GS102
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

TYPICAL DIAGRAM
IF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-053

-X3

5 6

10

11

18

19

14

JDI

22
24

12
14

-FV1
K2

21

11

11

-QV1

12
14

-QV2

12
14

-QU2

12
14

-FV1
K1

11

B
11

15

138

139

137
+00GH101:G02

/M132.C8

+00GH003

INTERFACE MODULE
16EO+

-K65
/M131.D1

C- B13

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10
22

23
10

23

E
IC693MDL655
+00GH002

-K22
/J004.C2

-AB B11

-AB A11

IA008.10
B3
400V.MAIN BOARD
INC2 CB VOLT
PRESENCE

-K22
/J004.C2

20BFA00_GS102_XM008

Date

2
First Issue

revision

30/04/2010

-AB B10

IA008.11
B4
400V.VOLTAGE CCT
MCB
CLOSED

-K22
/J004.C2

20BFA00_GS102B_XM031

20BFA00_GS102_XM014

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K22
/J004.C2

-AB A9

IA008.14

B6
400V.MAIN BRD INC2
110V CTRL MCB
CLOSED

-K22

IA008.15
B7

/J004.C2

-K22

B8

/J004.C2

20BFA00_GS102C_XM031

=20CBA

RACK-0 SLOT 8 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B9

IA008.13

B5
400V.MAIN BRD INC2
VOL RELAY W/D
NORMAL

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IA008.12

path

323 sheets
next sheet
M134
Sheet
M133

/M005.B7

/M005.B7

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-G04
BUS TIE CB GS301
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

4C-

4C+

2D-

2D+

/M003.B7

/M003.B7

TYPICAL DIAGRAM
TF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-212

SHEET NO:-213

-X3 34

CT1

35

33

37

912
914

22
24

OF2

12
14

OF1

911

21

11

3054

2054

5041

4045

38

36

88

89

87
+00GH101:G04

/M135.C2

2140

C
2141

+00GH003

-K64
/M135.D1
/M136.D1

C- B12

A
A1
24+

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K22
/J004.D2

-CD B8 A8 B7 A7

-K22
/J004.E2

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K22
/J004.D2

-CD A1

Date
First Issue

C1
IHR1 SLOT8 DI
17-32 validatr
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K22
/J004.D2

-CD B2

IA008.18

C2
400V.MAIN BOARD
BUS TIE CB
OPEN
20BFA00_GS301_XG073

-K22
/J004.D2

IA008.19

C3
400V.MAIN BOARD
BUS TIE CB
CLOSED
20BFA00_GS301_XG031

-K22
/J004.D2

C4
400V.MAIN BOARD
BUS TIE CB
TEST
20BFA00_GS301_XG177

=20CBA

RACK-0 SLOT 8 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A2

IA008.17

20CBA00_EN182_DI008

-CD B1

IA008.16

path

323 sheets
next sheet
M135
Sheet
M134

TYPICAL DIAGRAM
TF1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
BPT1
DWG:-AS-D-GE-EO-3401

102

109

108

79

80

78

70

FV1

71

69

100

101

-X3

99

11

QU1

K1

QV2

5 6

23

12
14

JDI

11

11

811

CD1

312
314

53

12
14

CE1

SHEET NO:-250

12
14

-SA1

SHEET NO:-213

812
814

11

54

311

104

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-E
BUSBAR 1
DWG:-AS-D-GE-EO-3402
SHEET NO:-102

SHEET NO:-212

-SR

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-G04
BUS TIE CB GS301
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

SHEET NO:-213

-X3103

11

12
14

12
14

22

34

+00GH101:G04

33

32
+00GH101:E

/M134.C7

/M136.C2

+00GH003

-K64

A
A13
1P+

/M134.D1

C- B12

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K22
/J004.D2

-CD A3

-CD B3

IA008.20
C5
400V.MAIN BRD. TIE
CB SPRING
CHARGED

-K22
/J004.D2

20BFA00_GS301_XG173

Date

2
First Issue

revision

30/04/2010

-CD A4

IA008.21
C6
400V.MAIN BOARD
BUS TIE CB
REMOTE

-K22
/J004.D2

20BFA00_GS301_XG077

20BFA00_GS301_XG276

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K22
/J004.D2

-CD A12

IA008.24

C8
400V.MAIN BOARD
BUS TIE CB
DRAW-OUT
20BFA00_GS301_XG277

-K22
/J004.D2

IA008.25

D1
400V.MAIN BRD TIE
110V CTRL MCB
CLOSED
20BFA00_GS301_XM031

-K22
/J004.D2

D2
400V.MAIN BOARD
BB1 VOLTAGE
PRESENCE
20BFA00_GH101A_XM008

=20CBA

RACK-0 SLOT 8 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B12

IA008.23

C7
400V.MAIN BOARD
BUS TIE CB
DRAW-IN

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD B4

IA008.22

path

323 sheets
next sheet
M136
Sheet
M135

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-E
BUSBAR 1
DWG:-AS-D-GE-EO-3402
SHEET NO:-102

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-G
BUSBAR 2
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

TYPICAL DIAGRAM
BPT1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
BPT1
DWG:-AS-D-GE-EO-3401

11
7

27

28

-X3

26

5 6

21

QV2

23

FV1

22

34

QV1

K2

22
24

12
14
8 9

11

11
QU1

K1

12
14

FV1

12
14

K2

12
14

QV1

22
24
-X3

B
11

FV1

SHEET NO:-250

21

SHEET NO:-250
B

11

33

32

12
14

8 9

27

28

26

+00GH101:E

+00GH101:G

/M135.C8

+00GH003

INTERFACE MODULE
16EO+

-K64
/M134.D1

C- B12

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K22
/J004.E2

-CD B11

-CD A11

IA008.26
D3
400V.MAIN BRD BB1
VOL RELAY W/D
NORMAL

-K22
/J004.E2

20BFA00_GH101A_XM014

Date

2
First Issue

revision

30/04/2010

-CD B10

IA008.27
D4
400V.MAIN BRD BB1
PT MCB
CLOSED

-K22
/J004.E2

20BFA00_GH101A_XM031

20BFA00_GH101B_XM008

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K22
/J004.E2

-CD A9

IA008.30

D6
400V.MAIN BRD BB2
VOL RELAY W/D
NORMAL
20BFA00_GH101B_XM014

-K22
/J004.E2

IA008.31

D7
400V.MAIN BRD BB2
PT MCB
CLOSED

-K22

D8

/J004.E2

20BFA00_GH101B_XM031

=20CBA

RACK-0 SLOT 8 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B9

IA008.29

D5
400V.MAIN BOARD
BB2 VOLTAGE
PRESENCE

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10

IA008.28

path

323 sheets
next sheet
M137
Sheet
M136

/M005.E3

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-F01
AC/DC SUPPLY DISTRIBUTION
DWG:-AS-D-GE-EO-3402
SHEET NO:-200

-XP1

11
12
14

14
2

B
-XP2

-QF4

12
14
-X3

11

11

3056

4C-

4C+

/M003.E3

2056

5043

4047

2D-

2D+

/M005.D3

/M003.D3

12

11
+00GH101:F01

2142

C
2143

+00GH003

-K69

A1
24+

/M138.D1
/M139.D1

C- C03

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K23
/J004.C3

-AB B8 A8 B7 A7

-K23
/J004.C3

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K23
/J004.B3

-AB A1

Date
First Issue

A1
IHR1 SLOT9 DI 1-16
validator
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K23
/J004.B3

-AB B2

IA009.02

A2
400V.MAIN BRD
CTRL. POLAR1
PRESENCE
20BFA00_GH101C_XM008

-K23
/J004.B3

IA009.03

A3
-K23
400V.MAIN BRD PROT /J004.B3
MCB
CLOSED
20BFA00_GH101P_XM031

A4
400V.MAIN BRD
CTRL. POLAR2
PRESENCE
20BFA00_GH101D_XM008

=20CBA

RACK-0 SLOT 9 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A2

IA009.01

20CBA00_EN191_DI008

-AB B1

IA009.00

path

323 sheets
next sheet
M138
Sheet
M137

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-D02
20BFA00GS111
DWG:-AS-D-GE-EO-3402
SHEET NO:-104
TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

-X3 41

SDE2

42

40

44

45

43

38

811

53
39

CD1

-SA1

182
184

22
24

OF2
12
14

OF1

SHEET NO:-512

54

21

11

SHEET NO:-513

181

SHEET NO:-512

812
814

37

110

109

74

75

73
+00GH101:D02

/M139.C2

+00GH003

-K69

A
A13
1P+

/M137.D1

C- C03

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655

-AB A3

-AB B3

IA009.04

+00GH002

A5

-K23

-AB A4

IA009.05

-K23

/J004.B3

/J004.B3

A6
400V.MAIN BRD-FDR
CB-GS111
OPEN

-K23
/J004.C3

20BFA00_GS111_XG073

Date

2
First Issue

revision

30/04/2010

20BFA00_GS111_XG031

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K23
/J004.C3

-AB A12

IA009.08

A8
400V.MAIN BRD CB
O/C-GS111
TRIP
20BFA00_GS111_XM170

-K23
/J004.C3

IA009.09

B1
400V.MAIN BRD-FDR
CB-GS111
REMOTE
20BFA00_GS111_XG077

-K23
/J004.C3

B2
400V.MAIN BRD-FDR
CB-GS111
DRAW-OUT
20BFA00_GS111_XG277

=20CBA

RACK-0 SLOT 9 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IA009.07

A7
400V.MAIN BRD-FDR
CB-GS111
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IA009.06

path

323 sheets
next sheet
M139
Sheet
M138

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-512

93

91

104

105

103

114

21
OF2

115

-X3 41

113

22
24

OF1
12
14

912
914
92

-JDI
12
14

-SR

11

11

11

911

311
312
314

82

CT1

84

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-E02
20BFA00GS112
DWG:-AS-D-GE-EO-3402
SHEET NO:-102

SHEET NO:-512

CE1

-X3 83

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-D02
20BFA00GS111
DWG:-AS-D-GE-EO-3402
SHEET NO:-101

SHEET NO:-513
B

12
14

42

40

44

45

43

+00GH101:D02

+00GH101:E02

/M138.C8

+00GH003

INTERFACE MODULE
16EO+

-K69
/M137.D1

C- C03

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K23
/J004.C3

-AB B11

-AB A11

IA009.10
B3
400V.MAIN BRD-FDR
CB-GS111
DRAW-IN

-K23
/J004.C3

20BFA00_GS111_XG276

Date

2
First Issue

revision

30/04/2010

-AB B10

IA009.11
B4
400V.MAIN BRD-FDR
CB-GS111
TEST

-K23
/J004.C3

20BFA00_GS111_XG177

20BFA00_GS111_XG173

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

IA009.13

B5
400V.MAIN BRD CB
SPRNG-GS111
CHARGED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IA009.12

/J004.C3

-AB A9

B6
-K23
400V.MAIN BRD
/J004.C3
GS111 110V CTRLMCB
CLOSED
20BFA00_GS111_XM031

IA009.15

B7
400V.MAIN BRD-FDR
CB-GS112
OPEN
20BFA00_GS112_XG073

-K23
/J004.C3

B8
400V.MAIN BRD-FDR
CB-GS112
CLOSED
20BFA00_GS112_XG031

=20CBA

RACK-0 SLOT 9 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K23

-AB B9
IA009.14

path

323 sheets
next sheet
M140
Sheet
M139

/M005.E3

/M005.D3

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-E02
20BFA00GS112
DWG:-AS-D-GE-EO-3402
SHEET NO:-102

4C-

4C+

2D-

2D+

/M003.E3

/M003.D3

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-512

54

SDE2

CD1
812
814

53

182
184

-SA1

-X3 38

39

37

811

SHEET NO:-513

181

3057

2057

5044

4048

SHEET NO:-512

110

109

74

75

73
+00GH101:E02

/M141.C2

2144

C
2145

+00GH003

-K68

A1
24+

/M141.D1
/M142.D1

C- C02

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K23
/J004.D3

-CD B8 A8 B7 A7

-K23
/J004.E3

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K23
/J004.D3

-CD A1

Date
First Issue

C1
IHR1 SLOT9 DI
17-32 validatr
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K23
/J004.D3

-CD B2

IA009.18

C2
400V.MAIN BRD CB
O/C-GS112
TRIP
20BFA00_GS112_XM170

-K23
/J004.D3

IA009.19

C3
400V.MAIN BRD-FDR
CB-GS112
REMOTE
20BFA00_GS112_XG077

-K23
/J004.D3

C4
400V.MAIN BRD-FDR
CB-GS112
DRAW-OUT
20BFA00_GS112_XG277

=20CBA

RACK-0 SLOT 9 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A2

IA009.17

20CBA00_EN192_DI008

-CD B1

IA009.16

path

323 sheets
next sheet
M141
Sheet
M140

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-512

93

91

104

105

103

114

21
OF2

115

-X3 41

113

22
24

OF1
12
14

912
914
92

-JDI
12
14

-SR

11

11

11

911

311
312
314

82

CT1

84

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-C02
20BFA00GS113
DWG:-AS-D-GE-EO-3402
SHEET NO:-100

SHEET NO:-512

CE1

-X3 83

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-E02
20BFA00GS112
DWG:-AS-D-GE-EO-3402
SHEET NO:-102

SHEET NO:-513
B

12
14

42

40

44

45

43

+00GH101:E02

+00GH101:C02

/M140.C8

/M142.C2

+00GH003

-K68

A
A13
1P+

/M140.D1

C- C02

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K23
/J004.D3

-CD A3

-CD B3

IA009.20
C5
400V.MAIN BRD-FDR
CB-GS112
DRAW-IN

-K23
/J004.D3

20BFA00_GS112_XG276

Date

2
First Issue

revision

30/04/2010

-CD A4

IA009.21
C6
400V.MAIN BRD-FDR
CB-GS112
TEST

-K23
/J004.D3

20BFA00_GS112_XG177

20BFA00_GS112_XG173

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

IA009.23

C7
400V.MAIN BRD CB
SPRNG-GS112
CHARGED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD B4

IA009.22

/J004.D3

-CD A12

C8
-K23
400V.MAIN BRD
/J004.D3
GS112 110V CTRLMCB
CLOSED
20BFA00_GS112_XM031

IA009.25

D1
400V.MAIN BRD-FDR
CB-GS113
OPEN
20BFA00_GS113_XG073

-K23
/J004.D3

D2
400V.MAIN BRD-FDR
CB-GS113
CLOSED
20BFA00_GS113_XG031

=20CBA

RACK-0 SLOT 9 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K23

-CD B12
IA009.24

path

323 sheets
next sheet
M142
Sheet
M141

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-C02
20BFA00GS113
DWG:-AS-D-GE-EO-3402
SHEET NO:-100

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

39

37

110

109

74

75

73

11

911
CT1

83

-SR
12
14

CE1
812
814

53

182
184
-X3 38

912
914

CD1

-SA1

SHEET NO:-512

312
314

SDE2

SHEET NO:-513
311

SHEET NO:-512

54

181

SHEET NO:-513

811

SHEET NO:-512

84

82

92

93

91

104

105

103
+00GH101:C02

/M141.C8

+00GH003

INTERFACE MODULE
16EO+

-K68
/M140.D1

C- C02

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K23
/J004.E3

-CD B11

-CD A11

IA009.26
D3
400V.MAIN BRD CB
O/C-GS113
TRIP

-K23
/J004.E3

20BFA00_GS113_XM170

Date

2
First Issue

revision

30/04/2010

-CD B10

IA009.27
D4
400V.MAIN BRD-FDR
CB-GS113
REMOTE

-K23
/J004.E3

20BFA00_GS113_XG077

20BFA00_GS113_XG277

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K23
/J004.E3

-CD A9

IA009.30

D6
400V.MAIN BRD-FDR
CB-GS113
DRAW-IN
20BFA00_GS113_XG276

-K23
/J004.E3

IA009.31

D7
400V.MAIN BRD-FDR
CB-GS113
TEST
20BFA00_GS113_XG177

-K23
/J004.E3

D8
400V.MAIN BRD CB
SPRNG-GS113
CHARGED
20BFA00_GS113_XG173

=20CBA

RACK-0 SLOT 9 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B9

IA009.29

D5
400V.MAIN BRD-FDR
CB-GS113
DRAW-OUT

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10

IA009.28

path

323 sheets
next sheet
M143
Sheet
M142

/M005.E3

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-C02
20BFA00GS113
DWG:-AS-D-GE-EO-3402
SHEET NO:-100

4C-

4C+

/M003.E3
2D-

2D+

/M005.D3

/M003.D3

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

B
11

3058

2058

4049

5045

SHEET NO:-512

12
14

-JDI

-X3114

115

113
+00GH101:C02

2146

C
2147

+00GH003

-K71

A1
24+

/M144.D1
/M145.D1

C- C05

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K24
/J004.C5

-AB B8 A8 B7 A7

-K24
/J004.C5

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K24
/J004.B5

-AB A1
IA010.01

A1
IHR1 SLOT10 DI
1-16 validtr
PRESENCE
20CBA00_EN101_DI008

Date

2
First Issue

revision

30/04/2010

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K24
/J004.B5

-AB A2

-AB B2

IA010.02

A2
-K24
400V.MAIN BRD
/J004.B5
GS113 110V CTRLMCB
CLOSED

IA010.03
A3

-K24

A4

/J004.B5

20BFA00_GS113_XM031

=20CBA

RACK-0 SLOT 10 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B1

IA010.00

path

323 sheets
next sheet
M144
Sheet
M143

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-D04
20BFA00GS114
DWG:-AS-D-GE-EO-3402
SHEET NO:-101

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

-X3 41

42

40

44

CD1

45

-X3 38

43

39

37

CE1
812
814

53

182
184

-SA1

110

109

74

312
314

SDE2
22
24

OF2
12
14

OF1

54

11

21

181

SHEET NO:-512
311

SHEET NO:-513

811

SHEET NO:-512

75

73

83

84

82
+00GH101:D04

/M145.C2

+00GH003

-K71

A
A13
1P+

/M143.D1

C- C05

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K24
/J004.B5

-AB A3

-AB B3

IA010.04
A5
400V.MAIN BRD-FDR
CB-GS114
OPEN

-K24
/J004.B5

20BFA00_GS114_XG073

Date

2
First Issue

revision

30/04/2010

-AB A4

IA010.05
A6
400V.MAIN BRD-FDR
CB-GS114
CLOSED

-K24
/J004.C5

20BFA00_GS114_XG031

20BFA00_GS114_XM170

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K24
/J004.C5

-AB A12

IA010.08

A8
400V.MAIN BRD-FDR
CB-GS114
REMOTE
20BFA00_GS114_XG077

-K24
/J004.C5

IA010.09

B1
400V.MAIN BRD-FDR
CB-GS114
DRAW-OUT
20BFA00_GS114_XG277

-K24
/J004.C5

B2
400V.MAIN BRD-FDR
CB-GS114
DRAW-IN
20BFA00_GS114_XG276

=20CBA

RACK-0 SLOT 10 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IA010.07

A7
400V.MAIN BRD CB
O/C-GS114
TRIP

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IA010.06

path

323 sheets
next sheet
M145
Sheet
M144

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

104

105

103

114

115

SDE2

42

40

44

182
184

22
24

OF2

-X3 41

113

181

21

11
OF1
12
14

-JDI
12
14

912
914

91

SHEET NO:-512

11

911

SHEET NO:-512

-SR

93

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-E04
20BFA00GS115
DWG:-AS-D-GE-EO-3402
SHEET NO:-102

CT1

-X3 92

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-D04
20BFA00GS114
DWG:-AS-D-GE-EO-3402
SHEET NO:-101

SHEET NO:-513
B

11

12
14

45

43

38

39

37

+00GH101:D04

+00GH101:E04

/M144.C8

+00GH003

INTERFACE MODULE
16EO+

-K71
/M143.D1

C- C05

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K24
/J004.C5

-AB B11

-AB A11

IA010.10
B3
400V.MAIN BRD-FDR
CB-GS114
TEST

-K24
/J004.C5

20BFA00_GS114_XG177

Date

2
First Issue

revision

30/04/2010

-AB B10

IA010.11

IA010.12

B4
400V.MAIN BRD CB
SPRNG-GS114
CHARGED

-K24
/J004.C5

20BFA00_GS114_XG173

B5
-K24
400V.MAIN BRD
/J004.C5
GS114 110V CTRLMCB
CLOSED
20BFA00_GS114_XM031

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-AB B9

-AB A9

IA010.14

B6
400V.MAIN BRD-FDR
CB-GS115
OPEN
20BFA00_GS115_XG073

-K24
/J004.C5

IA010.15

B7
400V.MAIN BRD-FDR
CB-GS115
CLOSED
20BFA00_GS115_XG031

-K24
/J004.C5

B8
400V.MAIN BRD CB
O/C-GS115
TRIP
20BFA00_GS115_XM170

=20CBA

RACK-0 SLOT 10 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A10
IA010.13

path

323 sheets
next sheet
M146
Sheet
M145

/M005.E3

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-E04
20BFA00GS115
DWG:-AS-D-GE-EO-3402
SHEET NO:-102

4C-

4C+

/M003.E3
2D-

2D+

/M005.D3

/M003.D3

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-512

CE1
812
814

53
-X3

110

109

74

312
314

CD1

-SA1

3059

2059

5046

4050

54

811

311

SHEET NO:-513

75

73

83

84

82
+00GH101:E04

/M147.C2

2148

C
2149

+00GH003

-K70

A1
24+

/M147.D1
/M148.D1

C- C04

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K24
/J004.D5

-CD B8 A8 B7 A7

-K24
/J004.E5

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K24
/J004.D5

-CD A1

Date
First Issue

C1
IHR1 SLOT10 DI
17-32 validtr
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K24
/J004.D5

-CD B2

IA010.18

C2
400V.MAIN BRD-FDR
CB-GS115
REMOTE
20BFA00_GS115_XG077

-K24
/J004.D5

IA010.19

C3
400V.MAIN BRD-FDR
CB-GS115
DRAW-OUT
20BFA00_GS115_XG277

-K24
/J004.D5

C4
400V.MAIN BRD-FDR
CB-GS115
DRAW-IN
20BFA00_GS115_XG276

=20CBA

RACK-0 SLOT 10 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A2

IA010.17

20CBA00_EN102_DI008

-CD B1

IA010.16

path

323 sheets
next sheet
M147
Sheet
M146

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
OFP4M+N/2
DWG:-AS-D-GE-EO-3401

104

105

103

114

115

SDE2

54

52

56

182
184

22
24

OF2

-X3 53

113

181

21

11
OF1
12
14

-JDI
12
14

912
914

91

SHEET NO:-532

11

911

SHEET NO:-512

-SR

93

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-C04
20BFA00GS116
DWG:-AS-D-GE-EO-3402
SHEET NO:-100

CT1

-X3 92

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-E04
20BFA00GS115
DWG:-AS-D-GE-EO-3402
SHEET NO:-102

SHEET NO:-513
B

11

12
14

57

55

50

51

49

+00GH101:E04

+00GH101:C04

/M146.C7

/M148.C2

+00GH003

-K70

A
A13
1P+

/M146.D1

C- C04

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K24
/J004.D5

-CD A3

-CD B3

IA010.20
C5
400V.MAIN BRD-FDR
CB-GS115
TEST

-K24
/J004.D5

20BFA00_GS115_XG177

Date

2
First Issue

revision

30/04/2010

-CD A4

IA010.21

IA010.22

C6
400V.MAIN BRD CB
SPRNG-GS115
CHARGED

-K24
/J004.D5

20BFA00_GS115_XG173

C7
-K24
400V.MAIN BRD
/J004.D5
GS115 110V CTRLMCB
CLOSED
20BFA00_GS115_XM031

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-CD B12

-CD A12

IA010.24

C8
400V.MAIN BRD-FDR
CB-GS116
OPEN
20BFA00_GS116_XG073

-K24
/J004.D5

IA010.25

D1
400V.MAIN BRD-FDR
CB-GS116
CLOSED
20BFA00_GS116_XG031

-K24
/J004.D5

D2
400V.MAIN BRD CB
O/C-GS116
TRIP
20BFA00_GS116_XM170

=20CBA

RACK-0 SLOT 10 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B4
IA010.23

path

323 sheets
next sheet
M148
Sheet
M147

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-C04
20BFA00GS116
DWG:-AS-D-GE-EO-3402
SHEET NO:-100

TYPICAL DIAGRAM
OFP4M+N/2
DWG:-AS-D-GE-EO-3401

122

121

86

87

85

95

96

94

11

11
-SR

104

-JDI

105

103

116

12
14

CT1
912
914

812
814

53
-X3

CE1
312
314

CD1

-SA1

12
14

54

811

SHEET NO:-533
911

SHEET NO:-532

311

SHEET NO:-533

117

115

126

127

125
+00GH101:C04

/M147.C7

+00GH003

INTERFACE MODULE
16EO+

-K70
/M146.D1

C- C04

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K24
/J004.E5

-CD B11

-CD A11

IA010.26
D3
400V.MAIN BRD-FDR
CB-GS116
REMOTE

-K24
/J004.E5

20BFA00_GS116_XG077

Date

2
First Issue

revision

30/04/2010

-CD B10

IA010.27
D4
400V.MAIN BRD-FDR
CB-GS116
DRAW-OUT

-K24
/J004.E5

20BFA00_GS116_XG277

20BFA00_GS116_XG276

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K24
/J004.E5

-CD A9

IA010.30

D6
400V.MAIN BRD-FDR
CB-GS116
TEST
20BFA00_GS116_XG177

-K24
/J004.E5

IA010.31

D7
400V.MAIN BRD CB
SPRNG-GS116
CHARGED
20BFA00_GS116_XG173

-K24
/J004.E5

D8
400V.MAIN BRD
GS116 110V CTRLMCB
CLOSED
20BFA00_GS116_XM031

=20CBA

RACK-0 SLOT 10 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B9

IA010.29

D5
400V.MAIN BRD-FDR
CB-GS116
DRAW-IN

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10

IA010.28

path

323 sheets
next sheet
M149
Sheet
M148

/M005.E5

/M715.C6

/M715.C6

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-F04
20BFA00GS117
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

4C-

4C+

/M003.E5
2D-

2D+

/M005.D5

/M003.D5

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-512
21

11

2153

12
14

OF2

-X3 41

22
24

OF1

3061

2061

5048

4052

2152

42

40

44

45

43
+00GH101:F04

/M150.C2

2150

C
2151

+00GH003

-K73

A1
24+

/M150.D1
/M151.D1

C- C07

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K28
/J004.C6

-AB B8 A8 B7 A7

-K28
/J004.C6

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K28
/J004.B6

-AB A1

Date
First Issue

A1
IHR2 SLOT3 DI 1-16
validator
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K28
/J004.B6

-AB B2

IB003.02

A2
IHR2 TOP 5s
SYNCRO.
APPEAR
20CBA00_EN23_XZ025

-K28
/J004.B6

IB003.03

A3
400V.MAIN BRD-FDR
CB-GS117
OPEN
20BFA00_GS117_XG073

-K28
/J004.B6

A4
400V.MAIN BRD-FDR
CB-GS117
CLOSED
20BFA00_GS117_XG031

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A2

IB003.01

20CBA00_EN231_DI008

-AB B1

IB003.00

path

323 sheets
next sheet
M150
Sheet
M149

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-F04
20BFA00GS117
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

39

37

110

109

74

75

73

B
11

911
CT1

83

-SR
12
14

CE1
812
814

53

182
184
-X3 38

SHEET NO:-512

912
914

CD1

-SA1

312
314

SDE2

SHEET NO:-513
311

SHEET NO:-512

54

181

SHEET NO:-513

811

SHEET NO:-512

84

82

92

93

91

104

105

103
+00GH101:F04

/M149.C8

/M151.C2

+00GH003

-K73

A
A13
1P+

/M149.D1

C- C07

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K28
/J004.B6

-AB A3

-AB B3

IB003.04
A5
400V.MAIN BRD CB
O/C-GS117
TRIP

-K28
/J004.B6

20BFA00_GS117_XM170

Date

2
First Issue

revision

30/04/2010

-AB A4

IB003.05
A6
400V.MAIN BRD-FDR
CB-GS117
REMOTE

-K28
/J004.C6

20BFA00_GS117_XG077

20BFA00_GS117_XG277

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K28
/J004.C6

-AB A12

IB003.08

A8
400V.MAIN BRD-FDR
CB-GS117
DRAW-IN
20BFA00_GS117_XG276

-K28
/J004.C6

IB003.09

B1
400V.MAIN BRD-FDR
CB-GS117
TEST
20BFA00_GS117_XG177

-K28
/J004.C6

B2
400V.MAIN BRD CB
SPRNG-GS117
CHARGED
20BFA00_GS117_XG173

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IB003.07

A7
400V.MAIN BRD-FDR
CB-GS117
DRAW-OUT

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IB003.06

path

323 sheets
next sheet
M151
Sheet
M150

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-F04
20BFA00GS117
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-L02
20BFA00GS118
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-513

-X3114

115

-X3 41

113

SDE2

42

40

44

45

43

38

39

37

CD1

-SA1

182
184

22
24

OF2
12
14

OF1
12
14

-JDI

181

21

11

11

SHEET NO:-512
811

SHEET NO:-512

54

SHEET NO:-512

53

812
814

110

109

74

75

73

+00GH101:F04

+00GH101:L02

/M150.C8

+00GH003

INTERFACE MODULE
16EO+

-K73
/M149.D1

C- C07

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K28
/J004.C6

-AB B11

-AB A11

IB003.10
B3
-K28
400V.MAIN BRD
/J004.C6
GS117 110V CTRLMCB
CLOSED
20BFA00_GS117_XM031

Date

2
First Issue

revision

30/04/2010

-AB B10

IB003.11
B4
400V.MAIN BRD-FDR
CB-GS118
OPEN

-K28
/J004.C6

20BFA00_GS118_XG073

20BFA00_GS118_XG031

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K28
/J004.C6

-AB A9

IB003.14

B6
400V.MAIN BRD CB
O/C-GS118
TRIP
20BFA00_GS118_XM170

-K28
/J004.C6

IB003.15

B7
400V.MAIN BRD-FDR
CB-GS118
REMOTE
20BFA00_GS118_XG077

-K28
/J004.C6

B8
400V.MAIN BRD-FDR
CB-GS118
DRAW-OUT
20BFA00_GS118_XG277

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B9

IB003.13

B5
400V.MAIN BRD-FDR
CB-GS118
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IB003.12

path

323 sheets
next sheet
M152
Sheet
M151

/M005.E5

/M005.D5

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-L02
20BFA00GS118
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

4C-

4C+

2D-

2D+

/M003.E5

/M003.D5

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-512
B

-X3 83

11
-SR
12
14

312
314

CT1
912
914

CE1

3062

2062

5049

4053

311

SHEET NO:-513
911

SHEET NO:-512

84

82

92

93

91

104

105

103
+00GH101:L02

/M153.C2

2154

C
2155

+00GH003

-K72

A1
24+

/M153.D1
/M154.D1

C- C06

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

E
IC693MDL655-CD B6 A6 IC693MDL655
B5 A5
-CD B8 A8 B7 A7

/J004.D6

+00GH002

-K28
/J004.E6

+00GH002

DCOM
NC
NC
0V

-K28

+24VOut
NC
NC
CCOM

+00GH002

IC693MDL655

-K28
/J004.D6

-CD A1

Date
First Issue

C1
IHR2 SLOT3 DI
17-32 validatr
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K28
/J004.D6

-CD B2

IB003.18

C2
400V.MAIN BRD-FDR
CB-GS118
DRAW-IN
20BFA00_GS118_XG276

-K28
/J004.D6

IB003.19

C3
400V.MAIN BRD-FDR
CB-GS118
TEST
20BFA00_GS118_XG177

-K28
/J004.D6

C4
400V.MAIN BRD CB
SPRNG-GS118
CHARGED
20BFA00_GS118_XG173

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A2

IB003.17

20CBA00_EN232_DI008

-CD B1

IB003.16

path

323 sheets
next sheet
M153
Sheet
M152

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-L02
20BFA00GS118
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-H02
20BFA00GS119
DWG:-AS-D-GE-EO-3402
SHEET NO:-105

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-513

-X3114

115

-X3 41

113

SDE2

42

40

44

45

43

38

39

CD1

-SA1

182
184

22
24

OF2
12
14

OF1
12
14

-JDI

181

21

11

11

SHEET NO:-512
811

SHEET NO:-512

54

SHEET NO:-512

53

812
814

37

110

109

74

75

73

+00GH101:L02

+00GH101:H02

/M152.C8

/M154.C2

+00GH003

-K72

A
A13
1P+

/M152.D1

C- C06

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K28
/J004.D6

-CD A3

-CD B3

IB003.20
C5
-K28
400V.MAIN BRD
/J004.D6
GS118 110V CTRLMCB
CLOSED
20BFA00_GS118_XM031

Date

2
First Issue

revision

30/04/2010

-CD A4

IB003.21
C6
400V.MAIN BRD-FDR
CB-GS119
OPEN

-K28
/J004.D6

20BFA00_GS119_XG073

20BFA00_GS119_XG031

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K28
/J004.D6

-CD A12

IB003.24

C8
400V.MAIN BRD CB
O/C-GS119
TRIP
20BFA00_GS119_XM170

-K28
/J004.D6

IB003.25

D1
400V.MAIN BRD-FDR
CB-GS119
REMOTE
20BFA00_GS119_XG077

-K28
/J004.D6

D2
400V.MAIN BRD-FDR
CB-GS119
DRAW-OUT
20BFA00_GS119_XG277

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B12

IB003.23

C7
400V.MAIN BRD-FDR
CB-GS119
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD B4

IB003.22

path

323 sheets
next sheet
M154
Sheet
M153

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-512

SHEET NO:-512

92

93

91

105

103

114

OF2

115

-X3 41

113

22
24

OF1
12
14

-JDI

104

21

11

11

11
-SR

912
914
82

911

311
312
314
84

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

CT1

-X3 83

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-M02
20BFA00GS120
DWG:-AS-D-GE-EO-3402
SHEET NO:-107

SHEET NO:-513

CE1

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-H02
20BFA00GS119
DWG:-AS-D-GE-EO-3402
SHEET NO:-105

SHEET NO:-512
B

12
14

12
14

42

40

44

45

43

+00GH101:H02

+00GH101:M02

/M153.C8

+00GH003

INTERFACE MODULE
16EO+

-K72
/M152.D1

C- C06

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K28
/J004.E6

-CD B11

-CD A11

IB003.26
D3
400V.MAIN BRD-FDR
CB-GS119
DRAW-IN

-K28
/J004.E6

20BFA00_GS119_XG276

Date

2
First Issue

revision

30/04/2010

-CD B10

IB003.27
D4
400V.MAIN BRD-FDR
CB-GS119
TEST

-K28
/J004.E6

20BFA00_GS119_XG177

20BFA00_GS119_XG173

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

IB003.29

D5
400V.MAIN BRD CB
SPRNG-GS119
CHARGED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10

IB003.28

/J004.E6

-CD A9

D6
-K28
400V.MAIN BRD
/J004.E6
GS119 110V CTRLMCB
CLOSED
20BFA00_GS119_XM031

IB003.31

D7
400V.MAIN BRD-FDR
CB-GS120
OPEN
20BFA00_GS120_XG073

-K28
/J004.E6

D8
400V.MAIN BRD-FDR
CB-GS120
CLOSED
20BFA00_GS120_XG031

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K28

-CD B9
IB003.30

path

323 sheets
next sheet
M155
Sheet
M154

/M005.E5

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-M02
20BFA00GS120
DWG:-AS-D-GE-EO-3402
SHEET NO:-107

4C-

4C+

/M003.E5
2D-

2D+

/M005.D5

/M003.D5

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-512

54

SDE2

CD1
812
814

53

182
184

-SA1

-X3 38

39

37

811

SHEET NO:-513

181

3063

2063

4054

5050

SHEET NO:-512

110

109

74

75

73
+00GH101:M02

/M156.C2

2156

C
2157

+00GH003

-K75

A1
24+

/M156.D1
/M157.D1

C- C09

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K29
/J004.C8

-AB B8 A8 B7 A7

-K29
/J004.C8

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K29
/J004.B8

-AB A1

Date
First Issue

A1
IHR2 SLOT4 DI 1-16
validator
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K29
/J004.B8

-AB B2

IB004.02

A2
400V.MAIN BRD CB
O/C-GS120
TRIP
20BFA00_GS120_XM170

-K29
/J004.B8

IB004.03

A3
400V.MAIN BRD-FDR
CB-GS120
REMOTE
20BFA00_GS120_XG077

-K29
/J004.B8

A4
400V.MAIN BRD-FDR
CB-GS120
DRAW-OUT
20BFA00_GS120_XG277

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A2

IB004.01

20CBA00_EN241_DI008

-AB B1

IB004.00

path

323 sheets
next sheet
M156
Sheet
M155

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

92

93

91

12
14

OF1
12
14

-JDI

-JDI

104

11

11
11

11
-SR

912
914
82

SHEET NO:-512

911

311
312
314
84

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

CT1

-X3 83

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-L04
20BFA00GS121
DWG:-AS-D-GE-EO-3402
SHEET NO:-106

SHEET NO:-513

CE1

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-M02
20BFA00GS120
DWG:-AS-D-GE-EO-3402
SHEET NO:-107

SHEET NO:-512
B

12
14

12
14

105

103

114

115

-X3114

113

115

113

41

42

40

+00GH101:M02

+00GH101:L04

/M155.C7

/M157.C2

+00GH003

-K75

A
A13
1P+

/M155.D1

C- C09

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K29
/J004.B8

-AB A3

-AB B3

IB004.04
A5
400V.MAIN BRD-FDR
CB-GS120
DRAW-IN

-K29
/J004.B8

20BFA00_GS120_XG276

Date

2
First Issue

revision

30/04/2010

-AB A4

IB004.05
A6
400V.MAIN BRD-FDR
CB-GS120
TEST

-K29
/J004.C8

20BFA00_GS120_XG177

20BFA00_GS120_XG173

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

IB004.07

A7
400V.MAIN BRD CB
SPRNG-GS120
CHARGED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IB004.06

/J004.C8

-AB A12

A8
-K29
400V.MAIN BRD
/J004.C8
GS120 110V CTRLMCB
CLOSED
20BFA00_GS120_XM031

IB004.09

B1
-K29
400V.MAIN BRD
/J004.C8
GS121 110V CTRLMCB
CLOSED
20BFA00_GS121_XM031

B2
400V.MAIN BRD-FDR
CB-GS121
OPEN
20BFA00_GS121_XG073

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K29

-AB B12
IB004.08

path

323 sheets
next sheet
M157
Sheet
M156

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-L04
20BFA00GS121
DWG:-AS-D-GE-EO-3402
SHEET NO:-106

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

-X3 44

43

38

37

110

109

74

75

73

911

CE1
812
814

53
39

SHEET NO:-513

CT1

83

912
914

CD1

-SA1

182
184
45

SHEET NO:-512

312
314

SDE2
22
24

OF2

54

21

181

SHEET NO:-512

311

SHEET NO:-513

811

SHEET NO:-512

84

82

92

93

91
+00GH101:L04

/M156.C8

+00GH003

INTERFACE MODULE
16EO+

-K75
/M155.D1

C- C09

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K29
/J004.C8

-AB B11

-AB A11

IB004.10
B3
400V.MAIN BRD-FDR
CB-GS121
CLOSED

-K29
/J004.C8

20BFA00_GS121_XG031

Date

2
First Issue

revision

30/04/2010

-AB B10

IB004.11
B4
400V.MAIN BRD CB
O/C-GS121
TRIP

-K29
/J004.C8

20BFA00_GS121_XM170

20BFA00_GS121_XG077

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K29
/J004.C8

-AB A9

IB004.14

B6
400V.MAIN BRD-FDR
CB-GS121
DRAW-OUT
20BFA00_GS121_XG277

-K29
/J004.C8

IB004.15

B7
400V.MAIN BRD-FDR
CB-GS121
DRAW-IN
20BFA00_GS121_XG276

-K29
/J004.C8

B8
400V.MAIN BRD-FDR
CB-GS121
TEST
20BFA00_GS121_XG177

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B9

IB004.13

B5
400V.MAIN BRD-FDR
CB-GS121
REMOTE

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IB004.12

path

323 sheets
next sheet
M158
Sheet
M157

/M005.E5

/M005.D5

4C-

4C+

2D-

2D+

/M003.E5

/M003.D5

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-L04
20BFA00GS121
DWG:-AS-D-GE-EO-3402
SHEET NO:-106

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-H04
20BFA00GS122
DWG:-AS-D-GE-EO-3402
SHEET NO:-105

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

SHEET NO:-512

SHEET NO:-513

SHEET NO:-512

105

-X3114

103

12
14
115

113

41

42

+00GH101:L04

3064

2064

5051

4055

-X3104

OF1
12
14

-JDI
12
14

-SR

11

11

B
11

40
+00GH101:H04

/M159.C2

2158

C
2159

+00GH003

-K74

A1
24+

/M159.D1
/M160.D1

C- C08

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K29
/J004.D8

-CD B8 A8 B7 A7

-K29
/J004.E8

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K29
/J004.D8

-CD A1

Date
First Issue

C1
IHR2 SLOT4 DI
17-32 validatr
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K29
/J004.D8

-CD B2

IB004.18

C2
400V.MAIN BRD CB
SPRNG-GS121
CHARGED
20BFA00_GS121_XG173

-K29
/J004.D8

IB004.19

C3
-K29
400V.MAIN BRD
/J004.D8
GS122 110V CTRLMCB
CLOSED
20BFA00_GS122_XM031

C4
400V.MAIN BRD-FDR
CB-GS122
OPEN
20BFA00_GS122_XG073

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A2

IB004.17

20CBA00_EN242_DI008

-CD B1

IB004.16

path

323 sheets
next sheet
M159
Sheet
M158

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-H04
20BFA00GS122
DWG:-AS-D-GE-EO-3402
SHEET NO:-105

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

-X3 44

43

38

37

110

109

911

CE1
812
814

53
39

74

75

73

CT1

83

912
914

CD1

-SA1

182
184
45

SHEET NO:-513

312
314

SDE2
22
24

OF2

54

21

181

SHEET NO:-512

311

SHEET NO:-513

811

SHEET NO:-512

84

82

92

93

91
+00GH101:H04

/M158.C8

/M160.C2

+00GH003

-K74

A
A13
1P+

/M158.D1

C- C08

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K29
/J004.D8

-CD A3

-CD B3

IB004.20
C5
400V.MAIN BRD-FDR
CB-GS122
CLOSED

-K29
/J004.D8

20BFA00_GS122_XG031

Date

2
First Issue

revision

30/04/2010

-CD A4

IB004.21
C6
400V.MAIN BRD CB
O/C-GS122
TRIP

-K29
/J004.D8

20BFA00_GS122_XM170

20BFA00_GS122_XG077

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K29
/J004.D8

-CD A12

IB004.24

C8
400V.MAIN BRD-FDR
CB-GS122
DRAW-OUT
20BFA00_GS122_XG277

-K29
/J004.D8

IB004.25

D1
400V.MAIN BRD-FDR
CB-GS122
DRAW-IN
20BFA00_GS122_XG276

-K29
/J004.D8

D2
400V.MAIN BRD-FDR
CB-GS122
TEST
20BFA00_GS122_XG177

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B12

IB004.23

C7
400V.MAIN BRD-FDR
CB-GS122
REMOTE

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD B4

IB004.22

path

323 sheets
next sheet
M160
Sheet
M159

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-H04
20BFA00GS122
DWG:-AS-D-GE-EO-3402
SHEET NO:-105

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-M04
20BFA00GS123
DWG:-AS-D-GE-EO-3402
SHEET NO:-107

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
OFP4M+N/2
DWG:-AS-D-GE-EO-3401

SHEET NO:-512

SHEET NO:-533

SHEET NO:-533

-X3126

103

127

125

53

54

52

181

SDE2

56

-SA1

182
184

22
24

OF2
12
14

OF1
12
14

105

21

11

11

11
12
14

-JDI

-X3104

SHEET NO:-532

B
-SR

54

57

55

50

53

51

49

122

121
+00GH101:M04

/M159.C7

+00GH003

INTERFACE MODULE
16EO+

-K74
/M158.D1

C- C08

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K29
/J004.E8

-CD B11

-CD A11

IB004.26
D3
400V.MAIN BRD CB
SPRNG-GS122
CHARGED

-K29
/J004.E8

20BFA00_GS122_XG173

Date

2
First Issue

revision

30/04/2010

-CD B10

IB004.27
D4
400V.MAIN BRD
GS123 110V CTRLMCB
CLOSED

-K29
/J004.E8

20BFA00_GS123_XM031

20BFA00_GS123_XG073

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K29
/J004.E8

-CD A9

IB004.30

D6
400V.MAIN BRD-FDR
CB-GS123
CLOSED
20BFA00_GS123_XG031

-K29
/J004.E8

IB004.31

D7
400V.MAIN BRD CB
O/C-GS123
TRIP
20BFA00_GS123_XM170

-K29
/J004.E8

D8
400V.MAIN BRD-FDR
CB-GS123
REMOTE
20BFA00_GS123_XG077

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B9

IB004.29

D5
400V.MAIN BRD-FDR
CB-GS123
OPEN

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10

IB004.28

path

323 sheets
next sheet
M161
Sheet
M160

/M005.E7

/M005.D7

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-M04
20BFA00GS123
DWG:-AS-D-GE-EO-3402
SHEET NO:-107

4C-

4C+

2D-

2D+

/M003.E7

/M003.D7

TYPICAL DIAGRAM
OFP4M+N/2
DWG:-AS-D-GE-EO-3401

-X3 86

87

85

95

912
914

CT1
312
314

CE1
812
814

CD1

911

811

3066

2066

5053

4057

SHEET NO:-533
311

SHEET NO:-532

96

94

104

105

103
+00GH101:M04

/M162.C2

2160

C
2161

+00GH003

-K77
/M162.D1
/M163.D1

C- C11

A
A1
24+

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K30
/J005.C2

-AB B8 A8 B7 A7

-K30
/J005.C2

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K30
/J005.B2

-AB A1

Date
First Issue

A1
IHR2 SLOT5 DI 1-16
validator
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K30
/J005.B2

-AB B2

IB005.02

A2
400V.MAIN BRD-FDR
CB-GS123
DRAW-OUT
20BFA00_GS123_XG277

-K30
/J005.B2

IB005.03

A3
400V.MAIN BRD-FDR
CB-GS123
DRAW-IN
20BFA00_GS123_XG276

-K30
/J005.B2

A4
400V.MAIN BRD-FDR
CB-GS123
TEST
20BFA00_GS123_XG177

=20CBA

RACK-0 SLOT 5 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A2

IB005.01

20CBA00_EN251_DI008

-AB B1

IB005.00

path

323 sheets
next sheet
M162
Sheet
M161

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-M04
20BFA00GS123
DWG:-AS-D-GE-EO-3402
SHEET NO:-107

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-M04/M05
GS129
DWG:-AS-D-GE-EO-3404
SHEET NO:-108

TYPICAL DIAGRAM
OFP4M+N/2
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
OFP1M+N/1
DWG:-AS-D-GE-EO-3401

SHEET NO:-533

SHEET NO:-561

117

-X3 10

115

11

811
KM

-Q01
CD

15

14

19

18

26

B
-Q01
CE

812
814

12
14

12
14

12
14

KD
12
14

OF2

-SR

11

11

11

11

-X3116

311

312
314

27

25

23

24

22

+00GH101:M04

+02GH101:M05

/M161.C8

/M163.C4

+00GH003

-K77

A
A13
1P+

/M161.D1

C- C11

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K30
/J005.B2

-AB A3

-AB B3

IB005.04
A5
400V.MAIN BRD CB
SPRNG-GS123
CHARGED

-K30
/J005.B2

20BFA00_GS123_XG173

Date

2
First Issue

revision

30/04/2010

-AB A4

IB005.05
A6
400V.ESSEN BRD-FDR
CB-GS129
CLOSED

-K30
/J005.C2

20BFA02_GS129_XG031

20BFA02_GS129_XM170

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

IB005.07

A7
400V.ESSEN BRD CB
O/C-GS129
TRIP

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IB005.06

/J005.C2

-AB A12

A8
-K30
400V.ESSEN BRD-FDR /J005.C2
CB-GS129
REMOTE
20BFA02_GS129_XG077

IB005.09

B1
-K30
400V.ESSEN BRD-FDR /J005.C2
CB-GS129
DRAW-OUT
20BFA02_GS129_XG277

B2
400V.ESSEN BRD-FDR
CB-GS129
DRAW-IN
20BFA02_GS129_XG276

=20CBA

RACK-0 SLOT 5 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K30

-AB B12
IB005.08

path

323 sheets
next sheet
M163
Sheet
M162

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-M04/M05
GS129
DWG:-AS-D-GE-EO-3404
SHEET NO:-108

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-C05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3403
SHEET NO:-101

TYPICAL DIAGRAM
OFP1M+N/1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401

SHEET NO:-561

SHEET NO:-133

-X3

7 8

13

-X3 55

12

21
22
24

OF1

12
14

OF1

12
14

-QF1

12
14

OF2

11

11

B
11

56

54

58

59

57

+02GH101:M05

+01GH101:C05

/M162.C8

+00GH003

INTERFACE MODULE
16EO+

-K77
/M161.D1

C- C11

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655

-AB B11

-AB A11

IB005.10

+00GH002

B3

-K30

-AB B10

IB005.11
B4

-K30

/J005.C2

IB005.12

-K30

/J005.C2

/J005.C2

B5
-K30
400V.ESSEN BRD-FDR /J005.C2
CB-GS129
OPEN
20BFA02_GS129_XG073

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-AB B9

-AB A9

IB005.14

B6
400VESSEN BRD
GS129 110V MCB
CLOSED
20BFA02_GS129_XM031

-K30
/J005.C2

IB005.15

B7
-K30
400V.COMON
/J005.C2
BOARD-INCOMNG1 CB
OPEN
20BFA01_GS301_XG073

B8
400V.COMON
BOARD-INCOMNG1 CB
CLOSED
20BFA01_GS301A_XG031

=20CBA

RACK-0 SLOT 5 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A10
IB005.13

path

323 sheets
next sheet
M164
Sheet
M163

/M005.E7

/M005.D7

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-C05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3403
SHEET NO:-101

4C-

4C+

2D-

2D+

/M003.E7

/M003.D7

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-134
11
-SR

-SA1

110

108

124

53

12
14

912
914

3067

2067

5054

4058

CT1

-X3109

54

911

125

123

130

129
+01GH101:C05

/M165.C2

2162

C
2163

+00GH003

-K76
/M165.D1
/M166.D1

C- C10

A
A1
24+

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K30
/J005.D2

-CD B8 A8 B7 A7

-K30
/J005.E2

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K30
/J005.D2

-CD A1
IB005.17

C1
IHR2 SLOT5 DI
17-32 validatr
PRESENCE
20CBA00_EN252_DI008

Date

2
First Issue

revision

30/04/2010

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K30
/J005.D2

-CD A2

-CD B2

IB005.18

C2
-K30
400V.COMON
/J005.D2
BOARD-INCOMNG1 CB
TEST
20BFA01_GS301_XG177

IB005.19

C3
400V.COMON
BRD-INC1CB SPRING
CHARGED
20BFA01_GS301_XG173

-K30
/J005.D2

C4
400V.COMON
BOARD-INCOMNG1 CB
REMOTE
20BFA01_GS301_XG077

=20CBA

RACK-0 SLOT 5 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B1

IB005.16

path

323 sheets
next sheet
M165
Sheet
M164

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-C05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3403
SHEET NO:-101

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401

101

99

5 6

10

11

SHEET NO:-131

19

91 92

90

11

21

11

-JDI

14

15

12
14

-FV1
K2
22
24

-QV1
12
14

CD1
812
814

18

SHEET NO:-134
B

811
-QV2

12
14

312
314
-X3100

-QU2
12
14

-FV1
K1
12
14

CE1

SHEET NO:-133
11

11

311

SHEET NO:-131
11

SHEET NO:-134

8 9

121122

120
+01GH101:C05

/M164.C7

+00GH003

-K76

A
A13
1P+

/M164.D1

C- C10

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K30
/J005.D2

-CD A3

-CD B3

IB005.20
C5
-K30
400V.COMON
/J005.D2
BOARD-INCOMNG1 CB
DRAW-IN
20BFA01_GS301_XG276

Date

2
First Issue

revision

30/04/2010

-CD A4

IB005.21

IB005.22

C6
400V.COMON
BRD-INC.1 AC VOL
PRESENCE

-K30
/J005.D2

20BFA01_GS301_XM008

C7
-K30
400V.COMON
/J005.D2
BOARD-INCOMNG1 CB
DRAW-OUT
20BFA01_GS301_XG277

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-CD B12

-CD A12

IB005.24

C8
400V.COMMON BRD
INC1 VOL MCB
CLOSED
20BFA01_GS301B_XM031

-K30
/J005.D2

IB005.25

D1
400V.COMON INC1
VOL RELAY W/D
NORMAL
20BFA01_GS301_XM014

-K30
/J005.D2

D2
400VCOMMON BRD
INC1 110V CTRLMCB
CLOSED
20BFA01_GS301C_XM031

=20CBA

RACK-0 SLOT 5 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B4
IB005.23

path

323 sheets
next sheet
M166
Sheet
M165

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-D05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3403
SHEET NO:-102

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-134

54

58

57

109

110

108

124

125

311
CE1

-SA1

123

312
314

912
914
59

54
-SR

12
14

CT1

22
24
56

11

21

11

OF1

12
14

OF1

-X3 55

911

53

SHEET NO:-133

130

129

100

101

99
+01GH101:D05

+00GH003

INTERFACE MODULE
16EO+

-K76
/M164.D1

C- C10

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K30
/J005.E2

-CD B11

-CD A11

IB005.26
D3
-K30
400V.COMON
/J005.E2
BOARD-INCOMNG2 CB
OPEN
20BFA01_GS302_XG073

Date

2
First Issue

revision

30/04/2010

-CD B10

IB005.27

IB005.28

D4
400V.COMON
BOARD-INCOMNG2 CB
CLOSED

-K30
/J005.E2

20BFA01_GS302A_XG031

D5
-K30
400V.COMON
/J005.E2
BOARD-INCOMNG2 CB
TEST
20BFA01_GS302_XG177

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-CD B9

-CD A9

IB005.30

D6
400V.COMON
BRD-INC2 CB SPRING
CHARGED
20BFA01_GS302_XG173

-K30
/J005.E2

IB005.31

D7
-K30
400V.COMON
/J005.E2
BOARD-INCOMNG2 CB
REMOTE
20BFA01_GS302_XG077

D8
400V.COMON
BOARD-INCOMNG2 CB
DRAW-IN
20BFA01_GS302_XG276

=20CBA

RACK-0 SLOT 5 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A10
IB005.29

path

323 sheets
next sheet
M167
Sheet
M166

/M005.E7

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-D05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3403
SHEET NO:-102

4C-

4C+

/M003.E7
2D-

2D+

/M005.D7

/M003.D7

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-133

-X3 91

92

90

5 6

-QV1

10

11

12
14

-QV2
12
14

12
14

-QU2

11

11

11
12
14

-FV1
K1

812
814

3068

2068

5055

4059

CD1

11

811

SHEET NO:-131

18

19

14

15
+01GH101:D05

/M168.C2

2164

C
2165

+00GH003

-K79
/M168.D1
/M169.D1

C- C13

A
A1
24+

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

E
IC693MDL655-AB B6 A6 IC693MDL655
B5 A5
-AB B8 A8 B7 A7

/J005.C3

+00GH002

-K31
/J005.C3

+00GH002

BCOM
NC
NC
0V

-K31

+24Out
NC
NC
ACOM

+00GH002

IC693MDL655

-K31
/J005.B3

-AB A1
IB006.01

A1
IHR2 SLOT6 DI 1-16
validator
PRESENCE
20CBA00_EN261_DI008

Date

2
First Issue

revision

30/04/2010

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K31
/J005.B3

-AB A2

-AB B2

IB006.02

A2
-K31
400V.COMON
/J005.B3
BOARD-INCOMNG2 CB
DRAW-OUT
20BFA01_GS302_XG277

IB006.03

A3
400V.COMON
BRD-INC.2 VOL
PRESENCE

-K31
/J005.B3

20BFA01_GS302_XM008

A4
400V.COMMON BRD
INC2 VOL MCB
CLOSED
20BFA01_GS302B_XM031

=20CBA

RACK-0 SLOT 6 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B1

IB006.00

path

323 sheets
next sheet
M168
Sheet
M167

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-D05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3403
SHEET NO:-102

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-D01
BUSBAR MEASURE
DWG:-AS-D-GE-EO-3403
SHEET NO:-102

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
TYPE:-BPT1
DWG:-AS-D-GE-EO-3401

SHEET NO:-131

SHEET NO:-134

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-C01
AC/DC SUPPLY DISTRIBUTION
DWG:-AS-D-GE-EO-3403

SHEET NO:-250

SHEET NO:-200

-X3

8 9

121

122

-X3

120

5 6

23

22

34

FV1

33

32 27

11
-XP1

28

26

12
14

K2

12
14

12
14

QV1

12
14

QV2

11

11

11

11
QU1

K1

12
14

12
14

FV1

12
14

11
-JDI

22
24

-FV1
K2

11

B
21

8 9

-X3

+01GH101:D05

+01GH101:D01

+01GH101:C01

/M167.C7

/M169.C2

+00GH003

-K79

A
A13
1P+

/M167.D1

C- C13

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K31
/J005.B3

-AB A3

-AB B3

IB006.04
A5
400V.COMON INC2
VOL RELAY W/D
NORMAL

-K31
/J005.B3

20BFA01_GS302_XM014

Date

2
First Issue

revision

30/04/2010

-AB A4

IB006.05
A6
400VCOMMON BRD
INC2 110V CTRLMCB
CLOSED

-K31
/J005.C3

20BFA01_GS302C_XM031

20BFA01_GH101_XM008

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K31
/J005.C3

-AB A12

IB006.08

A8
400V.COMMON BRD
VOL PT MCB
CLOSED
20BFA01_GH101_XM031

-K31
/J005.C3

IB006.09

B1
400V.COMMON BRD
WATCHDOG
NORMAL
20BFA01_GH101_XM014

-K31
/J005.C3

B2
400V.COMMON BRD
CTRL. POLAR1
PRESENCE
20BFA01_GH101C_XM008

=20CBA

RACK-0 SLOT 6 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IB006.07

A7
400V.COMON
BOARD-BB VOLTAGE
PRESENCE

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IB006.06

path

323 sheets
next sheet
M169
Sheet
M168

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-C01
AC/DC SUPPLY DISTRIBUTION
DWG:-AS-D-GE-EO-3403

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-C03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3413
SHEET NO:-102

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-133

SHEET NO:-134

-X3 55

56

54

58

B
11

911

21
OF2

CT1

-SR

912
914

12
14

12
14

14
-X3

OF1

-XP2

22
24

-QF4

11

11

11

12
14

SHEET NO:-200

59

57

109

110

108

124

125

123

+01GH101:C01

+01GH101:C03

/M168.C8

+00GH003

INTERFACE MODULE
16EO+

-K79
/M167.D1

C- C13

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K31
/J005.C3

-AB B11

-AB A11

IB006.10
B3
400V.COMMON BRD
PROT MCB
CLOSED

-K31
/J005.C3

20BFA01_GH101P_XM031

Date

2
First Issue

revision

30/04/2010

-AB B10

IB006.11
B4
400V.COMMON BRD
CTRL. POLAR2
PRESENCE

-K31
/J005.C3

20BFA01_GH101D_XM008

B5
-K31
400V.HVAC
/J005.C3
BOARD-INCOMING1 CB
OPEN

B6
-K31
400V.HVAC
/J005.C3
BOARD-INCOMING1 CB
CLOSED

B7
-K31
400V.HVAC
/J005.C3
BOARD-INCOMING1 CB
TEST

20SAA01_GS301_XG073

Customer

GOVERNMENT OF UGANDA
BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

20SAA01_GS301A_XG031

IB006.15

20SAA01_GS301_XG177

B8
400V.HVAC
BRD-INC1CB SPRING
CHARGED
20SAA01_GS301_XG173

=20CBA

RACK-0 SLOT 6 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A9

IB006.14

Project name

Repl. f.

-AB B9

IB006.13

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IB006.12

path

323 sheets
next sheet
M170
Sheet
M169

/M005.E7

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-C03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3413
SHEET NO:-102

4C-

4C+

/M003.E7
2D-

2D+

/M005.D7

/M003.D7

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401

312
314

53
-X3

CD1

130

129

100

812
814

CE1

-SA1

811

311

SHEET NO:-133

54

3069

2069

4060

5056

SHEET NO:-134

101

99

91

92

90
+01GH101:C03

/M171.C3

2166

C
2167

+00GH003

-K78
/M171.D1
/M172.D1

C- C12

A
A1
24+

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

E
IC693MDL655-CD B6 A6 IC693MDL655
B5 A5
-CD B8 A8 B7 A7

/J005.D3

+00GH002

-K31
/J005.E3

+00GH002

DCOM
NC
NC
0V

-K31

+24VOut
NC
NC
CCOM

+00GH002

IC693MDL655

-K31
/J005.D3

-CD A1
C1
IHR2 SLOT6 DI
17-32 validatr
PRESENCE
20CBA00_EN262_DI008

Date

2
First Issue

revision

30/04/2010

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K31
/J005.D3

-CD A2

-CD B2

IB006.17

IB006.18

IB006.19

C2
-K31
400V.HVAC
/J005.D3
BOARD-INCOMING1 CB
REMOTE

C3
-K31
400V.HVAC
/J005.D3
BOARD-INCOMING1 CB
DRAW-IN

C4
400V.HVAC
BOARD-INCOMING1 CB
DRAW-OUT

20SAA01_GS301_XG077

20SAA01_GS301_XG276

20SAA01_GS301_XG277

=20CBA

RACK-0 SLOT 6 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B1

IB006.16

path

323 sheets
next sheet
M171
Sheet
M170

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-C03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3413
SHEET NO:-102

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-D03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3413
SHEET NO:-103

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401

SHEET NO:-131

SHEET NO:-134

SHEET NO:-133

-X3

10

11

18

19

14

-X3

15

8 9

121122

-X3 55

120

21
22
24

OF2

12
14

OF1

12
14

-JDI

22
24

-FV1
K2

11

11

21

11
-QV1
12
14

-QV2
12
14

-QU2
12
14

12
14

-FV1
K1

11

11

B
11

56

54

58

59

57

+01GH101:C03

+01GH101:D03

/M170.C8

/M172.C2

+00GH003

-K78

A
A13
1P+

/M170.D1

C- C12

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K31
/J005.D3

Date

2
First Issue

revision

-CD A3

-CD B3

IB006.20

C6
400V.HVAC BRD INC1
VOL MCB
CLOSED

20SAA01_GS301_XM008

20SAA01_GS301B_XM031

-K31
/J005.D3

20SAA01_GS301_XM014

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

IB006.23

C7
400V.HVAC INC1 VOL
RELAY W/D
NORMAL

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD B4

IB006.22

C5
-K31
400V.HVAC BRD-INC1 /J005.D3
AC VOL
PRESENCE

30/04/2010

-CD A4

IB006.21

/J005.D3

C8
-K31
400V.HVAC BRD INC1 /J005.D3
110V CTRLMCB
CLOSED
20SAA01_GS301C_XM031

-CD A12
IB006.25

D1
-K31
400V.HVAC
/J005.D3
BOARD-INCOMING2 CB
OPEN

D2
400V.HVAC
BOARD-INCOMING2 CB
CLOSED

20SAA01_GS302_XG073

20SAA01_GS302A_XG031

=20CBA

RACK-0 SLOT 6 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K31

-CD B12
IB006.24

path

323 sheets
next sheet
M172
Sheet
M171

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-D03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3413
SHEET NO:-103

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401

108

124

125

123

130

129

100

101

99

91

92

90

-QV2
12
14

-QU2
12
14

12
14

-FV1
K1

11

11

11

811

B
CD1

312
314

53

912
914
110

CE1

-SA1

SHEET NO:-131

812
814

-SR
12
14

CT1

-X3109

54

11

911

SHEET NO:-133
311

SHEET NO:-134

10

11

18

19
+01GH101:D03

/M171.C7

+00GH003

INTERFACE MODULE
16EO+

-K78
/M170.D1

C- C12

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K31
/J005.E3

-CD B11

-CD A11

IB006.26
D3
-K31
400V.HVAC
/J005.E3
BOARD-INCOMING2 CB
TEST
20SAA01_GS302_XG177

Date

2
First Issue

revision

30/04/2010

-CD B10

IB006.27
D4
400V.HVAC
BRD-INC2CB SPRING
CHARGED

-K31
/J005.E3

20SAA01_GS302_XG173

D5
-K31
400V.HVAC
/J005.E3
BOARD-INCOMING2 CB
REMOTE

D6
-K31
400V.HVAC
/J005.E3
BOARD-INCOMING2 CB
DRAW-IN

D7
-K31
400V.HVAC
/J005.E3
BOARD-INCOMING2 CB
DRAW-OUT

20SAA01_GS302_XG077

Customer

GOVERNMENT OF UGANDA
BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

20SAA01_GS302_XG276

IB006.31

20SAA01_GS302_XG277

D8
400V.HVAC BRD-INC2
AC VOL
PRESENCE
20SAA01_GS302_XM008

=20CBA

RACK-0 SLOT 6 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A9

IB006.30

Project name

Repl. f.

-CD B9

IB006.29

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10

IB006.28

path

323 sheets
next sheet
M173
Sheet
M172

/M006.B3

/M006.A3

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-D03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3413
SHEET NO:-103

4C-

4C+

2D-

2D+

/M004.B3

/M004.A3

SHEET NO:-131

3071

SHEET NO:-134

-X3

14

15

12
14

-JDI

22
24

-FV1
K2

12
14

-QV1

11

21

B
11

2071

5058

4062

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401

8 9

121

122

120
+01GH101:D03

2168

C
2169

+00GH003

-K83

A1
24+

/M174.D1
/M175.D1

C- D03

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K32
/J005.C5

-AB B8 A8 B7 A7

-K32
/J005.C5

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K32
/J005.B5

-AB A1

Date
First Issue

A1
IHR2 SLOT7 DI 1-16
validator
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K32
/J005.B5

-AB B2

IB007.02

A2
400V.HVAC BRD INC2
VOL MCB
CLOSED
20SAA01_GS302B_XM031

-K32
/J005.B5

IB007.03

A3
400V.HVAC INC2 VOL
RELAY W/D
NORMAL
20SAA01_GS302_XM014

-K32
/J005.B5

A4
400VHVAC INC2 110V
CTRL MCB
CLOSED
20SAA01_GS302C_XM031

=20CBA

RACK-0 SLOT 7 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A2

IB007.01

20CBA00_EN271_DI008

-AB B1

IB007.00

path

323 sheets
next sheet
M174
Sheet
M173

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-D01
BUSBAR MEASURE
DWG:-AS-D-GE-EO-3413
SHEET NO:-103

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-C01
AC/DC SUPPLY DISTRIBUTION
DWG:-AS-D-GE-EO-3413

TYPICAL DIAGRAM
BPT1
DWG:-AS-D-GE-EO-3401
SHEET NO:-250

SHEET NO:-200

8 9

5 6

23

22

34

33

32

27

-QF4

-X3

26

12
14

-XP2
14

12
14

-XP1

28

11

11

11

11
QV1
12
14

QV2
12
14

QU1

K1

12
14

22
24
-X3

11

11
FV1

K2

12
14

FV1

11

B
21

-X3

+01GH101:D01

+01GH101:C01

+00GH003

-K83

A
A13
1P+

/M173.D1

C- D03

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K32
/J005.B5

-AB A3

-AB B3

IB007.04
A5
400V.HVAC BB VOL
RELAY W/D
NORMAL

-K32
/J005.B5

20SAA01_GH101A_XM014

Date

2
First Issue

revision

30/04/2010

-AB A4

IB007.05
A6
400V.HVAC BOARD-BB
VOLTAGE
PRESENCE

-K32
/J005.C5

20SAA01_GH101_XM008

20SAA01_GH101_XM031

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

IB007.07

A7
400V.HVAC BRD BB
PT MCB
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IB007.06

/J005.C5

-AB A12

A8
-K32
400V.HVAC
/J005.C5
BOARD-CTRL POLAR1
PRESENCE
20SAA01_GH101C_XM008

IB007.09

B1
400V.HVAC BOARD
PROT MCB
CLOSED
20SAA01_GH101P_XM031

-K32
/J005.C5

B2
400V.HVAC
BOARD-CTRL POLAR2
PRESENCE
20SAA01_GH101D_XM008

=20CBA

RACK-0 SLOT 7 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K32

-AB B12
IB007.08

path

323 sheets
next sheet
M175
Sheet
M174

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-C03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3414
SHEET NO:-102

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-134

54

58

-X3109

57

110

108

124

125

311
CE1

-SA1

123

312
314

912
914
59

54
-SR

12
14

CT1

22
24
56

11

21

11

OF2

12
14

OF1

-X3 55

911

53

SHEET NO:-133

130

129

100

101

99
+02GH101:C03

+00GH003

INTERFACE MODULE
16EO+

-K83
/M173.D1

C- D03

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K32
/J005.C5

-AB B11

-AB A11

IB007.10
B3
400V.CHILLER
BRD-INCOMNG1 CB
OPEN

-K32
/J005.C5

20SAA02_GS301_XG073

Date

2
First Issue

revision

30/04/2010

-AB B10

IB007.11
B4
400V.CHILLER
BRD-INCOMNG1 CB
CLOSED

-K32
/J005.C5

20SAA02_GS301A_XG031

20SAA02_GS301_XG177

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K32
/J005.C5

-AB A9

IB007.14

B6
400V.CHILER
BRD-INC1CB SPRNG
CHARGED
20SAA02_GS301_XG173

-K32
/J005.C5

IB007.15

B7
400V.CHILLER
BRD-INCOMNG1 CB
REMOTE
20SAA02_GS301_XG077

-K32
/J005.C5

B8
400V.CHILLER
BRD-INCOMNG1 CB
DRAW-IN
20SAA02_GS301_XG276

=20CBA

RACK-0 SLOT 7 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B9

IB007.13

B5
400V.CHILLER
BRD-INCOMNG1 CB
TEST

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IB007.12

path

323 sheets
next sheet
M176
Sheet
M175

/M006.B3

/M006.B3

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-C03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3414
SHEET NO:-102

4C-

4C+

2D-

2D+

/M004.B3

/M004.A3

SHEET NO:-133

SHEET NO:-131

92

-X3

90

11
-QV1

10

11

12
14

-QV2
12
14

-QU2
12
14

812
814
-X3 91

11

11
-FV1
K1
12
14

CD1

11

811

3072

2072

5059

4063

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401

18

19

-X3

14

15
+02GH101:C03

/M177.C2

2170

C
2171

+00GH003

-K82

A1
24+

/M177.D1
/M178.D1

C- D02

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K32
/J005.D5

-CD B8 A8 B7 A7

-K32
/J005.E5

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K32
/J005.D5

-CD A1

Date
First Issue

C1
IHR2 SLOT7 DI
17-32 validatr
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K32
/J005.D5

-CD B2

IB007.18

C2
400V.CHILLER
BRD-INCOMNG1 CB
DRAW-OUT
20SAA02_GS301_XG277

-K32
/J005.D5

IB007.19

C3
400V.CHILER
BRD-INC.1 AC VOL
PRESENCE
20SAA02_GS301_XM008

-K32
/J005.D5

C4
400V.CHILLER
BRD-IC1 VOL MCB
CLOSED
20SAA02_GS301B_XM031

=20CBA

RACK-0 SLOT 7 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A2

IB007.17

20CBA00_EN272_DI008

-CD B1

IB007.16

path

323 sheets
next sheet
M177
Sheet
M176

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-C03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3414
SHEET NO:-102

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-D03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3414
SHEET NO:-103

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401

SHEET NO:-131

SHEET NO:-134

SHEET NO:-133

-X3

121

122

-X3 55

120

56

54

58

911

B
CT1

-SR

912
914

22
24

OF2

12
14

OF1

12
14

8 9

21

11

11

21
22
24

-JDI

SHEET NO:-134

B
-FV1
K2

11

12
14

59

57

109

110

108

124

125

123

+02GH101:C03

+02GH101:D03

/M176.C8

/M178.C2

+00GH003

-K82

A
A13
1P+

/M176.D1

C- D02

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K32
/J005.D5

-CD A3

-CD B3

IB007.20
C5
400VCHILLER INC1
VOL RELAY W/D
NORMAL

-K32
/J005.D5

20SAA02_GS301_XM014

Date

2
First Issue

revision

30/04/2010

-CD A4

IB007.21
C6
400VCHILLER INC1
110V CTRL MCB
CLOSED

-K32
/J005.D5

20SAA02_GS301C_XM031

20SAA02_GS302_XG073

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number

Approved

DELAGE

Origin

Repl. f.

-K32
/J005.D5

-CD A12

IB007.24

C8
400V.CHILLER
BRD-INCOMNG2 CB
CLOSED
20SAA02_GS302A_XG031

-K32
/J005.D5

IB007.25

D1
400V.CHILLER
BRD-INCOMNG2 CB
TEST
20SAA02_GS302_XG177

-K32
/J005.D5

D2
400V.CHILER
BRD-INC2CB SPRNG
CHARGED
20SAA02_GS302_XG173

=20CBA

RACK-0 SLOT 7 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B12

IB007.23

C7
400V.CHILLER
BRD-INCOMNG2 CB
OPEN

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM
1104

-CD B4

IB007.22

path

323 sheets
next sheet
M178
Sheet
M177

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-D03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3414
SHEET NO:-103

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-133

130

129

100

101

99

91

92

90

10

11

11
-JDI

19-X3

18

12
14

-QV1
12
14

-QV2
12
14

-QU2

11

11

11

11
-FV1
K1

12
14

312
314

53
-X3

CD1
812
814

CE1

-SA1

SHEET NO:-134
B

12
14

54

311

SHEET NO:-131

811

SHEET NO:-134

14

15

121

122

120
+02GH101:D03

/M177.C7

+00GH003

INTERFACE MODULE
16EO+

-K82
/M176.D1

C- D02

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K32
/J005.E5

-CD B11

-CD A11

IB007.26
D3
400V.CHILLER
BRD-INCOMNG2 CB
REMOTE

-K32
/J005.E5

20SAA02_GS302_XG077

Date

2
First Issue

revision

30/04/2010

-CD B10

IB007.27
D4
400V.CHILLER
BRD-INCOMNG2 CB
DRAW-IN

-K32
/J005.E5

20SAA02_GS302_XG276

400V.CHILLER
BRD-INCOMNG2 CB
DRAW-OUT
20SAA02_GS302_XG277

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K32
/J005.E5

-CD A9

IB007.30

D6
400V.CHILER
BRD-INC.2 AC VOL
PRESENCE
20SAA02_GS302_XM008

-K32
/J005.E5

IB007.31

D7
400V.CHILLER
BRD-IC2 PT MCB
CLOSED

-K32
/J005.E5

20SAA02_GS302B_XM031

D8
400VCHILLER BRD-IC
2 110V CTRLMCB
CLOSED
20SAA02_GS302C_XM031

=20CBA

RACK-0 SLOT 7 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B9

IB007.29
D5

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10

IB007.28

path

323 sheets
next sheet
M179
Sheet
M178

/M006.B3
4C-

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-D03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3414
SHEET NO:-103

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-D01
BUSBAR MEASURE
DWG:-AS-D-GE-EO-3414
SHEET NO:-103

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
BPT1
DWG:-AS-D-GE-EO-3401

3073

SHEET NO:-131

SHEET NO:-250

-X3

8 9

-X3

5 6

11

11
QV2

QV1

23

22

34

12
14

QU1

K1

12
14

22
24

FV1

12
14

-FV1
K2

11

11

21

12
14

/M006.B3
4C+
2073

5060

4064

2D-

2D+

/M004.B3

/M004.B3

33

32

27 28

26

+02GH101:D03

+02GH101:D01

/M180.C2

2172

C
2173

+00GH003

-K85

A1
24+

/M180.D1
/M181.D1

C- D05

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K33
/J005.C6

-AB B8 A8 B7 A7

-K33
/J005.C6

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K33
/J005.B6

-AB A1

Date
First Issue

A1
IHR2 SLOT8 DI 1-16
validator
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K33
/J005.B6

-AB B2

IB008.02

A2
400VCHILLER INC2
VOL RELAY W/D
NORMAL
20SAA02_GS302_XM014

-K33
/J005.B6

IB008.03

A3
400VCHILLER
BOARD-BB VOLTAGE
PRESENCE
20SAA02_GH101_XM008

-K33
/J005.B6

A4
400V.CHILLER BRD
BB PT MCB
CLOSED
20SAA02_GH101_XM031

=20CBA

RACK-0 SLOT 8 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A2

IB008.01

20CBA00_EN281_DI008

-AB B1

IB008.00

path

323 sheets
next sheet
M180
Sheet
M179

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-D01
BUSBAR MEASURE
DWG:-AS-D-GE-EO-3414
SHEET NO:-103

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-C01
AC/DC SUPPLY DISTRIBUTION
DWG:-AS-D-GE-EO-3414

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3404
SHEET NO:-103

TYPICAL DIAGRAM
BPT1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401

SHEET NO:-250

SHEET NO:-200

SHEET NO:-113

8 9

-X3

-X3

12
14

12
14
8

OF2

-X3 81

+02GH101:D01

22
24

OF1

-XP2

21

11

11

11

12
14

12
14
-X3

-QF4

-XP1

K2

14

FV1

11

B
11

82

80

84

85

83

+02GH101:C01

+02GH101:E05

/M179.C7

/M181.C2

+00GH003

-K85

A
A13
1P+

/M179.D1

C- D05

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K33
/J005.B6

-AB A3

-AB B3

IB008.04
A5
400V.CHILLER BB
VOL RELAY W/D
NORMAL

-K33
/J005.B6

20SAA02_GH101_XM014

Date

2
First Issue

revision

30/04/2010

-AB A4

IB008.05
A6
400V.CHILLER
BRD-CTRL POLAR1
PRESENCE

-K33
/J005.C6

20SAA02_GH101C_XM008

20SAA02_GH101P_XM031

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K33
/J005.C6

-AB A12

IB008.08

A8
400V.CHILLER
BRD-CTRL POLAR2
PRESENCE
20SAA02_GH101D_XM008

-K33
/J005.C6

IB008.09

B1
400V.ESSEN.
BRD-INCOMNG1 CB
OPEN
20BFA02_GS301_XG073

-K33
/J005.C6

B2
400V.ESSEN.
BRD-INCOMNG1 CB
CLOSED
20BFA02_GS301A_XG031

=20CBA

RACK-0 SLOT 8 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IB008.07

A7
400V.CHILLER BRD
PROT MCB
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IB008.06

path

323 sheets
next sheet
M181
Sheet
M180

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3404
SHEET NO:-103

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401

134

150

151

149

156

155

126

127

125

117

118

116

5 6

-QV2
12
14

-QU2
12
14

12
14

-FV1
K1

11

11

11

811

B
CD1

312
314

53

912
914
136

CE1

-SA1

SHEET NO:-111

812
814

-SR
12
14

CT1

-X3135

54

11

911

SHEET NO:-113
311

SHEET NO:-114

36

37

44

45
+02GH101:E05

/M180.C7

+00GH003

INTERFACE MODULE
16EO+

-K85
/M179.D1

C- D05

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K33
/J005.C6

-AB B11

-AB A11

IB008.10
B3
400V.ESSEN.
BRD-INCOMNG1 CB
TEST

-K33
/J005.C6

20BFA02_GS301_XG177

Date

2
First Issue

revision

30/04/2010

-AB B10

IB008.11
B4
400V.ESSEN.
BRD-INC1 SPRING
CHARGED

-K33
/J005.C6

20BFA02_GS301_XG173

20BFA02_GS301_XG077

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K33
/J005.C6

-AB A9

IB008.14

B6
400V.ESSEN.
BRD-INCOMNG1 CB
DRAW-IN
20BFA02_GS301_XG276

-K33
/J005.C6

IB008.15

B7
400V.ESSEN.
BRD-INCOMNG1 CB
DRAW-OUT
20BFA02_GS301_XG277

-K33
/J005.C6

B8
400V.ESSEN.
BRD-INC1 VOLTAGE
PRESENCE
20BFA02_GS301_XM008

=20CBA

RACK-0 SLOT 8 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B9

IB008.13

B5
400V.ESSEN.
BRD-INCOMNG1 CB
REMOTE

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IB008.12

path

323 sheets
next sheet
M182
Sheet
M181

/M006.B3

/M006.B3

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3404
SHEET NO:-103

4C-

4C+

2D-

2D+

/M004.B3

/M004.B3

3074

SHEET NO:-111
21

11

2074

5061

4065

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401

-X3

22
24

-FV1
K2

12
14

-QV1

41

40

8 9

7
+02GH101:E05

/M183.C2
2174

C
2175

+00GH003

-K84

A1
24+

/M183.D1
/M184.D1

C- D04

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K33
/J005.D6

-CD B8 A8 B7 A7

-K33
/J005.E6

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K33
/J005.D6

-CD A1

Date
First Issue

C1
IHR2 SLOT8 DI
17-32 validato
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K33
/J005.D6

-CD B2

IB008.18

C2
400V.ESSEN
BRD-INC1 VOLT MCB
CLOSED

-K33

IB008.19
C3

/J005.D6

-K33
/J005.D6

20BFA02_GS301B_XM031

C4
400V.ESSEN BRD
INC1VOL RELAY W/D
NORMAL
20BFA02_GS301_XM014

=20CBA

RACK-0 SLOT 8 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A2

IB008.17

20CBA00_EN282_DI008

-CD B1

IB008.16

path

323 sheets
next sheet
M183
Sheet
M182

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3404
SHEET NO:-103

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:-114

148

-X3 81

146

82

80

84

911

B
CT1

-SR

912
914

22
24

OF2

12
14

OF1

12
14
-X3147

21

11

11

B
-JDI

85

-X3135

83

54

SHEET NO:-113

11

SHEET NO:-114

-SA1

12
14

136

134

150

53

151

149

156

155

+02GH101:E05

+02GH101:F05

/M182.C8

/M184.C2

+00GH003

-K84

A
A13
1P+

/M182.D1

C- D04

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K33
/J005.D6

Date

2
First Issue

revision

-CD A3

-CD B3

IB008.20

C6
400V.ESSEN.
BRD-INCOMNG2 CB
OPEN

20BFA02_GS301C_XM031

20BFA02_GS302_XG073

-K33
/J005.D6

20BFA02_GS302A_XG031

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K33
/J005.D6

-CD A12

IB008.24

C8
400V.ESSEN.
BRD-INCOMNG2 CB
TEST
20BFA02_GS302_XG177

-K33
/J005.D6

IB008.25

D1
400V.ESSEN.
BRD-INC2 SPRING
CHARGED
20BFA02_GS302_XG173

-K33
/J005.D6

D2
400V.ESSEN.
BRD-INCOMNG2 CB
REMOTE
20BFA02_GS302_XG077

=20CBA

RACK-0 SLOT 8 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B12

IB008.23

C7
400V.ESSEN.
BRD-INCOMNG2 CB
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD B4

IB008.22

C5
-K33
400V.ESSEN BRD-IC1 /J005.D6
110V MCB
CLOSED

30/04/2010

-CD A4

IB008.21

path

323 sheets
next sheet
M184
Sheet
M183

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401

125

117

118

116

5 6

37

-FV1
K2

44

45-X3

22
24

-QV1
12
14

-QV2
12
14

36

21

11

11

11
-QU2
12
14

12
14

-FV1
K1

812
814
127

SHEET NO:-111
B

CD1

312
314

CE1

-X3126

SHEET NO:-111
11

311

SHEET NO:-113
811

SHEET NO:-114

41

40

8 9

7
+02GH101:F05

/M183.C7

+00GH003

INTERFACE MODULE
16EO+

-K84
/M182.D1

C- D04

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10
22

23
10

23

E
IC693MDL655
+00GH002

-K33
/J005.E6

-CD B11

-CD A11

IB008.26
D3
400V.ESSEN.
BRD-INCOMNG2 CB
DRAW-IN

-K33
/J005.E6

20BFA02_GS302_XG276

Date

2
First Issue

revision

30/04/2010

-CD B10

IB008.27
D4
400V.ESSEN.
BRD-INCOMNG2 CB
DRAW-OUT

-K33
/J005.E6

20BFA02_GS302_XG277

20BFA02_GS302_XM008

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K33
/J005.E6

-CD A9

IB008.30

D6
400V.ESSEN
BRD-INC2 VOLT MCB
CLOSED

-K33

IB008.31
D7

/J005.E6

-K33
/J005.E6

20BFA02_GS302B_XM031

D8
400V.ESSEN. INC2
VOL RELAY W/D
NORMAL
20BFA02_GS302_XM014

=20CBA

RACK-0 SLOT 8 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B9

IB008.29

D5
400V.ESSEN. BRD-IN
C2 AC VOLTAGE
PRESENCE

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10

IB008.28

path

323 sheets
next sheet
M185
Sheet
M184

/M006.B5

/M006.A5

4C-

4C+

2D-

2D+

/M004.B5

/M004.A5

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-G04
INCOMER D/G CB GS103
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
IFDG
DWG:-AS-D-GE-EO-3401

3076

SHEET NO:-193
11

B
11

2076

5063

4067

SHEET NO:-114
B

-X3147

12
14

OF1

12
14

-JDI

148

-X3 66

146

67

+02GH101:F05

65
+02GH101:G04

/M186.C2

2176

C
2177

+00GH003

-K87

A1
24+

/M186.D1
/M187.D1

C- D07

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K34
/J005.C8

-AB B8 A8 B7 A7

-K34
/J005.C8

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K34
/J005.B8

-AB A1

Date
First Issue

A1
IHR2 SLOT9 DI 1-16
validator
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K34
/J005.B8

-AB B2

IB009.02

A2
400V.ESSEN
BRD-INC2 110V MCB
CLOSED

-K34

IB009.03
A3

/J005.B8

-K34
/J005.B8

20BFA02_GS302C_XM031

A4
400V.ESSEN.
BRD-D/G CB
OPEN
20BFA02_GS103_XG073

=20CBA

RACK-0 SLOT 9 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A2

IB009.01

20CBA00_EN291_DI008

-AB B1

IB009.00

path

323 sheets
next sheet
M186
Sheet
M185

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-G04
INCOMER D/G CB GS103
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

TYPICAL DIAGRAM
IFDG
DWG:-AS-D-GE-EO-3401

-X3 69

68

117

118

116

129

130

128

135

134

108

811

B
CD1

812
814

CE1

-SA1
312
314

912
914
70

54
-SR

12
14

CT1

22
24

OF2

11

21

911

SHEET NO:-193
311

SHEET NO:-194

53

SHEET NO:-193

109

107

99 100

98
+02GH101:G04

/M185.C8

/M187.C2

+00GH003

-K87

A
A13
1P+

/M185.D1

C- D07

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655

-AB A3

-AB B3

IB009.04

+00GH002

A5
400V.ESSEN.
BRD-D/G CB
CLOSED

-K34
/J005.B8

-K34
/J005.B8

20BFA02_GS103A_XG031

Date

2
First Issue

revision

30/04/2010

-AB A4

IB009.05
A6
400V.ESSEN.
BRD-D/G CB
TEST

-K34
/J005.C8

20BFA02_GS103_XG177

20BFA02_GS103_XG173

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K34
/J005.C8

-AB A12

IB009.08

A8
400V.ESSEN.
BRD-D/G CB
REMOTE
20BFA02_GS103_XG077

-K34
/J005.C8

IB009.09

B1
400V.ESSEN.
BRD-D/G CB
DRAW-IN

-K34
/J005.C8

20BFA02_GS103_XG276

B2
400V.ESSEN.
BRD-D/G CB
DRAW-OUT
20BFA02_GS103_XG277

=20CBA

RACK-0 SLOT 9 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IB009.07

A7
400V.ESSEN.
BRD-D/G CB SPRNG
CHARGED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IB009.06

path

323 sheets
next sheet
M187
Sheet
M186

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-G04
INCOMER D/G CB GS103
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

TYPICAL DIAGRAM
IFDG
DWG:-AS-D-GE-EO-3401
SHEET NO:-193

-X3 63

64

62

14

15

22

23

11

21

-JDI

18

19

12
14

K2

22
24

FV1

12
14

QV1

12
14

QV2

12
14
6

11

11

11

11

QU2

K1

12
14

FV1

182
184

SDE2

SHEET NO:-194
B

181

SHEET NO:-191

145

146

144
+02GH101:G04

/M186.C7

+00GH003

INTERFACE MODULE
16EO+

-K87
/M185.D1

C- D07

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K34
/J005.C8

Date

2
First Issue

revision

-AB B11

-AB A11

IB009.10

B4
400V.ESSEN.BRD-INC
.DG VOL.
PRESENCE

20BFA02_GS103_XM170

20BFA02_GS103_XM008

-K34
/J005.C8

20BFA02_GS103B_XM031

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

IB009.13

B5
400V.ESSEN BRD DG
VOL. MCB
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IB009.12

B3
-K34
400V.ESSEN.BRD-D/G /J005.C8
CB
TRIP

30/04/2010

-AB B10

IB009.11

/J005.C8

-AB A9
IB009.15

B6
-K34
400V.ESSEN.BRD-D/G /J005.C8
VOL RELAY W/D
NORMAL

B7
400V.ESSEN BRD DG
110V CTRLMCB
CLOSED

20BFA02_GS103_XM014

20BFA02_GS103C_XM031

-K34

B8

/J005.C8

=20CBA

RACK-0 SLOT 9 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K34

-AB B9
IB009.14

path

323 sheets
next sheet
M188
Sheet
M187

/M006.B5

/M006.B5

POWER HOUSE LIGHTING SWITCHBOARD


20SLA00GH101
COLUMN NO:-B01
DWG:-AS-D-GE-EO-3415

4C-

4C+

2D-

2D+

/M004.B5

/M004.A5

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F02
BUS TIE CB GS303
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

TYPICAL DIAGRAM
TF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-233

SHEET NO:-212

EXR

-X3 34

22
24

OF2

12
14

OF1

43
-X3

21

11

44

3077

2077

5064

B
4068

35

33

37

38

36

+00GH101:B02

+02GH101:F02

/M189.C2

2178

C
2179

+00GH003

-K86

A1
24+

/M189.D1
/M190.D1

C- D06

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K34
/J005.D8

-CD B8 A8 B7 A7

-K34
/J005.E8

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K34
/J005.D8

-CD A1

Date
First Issue

C1
IHR2 SLOT9 DI
17-32 validatr
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K34
/J005.D8

-CD B2

IB009.18

C2
240V.P/H LIGHT.BRD
-EMERGENCY
SELECTED
20SLA00_GH101_XG081

-K34
/J005.D8

IB009.19

C3
-K34
400V.ESSEN.BOARD-B /J005.D8
US TIE CB
OPEN
20BFA02_GS303_XG073

C4
400V.ESSEN.BOARD-B
US TIE CB
CLOSED
20BFA02_GS303_XG031

=20CBA

RACK-0 SLOT 9 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A2

IB009.17

20CBA00_EN292_DI008

-CD B1

IB009.16

path

323 sheets
next sheet
M189
Sheet
M188

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F02
BUS TIE CB GS303
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

TYPICAL DIAGRAM
TF1
DWG:-AS-D-GE-EO-3401

-X3103

87

104

102

109

108

79

SHEET NO:-215
11

811

B
JDI

812
814

12
14

CD1

312
314

CE1

53

912
914
89

311

-SA1

-SR
12
14

CT1

-X3 88

SHEET NO:-212

11

911

SHEET NO:-213
54

SHEET NO:-213

80

78

70

71

69

100

101

99
+02GH101:F02

/M188.C7

+00GH003

-K86

A
A13
1P+

/M188.D1

C- D06

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K34
/J005.D8

-CD A3

-CD B3

IB009.20
C5
-K34
400V.ESSEN.BOARD-B /J005.D8
US TIE CB
TEST
20BFA02_GS303_XG177

Date

2
First Issue

revision

30/04/2010

-CD A4

IB009.21

IB009.22

C6
400V.ESSEN.
BRD-TIE CB SPRNG
CHARGED

-K34
/J005.D8

20BFA02_GS303_XG173

C7
-K34
400V.ESSEN.BOARD-B /J005.D8
US TIE CB
REMOTE
20BFA02_GS303_XG077

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-CD B12

-CD A12

IB009.24

C8
-K34
400V.ESSEN.BOARD-B /J005.D8
US TIE CB
DRAW-IN
20BFA02_GS303_XG276

IB009.25

D1
-K34
400V.ESSEN.BOARD-B /J005.D8
US TIE CB
DRAW-OUT
20BFA02_GS303_XG277

D2
400V.ESSEN.BRD TIE
110V CTRL MCB
CLOSED
20BFA02_GS303_XM031

=20CBA

RACK-0 SLOT 9 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B4
IB009.23

path

323 sheets
next sheet
M190
Sheet
M189

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E01
BUSBAR 1
DWG:-AS-D-GE-EO-3404
SHEET NO:-103

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-G01
BUSBAR 2
DWG:-AS-D-GE-EO-3404
SHEET NO:-103

TYPICAL DIAGRAM
BPT1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
BPT1
DWG:-AS-D-GE-EO-3401

SHEET NO:-250

SHEET NO:-250

-X3

5 6

23

22

34

32

8 9

27

28

-X3

26

23

FV1

22

34

11
QV1

33

32

12
14

K2

22
24

QV2

12
14

5 6

21

11

11
QU1

K1

12
14

FV1

12
14

22
24
33

11

QV1

K2

12
14

FV1

11

21

11

12
14

QV2
12
14

QU1

K1

12
14

FV1

11

B
11

8 9

27

28

26

+02GH101:E01

+02GH101:G01

+00GH003

INTERFACE MODULE
16EO+

-K86
/M188.D1

C- D06

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K34
/J005.E8

Date

2
First Issue

revision

-CD B11

-CD A11

IB009.26

IB009.28

D3
-K34
400V.ESSEN
/J005.E8
BOARD-BB1 VOLTAGE
PRESENCE

D4
400V.ESSEN BRD BB1
VOL RELAY W/D
NORMAL

20BFA02_GH101A_XM008

20BFA02_GH101A_XM014

30/04/2010

-CD B10

IB009.27

-K34
/J005.E8

D7
-K34
400V.ESSEN BRD BB2 /J005.E8
VOL RELAY W/D
NORMAL

D8
400V.ESSEN BRD BB2
PT MCB
CLOSED

20BFA02_GH101A_XM031

20BFA02_GH101B_XM008

20BFA02_GH101B_XM014

20BFA02_GH101B_XM031

Customer

GOVERNMENT OF UGANDA
BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

=20CBA

RACK-0 SLOT 9 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A9
IB009.31

D6
-K34
400V.ESSEN
/J005.E8
BOARD-BB2 VOLTAGE
PRESENCE

Project name

Repl. f.

-CD B9
IB009.30

D5
-K34
400V.ESSEN BRD BB1 /J005.E8
PT MCB
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10
IB009.29

path

323 sheets
next sheet
M191
Sheet
M190

/M006.B5

/M006.B5

400V TRANSFORMER-1
20BFT03GH202
TEMPERATURE CONTROLLER
DWG:-AS-D-GE-WD-3502

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E02
AC/DC SUPPLY DISTRIBUTION
DWG:-AS-D-GE-EO-3404

3078

4C-

4C+
2078

5065

4069

2D-

2D+

/M004.B5

/M004.B5

SHEET NO:-200

11

11

SHEET NO:-1
-XP1

-X3

18

14

12
14
16 17

B
-QF4

+03GH202

+02GH101:E02

/M192.C2

2180

C
2181

+00GH003

-K89

A1
24+

/M192.D1
/M193.D1

C- D09

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K35
/J006.C2

-AB B8 A8 B7 A7

-K35
/J006.C2

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K35
/J006.B2

-AB A1

Date
First Issue

A1
IHR2 SLOT10 DI
1-16 validatr
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K35
/J006.B2

-AB B2

IB010.02

A2
400V. TRF-1 TEMP
RELAY
NORMAL
20BFT03_GT001B_XM014

-K35
/J006.B2

IB010.03

A3
400V.ESSEN BRD
CTRL POLAR1
PRESENCE

-K35
/J006.B2

20BFA02_GH101C_XM008

A4
400V.ESSEN BRD
PROT. MCB
CLOSED
20BFA02_GH101P_XM031

=20CBA

RACK-0 SLOT 10 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A2

IB010.01

20CBA00_EN201_DI008

-AB B1

IB010.00

path

323 sheets
next sheet
M192
Sheet
M191

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E02
AC/DC SUPPLY DISTRIBUTION
DWG:-AS-D-GE-EO-3404

11

-X3

10

+02GH101:E02

2 3

91

11
SD

OF1

-X3

+00GH101:F02

B
SD

92
94

14
-X3

91

11
OF1

-QF3

12
14
4

SHEET NO:-221

92
94

-XP2

-X3

SHEET NO:-220

11

SHEET NO:-200

11

SHEET NO:-200
B

POWER HOUSE LIGHTING SWITCHBOARD


20SLA00GH101
COLUMN NO:-B01/F02
DWG:-AS-D-GE-EO-3415

12
14

12
14

2 3

+00GH101:B01

+00GH101:F02

/M191.C7

/M193.C5

+00GH003

-K89

A
A13
1P+

/M191.D1

C- D09

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K35
/J006.B2

-AB A3

-AB B3

IB010.04
A5
400V.ESSEN BRD
CTRL POLAR2
PRESENCE

-K35
/J006.B2

20BFA02_GH101D_XM008

Date

2
First Issue

revision

30/04/2010

-AB A4

IB010.05
A6
240V.P/H
LIGHT.BRD-CTRL MCB
CLOSED

-K35
/J006.C2

20SLA00_GH101C_XM031

20SLA00_GS301_XG033

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K35
/J006.C2

-AB A12

IB010.08

A8
240V.P/H
LIGHT.BRD-INC 1 CB
TRIP
20SLA00_GS301_XM170

-K35
/J006.C2

IB010.09

B1
240V.P/H
LIGHT.BRD-INC 2 CB
CLOSED
20SLA00_GS302_XG033

-K35
/J006.C2

B2
240V.P/H
LIGHT.BRD-INC 2 CB
TRIP
20SLA00_GS302_XM170

=20CBA

RACK-0 SLOT 10 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IB010.07

A7
240V.P/H
LIGHT.BRD-INC 1 CB
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IB010.06

path

323 sheets
next sheet
M193
Sheet
M192

POWER HOUSE LIGHTING SWITCHBOARD


20SLA00GH101
COLUMN NO:-F01/F02
DWG:-AS-D-GE-EO-3415

-X3 25

27

41

42

40

38

39

37

22

21

31

32

-X3

33

11

11

11
-XP1

B
-XP2

12
14

-QF4
14

12
14

-QV2

12
14

92
94

92
94
26

-QU1

12
14

-FV1
K1

-FV1
K2

12
14

-QV1

11

91

11

11

SHEET NO:-200
91

SHEET NO:-222

12

13

+00GH101:F01

+00GH101:F02

/M192.C8

+00GH003

INTERFACE MODULE
16EO+

-K89
/M191.D1

C- D09

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K35
/J006.C2

-AB B11

-AB A11

IB010.10
B3
240V.P/H LIGHT.BRD
BB PT MCB
CLOSED

-K35
/J006.C2

20SLA00_GH101_XG031

Date

2
First Issue

revision

30/04/2010

-AB B10

IB010.11
B4
240V.P/H LIGHT BB
VOL RELAY W/D
NORMAL

-K35
/J006.C2

20SLA00_GH101_XM014

20SLA00_GH101_XM008

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K35
/J006.C2

-AB A9

IB010.14

B6
240V.P/H LIGHT.BRD
-CTRL POLAR1
PRESENCE
20SLA00_GH101C_XM008

-K35
/J006.C2

IB010.15

B7
240V.P/H LIGHT.BRD
PROT MCB
CLOSED
20SLA00_GH101P_XM031

-K35
/J006.C2

B8
240V.P/H LIGHT.BRD
-CTRL POLAR2
PRESENCE
20SLA00_GH101D_XM008

=20CBA

RACK-0 SLOT 10 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B9

IB010.13

B5
240V.P/H LIGHT BB
VOLTAGE
PRESENCE

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IB010.12

path

323 sheets
next sheet
M194
Sheet
M193

/M006.B5

/M006.B5

400V TRANSFORMER-1
20BFT03GH202
TEMPERATURE CONTROLLER
DWG:-AS-D-GE-WD-3502

4C-

4C+

2D-

2D+

/M004.B5

/M004.B5

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-C03
20BFA00GS116
DWG:-AS-D-GE-EO-3402
SHEET NO:-100

3079

2079

5066

4070

TYPICAL DIAGRAM
OFP4M+N/2
DWG:-AS-D-GE-EO-3401
SHEET NO:-1

SHEET NO:-530
B

A4

A3

-F1
01

10 11

12

13 14

-X3

15

+03GT001

+00GH101:C03

/M195.C2

2182

C
2183

+00GH003

-K88

A1
24+

/M195.D1
/M196.D1

C- D08

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K35
/J006.D2

-CD B8 A8 B7 A7

-K35
/J006.E2

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K35
/J006.D2

-CD A1

Date
First Issue

C1
IHR2 SLOT10 DI
17-32 validtr
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K35
/J006.D2

-CD B2

IB010.18

C2
400V.TRF-1 TEMP

IB010.19

ALARM

TRIP

C4
400V.TRF-1
PROT.51N
TRIP

20BFT03_GT001_XM023

20BFT03_GT001A_XM170

20BFT03_GT001B_XM170

-K35
/J006.D2

C3
400V.TRF-1 TEMP

-K35
/J006.D2

=20CBA

RACK-0 SLOT 10 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A2

IB010.17

20CBA00_EN202_DI008

-CD B1

IB010.16

path

323 sheets
next sheet
M195
Sheet
M194

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-C03
20BFA00GS116
DWG:-AS-D-GE-EO-3402
SHEET NO:-100

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-M03
20BFA00GS223
DWG:-AS-D-GE-EO-3402
SHEET NO:-107

400V TRANSFORMER-2
20BFT04GH202
TEMPERATURE CONTROLLER
DWG:-AS-D-GE-WD-3502

TYPICAL DIAGRAM
OFP4M+N/2
DWG:-AS-D-GE-EO-3401

400V TRANSFORMER-2
20BFT04GH202
TEMPERATURE CONTROLLER
DWG:-AS-D-GE-WD-3502

TYPICAL DIAGRAM
OFP4M+N/2
DWG:-AS-D-GE-EO-3401
SHEET NO:-1

SHEET NO:-530

10

10 11

12

13 14

-X3

15

+00GH101:C03

A3

-F1
01

A3

-F1
01

A3

-F1
01

-X3

A4

A4

SHEET NO:-1
A4

SHEET NO:-530

-X3

10

+04GT001

16

17

18

+00GH101:M03

+04GT001

/M194.C8

+00GH003

-K88

A
A13
1P+

/M194.D1

C- D08

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K35
/J006.D2

-CD A3

-CD B3

IB010.20
C5
400V.TRF-1 PROT
VOL RELAY W/D
NORMAL

-K35
/J006.D2

20BFT03_GT001A_XM014

Date

2
First Issue

revision

30/04/2010

-CD A4

IB010.21
C6
400V.TRF-2 TEMP

C7
400V.TRF-2 TEMP

ALARM

TRIP
20BFT04_GT001A_XM170

20BFT04_GT001B_XM170

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

/J006.D2

-K35
/J006.D2

IB010.25

D1
400V.TRF-2 PROT
VOL RELAY W/D
NORMAL

-K35
/J006.D2

20BFT04_GT001A_XM014

D2
400V.TRF-2 TEMP
RELAY
NORMAL
20BFT04_GT001B_XM014

=20CBA

RACK-0 SLOT 10 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K35

-CD A12

IB010.24

20BFT04_GT001_XM023

/J006.D2

-CD B12

IB010.23
C8
400V.TRF-2
PROT.51N
TRIP

-K35

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD B4

IB010.22

path

323 sheets
next sheet
M196
Sheet
M195

400V SST-1
20BFT01GH202
TEMPERATURE CONTROLLER
DWG:-AS-D-GE-WD-3502

400V SST-2
20BFT02GH202
TEMPERATURE CONTROLLER
DWG:-AS-D-GE-WD-3502

SHEET NO:-1

SHEET NO:-1

10 11

12

13 14

15

16 17

18

10 11

12

13 14

15

16 17

18

+01GT001

+02GT001

+00GH003

INTERFACE MODULE
16EO+

-K88
/M194.D1

C- D08

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K35
/J006.E2

Date

2
First Issue

revision

-CD B11

-CD A11

IB010.26

-CD B10

IB010.27

D3
400V.SST-1 TEMP
ALARM

TRIP

20BFT01_GT001_XM023

20BFT01_GT001B_XM170

20BFT01_GT001_XM014

30/04/2010

/J006.E2

D4
400V.SST-1 TEMP

-K35
/J006.E2

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K35
/J006.E2

-CD A9

IB010.30

D6
400V.SST-2 TEMP

IB010.31

ALARM

TRIP

D8
400V.SST-2 TEMP
RELAY
NORMAL

20BFT02_GT001_XM023

20BFT02_GT001B_XM170

20BFT02_GT001_XM014

-K35
/J006.E2

D7
400V.SST-2 TEMP

-K35
/J006.E2

=20CBA

RACK-0 SLOT 10 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B9

IB010.29

D5
400V.SST-1 TEMP
RELAY
NORMAL

-K35

-CD A10

IB010.28

path

323 sheets
next sheet
M197
Sheet
M196

TYPICAL DIAGRAM
OFMV/1
DWG:-AS-D-GE-EO-3401

/M715.C7

/M715.C7

4C-

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-N03
COMMON COOLING WATER VALVE PAC00AA251
DWG NO:-AS-D-GE-EO-3404
SHEET NO:-109

SHEET NO:-492

3081

-X3B

22
24

-XTC

22
24

-XTO

22
24

-XCV

21

21

2187

21

B
2186

2081

5068

4072

/M006.B7

/M006.A7
4C+

2D-

2D+

/M004.B7

/M004.A7

10

11

12
+02GH101:N03

/M198.C2

2184

C
2185

+00GH003

-K91
/M198.D1
/M199.D1

C- D11

A
A1
24+

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K39
/J006.C3

-AB B8 A8 B7 A7

-K39
/J006.C3

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K39
/J006.B3

-AB A1

Date
First Issue

A1
AUX:IHR3 SLOT3 DI
1-16 validator
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K39
/J006.B3

-AB B2

IC003.02

A2
IHR3 TOP 5s
SYNCRO.
APPEAR
20CBA00_EN33_XZ025

-K39
/J006.B3

IC003.03

A3
COM.COOL.WTR:
VALVE- AA251
CLOSED

-K39
/J006.B3

20PAC00_AA251_XG031

A4
COM.COOLWTR: VALVE
- AA251 TORQUE
FAULT
20PAC00_AA251_XM004

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A2

IC003.01

20CBA00_EN331_DI008

-AB B1

IC003.00

path

323 sheets
next sheet
M198
Sheet
M197

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-N03
COMMON COOLING WATER VALVE PAC00AA251
DWG NO:-AS-D-GE-EO-3404
SHEET NO:-109

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-N04
COMMON COOLING WATER VALVE PAC00AA261
DWG NO:-AS-D-GE-EO-3404
SHEET NO:-109

TYPICAL DIAGRAM
OFMV/1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
OFMV/1
DWG:-AS-D-GE-EO-3401

SHEET NO:-492

SHEET NO:-492

-X3B

23

-X3B

24

44

21

21
5

-SA1

10

43

22
24

-XTC

22
24

-XTO

22
24

-XCV

22
24

-XOV

16
18

43
8

21

15
-XF1

-SA1

-X3A

21

B
44

11

12 -X3A

+02GH101:N03

/M197.C8

+02GH101:N04

/M199.C3

/M199.C2

+00GH003

-K91

A
A13
1P+

/M197.D1

C- D11

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K39
/J006.B3

-AB A3

-AB B3

IC003.04
A5
COM.COOL.WTR: VLV
AA251STARTER
REMOTE

-K39
/J006.B3

20PAC00_AA251_XG077

Date

2
First Issue

revision

30/04/2010

-AB A4

IC003.05
A6
COM.COOL.WTR: VLV
AA251STARTER
NORMAL

-K39
/J006.C3

20PAC00_AA251_XM014

20PAC00_AA261_XG073

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K39
/J006.C3

-AB A12

IC003.08

A8
COM.COOL.WTR:
VALVE- AA261
CLOSED
20PAC00_AA261_XG031

-K39
/J006.C3

IC003.09

B1
-K39
COM.COOLWTR: VALVE /J006.C3
- AA261 TORQUE
FAULT
20PAC00_AA261_XM004

B2
COM.COOL.WTR: VLVAA261STARTER
REMOTE
20PAC00_AA261_XG077

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IC003.07

A7
COM.COOL.WTR:
VALVE- AA261
OPEN

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IC003.06

path

323 sheets
next sheet
M199
Sheet
M198

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-N04
COMMON COOLING WATER VALVE PAC00AA261
DWG NO:-AS-D-GE-EO-3404
SHEET NO:-109

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-N03
COMMON COOLING WATER VALVE PAC00AA251
DWG NO:-AS-D-GE-EO-3404
SHEET NO:-109

TYPICAL DIAGRAM
OFMV/1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
OFMV/1
DWG:-AS-D-GE-EO-3401

SHEET NO:-492

COMMON COOLING WATER


20PAC00AT201
FILTER 20PAC00AT201
DWG:203460321

SHEET NO:-492

SHEET NO:-2

SHEET NO:-1

SHEET NO:-2

SHEET NO:-2

-X3B

24

+02GH101:N04

/M198.C8

-X0

10

14

14
13

-K4

12

11

13

-K3

22

13

22
24
23

-Q1

-K1

-XOV

16
18
-X3B

14

15
-XF1

21

B
21

14

13

18

17

+02GH101:N03

+00AT201

/M198.C3

+00GH003

INTERFACE MODULE
16EO+

-K91
/M197.D1

C- D11

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K39
/J006.C3

-AB B11

-AB A11

IC003.10
B3
-K39
COM.COOL.WTR: VLV- /J006.C3
AA261STARTER
NORMAL
20PAC00_AA261_XM014

Date

2
First Issue

revision

30/04/2010

-AB B10

IC003.11
B4
COM.COOL.WTR:
VALVE- AA251
OPEN

-K39
/J006.C3

20PAC00_AA251_XG073

20PAC00_AT201_XG168

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K39
/J006.C3

-AB A9

IC003.14

B6
COM.COOL.WTR:
FILTER-AT201
FAULT
20PAC00_AT201_XM014

-K39
/J006.C3

IC003.15

B7
COM.COOL.WTR:
FILTER-AT201
CLOG

-K39
/J006.C3

20PAC00_AT201_XG195

B8
COM.COOL.WTR:
FILTER-AT201
READY
20PAC00_AT201_XG075

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B9

IC003.13

B5
COM.COOL.WTR:
FILTER-AT201
OPER

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IC003.12

path

323 sheets
next sheet
M200
Sheet
M199

4C3082

SHEET NO:-1

SHEET NO:-2

-Q1

-K3

10

13

13

22

-K1

-X0

14

21

B
14

2082

5069

4073

COMMON COOLING WATER


FILTER 20PAC00AT202
DWG:-203460321

SHEET NO:-2
B

/M006.B7

/M006.B7
4C+

2D-

2D+

/M004.B7

/M004.A7

12

11

14

13
+00AT202

/M201.C2

2188

C
2189

+00GH003

-K90
/M201.D1
/M202.D1

C- D10

A
A1
24+

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K39
/J006.D3

-CD B8 A8 B7 A7

-K39
/J006.E3

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K39
/J006.D3

-CD A1

Date
First Issue

C1
AUX:IHR3 SLOT3 DI
17-32 validatr
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K39
/J006.D3

-CD B2

IC003.18

C2
COM.COOL.WTR:
FILTER-AT202
OPER
20PAC00_AT202_XG168

-K39
/J006.D3

IC003.19

C3
COM.COOL.WTR:
FILTER-AT202
FAULT

-K39
/J006.D3

20PAC00_AT202_XM014

C4
COM.COOL.WTR:
FILTER-AT202
CLOG
20PAC00_AT202_XG195

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A2

IC003.17

20CBA00_EN332_DI008

-CD B1

IC003.16

path

323 sheets
next sheet
M201
Sheet
M200

COMMON COOLING WATER


FILTER 20PAC00AT202
DWG:-203460321

LP COMPRESSED AIR SYSTEM


LOCAL CONTROL PANEL
20SCA00GH101
DWG NO:-AS-D-GE-EO-5900

SHEET NO:-8

-X4

17

18

17

124

128

26

25

B
KA6

KA24

126
8

123

127

125
KA23

KA2

106

13
18

KA1

118

-K4

105

KA16

106

14

105

117

SHEET NO:-2

28

27

24

23

+00AT202

+00GHXXX

/M200.C7

/M202.C1

+00GH003

-K90

A
A13
1P+

/M200.D1

C- D10

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K39
/J006.D3

-CD A3

-CD B3

IC003.20
C5
COM.COOL.WTR:
FILTER-AT202
READY

-K39
/J006.D3

20PAC00_AT202_XG075

Date

2
First Issue

revision

30/04/2010

-CD A4

IC003.21

IC003.22

C6
DE-MINERAL PURITY
WATER SENSOR
FAULT

-K39
/J006.D3

20PCC00_SESOR_XM008

C8
-K39
AUX:LP COMPRESSOR /J006.D3
1&2
FAULT

20SCA00_AN001C_XM081

20SCA00_AN001C_XM004

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-CD A12
IC003.25

D1
AUX:LP DRYER 1&2
FAULT

D2
AUX:LP LCB
POLARITY
PRESENCE

20SCA00_AT001D_XM004

20SCA00_AN000_XM008

-K39
/J006.D3

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B12
IC003.24

C7
-K39
LP COMP: AIR
/J006.D3
SYSTEM AUTO MODE
SELECTED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD B4
IC003.23

path

323 sheets
next sheet
M202
Sheet
M201

LP COMPRESSED AIR SYSTEM


LOCAL CONTROL PANEL
20SCA00GH101
DWG NO:-AS-D-GE-EO-5900

DIESEL GENERATOR
FIRE PROTECTION
Cubicle:20SGA00GH001
DWG:-HEPBUJ20CYE0009

POWER HOUSE
1500KVA DIESEL GENERATOR
20BRV00GH101
DWG:-AS-D-RH-EO-3710
Sheet No: 30

SHEET NO:-06

-R2

-R4

113

001

-R1

114

002

KA5

-X4

14

13

14

13

15

26

25

-X7

27

+00GHXXX

B
KA3

KA3
004

003

SHEET NO:-8

+00XC10

+00GH001

/M201.C7

+00GH003

INTERFACE MODULE
16EO+

-K90
/M200.D1

C- D10

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K39
/J006.E3

-CD B11

-CD A11

IC003.26
D3
AUX:AIR SYSTEM
PRESSURE
TOO-LOW

-K39
/J006.E3

20SCA00_CP003S_XM189

Date

2
First Issue

revision

30/04/2010

-CD B10

IC003.27
D4
P/H DG: FIRE
PROTECTION
NORMAL

-K39
/J006.E3

20SGA00_GH001_XM014

20SGA00_GH001_XM035

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

IC003.29

D5
P/H DG: FIRE
CONFIRMED
DETECTED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10

IC003.28

/J006.E3

-CD A9

D6
P/H DG: FIRE
ALARM
ALARM
20SGA00_GH001_XM023

IC003.31
D7

D8

CB
OPEN

CB
CLOSED

20BRV00_GS101_XG073

20BRV00_GS101_XG031

-K39 P/H:DIESEL GENERATOR -K39 P/H:DIESEL GENERATOR


/J006.E3
/J006.E3

=20CBA

RACK-0 SLOT 3 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K39

-CD B9
IC003.30

path

323 sheets
next sheet
M203
Sheet
M202

/M006.B7

4C-

4,16kV MV CUBICLE
20BBA01GH101
COLUMN NO:-A
SWY. SUPPLY NO. 1
DWG:-AS-D-GE-EO-3300

-QL1

-FU01

-QL1

3
-X4

3083

SHEET NO:-212

NA

/M006.B7
4C+
2083

5070

4074

2D-

2D+

/M004.B7

/M004.B7

23

24
+01GH101:A

/M204.C3

2190

C
2191

+00GH003

-K93
/M204.D1
/M205.D1

C- D13

A
A1
24+

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K40
/J006.C5

-AB B8 A8 B7 A7

-K40
/J006.C5

IC693MDL655
+00GH002

BCOM
NC
NC
0V

+00GH002

+24Out
NC
NC
ACOM

IC693MDL655-AB B6 A6 B5 A5

-K40
/J006.B5

-AB A1

Date
First Issue

A1
IHR3 SLOT4 DI 1-16
validator
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K40
/J006.B5

-AB B2

IC004.02

A2
4,16KV CELL1:
LINE1 CB GS301
OPEN
20BBA01_GS301_XG073

-K40
/J006.B5

IC004.03

A3
4,16KV CELL1:
LINE1 CB GS301
CLOSED

-K40
/J006.B5

20BBA01_GS301_XG031

A4
4,16KV CELL1:
LINE1 CB GS301
TRIP
20BBA01_GS301_XM170

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB A2

IC004.01

20CBA00_EN341_DI008

-AB B1

IC004.00

path

323 sheets
next sheet
M204
Sheet
M203

-X3

SHEET NO:-212

SHEET NO:-212

12

11

-X4

15

16

3
14

-X4

13

B
-QL1

-QT1
3

-QT1

-QT1

11

12
14
2

-QT1

-QF3

-XP2

12
14

-XP1

14

4,16kV MV CUBICLE
20BBA02GH101
COLUMN NO:-A
SWY. SUPPLY NO.2
DWG:-AS-D-GE-EO-3301

SHEET NO:-212

11

11

SHEET NO:-200

4,16kV MV CUBICLE
20BBA01GH101
COLUMN NO:-B
SWY. SUPPLY NO. 1
DWG:-AS-D-GE-EO-3300

4,16kV MV CUBICLE
20BBA01GH101
COLUMN NO:-A
SWY. SUPPLY NO. 1
DWG:-AS-D-GE-EO-3300

-X4

+01GH101:A

+01GH101:B

+02GH101:A

/M203.C8

/M205.C2

+00GH003

-K93

A
A13
1P+

/M203.D1

C- D13

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K40
/J006.B5

-AB A3

-AB B3

IC004.04
A5
4,16KV CELL1:LINE1
110V CTRLMCB
CLOSED

-K40
/J006.B5

20BBA01_GS303_XM031

Date

2
First Issue

revision

30/04/2010

-AB A4

IC004.05
A6
4,16KV CELL1:LINE1
ES GS441
OPEN

-K40
/J006.C5

20BBA01_GS441_XG073

20BBA01_GS441_XG031

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K40
/J006.C5

-AB A12

IC004.08

A8
4,16KV CELL1:LINE
ES GS442
OPEN
20BBA01_GS442_XG073

-K40
/J006.C5

IC004.09

B1
4,16KV CELL1:LINE1
ES GS442
CLOSED
20BBA01_GS442_XG031

-K40
/J006.C5

B2
4,16KV CELL2:LNE2
CB GS301
OPEN
20BBA02_GS301_XG073

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B12

IC004.07

A7
4,16KV CELL1:LINE1
ES GS441
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB B4

IC004.06

path

323 sheets
next sheet
M205
Sheet
M204

4,16kV MV CUBICLE
20BBA02GH101
COLUMN NO:-A
SWY. SUPPLY NO.2
DWG:-AS-D-GE-EO-3301

23

-X3

24

12

11

-X4

-QT1

15

16

-QT1

3
4

2
-QT1

-QF3

12
14

SHEET NO:-212

14
-XP2

12
14

NA

5
-X4

-XP1

11

-FU01

-QL1

SHEET NO:-212

11

SHEET NO:-200
11

SHEET NO:-212

4,16kV MV CUBICLE
20BBA02GH101
COLUMN NO:-A
SWY. SUPPLY NO.2
DWG:-AS-D-GE-EO-3301

14

-X4

13

+02GH101:A

+02GH101:B

/M204.C7

+00GH003

INTERFACE MODULE
16EO+

-K93
/M203.D1

C- D13

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10

23

22

10

23

E
IC693MDL655
+00GH002

-K40
/J006.C5

-AB B11

-AB A11

IC004.10
B3
4,16KV CELL2:LINE2
CB GS301
CLOSED

-K40
/J006.C5

20BBA02_GS301_XG031

Date

2
First Issue

revision

30/04/2010

-AB B10

IC004.11
B4
4,16KV CELL2: LINE2
CB GS301
TRIP

-K40
/J006.C5

20BBA02_GS301_XM170

20BBA02_GS303_XM031

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K40
/J006.C5

-AB A9

IC004.14

B6
4,16KV CELL2:LINE2
ES GS441
OPEN
20BBA02_GS441_XG073

-K40
/J006.C5

IC004.15

B7
4,16KV CELL2:LINE2
ES GS441
CLOSED
20BBA02_GS441_XG031

-K40
/J006.C5

B8
4,16KV CELL2: LINE2
ES GS442
OPEN
20BBA02_GS442_XG073

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-AB B9

IC004.13

B5
4,16KV CELL2:LINE2
110V CTRLMCB
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-AB A10

IC004.12

path

323 sheets
next sheet
M206
Sheet
M205

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-F01
AC/DC SUPPLY DISTRIBUTION
DWG:-AS-D-GE-EO-3402

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-C01
AC/DC SUPPLY DISTRIBUTION
DWG:-AS-D-GE-EO-3403

SHEET NO:-200

11

SHEET NO:-200

-QT1

B
11

4C-

4,16kV MV CUBICLE
20BBA02GH101
COLUMN NO:-A
SWY. SUPPLY NO.2
DWG:-AS-D-GE-EO-3301

3084

-QF3

-QF3
14

14

2084

5071

4075

SHEET NO:-212
B

/M006.B7

/M006.B7
4C+

2D-

2D+

/M004.B7

/M004.B7

-X4

-X3

-X3

+02GH101:B

+00GH101:F01

+01GH101:C01

2192

C
2193

+00GH003

-K92
/M207.D1
/M208.D1

C- D12

A
A1
24+

A2
24-

A7

A8

A5

A6

A9
1P+

A10
1P+

INTERFACE MODULE
A12 16EO+
1P+

A11
1P+

B
B1
FU3

500mA

B2

FU4

500mA

B7
FU1

3A

B8

FU2

B5

B6
C

3A

C1

S2

C2

C3

C4

1C+

D
1C-

D1

1P+
S1

D4

1P-

1P-

1C+

1C+

1C+

1C+

13

D3

1P-

25

1P-

D2

1P-

16

17

J1
13

J2

25

16

17

-K40
/J006.D5

-CD B8 A8 B7 A7

-K40
/J006.E5

IC693MDL655
+00GH002

DCOM
NC
NC
0V

+00GH002

+24VOut
NC
NC
CCOM

IC693MDL655-CD B6 A6 B5 A5

-K40
/J006.D5

-CD A1

Date
First Issue

C1
IHR3 SLOT4 DI
17-32 validator
PRESENCE

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K40
/J006.D5

-CD B2

IC004.18

C2
4,16KV CELL2: LINE2
ES GS442
CLOSED
20BBA02_GS442_XG031

-K40

/J006.D5

IC004.19

C3
400V.ESSEN BRD
CTRL MCB
CLOSED

-K40
/J006.D5

20BFA00_GH101C_XM031

C4
400V.COMMON BRD
CTRL. MCB
CLOSED
20BFA01_GH101C_XM031

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD A2

IC004.17

20CBA00_EN342_DI008

-CD B1

IC004.16

path

323 sheets
next sheet
M207
Sheet
M206

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-C01
AC/DC SUPPLY DISTRIBUTION
DWG:-AS-D-GE-EO-3413

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-D01
AC/DC SUPPLY DISTRIBUTION
DWG:-AS-D-GE-EO-3401

-X3

-X3

SHEET NO:-1

SHEET NO:-1

11

SHEET NO:-1

400V SST-1
20BFT01GH202
DWG:-AS-D-GE-WD-3502

B
-QF3

14

-QF3

14

-QF3

400V TRANSFORMER-2
20BFT04GH202
TEMPERATURE CONTROLLER
DWG:-AS-D-GE-WD-3502

14

400V TRANSFORMER-1
20BFT03GH202
TEMPERATURE CONTROLLER
DWG:-AS-D-GE-WD-3502

SHEET NO:-200

11

SHEET NO:-200

11

SHEET NO:-200

ESS. AUXI. LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E02
AC/DC SUPPLY DISTRIBUTION
DWG:-AS-D-GE-EO-3404

-X3

+01GH101:C01

+02GH101:C01

24 22

23

+02GH101:E02

24 22

23

+03GT001

24 22

+04GT001

23
+01GT001

+00GH003

-K92

A
A13
1P+

/M206.D1

C- D12

A14
1P+

A15
1P+

INTERFACE MODULE
16EO+

A16
1P+

B
B9
1P+
C

C5

C6

C7

C8

B10
1P+

C9

C10

D
D
D5

D6

D7

D8

D9

D10

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

1P-

J1

18
5

J2

19
18

20

19

20

E
IC693MDL655
+00GH002

-K40
/J006.D5

-CD A3

-CD B3

IC004.20
C5
400V.HVAC
BOARD-CTRL MCB
CLOSED

-K40
/J006.D5

20SAA01_GH101C_XM031

Date

2
First Issue

revision

30/04/2010

-CD A4

IC004.21
C6
400V.CHILLER
BRD-CTRL MCB
CLOSED

-K40
/J006.D5

20SAA02_GH101C_XM031

20BFA02_GH101C_XM031

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

-K40
/J006.D5

-CD A12

IC004.24

C8
400V.TRF-1 CELL
DOOR
CLOSED
20BFT03_GT001_XG033

-K40
/J006.D5

IC004.25

D1
400V.TRF-2 CELL
DOOR
CLOSED

-K40
/J006.D5

20BFT04_GT001_XG033

D2
400V.SST-1 CELL
DOOR
CLOSED
20BFT01_GT001_XG033

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-CD B12

IC004.23

C7
400V.ESSEN BRD
CTRL MCB
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD B4

IC004.22

path

323 sheets
next sheet
M208
Sheet
M207

400V SST-2
20BFT02GH202
TEMPERATURE CONTROLLER
DWG:-AS-D-GE-WD-3502

400VAC MAIN SWITCHBOARD


20BFA02GH101
COLUMN NO:-G02
GS130
DWG:-AS-D-GE-EO-3404
SHEET NO:-105

400VAC MAIN SWITCHBOARD


20BFA02GH101
COLUMN NO:-H01
GS131
DWG:-AS-D-GE-EO-3404
SHEET NO:-106

TYPICAL DIAGRAM
OFP1/4
DWG:-AS-D-GE-EO-3401
SHEET NO:-350

TYPICAL DIAGRAM
OFP1/4
DWG:-AS-D-GE-EO-3401
SHEET NO:-350

SHEET NO:-1

11

B
11

24 22

-X3

23

12
14

-Q01
F01

12
14

-Q01
F01

5 4

-X3

+02GT001

5 4

+02GH101:G02

+02GH101:H01

+00GH003

INTERFACE MODULE
16EO+

-K92
/M206.D1

C- D12

B
B11
1P+
C

B12
1P+

C11

B13
1P+

C12

B14
1P+

C13

B15
1P+

C14

B16
1P+

C15

C16

D
D
D11

D12

D13

D14

D15

D16

1P-

1P-

1P-

1P-

1P-

1P-

1C+

1C+

1C+

1C+

1C+

1C+

J1

21
8

J2

9
21

22
9

10
22

23
10

23

E
IC693MDL655
+00GH002

-K40
/J006.E5

-CD B11

-CD A11

IC004.26
D3
400V.SST-2 CELL
DOOR
CLOSED

-K40
/J006.E5

20BFT02_GT001_XG033

Date

2
First Issue

revision

30/04/2010

-CD B10

IC004.27
D4
400V MAIN BRD O/G
CB GS130
CLOSED

-K40
/J006.E5

20BFA02_GS130_XG033

Customer

GOVERNMENT OF UGANDA
BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

D6

-K40

/J006.E5

IC004.31
D7

/J006.E5

-K40

D8

/J006.E5

=20CBA

RACK-0 SLOT 4 MDL655


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K40

-CD A9

IC004.30

20BFA02_GS131_XG033

Project name

Repl. f.

-CD B9

IC004.29

D5
400V MAIN BRD O/G
CB GS131
CLOSED

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-CD A10

IC004.28

path

323 sheets
next sheet
M209
Sheet
M208

/M611.A3

/K016.E7

4086

2D-

/M004.D5

/M716.C2

/M516.E3

4177

/M210.A1

10

4149

4168

4143

5080

-S2
+00GH001
/J001.B3
A- D02

4087

-X234

5
+00GH002

4125

4124

4123

4122

5106

E
IC693MDL645

-K45
/J006.C6

FA004.00

FA004.01

2
A1
AUX:FC SLOT 4 DI
POLARITY
PRESENCE

+00GH002

24V OUT
0V
NC
24V IN

+00GH002

IC693MDL645

18 19 20 1

-K45
/J006.B6

-K45
/J006.B6

20CBA00_EN140_DI008

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

20CBA00_003HR_25DI

FA004.02

4
A3
AUX:AI MODULE
POLARITY
PRESENCE

-K45
/J006.B6

FA004.03

5
A4
AUX:RESET PB

-K45
/J006.B6

RESET

20CBA00_EN140_AI008

20CBA00_S001_XG149

=20CBA

RACK-0 SLOT 4 MDL645


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

3
A2
AUX:FC TOP 5s PLC
SYNCRO.
APPEAR

path

323 sheets
next sheet
M210
Sheet
M209

/M004.D5

13
14

13

-T13

/M211.A1

4178D

4087E

+00GH002
/K009.B3
B- D04

14

13

-T12
+00GH002
/K009.B2
B- D02

14

13

-T2
+00GH001
/K003.B3
B- C04

4087D

4178C

4087C

4178B

4087B

14

1
2

-T1
+00GH001
/K003.B2
B- C02

4178A

-X234

4181

-S1
+00GH001
/J001.B1
A- D01

4178

-S1
+00GH001
/J001.B1
A- D01

4180

4087

/M209.B8

4087A

10

11
+00GH002

4131

4130

4129

4128

4127

4126

E
IC693MDL645
+00GH002

-K45
/J006.B6

REMOTE

LOCAL

20CBA00_S002_XG183

20CBA00_S003_XG184

20CBA00_GK902_XM196

30/04/2010

-K45
/J006.B6

7
A6
AUX:CONTROL LEVEL

FA004.06

8
A7
AUX:110/24V DC
CONVERTER1-GH001
HEALTHY

Date

revision

FA004.05

6
A5
AUX:CONTROL LEVEL

First Issue

FA004.04

-K45
/J006.C6

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K45
/J006.C6

9
A8
AUX:110/24V DC
CONVERTER2-GH001
HEALTHY

FA004.08

-K45
/J006.C6

20CBA00_GK903_XM196

FA004.09

10
B1
AUX:110/24V DC
CONVERTER1-GH002
HEALTHY

-K45
/J006.C6

20CBA00_GK906_XM196

11
B2
AUX:110/24V DC
CONVERTER2-GH002
HEALTHY
20CBA00_GK907_XM196

=20CBA

RACK-0 SLOT 4 MDL645


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

FA004.07

path

323 sheets
next sheet
M211
Sheet
M210

-X234 12

2
5
4178G

4178F

4178E

-T5
+00GH001
/J002.B5
B- E 06

-T4

4087G

+00GH001
/J002.B3
B- E 04

-T3
+00GH001
/J002.B1
B- E 02

4087F

4087E

/M210.A8

13

14

15

16

17
+00GH002

4137

4136

4135

4134

4133

4132

E
IC693MDL645

FA004.10

FA004.11

12
B3
AUX:S8000-1
ETHERNET SWITCH
NORMAL

+00GH002

-K45
/J006.C6

-K45
/J006.C6

20CBA00_GK908_XM014

Date

2
First Issue

revision

30/04/2010

13
B4
AUX:S8000-2
ETHERNET SWITCH
NORMAL

FA004.12

-K45
/J006.C6

20CBA00_GK909_XM014

14
B5
AUX:OFFICE
ETHERNET SWITCH
NORMAL

Customer

GOVERNMENT OF UGANDA

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

/J006.C6

FA004.14

-K45

FA004.15

16
B7

-K45

/J006.C6

17
B8

/J006.C6

=20CBA

RACK-0 SLOT 4 MDL645


LOGICAL INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

15_I/O Modules DI

Repl. by

-K45

15
B6

20CBA00_GK910_XM014

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

FA004.13

path

323 sheets
next sheet
M501
Sheet
M211

FA005.00
400V.MAIN BOARD
INCOMNG1 C.B
OPENING

-K46
+00GH002

/J006.C8

-K46

IC693MDL753-AB B6 A6 B5 A5

+00GH003

-K97

BCOM
BVIN
BVIN
NC

NC
AVIN
AVIN
ACOM

/J006.C8

FA005.01
400V.MAIN BOARD
INCOMNG1 C.B
CLOSING

20BFA00_GS101_YB108

-K46

A1

/J006.B8

-AB B8 A8 B7 A7

-K46

FA005.02
400V.MAIN BOARD
INCOMNG2 C.B
OPENING

20BFA00_GS101_YB106

A2

/J006.B8

-K46

FA005.03
400V.MAIN BOARD
INCOMNG2 C.B
CLOSING

20BFA00_GS102_YB108

A3

/J006.B8

-K46

20BFA00_GS102_YB106

A4

/J006.B8

-AB A1

-AB B1

-AB A2

-AB B2

28

10

29

11

J1
20

23

INTERFACE MODULE
16DO

/M502.B1
/M503.B1

C- E 03

R13
S17

R14

R15

R16

S18

S13
FU17

FU18

500mA

1A

2C-

S14

FU15

1A

NO

FU14

NC

2C-

NO

1A

NC

FU13

NO

2CR17

NC

NO

2CNC

2C-

2C-

S15

FU16

1A

S16

500mA

C
B1

B2

B11 B12

B5

B7

D1

D2

D3

D4

D
A1

A2

A11 A12

A5

A7

C1

C2

C3

C4

D
4138

4081

5073

4077

Date

2
First Issue

revision

30/04/2010

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

24

30

29

-X3

34

24

30

29

TYPICAL DIAGRAM
IF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-052

TYPICAL DIAGRAM
IF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-052

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-F02
INCOMING 1 GS101
DWG:-AS-D-GE-EO-3402
SHEET NO:-103

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-G02
INCOMING 1 GS102
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

=20CBA

RACK-01 SLOT 5 MDL753


LOGICAL OUTPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

34

E
/M504.E3

/M004.D3

/M004.E3

/M004.D3

2D-

2D+

2D+

-X3

path

323 sheets
next sheet
M502
Sheet
M501

FA005.04
400V.MAIN BOARD
BUS TIE C.B
OPENING

-K46

+00GH003

-K97

FA005.05
400V.MAIN BOARD
BUS TIE C.B
CLOSING

20BFA00_GS301_YB108

-K46

A5

/J006.B8

FA005.06

A7

/J006.C8

-K46

FA005.08

400V.COMON
BOARD-INCOMNG1 CB
CLOSING

20BFA01_GS301_YB108

-K46

A6
AB

FA005.07

400V.COMON
BOARD-INCOMNG1 CB
OPENING

20BFA00_GS301_YB106
-

/J006.B8

A8

/J006.C8

-AB A3

B3

-AB A4

-AB B4

30

12

31

13

FA005.09

400V.COMON
BOARD-INCOMNG2 CB
OPENING

20BFA01_GS301_YB106

-K46

20BFA01_GS302_YB108

B1

/J006.C8

400V.COMON
BOARD-INCOMNG2 CB
CLOSING

-K46

20BFA01_GS302_YB106

B2

/J006.C8

-AB B12

-AB A12

J1

/M501.B1

32

INTERFACE MODULE
16DO

14

C- E 03

S11

S12

2C-

S13

FU14

1A

2C-

S14

FU15

1A

NO

1A

NC

FU13

NO

2C-

R16
NC

1A

NO

FU12

R15
NC

2C-

NO

1A

R14
NC

FU11

NC

NC

2C-

R13
NO

R12
NO

R11

2C-

S15

FU16

1A

S16

C
D5

D6

D7

D8

D9

D10

D
C5

C6

C7

C8

C9

C10

-X3

12

-X3

33

23

29

-X3

28

33

23

29

28+01GH101:D05

+01GH101:C05

TYPICAL DIAGRAM
TF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-211

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-132

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-132

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-G04
BUS TIE CB GS301
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-C05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3403
SHEET NO:-101

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-D05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3403
SHEET NO:-102

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

RACK-01 SLOT 5 MDL753


LOGICAL OUTPUTS

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M503
Sheet
M502

FA005.10

FA005.11

400V.HVAC
BOARD-INCOMING1 CB
OPENING

-K46

-K46

B3

B4

/J006.C8

-K97

B5

/J006.C8

-AB A11

-K46

FA005.14

400V.HVAC
BOARD-INCOMING2 CB
CLOSING

20SAA01_GS302_YB108

-K46

FA005.13

400V.HVAC
BOARD-INCOMING2 CB
OPENING

20SAA01_GS301_YB106

-AB B11

+00GH003

FA005.12

400V.HVAC
BOARD-INCOMING1 CB
CLOSING

20SAA01_GS301_YB108

/J006.C8

B6

/J006.C8

-AB B10

FA005.15

400V.CHILLER
BRD-INCOMNG1 CB
OPENING

20SAA01_GS302_YB106

-K46

20SAA02_GS301_YB108

B7

/J006.C8

-AB A10

400V.CHILLER
BRD-INCOMNG1 CB
CLOSING

-K46

20SAA02_GS301_YB106

B8

/J006.C8

-AB B9

-AB A9

35

17

J1
33

/M501.B1

15

34

16

INTERFACE MODULE
16DO

C- E 03

S5

S6

2C-

S7

FU8

1A

2C-

S8

FU9

1A

NO

1A

NC

FU7

NO

2C-

R10
NC

1A

NO

FU6

R9
NC

2C-

NO

1A

R8
NC

FU5

NC

NC

2C-

R7
NO

R6
NO

R5

2C-

S9

FU10

1A

S10

C
D11

D12

D13

D14

D15

D16

D
C11

C12

C13

C14

C15

C16

-X3

33

23

29

-X3

28
+01GH101:C03

33

23

29

-X3

28
+01GH101:D03

33

23

28 +02GH101:C03

29

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-132

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-132

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-132

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-C03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3413
SHEET NO:-102

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-D03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3413
SHEET NO:-103

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-C03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3414
SHEET NO:-102

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

RACK-01 SLOT 5 MDL753


LOGICAL OUTPUTS

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M504
Sheet
M503

FA005.16

-K46
+00GH002

/J006.E8

-K46

IC693MDL753-CD B6 A6 B5 A5

+00GH003

-K96

DCOM
DVIN
DVIN
NC

NC
CVIN
CVIN
CCOM

/J006.D8

FA005.17

400V.CHILLER
BRD-INCOMNG2 CB
OPENING

IC693MDL753
+00GH002

C1

/J006.D8

-CD B8 A8 B7 A7

-K46

FA005.18

400V.CHILLER
BRD-INCOMNG2 CB
CLOSING

20SAA02_GS302_YB108

-K46

C2

/J006.D8

FA005.19

400V.ESSEN.
BRD-INCOMNG1 CB
OPENING

20SAA02_GS302_YB106

-K46

20BFA02_GS301_YB108

C3

/J006.D8

400V.ESSEN.
BRD-INCOMNG1 CB
CLOSING

-K46

20BFA02_GS301_YB106

C4

/J006.D8

-CD A1

-CD B1

-CD A2

-CD B2

28

10

29

11

J1
20

23

INTERFACE MODULE
16DO

/M505.B1
/M506.B1

C- E 02

R13
S17

R14

R15

R16

S18

S13
FU17

FU18

500mA

1A

2C-

S14

FU15

1A

NO

FU14

NC

2C-

NO

1A

NC

FU13

NO

2CR17

NC

NO

2CNC

2C-

2C-

S15

FU16

1A

S16

500mA

C
B1

B2

B11 B12

B5

B7

D1

D2

D3

D4

D
A1

A2

A11 A12

A5

A7

C1

C2

C3

C4

D
4139

4138

5074

4078

-X3

33

23

29

-X3

28

59

49

55

54+02GH101:E05

Date

2
First Issue

revision

30/04/2010

/M507.E3

/M501.E3

/M004.E3

/M004.D3

2D-

2D+

+02GH101:D03

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:-112

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-D03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3414
SHEET NO:-103

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3404
SHEET NO:-103

=20CBA

RACK-01 SLOT 5 MDL753


LOGICAL OUTPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-132

path

323 sheets
next sheet
M505
Sheet
M504

FA005.20

A
IC693MDL753
+00GH002

-K46

FA005.21

400V.ESSEN.
BRD-INCOMNG2 CB
OPENING

+00GH003

-K96

-K46

C5

FA005.22

400V.ESSEN.
BRD-INCOMNG2 CB
CLOSING

20BFA02_GS302_YB108

/J006.D8

C6

/J006.D8

FA005.23
400V.ESSEN.
BRD-D/G CB
OPENING

20BFA02_GS302_YB106

C7

/J006.D8

-K46

FA005.24
400V.ESSEN.
BRD-D/G CB
CLOSING

20BFA02_GS103_YB108

-K46

C8

/J006.D8

-CD A3

-CD B3

-CD A4

-CD B4

30

12

31

13

FA005.25

400V.ESSEN.
BRD-BUS TIE CB
OPENING

20BFA02_GS103_YB106

-K46

20BFA02_GS303_YB108

D1

/J006.D8

400V.ESSEN.
BRD-BUS TIE CB
CLOSING

-K46

20BFA02_GS303_YB106

D2

/J006.D8

-CD B12

-CD A12

J1

/M504.B1

32

INTERFACE MODULE
16DO

14

C- E 02

S11

S12

2C-

S13

FU14

1A

2C-

S14

FU15

1A

NO

1A

NC

FU13

NO

2C-

R16
NC

1A

NO

FU12

R15
NC

2C-

NO

1A

R14
NC

FU11

NC

NC

2C-

R13
NO

R12
NO

R11

2C-

S15

FU16

1A

S16

C
D5

D6

D7

D8

D9

D10

D
C5

C6

C7

C8

C9

C10

-X3

59

49

55

-X3

54

37

27

33

+02GH101:F05

-X3

32

12

7 +02GH101:F02

+02GH101:G04

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:-112

TYPICAL DIAGRAM
IFDG
DWG:-AS-D-GE-EO-3401
SHEET NO:-192

TYPICAL DIAGRAM
TF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-211

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-G04
INCOMER D/G CB GS103
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F02
BUS TIE CB GS303
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

RACK-01 SLOT 5 MDL753


LOGICAL OUTPUTS

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M506
Sheet
M505

FA005.26

FA005.27

FA005.28

FA005.29

FA005.30

FA005.31

IC693MDL753
+00GH002

-K46

-K46

D3

/J006.E8

-CD B11

+00GH003

-K96

-K46

D4

/J006.E8

-K46

D5

/J006.E8

-CD A11

-K46

D6

/J006.E8

-CD B10

-K46

D7

/J006.E8

-CD A10

D8

/J006.E8

-CD B9

-CD A9

35

17

J1
33

/M504.B1

15

34

16

INTERFACE MODULE
16DO

C- E 02

S5

S6

2C-

S7

FU8

1A

2C-

S8

FU9

1A

2C-

S9

NO

1A

NC

FU7

NO

2C-

R10
NC

1A

NO

FU6

R9
NC

2C-

NO

1A

R8
NC

FU5

NO

NC

2C-

R7
NC

R6
NO

R5

FU10

1A

S10

C
D11

D12

D13

D14

D15

D16

D
C11

C12

C13

C14

C15

C16

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

RACK-01 SLOT 5 MDL753


LOGICAL OUTPUTS

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M507
Sheet
M506

FA006.00

/J007.C2

-K47
+00GH002

/J007.C2

-K47

IC693MDL753-AB B6 A6 B5 A5

+00GH003

-K99

BCOM
BVIN
BVIN
NC

NC
AVIN
AVIN
ACOM

IC693MDL753

FA006.01

400V.MAIN
BOARD-FDR CB-GS111
OPENING

+00GH002

A1

/J007.B2

-AB B8 A8 B7 A7

FA006.02

-K47
/J007.B2

400V.MAIN
BOARD-FDR CB-GS112
OPENING

20BFA00_GS111_YB106

-K47

A2

FA006.03

400V.MAIN
BOARD-FDR CB-GS111
CLOSING

20BFA00_GS111_YB108

-K47

-K47

A3

/J007.B2

20BFA00_GS112_YB108

A4

/J007.B2

-AB A1

-AB B1

-AB A2

-AB B2

28

10

29

11

J1
20

23

INTERFACE MODULE
16DO

/M508.B1
/M509.B1

C- E 05

R13
S17

R14

R15

R16

S18

S13
FU17

FU18

500mA

1A

2C-

S14

FU15

1A

NO

FU14

NC

2C-

NO

1A

NC

FU13

NO

2CR17

NC

NO

2CNC

2C-

2C-

S15

FU16

1A

S16

500mA

C
B1

B2

B11 B12

B5

B7

D1

D2

D3

D4

D
A1

A2

A11 A12

A5

A7

C1

C2

C3

C4

D
4140

4139

5075

4079

Date
First Issue

revision

30/04/2010

/M510.E3

/M504.E3

/M004.E3

/M004.D3

2D-

2D+

-X3 12

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-X3 12

7 +00GH101:D02

2 +00GH101:E02

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-D02
20BFA00GS111
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-E02
20BFA00GS112
DWG:-AS-D-GE-EO-3402
SHEET NO:-102

=20CBA

RACK-0 SLOT 6 MDL753


LOGICAL OUTPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

path

323 sheets
next sheet
M508
Sheet
M507

FA006.04

A
IC693MDL753
+00GH002

-K47

FA006.05

+00GH003

-K99

%Q0038

-K47
/J007.B2

A7

/J007.C2

FA006.08

-K47
/J007.C2

-AB A3

-AB B3

-AB A4

-AB B4

30

12

31

13

400V.MAIN
BOARD-FDR CB-GS114
OPENING

20BFA00_GS113_YB106

-K47

A8

FA006.09

400V.MAIN
BOARD-FDR CB-GS113
CLOSING

20BFA00_GS113_YB108

-K47

A6

FA006.07

400V.MAIN
BOARD-FDR CB-GS113
OPENING

20BFA00_GS112_YB106

A5

FA006.06

400V.MAIN
BOARD-FDR CB-GS112
CLOSING

/J007.B2

-K47

B1

/J007.C2

20BFA00_GS114_YB108

B2

/J007.C2

-AB B12

-AB A12

J1

/M507.B1

32

INTERFACE MODULE
16DO

14

C- E 05

S11

S12

2C-

S13

FU14

1A

2C-

S14

FU15

1A

NO

1A

NC

FU13

NO

2C-

R16
NC

1A

NO

FU12

R15
NC

2C-

NO

1A

R14
NC

FU11

NO

NC

2C-

R13
NC

R12
NO

R11

2C-

S15

FU16

1A

S16

C
D5

D6

D7

D8

D9

D10

D
C5

C6

C7

C8

C9

C10

-X3

-X3 12

7 +00GH101:E02

-X3 12

7 +00GH101:C02

2 +00GH101:D04

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-E02
20BFA00GS112
DWG:-AS-D-GE-EO-3402
SHEET NO:-102

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-C02
20BFA00GS113
DWG:-AS-D-GE-EO-3402
SHEET NO:-100

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-D04
20BFA00GS114
DWG:-AS-D-GE-EO-3402
SHEET NO:-101

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

RACK-0 SLOT 6 MDL753


LOGICAL OUTPUTS

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M509
Sheet
M508

FA006.10

A
IC693MDL753
+00GH002

-K47

FA006.11

%Q0044

-K47
/J007.C2

-AB B11

+00GH003

-K99

-K47

B4

FA006.13

400V.MAIN
BOARD-FDR CB-GS115
OPENING

20BFA00_GS114_YB106

B3

FA006.12

400V.MAIN
BOARD-FDR CB-GS114
CLOSING

/J007.C2

/J007.C2

-AB A11

FA006.14

-K47

20BFA00_GS115_YB106

/J007.C2

-AB B10

400V.MAIN
BOARD-FDR CB-GS116
OPENING

-K47

B6

FA006.15

400V.MAIN
BOARD-FDR CB-GS115
CLOSING

20BFA00_GS115_YB108

B5

-K47

B7

/J007.C2

-AB A10

20BFA00_GS116_YB108

B8

/J007.C2

-AB B9

-AB A9

35

17

J1
33

/M507.B1

15

34

16

INTERFACE MODULE
16DO

C- E 05

S5

S6

2C-

S7

FU8

1A

2C-

S8

FU9

1A

NO

1A

NC

FU7

NO

2C-

R10
NC

1A

NO

FU6

R9
NC

2C-

NO

1A

R8
NC

FU5

NO

NC

2C-

R7
NC

R6
NO

R5

2C-

S9

FU10

1A

S10

C
D11

D12

D13

D14

D15

D16

D
C11

C12

C13

C14

C15

C16

-X3

-X3 12

7 +00GH101:D04

-X3 24

7 +00GH101:E04

14 +00GH101:C04

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

TYPICAL DIAGRAM
OFP4M+N/2
DWG:-AS-D-GE-EO-3401
SHEET NO:-531

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-D04
20BFA00GS114
DWG:-AS-D-GE-EO-3402
SHEET NO:-101

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-E04
20BFA00GS115
DWG:-AS-D-GE-EO-3402
SHEET NO:-102

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-C04
20BFA00GS116
DWG:-AS-D-GE-EO-3402
SHEET NO:-100

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

RACK-0 SLOT 6 MDL753


LOGICAL OUTPUTS

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M510
Sheet
M509

FA006.16

/J007.D2

-K47
+00GH002

/J007.E2

-K47

IC693MDL753-CD B6 A6 B5 A5

+00GH003

-K98

FA006.17

%Q0050

C1

/J007.D2

-CD B8 A8 B7 A7

-K47

-K47

C2

/J007.D2

FA006.19

400V.MAIN
BOARD-FDR CB-GS117
OPENING

20BFA00_GS116_YB106

-K47

FA006.18

400V.MAIN
BOARD-FDR CB-GS116
CLOSING

DCOM
DVIN
DVIN
NC

NC
CVIN
CVIN
CCOM

20BFA00_GS117_YB108

C3

/J007.D2

400V.MAIN
BOARD-FDR CB-GS117
CLOSING

-K47

20BFA00_GS117_YB106

C4

/J007.D2

-CD A1

-CD B1

-CD A2

-CD B2

28

10

29

11

J1
20

23

INTERFACE MODULE
16DO

/M511.B1
/M512.B1

C- E 04

R13
S17

R14

R15

R16

S18

S13
FU17

FU18

500mA

1A

2C-

S14

FU15

1A

NO

FU14

NC

2C-

NO

1A

NC

FU13

NO

2CR17

NC

NO

2CNC

2C-

2C-

S15

FU16

1A

S16

500mA

C
B1

B2

B11 B12

B5

B7

D1

D2

D3

D4

D
A1

A2

A11 A12

A5

A7

C1

C2

C3

C4

D
4141

4140

5076

4080

Date

2
First Issue

revision

30/04/2010

/M513.E3

/M507.E3

/M004.E3

/M004.D3

-X3 12

19 +00GH101:C04

Customer

GOVERNMENT OF UGANDA
BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

7 +00GH101:F04

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-F04
20BFA00GS117
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

=20CBA

RACK-0 SLOT 6 MDL753


LOGICAL OUTPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

Project name

Repl. f.

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-C04
20BFA00GS116
DWG:-AS-D-GE-EO-3402
SHEET NO:-100

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

20

TYPICAL DIAGRAM
OFP4M+N/2
DWG:-AS-D-GE-EO-3401
SHEET NO:-531

2D-

2D+

-X3

path

323 sheets
next sheet
M511
Sheet
M510

FA006.20

%Q0053

FA006.21

+00GH002

-K47
/J007.D2

+00GH003

-K98

-K47

C5

FA006.22

400V.MAIN
BOARD-FDR CB-GS118
OPENING

IC693MDL753

/J007.D2

FA006.23

-K47

C7

/J007.D2

-K47

C8

/J007.D2

-CD A3

-CD B3

-CD A4

-CD B4

30

12

31

13

FA006.25

400V.MAIN
BOARD-FDR CB-GS119
OPENING

20BFA00_GS118_YB106

-K47

FA006.24

400V.MAIN
BOARD-FDR CB-GS118
CLOSING

20BFA00_GS118_YB108

C6

20BFA00_GS119_YB108

D1

/J007.D2

400V.MAIN
BOARD-FDR CB-GS119
CLOSING

-K47

20BFA00_GS119_YB106

D2

/J007.D2

-CD B12

-CD A12

J1

/M510.B1

32

INTERFACE MODULE
16DO

14

C- E 04

S11

S12

2C-

S13

FU14

1A

2C-

S14

FU15

1A

NO

1A

NC

FU13

NO

2C-

R16
NC

1A

NO

FU12

R15
NC

2C-

NO

1A

R14
NC

FU11

NC

NC

2C-

R13
NO

R12
NO

R11

2C-

S15

FU16

1A

S16

C
D5

D6

D7

D8

D9

D10

D
C5

C6

C7

C8

C9

C10

-X3 12

-X3 12

7 +00GH101:L02

7 +00GH101:H02

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-L02
20BFA00GS118
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-H02
20BFA00GS119
DWG:-AS-D-GE-EO-3402
SHEET NO:-105

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

RACK-0 SLOT 6 MDL753


LOGICAL OUTPUTS

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M512
Sheet
M511

FA006.26

%Q0059

FA006.27

+00GH002

-K47

-K47

D3

/J007.E2

D4

/J007.E2

-K98

FA006.29

%Q0062

FA006.30

FA006.31

400V.MAIN
BOARD-FDR CB-GS120
CLOSING

20BFA00_GS120_YB108

-CD B11

+00GH003

FA006.28

400V.MAIN
BOARD-FDR CB-GS120
OPENING

IC693MDL753

-K47

20BFA00_GS120_YB106

-K47

D5

/J007.E2

-CD A11

-K47

D6

/J007.E2

-CD B10

-K47

D7

/J007.E2

-CD A10

D8

/J007.E2

-CD B9

-CD A9

35

17

J1
33

/M510.B1

15

34

16

INTERFACE MODULE
16DO

C- E 04

S5

S6

2C-

S7

FU8

1A

2C-

S8

FU9

1A

2C-

S9

NO

1A

NC

FU7

NO

2C-

R10
NC

1A

NO

FU6

R9
NC

2C-

NO

1A

R8
NC

FU5

NC

NC

2C-

R7
NO

R6
NO

R5

FU10

1A

S10

C
D11

D12

D13

D14

D15

D16

D
C11

C12

C13

C14

C15

C16

-X3 12

7 +00GH101:M02

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511
E

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-M02
20BFA00GS120
DWG:-AS-D-GE-EO-3402
SHEET NO:-107

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

RACK-0 SLOT 6 MDL753


LOGICAL OUTPUTS

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M513
Sheet
M512

FA007.00

/J007.C3

-K48
+00GH002

/J007.C3

-K48

IC693MDL753-AB B6 A6 B5 A5

+00GH003

-K101

BCOM
BVIN
BVIN
NC

NC
AVIN
AVIN
ACOM

IC693MDL753

FA007.01

400V.MAIN
BOARD-FDR CB-GS121
OPENING

+00GH002

A1

/J007.B3

-AB B8 A8 B7 A7

FA007.02

-K48
/J007.B3

400V.MAIN
BOARD-FDR CB-GS122
OPENING

20BFA00_GS121_YB106

-K48

A2

FA007.03

400V.MAIN
BOARD-FDR CB-GS121
CLOSING

20BFA00_GS121_YB108

-K48

-K48

A3

/J007.B3

20BFA00_GS122_YB108

A4

/J007.B3

-AB A1

-AB B1

-AB A2

-AB B2

28

10

29

11

J1
20

23

INTERFACE MODULE
16DO

/M514.B1
/M515.B1

C- E 07

R13
S17

R14

R15

R16

S18

S13
FU17

FU18

500mA

1A

2C-

S14

FU15

1A

NO

FU14

NC

2C-

NO

1A

NC

FU13

NO

2CR17

NC

NO

2CNC

2C-

2C-

S15

FU16

1A

S16

500mA

C
B1

B2

B11 B12

B5

B7

D1

D2

D3

D4

D
A1

A2

A11 A12

A5

A7

C1

C2

C3

C4

D
4142

4141

5078

4084

Date

2
First Issue

revision

30/04/2010

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-X3 12

7 +00GH101:L04

2 +00GH101:H04

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-L04
20BFA00GS121
DWG:-AS-D-GE-EO-3402
SHEET NO:-106

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-H04
20BFA00GS122
DWG:-AS-D-GE-EO-3402
SHEET NO:-105

=20CBA

RACK-0 SLOT 7 MDL753


LOGICAL OUTPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

/M516.E3

/M510.E3

/M004.E5

/M004.D5

2D-

2D+

-X3 12

path

323 sheets
next sheet
M514
Sheet
M513

FA007.04

A
IC693MDL753
+00GH002

-K48

FA007.05

+00GH003

-K101

%Q0070

-K48
/J007.B3

A7

/J007.C3

-K48

FA007.08

400V.MAIN
BOARD-FDR CB-GS123
CLOSING

20BFA00_GS123_YB108

-K48

A6

FA007.07

400V.MAIN
BOARD-FDR CB-GS123
OPENING

20BFA00_GS122_YB106

A5

FA007.06

400V.MAIN
BOARD-FDR CB-GS122
CLOSING

/J007.B3

A8

/J007.C3

-AB A3

-AB B3

-AB A4

-AB B4

30

12

31

13

FA007.09

400V.ESSEN
BOARD-FDR CB-GS129
OPENING

20BFA00_GS123_YB106

-K48

20BFA02_GS129_YB108

B1

/J007.C3

400V.ESSEN
BOARD-FDR CB-GS129
CLOSING

-K48

20BFA02_GS129_YB106

B2

/J007.C3

-AB B12

-AB A12

J1

/M513.B1

32

INTERFACE MODULE
16DO

14

C- E 07

S11

S12

2C-

S13

FU14

1A

2C-

S14

FU15

1A

NO

1A

NC

FU13

NO

2C-

R16
NC

1A

NO

FU12

R15
NC

2C-

NO

1A

R14
NC

FU11

NO

NC

2C-

R13
NC

R12
NO

R11

2C-

S15

FU16

1A

S16

C
D5

D6

D7

D8

D9

D10

D
C5

C6

C7

C8

C9

C10

-X3

-X3 24

7 +00GH101:H04

14

20

-X3

19 +00GH101:M04

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

TYPICAL DIAGRAM
OFP4M+N/2
DWG:-AS-D-GE-EO-3401
SHEET NO:-531

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-H04
20BFA00GS122
DWG:-AS-D-GE-EO-3402
SHEET NO:-105

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-M04
20BFA00GS123
DWG:-AS-D-GE-EO-3402
SHEET NO:-107

-X3

2 +02GH101:M05

TYPICAL DIAGRAM
OFP1M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-561

3 +02GH101:M05

TYPICAL DIAGRAM
OFP1M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-561

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-M04/M05
GS129
DWG:-AS-D-GE-EO-3404
SHEET NO:-108

=20CBA

RACK-0 SLOT 7 MDL753


LOGICAL OUTPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-M04/M05
GS129
DWG:-AS-D-GE-EO-3404
SHEET NO:-108

path

323 sheets
next sheet
M515
Sheet
M514

FA007.10
AUX: DC EMERGENCY
STOP
IC693MDL753
SELECTED

+00GH002

-K48

FA007.11
%Q0076
AUX: DIESEL GENERATOR
TEST MODE
SELECTED

20BRV00_DGE_YB081

20BRV00_DGT_YB081

-K48

B3

/J007.C3

B4

/J007.C3

-AB B11

+00GH003

-K101

FA007.12

FA007.13
AUX.DIESEL
GENERATOR
STARTING

/J007.C3

-AB A11

20BRV00_DG_YB199

-K48

B5
-AB B10

-K48

B7

/J007.C3

-AB A10

FA007.15
COM.COOL.WTR:
VALVE- AA251
OPENING

20SLA00_GH101_YB081

-K48

B6

/J007.C3

FA007.14
P/H EMERGENCY
LIGHTING
SELECTED

AUX.DIESEL
GENERATOR EMER
STOPING

20BRV00_DG_YB197

-K48

20PAC00_AA251_YB108

B8

/J007.C3

-AB B9

-AB A9

35

17

J1
33

/M513.B1

15

34

16

INTERFACE MODULE
16DO

C- E 07

S5

S6

2C-

S7

FU8

1A

2C-

S8

FU9

1A

2C-

NO

1A

NC

FU7

NO

2C-

R10
NC

1A

NO

FU6

R9
NC

2C-

NO

1A

R8
NC

FU5

NC

NC

2C-

R7
NO

R6
NO

R5

S9

FU10

1A

S10

C
D11

D12

D13

D14

D15

D16

D
C11

C12

C13

C14

C15

C16

-X4

-X7

16

-X8

SHEET NO:-30

SHEET NO:-29

SHEET NO:-23

-X3

SHEET NO:-Q131

Date

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-X3 35

ESS. AUXI.LV SWITCHBOARD


COMMON COOLING WATER
20BFA02GH101
COLUMN NO:-N03
VALVE PAC00AA251
DWG NO:-AS-D-GE-EO-3404
SHEET NO:-109

=20CBA

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

16_I/O Modules DO

33

TYPICAL DIAGRAM
OFMV/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-491

SHEET NO:-233

RACK-0 SLOT 7 MDL753


LOGICAL OUTPUTS

Repl. by

POWER HOUSE
LIGHTING SWITCHBOARD
20SLA00GH101
COLUMN NO:-B01
DWG:-AS-D-GE-EO-3415

POWER HOUSE
1500KVA DIESEL GENERATOR
20BRV00GH101
DWG:-AS-D-RH-EO-3710

First Issue

15

path

323 sheets
next sheet
M516
Sheet
M515

FA007.16
COM.COOL.WTR:
VALVE- AA251
IC693MDL753
CLOSING

-K48
+00GH002

/J007.E3

-K48
+00GH002

IC693MDL753-CD B6 A6 B5 A5

+00GH003

-K100

DCOM
DVIN
DVIN
NC

NC
CVIN
CVIN
CCOM

/J007.D3

+00GH002

FA007.17
COM.COOL.WTR:
VALVE- AA261
OPENING

20PAC00_AA251_YB106

-K48

C1

/J007.D3

IC693MDL753-CD B8 A8 B7 A7

-K48

FA007.18
COM.COOL.WTR:
VALVE- AA261
CLOSING

20PAC00_AA261_YB108

C2

/J007.D3

-K48

FA007.19

20PAC00_AA261_YB106

C3

/J007.D3

%Q0084

-K48

C4

/J007.D3

-CD A1

-CD B1

-CD A2

-CD B2

28

10

29

11

J1
20

23

INTERFACE MODULE
16DO

/M517.B1
/M518.B1

C- E 06

R13
S17

R14

R15

R16

S18

S13
FU17

FU18

500mA

1A

2C-

S14

FU15

1A

2C-

NO

FU14

NC

2C-

NO

1A

NC

FU13

NO

2CR17

NC

NO

2CNC

2C-

S15

FU16

1A

S16

500mA

C
B1

B2

B11 B12

B5

B7

D1

D2

D3

D4

D
A1

A2

A11 A12

A5

A7

C1

C2

C3

C4

D
4143

4142

5079

4085

Date

2
First Issue

revision

30/04/2010

/M209.A4

/M513.E3

/M004.E5

/M004.D5

2D-

2D+

-X3

33

38

37

ESS. AUXI.LV SWITCHBOARD


COMMON COOLING WATER
20BFA02GH101
COLUMN NO:-N03
VALVE PAC00AA251
DWG NO:-AS-D-GE-EO-3404
SHEET NO:-109

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-N04
COMMON COOLING WATER VALVE PAC00AA261
DWG NO:-AS-D-GE-EO-3404
SHEET NO:-109

Customer

GOVERNMENT OF UGANDA
BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

=20CBA

RACK-0 SLOT 7 MDL753


LOGICAL OUTPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

-X3 35

TYPICAL DIAGRAM
OFMV/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-491

Project name

Repl. f.

37

TYPICAL DIAGRAM
OFMV/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-491

Established P. BHATT

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

38

path

323 sheets
next sheet
M517
Sheet
M516

FA007.20

FA007.21

%Q0086

FA007.22

%Q0087

FA007.23

FA007.24

%Q0089

FA007.25

%Q0090

IC693MDL753
+00GH002

-K48

+00GH003

-K100

-K48

C5

/J007.D3

-K48

C6

/J007.D3

-K48

C7

/J007.D3

-K48

C8

/J007.D3

-CD A3

-CD B3

-CD A4

-CD B4

30

12

31

13

-K48

D1

/J007.D3

D2

/J007.D3

-CD B12

-CD A12

J1

/M516.B1

32

INTERFACE MODULE
16DO

14

C- E 06

S11

S12

2C-

S13

FU14

1A

2C-

S14

FU15

1A

2C-

S15

NO

1A

NC

FU13

NO

2C-

R16
NC

1A

NO

FU12

R15
NC

2C-

NO

1A

R14
NC

FU11

NO

NC

2C-

R13
NC

R12
NO

R11

FU16

1A

S16

C
D5

D6

D7

D8

D9

D10

D
C5

C6

C7

C8

C9

C10

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

RACK-0 SLOT 7 MDL753


LOGICAL OUTPUTS

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M518
Sheet
M517

FA007.26

FA007.27

FA007.28

FA007.29

FA007.30

FA007.31

IC693MDL753
+00GH002

-K48

-K48

D3

/J007.E3

-CD B11

+00GH003

-K100

-K48

D4

/J007.E3

-K48

D5

/J007.E3

-CD A11

-K48

D6

/J007.E3

-CD B10

-K48

D7

/J007.E3

-CD A10

D8

/J007.E3

-CD B9

-CD A9

35

17

J1
33

/M516.B1

15

34

16

INTERFACE MODULE
16DO

C- E 06

S5

S6

2C-

S7

FU8

1A

2C-

S8

FU9

1A

2C-

S9

NO

1A

NC

FU7

NO

2C-

R10
NC

1A

NO

FU6

R9
NC

2C-

NO

1A

R8
NC

FU5

NO

NC

2C-

R7
NC

R6
NO

R5

FU10

1A

S10

C
D11

D12

D13

D14

D15

D16

D
C11

C12

C13

C14

C15

C16

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

RACK-0 SLOT 7 MDL753


LOGICAL OUTPUTS

AS-D-PH-EO-4001

16_I/O Modules DO

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M601
Sheet
M518

/M603.A3

/M004.D3

48V DC DISTRIBUTION SYSTEM


BATTERY CHARGER-1
20BUC01GH501
DWG:-AS-D-GE-EO-3963

2D+

2A-

2A+

/M004.E7

/M004.D7

SHEET NO:-11

-P13

-P13

+
B

4144

4082

5083

4096

-P13

48V DC DISTRIBUTION SYSTEM


BATTERY CHARGER-2
20BUC02GH502
DWG:-AS-D-GE-EO-3963

SHEET NO:-5

-X942

-X942

1
+02GH502

5146

+01GH501

C
+00GH003

-K103

C
A7

A8

A1

A2

A3

A4

A6

C1

C2

C3

C4

C5

C6

C7

C8

C9

C10

C11 C12

/M602.C1

INTERFACE MODULE
8EA

C- E 09

B
B7

B8

B1
FU2
FU1

B2

B3

B4

B6

500mA

3C+

3C+

3C+

500mA

3C+

S1

RE1

S3

S2

R1

3C-

R2

input 0-5mA
= RLP1 500 ohms (1207125)
input 0-10mA
= RLP1 1000 ohms (1207127)

3C-

3C-

20

19

18

17

13

input 0-20mA
= RLP1 2000 ohms (1207128)

15

3C14

for current inputs

R3

J1
+24VIN
COM

/M603.E1

GND

/M603.E1

IC693ALG223

20

+00GH002

GND

19
COM

-K49

IC693ALG223

1 2
+24V IN
24V OUT

+00GH002

/M603.E1

-K49
/J007.B5

FA008.00

3
CH1
P/H 48V CHARGER 1
CURRENT
A

20BUC01_GH501_XQ002

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K49
/J007.B5

4
CH2
P/H 48V BATTERY 1
CURRENT
A

20BUC01_GR001_XQ003

FA008.02

-K49
/J007.B5

5
CH3
P/H 48V CHARGER 2
CURRENT
A

20BUC02_GH502_XQ002

=20CBA

RACK-0 SLOT 8 ALG223


ANALOG INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

17_I/O modules AI

Repl. by

FA008.01

path

323 sheets
next sheet
M602
Sheet
M601

48V DC DISTRIBUTION SYSTEM


BATTERY CHARGER-2
20BUC02GH502
DWG:-AS-D-GE-EO-3963

48V DC DISTRIBUTION SYSTEM


DISTRIBUTION CUBICLE
20BUC00GH101
DWG:-AS-D-GE-EO-3963

SHEET NO:-11

SHEET NO:-15

-P13

-P11

-P11

-X942

-X942

+02GH502

+00GH101

C
+00GH003

-K103

A
A9

A10

A11 A12

C13 C14

INTERFACE MODULE
8EA

C15 C16

/M601.C1

C- E 09

D
B9

B10

B11 B12

D1
3C+

D2

D3

D4

3C+

S4

3C-

D6

D7

D8

D9

3C+

S5

R4

D5

3C-

D11 D12

3C+

S6

R5

D10

3C-

D15 D16

3C+

S8

S7

R6

D13 D14

R7

input 0-5mA
= RLP1 500 ohms (1207125)
input 0-10mA
= RLP1 1000 ohms (1207127)

3C-

3C-

for current inputs

R8

25

12

24

11

23

10

22

21

input 0-20mA
= RLP1 2000 ohms (1207128)
J

E
IC693ALG223

FA008.03

+00GH002

-K49
/J007.B5

6
CH4
P/H 48V BATTERY 2
CURRENT
A

FA008.04

-K49
/J007.B5

20BUC02_GR001_XQ003

7
CH5
P/H 48V BOARD
BUSBAR1 VOLTAGE
V

20BUC00_GH101_XQ001

FA008.05

-K49
/J007.B5

8
CH6
P/H 48V BOARD
BUSBAR2 VOLTAGE
V

FA008.06

-K49

9
CH7

/J007.C5

Date
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

20BUC00_GH101_XQ002

%AI0010
=20CBA

RACK-0 SLOT 8 ALG223


ANALOG INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

17_I/O modules AI

Repl. by

-K49

10
CH8

/J007.C5

%AI0009

FA008.07

path

323 sheets
next sheet
M603
Sheet
M602

/M004.E7

110V DC
BATTERY CHARGER-1
20BUB01GH501
DWG:-AS-D-PH-EO-3904

2A-

2A+

/M605.A3

/M601.A3

/M004.D7

SHEET NO:-5

-P13

4145

4144

5084

4097

-X942

5147

+01GH501

C
+00GH003

-K102

C
A7

A8

A1

A2

A3

A4

A6

C1

C2

C3

C4

C5

C6

C7

C8

C9

C10

C11 C12

/M604.C1

INTERFACE MODULE
8EA

C- E 08

B
B7

B8

B1
FU2
FU1

B2

B3

B4

B6

500mA

3C+

3C+

3C+

500mA

3C+

S1

RE1

S3

S2

R1

3C-

R2

input 0-5mA
= RLP1 500 ohms (1207125)
input 0-10mA
= RLP1 1000 ohms (1207127)

3C-

3C-

20

19

18

17

13

input 0-20mA
= RLP1 2000 ohms (1207128)

15

14

3C-

/M601.E2
/M601.E2
/M601.E4

for current inputs

R3

J1
+24VIN
COM
GND

E
IC693ALG223
+00GH002

-K49

FA008.08

FA008.09

11
CH9

/J007.C5

-K49

12
CH10

/J007.C5

FA008.10

-K49
/J007.C5

13
CH11
P/H 110V CHARGER 1
CURRENT
A
20BUB01_GH501_XQ002

%AI0012
Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

RACK-0 SLOT 8 ALG223


ANALOG INPUTS

AS-D-PH-EO-4001

17_I/O modules AI

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M604
Sheet
M603

110V DC
BATTERY CHARGER-1
20BUB01GH501
DWG:-AS-D-PH-EO-3904

110V DC
MAIN AUXILLARY SWITCHBOARD
20BUB01GH101
Column No:-C03/D03
DWG:-AS-D-GE-EO-3950

110V DC
BATTERY CHARGER-2
20BUB02GH501
DWG:-AS-D-PH-EO-3904

SHEET NO:-220
SHEET NO:-10

SHEET NO:-5

-P13

-P13

-P13

-UV1

mA

mA

-X942

-X942

-X3

+01GH501

SHEET NO:-224

-UV1

23

22

+02GH501

-X3

24

23

22

24

+01GH101:C03

+01GH101:D03

C
+00GH003

-K102

A
A9

A10

A11 A12

C13 C14

INTERFACE MODULE
8EA

C15 C16

/M603.C1

C- E 08

D
B9

B10

B11 B12

D1
3C+

D2

D3

D4

3C+

S4

3C-

D6

D7

D8

D9

3C+

S5

R4

D5

3C-

D11 D12

3C+

S6

R5

D10

3C-

D15 D16

3C+

S8

S7

R6

D13 D14

R7

input 0-5mA
= RLP1 500 ohms (1207125)
input 0-10mA
= RLP1 1000 ohms (1207127)

3C-

3C-

for current inputs

R8

25

12

24

11

23

10

22

21

input 0-20mA
= RLP1 2000 ohms (1207128)
J

E
IC693ALG223

FA008.11

+00GH002

-K49
/J007.C5

14
CH12
P/H 110V BATTERY 1
CURRENT
A

FA008.12

-K49
/J007.C5

20BUB01_GR001_XQ001

Date

2
First Issue

revision

30/04/2010

15
CH13
P/H 110V CHARGER 2
CURRENT
A
20BUB02_GH501_XQ002

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K49
/J007.C5

16
CH14
P/H 110V BATTERY 2
CURRENT
A

FA008.14

-K49
/J007.C5

20BUB02_GR001_XQ001

17
CH15
-K49
P/H 110V MAIN
/J007.C5
BOARD BB1 VOLTAGE
V
20BUB01_GH101A_XQ001

FA008.15

18
CH16
P/H 110V MAIN
BOARD BB2 VOLTAGE
V
20BUB01_GH101B_XQ001

=20CBA

RACK-0 SLOT 8 ALG223


ANALOG INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

17_I/O modules AI

Repl. by

FA008.13

path

323 sheets
next sheet
M605
Sheet
M604

/M004.E7

SHEET NO:-220

SHEET NO:-10

-P14

mA

mA

-X3

230 VAC UPS BOARD


FOR COMPUTERISED CONTROL SYSTEM
20BRU00GH101
DWG:-AS-D-GE-EO-3605

-UV1

4146

4145

5085

4098

SHEET NO:-222

-UV1

110V DC
COMMON AUXILLARIES SWITCHBOARD
20BUB02GH101
Column No:-C01A/C05A
DWG:-AS-D-GE-EO-3951

2A-

2A+

/M607.A3

/M603.A3

/M004.D7

10

-X3

11

10

+02GH101:C05A

+00GH101

5148

+02GH101:C01A

-X44

11

C
+00GH003

-K105

C
A7

A8

A1

A2

A3

A4

A6

C1

C2

C3

C4

C5

C6

C7

C8

C9

C10

C11 C12

/M606.C1

INTERFACE MODULE
8EA

C- E11

B
B7

B8

B1
FU2
FU1

B2

B3

B4

B6

500mA

3C+

3C+

3C+

500mA

3C+

S1

RE1

S3

S2

R1

3C-

R2

input 0-5mA
= RLP1 500 ohms (1207125)
input 0-10mA
= RLP1 1000 ohms (1207127)

3C-

3C-

20

19

18

17

13

input 0-20mA
= RLP1 2000 ohms (1207128)

15

3C14

for current inputs

R3

J1
+24VIN
COM

/M607.E1

GND

/M607.E1

IC693ALG223

20

+00GH002

GND

19
COM

-K50

IC693ALG223

1 2
+24V IN
24V OUT

+00GH002

/M607.E1

-K50
/J007.B6

FA009.00

3
CH1
-K50
P/H 110V COMON
/J007.B6
BOARD BB1 VOLTAGE
V
20BUB02_GH101_XQ001

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

4
CH2
-K50
P/H 110V COMON
/J007.B6
BOARD BB2 VOLTAGE
V
20BUB02_GH101_XQ002

FA009.02

5
CH3
CTRL.UPS: LOAD
VOLTAGE
V

20BRU00_GH101_XQ001

=20CBA

RACK-0 SLOT 9 ALG223


ANALOG INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

17_I/O modules AI

Repl. by

FA009.01

path

323 sheets
next sheet
M606
Sheet
M605

230 VAC UPS BOARD


FOR COMPUTERISED CONTROL SYSTEM
20BRU00GH101
DWG:-AS-D-GE-EO-3605

230 VAC UPS BOARD


FOR COMPUTERISED CONTROL SYSTEM
20BRU01GH101
DWG:-AS-D-GE-EO-3605

SHEET NO:-8
-P14

-P14

SHEET NO:-11

-P01

230 VAC UPS BOARD


FOR COMMUNICATIONS SYSTEM
20BRU02GH101
DWG:-AS-D-GE-EO-3603

SHEET NO:-12

-P13

SHEET NO:-4

-P04

-X40

-X41

-X43A

+00GH101

+01GH101

+02GH101

C
+00GH003

-K105

A
A9

A10

A11 A12

C13 C14

INTERFACE MODULE
8EA

C15 C16

/M605.C1

C- E11

D
B9

B10

B11 B12

D1
3C+

D2

D3

D4

3C+

S4

3C-

D6

D7

D8

D9

3C+

S5

R4

D5

3C-

D11 D12

3C+

S6

R5

D10

3C-

D15 D16

3C+

S8

S7

R6

D13 D14

R7

input 0-5mA
= RLP1 500 ohms (1207125)
input 0-10mA
= RLP1 1000 ohms (1207127)

3C-

3C-

for current inputs

R8

25

12

24

11

23

10

22

21

input 0-20mA
= RLP1 2000 ohms (1207128)
J

E
IC693ALG223

FA009.03

+00GH002

-K50
/J007.B6

6
CH4
CTRL.UPS: LOAD
CURRENT
A

FA009.04

-K50
/J007.B6

20BRU00_GH101_XQ002

Date

2
First Issue

revision

30/04/2010

7
CH5
CTRL.UPS: SWITCH
BOARD VOLTAGE
V

20BRU01_GH101A_XQ001

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K50
/J007.B6

8
CH6
CTRL.UPS: SWICH
BOARD FREQUENCY
HZ

FA009.06

-K50
/J007.C6

20BRU01_GH101_XQ003

9
CH7
CTRL.UPS: SWITCH
BOARD CURRENT
A

20BRU01_GH101B_XQ001

FA009.07

-K50
/J007.C6

10
CH8
LIGHTING UPS INVT1
LOAD CURRENT
A

20BRU02_GH101_XQ002

=20CBA

RACK-0 SLOT 9 ALG223


ANALOG INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

17_I/O modules AI

Repl. by

FA009.05

path

323 sheets
next sheet
M607
Sheet
M606

/M004.E7

230 VAC UPS BOARD


FOR COMMUNICATIONS SYSTEM
20BRU02GH101
DWG:-AS-D-GE-EO-3603

2A-

2A+

SHEET NO:-8

4147

4146

5086

230 VAC UPS BOARD


FOR COMMUNICATIONS SYSTEM
20BRU04GH101
DWG:-AS-D-GE-EO-3603

SHEET NO:-4
4099

/M609.A3

/M605.A3

/M004.D7

-P05

-P04

-P05

-X43A

-X43B

1
+04GH101

5149

+02GH101

C
+00GH003

-K104

C
A7

A8

A1

A2

A3

A4

A6

C1

C2

C3

C4

C5

C6

C7

C8

C9

C10

C11 C12

/M608.C1

INTERFACE MODULE
8EA

C- E10

B
B7

B8

B1
FU2
FU1

B2

B3

B4

B6

500mA

3C+

3C+

3C+

500mA

3C+

S1

RE1

S3

S2

R1

3C-

R2

input 0-5mA
= RLP1 500 ohms (1207125)
input 0-10mA
= RLP1 1000 ohms (1207127)

3C-

3C-

20

+00GH002

-K50
/J007.C6

FA009.08

11
CH9
LIGHTING UPS INVT1
LOAD VOLTAGE
V

FA009.09

-K50
/J007.C6

20BRU02_GH101_XQ001

Date
First Issue

revision

J1
+24VIN
COM
GND
IC693ALG223

19

18

17

13

input 0-20mA
= RLP1 2000 ohms (1207128)

15

14

3C-

/M605.E2
/M605.E2
/M605.E4

for current inputs

R3

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

20BRU04_GH101_XQ003

FA009.10

-K50
/J007.C6

13
CH11
LIGHTING UPS INVT2
LOAD VOLTAGE
V
20BRU04_GH101_XQ004

=20CBA

RACK-0 SLOT 9 ALG223


ANALOG INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

17_I/O modules AI

Repl. by

12
CH10
LIGHTING UPS INVT2
LOAD CURRENT
A

path

323 sheets
next sheet
M608
Sheet
M607

230 VAC UPS BOARD


FOR COMMUNICATIONS SYSTEM
20BRU03GH101
DWG:-AS-D-GE-EO-3603

SHEET NO:-13

-P14

SHEET NO:-11

-P13

-P02

-X43

C
+00GH003

-K104

A
A9

A10

A11 A12

C13 C14

INTERFACE MODULE
8EA

C15 C16

/M607.C1

C- E10

D
B9

B10

B11 B12

D1
3C+

D2

D3

D4

3C+

S4

3C-

D6

D7

D8

3C+

S5

R4

D5

3C-

D10

D11 D12

3C+

S6

R5

D9

3C-

D15 D16

3C+

S8

S7

R6

D13 D14

R7

input 0-5mA
= RLP1 500 ohms (1207125)
input 0-10mA
= RLP1 1000 ohms (1207127)

3C-

3C-

for current inputs

R8

25

12

24

11

23

10

22

21

input 0-20mA
= RLP1 2000 ohms (1207128)
J

E
IC693ALG223
+00GH002

-K50
/J007.C6

FA009.11

14
CH12
-K50
LIGHTING UPS
/J007.C6
SWITCH BRD VOLTAGE
V
20BRU03_GH101_XQ001

FA009.12

15
CH13
-K50
LIGHTING UPS
/J007.C6
SWITCH BRD CURRENT
A
20BRU03_GH101_XQ002

FA009.13

16
CH14
-K50
LIGHTING UPS SWICH /J007.C6
BRD FREQ.
HZ

FA009.14

17
CH15

Date
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

20BRU03_GH101_XQ003

%AI0016
=20CBA

RACK-0 SLOT 9 ALG223


ANALOG INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

17_I/O modules AI

Repl. by

-K50

18
CH16

/J007.C6

%AI0015

FA009.15

path

323 sheets
next sheet
M609
Sheet
M608

/M607.A3

/M004.E7

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-E
BUSBAR 1
DWG:-AS-D-GE-EO-3402
SHEET NO:-102

400VAC MAIN SWITCHBOARD


20BFA00GH101
COLUMN NO:-G
BUSBAR 2
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-D01
BUSBAR MEASURE
DWG:-AS-D-GE-EO-3403
SHEET NO:-102

TYPICAL DIAGRAM
BPT1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
BPT1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
TYPE:-BPT1
DWG:-AS-D-GE-EO-3401

SHEET NO:-250

4148

4147

5087

4100

2A-

2A+

/M611.A3

/M004.D7

SHEET NO:-250

-UV1

14(-)

-X3

SHEET NO:-250

-UV1

13(+)

14(-)

-X3

-UV1

13(+)

+00GH101:G

+01GH101:D01

5150

+00GH101:E

-X3

13(+)

14(-)

C
+00GH003

-K107

C
A7

A8

A1

A2

A3

A4

A6

C1

C2

C3

C4

C5

C6

C7

C8

C9

C10

C11 C12

/M610.C1

INTERFACE MODULE
8EA

C- E13

B
B7

B8

B1
FU2
FU1

B2

B3

B4

B6

500mA

3C+

3C+

3C+

500mA

3C+

S1

RE1

S3

S2

R1

3C-

R2

input 0-5mA
= RLP1 500 ohms (1207125)
input 0-10mA
= RLP1 1000 ohms (1207127)

3C-

3C-

20

19

18

17

13

input 0-20mA
= RLP1 2000 ohms (1207128)

15

3C14

for current inputs

R3

J1
+24VIN
COM

/M611.E1

GND

/M611.E1

IC693ALG223

20

+00GH002

GND

19
COM

-K51

IC693ALG223

1 2
+24V IN
24V OUT

+00GH002

/M611.E1

-K51
/J007.B8

FA010.00

3
CH1
400V.MAIN BOARD
BB1 VOLTAGE
V

20BFA00_GH101_XQ001

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K51
/J007.B8

4
CH2
400V.MAIN BOARD
BB2 VOLTAGE
V

20BFA00_GH101_XQ002

FA010.02

-K51
/J007.B8

5
CH3
400V.COMON BOARD
BB1 VOLTAGE
V
20BFA01_GH101_XQ001

=20CBA

RACK-0 SLOT 10 ALG223


ANALOG INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

17_I/O modules AI

Repl. by

FA010.01

path

323 sheets
next sheet
M610
Sheet
M609

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-D01
BUSBAR MEASURE
DWG:-AS-D-GE-EO-3413
SHEET NO:-103

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-D01
BUSBAR MEASURE
DWG:-AS-D-GE-EO-3414
SHEET NO:-103

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E01/G01
BUSBAR 1/2
DWG:-AS-D-GE-EO-3404
SHEET NO:-103

TYPICAL DIAGRAM
BPT1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
BPT1
DWG:-AS-D-GE-EO-3401

TYPICAL DIAGRAM
BPT1
DWG:-AS-D-GE-EO-3401
SHEET NO:-250

SHEET NO:-250

SHEET NO:-250

-UV1

13(+)

14(-)

-X3

-UV1

13(+)

14(-)

-X3

-UV1

+01GH101:D01

14(-)

-X3 3

POWER HOUSE
LIGHTING SWITCHBOARD
20SLA00GH101
COLUMN NO:-F01
DWG:-AS-D-GE-EO-3415

-UV1
13(+)

+02GH101:D01

-X3

-UV1
13(+)

14(-)

+02GH101:E01

14(-)

13(+)

47

46

-X3

45

+02GH101:G01

+00GH101:F01

C
+00GH003

-K107

A
A9

A10

A11 A12

C13 C14

INTERFACE MODULE
8EA

C15 C16

/M609.C1

C- E13

D
B9

B10

B11 B12

D1
3C+

D2

D3

D4

3C+

S4

3C-

D6

D7

D8

D9

3C+

S5

R4

D5

3C-

D11 D12

3C+

S6

R5

D10

3C-

D15 D16

3C+

S8

S7

R6

D13 D14

R7

input 0-5mA
= RLP1 500 ohms (1207125)
input 0-10mA
= RLP1 1000 ohms (1207127)

3C-

3C-

for current inputs

R8

25

12

24

11

23

10

22

21

input 0-20mA
= RLP1 2000 ohms (1207128)
J

E
IC693ALG223

FA010.03

+00GH002

-K51
/J007.B8

6
CH4
400V.HVAC BOARD
BB VOLTAGE
V

FA010.04

-K51
/J007.B8

20SAA01_GH101_XQ001

Date

2
First Issue

revision

30/04/2010

7
CH5
400V.CHILLER
BRD-BB VOLTAGE
V

20SAA02_GH101_XQ001

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K51
/J007.B8

8
CH6
400V.ESSEN. BRDBB1 VOLTAGE
V

FA010.06

-K51
/J007.C8

20BFA02_GH101A_XQ001

9
CH7
400V.ESSEN. BRDBB2 VOLTAGE
V

20BFA02_GH101B_XQ001

FA010.07

-K51
/J007.C8

10
CH8
240V.AUX:P/H LIGHT
.BRD-BB VOLTAG
V
20SLA00_GH101_XQ001

=20CBA

RACK-0 SLOT 10 ALG223


ANALOG INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

17_I/O modules AI

Repl. by

FA010.05

path

323 sheets
next sheet
M611
Sheet
M610

4149

5151

4148

2A5088

/M004.E7

2A+
4101

/M209.A6

/M609.A3

/M004.D7

C
+00GH003

-K106

C
A7

A8

A1

A2

A3

A4

A6

C1

C2

C3

C4

C5

C6

C7

C8

C9

C10

C11 C12

/M612.C1

INTERFACE MODULE
8EA

C- E12

B
B7

B8

B1
FU2
FU1

B2

B3

B4

B6

500mA

3C+

3C+

3C+

500mA

3C+

S1

RE1

S3

S2

R1

3C-

R2

input 0-5mA
= RLP1 500 ohms (1207125)
input 0-10mA
= RLP1 1000 ohms (1207127)

3C-

3C-

20

19

18

17

13

input 0-20mA
= RLP1 2000 ohms (1207128)

15

14

3C-

/M609.E3
/M609.E3
/M609.E4

for current inputs

R3

J1
+24VIN
COM
GND

E
IC693ALG223
+00GH002

-K51

FA010.08

FA010.09

11
CH9

/J007.C8

-K51

12
CH10

/J007.C8

FA010.10

-K51

13
CH11

/J007.C8

%AI0011
Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

RACK-0 SLOT 10 ALG223


ANALOG INPUTS

AS-D-PH-EO-4001

17_I/O modules AI

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M612
Sheet
M611

400V SST-1
20BFT01GH202
TEMPERATURE CONTROLLER
DWG:-AS-D-GE-WD-3502

400V SST-2
20BFT02GH202
TEMPERATURE CONTROLLER
DWG:-AS-D-GE-WD-3502

SHEET NO:-1

400V TRANSFORMER-1
20BFT03GH202
TEMPERATURE CONTROLLER
DWG:-AS-D-GE-WD-3502

SHEET NO:-1

400V TRANSFORMER-2
20BFT04GH202
TEMPERATURE CONTROLLER
DWG:-AS-D-GE-WD-3502

SHEET NO:-1

SHEET NO:-1

B
COM

A1(+)

25

COM

26

A1(+)

25

COM

26

A1(+)

25

COM

26

A1(+)

25

26

C
+00GH003

-K106

A
A9

A10

A11 A12

C13 C14

INTERFACE MODULE
8EA

C15 C16

/M611.C1

C- E12

D
B9

B10

B11 B12

D1
3C+

D2

D3

D4

3C+

S4

3C-

D6

D7

D8

D9

3C+

S5

R4

D5

3C-

D11 D12

3C+

S6

R5

D10

3C-

D15 D16

3C+

S8

S7

R6

D13 D14

R7

input 0-5mA
= RLP1 500 ohms (1207125)
input 0-10mA
= RLP1 1000 ohms (1207127)

3C-

3C-

for current inputs

R8

25

12

24

11

23

10

22

21

input 0-20mA
= RLP1 2000 ohms (1207128)
J

E
IC693ALG223

FA010.11

+00GH002

-K51

14
CH12

/J007.C8

FA010.12

-K51
/J007.C8

15
CH13
400V. SST-1 TRF
TEMP
C

20BFT01_GT001_XQ001

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

-K51
/J007.C8

16
CH14
400V. SST-2 TRF
TEMP
C

FA010.14

-K51
/J007.C8

20BFT02_GT001_XQ001

17
CH15
400V. 4/4,16KV
TRF1 TEMP
C

20BFT03_GT001_XQ001

FA010.15

-K51
/J007.C8

18
CH16
400V. 4/4,16KV
TRF2 TEMP
C

20BFT04_GT001_XQ001

=20CBA

RACK-0 SLOT 10 ALG223


ANALOG INPUTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

17_I/O modules AI

Repl. by

FA010.13

path

323 sheets
next sheet
M701
Sheet
M612

S8000-1 NETWORK

/J002.D1

RS20 0800M2M2

/J002.D3

A
ETHERNET

E1

E6

E5

E4

B- E06

E1

E6

E5

E4

E3

E2

RS20 0800M2M2

/J002.D5

B- E04

E1

B- E02

-T5
+00GH001

ETHERNET

E6

-T4
+00GH001

ETHERNET

SITE NETWORK

E5

RS20 0800M2M2

E3

-T3
+00GH001

S8000-2 NETWORK

E2

E4

E3

E2

DUAL LINK

DUAL LINK

PCX 1

PCX 2

S8000-E
M1

Date

0
First Issue

revision

30/04/2010

S8000-E
M2

S8000-E
M1

PCX 1

SLOT 10

S8000-E
M2

S8000-E
M1

PCX 2

SLOT 6

S8000-E
M2

S8000-E
OFFICE

C10

SLOT 11

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

+00GH001
B- D02

E
SLOT 5

-K3

E1

-K13
+00GH002
B- C02

E0

-K13
+00GH002
B- C02

E2

E1

E2

E1

DL2

DL1

Repl. f.

=20CBA

S8000 ETHERNET

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M702
Sheet M701

OPTICAL RACK1

S8000 NETWORK-1

S8000 NETWORK-2

SITE NETWORK

OPTICAL RACK2

SPLICING RACK

RS20 SWITCH

RS20 SWITCH

RS20 SWITCH

SPLICING RACK

-X1
+00GH001
B- F 01

-X1
+00GH001
B- F 01

-T3

7E

6R

7R

/J001.A5

-X2
+00GH001
B- F 02

-T4
A1

/J002.C4
B- E04

/J001.B5

RS20 0800M2M2

+00GH001

6E

7E

6R

7R

B4

A2

/J001.A6

/J001.B5

-X2
+00GH001
B- F 02
B3

OPTICAL
FIBER

/J001.A6
OPTICAL
FIBER

-T5
A3

/J002.C6
B- E06

6E

7E

6R

7R

B6

A4

/J001.B6

/J001.B6

/J001.B6

RS20 0800M2M2

+00GH001

B5

6E

B4

CONTROL SYSTEM OPTICAL FIBER NETWORK DIAGRAM


DWG.No.:-AS-D-GE-EO-0001

B- E02

A2

/J001.A5

CONTROL SYSTEM OPTICAL FIBER NETWORK DIAGRAM


DWG.No.:-AS-D-GE-EO-0001

A1

/J002.C2

B3

RS20 0800M2M2

+00GH001

/J001.B6
OPTICAL
FIBER

/J001.B6

/J001.B6

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

F8000 OPTICAL NETWORK

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M703
Sheet M702

OPTICAL RACK

F8000 NETWORK-1

F8000 NETWORK-2

FIP REPEATER

FIP REPEATER

IR186

IR186

-X1
+00GH001
B- F 01

-T8
+00GH001
B- G02
/J001.A5

IR186-1 24VDC

T1

T2

B2

OPTICAL
FIBER

/J001.A5

R1

R2
F8000 : /M707.E2

-X2
+00GH001
B- F 02

-T9

B7

+00GH001
B- G04
/J001.B6

IR186-1 24VDC

T1

T2
OPTICAL
FIBER

B8

B1

CONTROL SYSTEM OPTICAL FIBER NETWORK DIA


DWG.No.:-AS-D-GE-EO-0001

/J001.B6

R1

R2
F8000 : /M707.E4

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

F8000 OPTICAL NETWORK


TO DRAINAGE PIT-1 LCC

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M704
Sheet
M703

OPTICAL RACK

F8000 NETWORK-1

F8000 NETWORK-2

FIP REPEATER

FIP REPEATER

IR186

IR186

-X1
+00GH001
B- F 01

-T10
+00GH001
B- G06

CONTROL SYSTEM OPTICAL FIBER NETWORK DIA


DWG.No.:-AS-D-GE-EO-0001

B9

T1

T2

B10

OPTICAL
FIBER

/J001.C5

R1

R2
F8000 : /M707.E6

-X2
+00GH001
B- F 02

-T11

B9

+00GH001
B- G08
/J001.C6

IR186-1 24VDC

T1

T2
OPTICAL
FIBER

B10

/J001.C5

IR186-1 24VDC

/J001.C6

R1

R2
F8000 : /M707.E7

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

F8000 OPTICAL NETWORK


TO DRAINAGE PIT-2 LCC

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M705
Sheet
M704

PCX-1

PCX-2

C8035 IHR-1 CONTROLLER

FIP CONNECTION

FIP CONNECTION

FIP MODULE

BEM 340

B
F8000-1

CR371
CH1

F8000-2

CR371

CH2

/M706.B1

/M706.C1

-K13

CH2

D
CH1

D
CH2

CH1

IC693BEM340
+00GH002

+00GH002
B- C02

SL

-K16

CH1

CH2

/M001.C3

MEDIUM 1

MEDIUM 2

MEDIUM 1

Serial Port
RS-485

MEDIUM 2

FIP - F8000

FIP - F8000

PCX 1

PCX 2

FIP BUS
Connector 1

FIP BUS
Connector 2

FIP Bus Controller

E
SLOT 4

IC693BEM340

SLOT9

02

IHR-1

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

F8000 FIP

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M706
Sheet M705

C8035 IHR-2 CONTROLLER

C8035 IHR-3 CONTROLLER

C8035 FIELD CONTROLLER

FIP LODULE

FIP LODULE

FIP MODULE

BEM 340

BEM 340

/M716.E1

F8000-1

CR371

CH1

/M705.B8

F8000-2

CR371

CH2

/M705.C8

/M707.C2

/M707.C3

IC693BEM340

IC693BEM340

+00GH002

SL

-K27

CH1

IC693BEM340

+00GH002

CH2

SL

-K38

/M001.E3

CH1

FIP BUS
Connector 1

FIP BUS
Connector 2

Serial Port
RS-485

IC693BEM340

FIP BUS
Connector 2

Serial Port
RS-485

Date
First Issue

30/04/2010

IC693BEM340

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

Repl. f.

FIP BUS
Connector 2

IC693BEM340

FIELD

=20CBA

F8000 FIP

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

FIP BUS
Connector 1

02

IHR-3

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

CH2

FIP Bus Controller

02

IHR-2

revision

FIP BUS
Connector 1

FIP Bus Controller

02

CH1

/M002.E3

FIP Bus Controller

SL

-K43

/M002.C3

Serial Port
RS-485

+00GH002

CH2

path

323 sheets
next sheet
M707
Sheet M706

FIP REPEATER

FIP REPEATER

FIP REPEATER

FIP REPEATER

F8000-1

F8000-2

F8000-1

F8000-2

IR 186-1

IR 186-1

IR 186-1

IR 186-1

-X8

-X9
TAP 2

B- I 01

CO1

10

20

19

18

17

16

15

14

13

12

11

CR371

NW1

AC

TAP 2

+00GH002
B- I 02

Gr
Rd
Or
Bk

CO2

CO1

LT
NW2

NW1

CR371

+00GH002

DC

10

20

19

18

17

16

15

14

13

12

11

AC

Gr
Rd
Or
Bk

CO2

LT
NW2

DC

CR303

CR303

/M706.C8

CR303

/M706.B8

CR303

-T8

-T11

+00GH001
B- G06

CH

-T10

+00GH001
B- G04

+00GH001
B- G02

CH

-T9

CH

CH

+00GH001
B- G08

F8000 COM

F8000 COM

F8000 COM

F8000 COM

IR186-1 24VDC

IR186-1 24VDC

IR186-1 24VDC

IR186-1 24VDC

Optic fiber : /M703.D7

Optic fiber : /M703.C6

Optic fiber : /M704.C6

Optic fiber : /M704.D7

DRAINAGE PIT-1 LCC

Date

0
First Issue

revision

30/04/2010

DRAINAGE PIT-2 LCC

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

F8000 FIP

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M708
Sheet
M707

PCM301

ILPH

-T14
+00GH002

B
/M710.B2
/M710.B2
/M710.B2
/M710.B2

RS232

RS232

PORT 2

PORT 1

1 SLHD

1
2

3
4

TXD

B
J

SLHD 1
TXD 2

P2

CTRL-IN
RS232
PRODUCT

M RXD
G 0V

3 RXD

RXD

0V

0V

E- A03

TXD

ON
OFF

RS232

SW1

4 RTS

RTS

ON

5 CTS

CTS

OFF

8 DCD

DCD 8

20 DTR

DTR 20

J1+

4115

2N8+

J1-

5099

2N8-

/K025.D2
/K025.D2

24VDC
SUPPLY

SW2
RXD- E
RS422
RS485
PRODUCT

RXD+ B
TXD- D
TXD+ A
0V C
F

P1

RXDRXD+
TXDTXD+
0V
SHLD

/M709.B3
/M709.B3

/M709.A3

IC693PCM301

RS485
MODBUS

+00GH002

-K44

PCM

/M002.E4

D
25-Pin
female
IC693PCM301

03

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

MODBUS NETWORK DISPATCHER


CHANNEL-1

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M709
Sheet M708

AUX. I/C FROM

AUX. I/C FROM

COMMON AUXILIARY I/C-1

COMMON AUXILIARY I/C-2

SST-1 POWER METER

SST-2 POWER METER

POWER METER

POWER METER

A
SHLD

/M708.C7

RXD+
RXD-

/M708.C7
/M708.C7

B
P1

P2

6
8
3
2
5
1

+00GH002
E-A04

6
8
3
2
5
1

-X4
RXDRXD+
TXDTXD+
0V

P6

6
8
3
2
5
1

P5

6
8
3
2
5
1

P4

6
8
3
2
5
1

C
P3

6
8
3
2
5
1

-X3 2 3

Date

0
First Issue

1 +00GH101

400VAC
MAIN SWITCHBOARD
20BFA00GH101
COLUMN NO:-F01
INCOMING 1 GS101
DWG:-AS-D-GE-EO-3402
SHEET NO:103
TYPICAL DIAGRAM IF1
DWG:AS-D-GE-EO-3401
SHEET NO:050

revision

30/04/2010

-X3 2 3

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-X3 2 3

1 +00GH101

400VAC
MAIN SWITCHBOARD
20BFA00GH101
COLUMN NO:-G01
INCOMING 2 GS102
DWG:-AS-D-GE-EO-3402
SHEET NO:104
TYPICAL DIAGRAM IF1
DWG:AS-D-GE-EO-3401
SHEET NO:050

Repl. f.

-X3 2 3

1 +01GH101

COMMON AUXILIARIES
LV SWITCHBOARD
20BFA01GH101
COLUMN NO:-D03
INCOMING 2 CB GS302
DWG:-AS-D-GE-EO-3403
SHEET NO:102
TYPICAL DIAGRAM IF5
DWG:AS-D-GE-EO-3401
SHEET NO:130

=20CBA

MODBUS NETWORK DISPATCHER


CHANNEL-1

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

1 +01GH101

COMMON AUXILIARIES
LV SWITCHBOARD
20BFA01GH101
COLUMN NO:-C03
INCOMING 1 CB GS301
DWG:-AS-D-GE-EO-3403
SHEET NO:101
TYPICAL DIAGRAM IF5
DWG:AS-D-GE-EO-3401
SHEET NO:130

path

323 sheets
next sheet
M710
Sheet M709

ILPH

-T15
+00GH002
E- A05

/M708.B1
/M708.B1

/M708.B1
/M708.C1

1
2

P2

CTRL-IN

G 0V

3
4

RS232
PRODUCT

M RXD
TXD

ON

SW1

OFF

RS232

ON

J1+

4116

2N8+

J1-

5100

2N8-

/K025.D3
/K025.D3

24VDC
SUPPLY

SW2

OFF

RXD- E
RS422
RS485
PRODUCT

RXD+ B
TXD- D
TXD+ A
0V C
F

P1

RXDRXD+
TXDTXD+

/M711.B4
/M711.B4

SHLD

/M711.A4
RS485
MODBUS

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

MODBUS NETWORK DISPATCHER


CHANNEL-2

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M711
Sheet
M710

HVAC I/C-1

HVAC I/C-2

AUX. CHILLER

AUX. CHILLER

POWER METER

POWER METER

LV I/C-1

LV I/C-2

POWER METER

POWER METER

A
SHLD

/M710.C6

RXDRXD+

RXD+
RXD-

/M710.C6
/M710.C6

SHLD

/M712.B4
/M712.B4

/M712.A4

B
P1

P2

6
8
3
2
5
1

+00GH002
E-A06

6
8
3
2
5
1

-X5
RXDRXD+
TXDTXD+
0V

P5

P6

6
8
3
2
5
1

P4

6
8
3
2
5
1

6
8
3
2
5
1

C
P3

6
8
3
2
5
1

-X3 2 3

Date

0
First Issue

-X3 2 3

1 +01GH101

PLANT HVAC
LV SWITCHBOARD
20SAA01GH101
COLUMN NO:-C02
INCOMING 1 CB GS301
DWG:-AS-D-GE-EO-3413
SHEET NO:102
TYPICAL DIAGRAM IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:130

revision

30/04/2010

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

-X3 2 3

1 +01GH101

PLANT HVAC
LV SWITCHBOARD
20SAA01GH101
COLUMN NO:-D02
INCOMING 2 CB GS302
DWG:-AS-D-GE-EO-3413
SHEET NO:103
TYPICAL DIAGRAM IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:130

Repl. f.

-X3 2 3

1 +02GH101

CHILLER
LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-D02
INCOMING 2 CB GS302
DWG:-AS-D-GE-EO-3414
SHEET NO:103
TYPICAL DIAGRAM IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:130

=20CBA

MODBUS NETWORK DISPATCHER


CHANNEL-2

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

1 +02GH101

CHILLER
LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-C02
INCOMING 1 CB GS301
DWG:-AS-D-GE-EO-3414
SHEET NO:102
TYPICAL DIAGRAM IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:130

path

323 sheets
next sheet
M712
Sheet
M711

ESSEN.

ESSEN.

ESSEN.

AUX. I/C-1

AUX. I/C-2

AUX. DG I/C

POWER METER

POWER METER

POWER METER

A
/M711.B7

/M711.A7
/M711.A7

SHLD

RXD+
RXD-

B
P1

P2

6
8
3
2
5
1

+00GH002
E-A07

6
8
3
2
5
1

-X6
RXDRXD+
TXDTXD+
0V

P5

P6

6
8
3
2
5
1

P4

6
8
3
2
5
1

6
8
3
2
5
1

C
P3

6
8
3
2
5
1

Date

2
First Issue

-X3 2 3

1 +02GH101

revision

30/04/2010

1 +02GH101

ESSENTIAL AUXILIARY
LV SWITCHBOARD
20BFA02GH101
COLUMN NO:-F03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3404
SHEET NO:104
TYPICAL DIAGRAM IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:110

Customer

GOVERNMENT OF UGANDA

Established PRANAV

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

E
/M712A.A4
/M712A.A4

-X3 2 3

ESSENTIAL AUXILIARY
LV SWITCHBOARD
20BFA02GH101
COLUMN NO:-E03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3404
SHEET NO:103
TYPICAL DIAGRAM IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:110

=20CBA

MODBUS NETWORK DISPATCHER


CHANNEL-2

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M712A
Sheet
M712

/M712.E5
/M712.E5

0- BATT.

24+BATT.

RXDRXD+

J1-

J1+

(RS485)

0V C

TXD- D

TXD+ A

RS422
RS485
PRODUCT

RXD- E
SW2
ON

OFF

ON

OFF

TXD
K

G 0V

CTRL-IN

P2

M RXD

RS232
PRODUCT

RXD+ B

SW1

ILPH

SERVICE PORT
D39 RS232

D/G CONTROLLER PSC3


D/G LOCAL CONTROL CUBICLE
20BRV00GH101
DWG:-AS-D-PH-EQ-3710
SHEET NO:4

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

MODBUS NETWORK DISPATCHER


CHANNEL-2

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

path

323 sheets
next sheet
M713
Sheet
M712A

-P1
+00GH001
A- C01

VIDEO TOUCH SCREEN


DISPLAY
TOUCH

VIDEO

B
VS

TC

-K3

VS

COM3

+00GH001
B- D02

COM3
TOUCH

VIDEO

C10

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

C10 & VIDEO TOUCH SCREEN

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M714
Sheet M713

CONTROL ROOM

OPTICAL

OPTICAL TO

RACK

ELECTRICAL CONVERTER

OPTO ISOLATOR

CURRENT / RS232

LOCAL MMI

CONVERTER

C10 - PC

-X232

1
+00GH001

4152

-X2
+00GH001
B-F 02

5103

4119

/K026.E3

/K026.E3

AE4821B

4150

/J001.C6

-R3

0V

4155

TXB-

+00GH001

C-C 01

C
RS232
COM1

-K3

+00GH001
B- D02

13+

13+

A2

A2

1
5102

/K026.E2

4118

/K026.E2

TXA+

-T6

5138

GND

B-E08
+00GH001

4154

C10

B- E10

COM1

PLC-OSP

+U IN

-K10

14

14

A1

-K4
+00GH001

0V

CL412 AM

GND

IN-OF

SYNCLOG

+U OUT

5137

-X232

+00GH001

B11

4151

4153

CONTROL SYSTEM OPTICAL FIBER NETWORK DIA


DWG.No.:-AS-D-GE-EO-0001

B-E16

+00GH001

Date

1
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P.SAINI

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

1 MINUTE
CLOCK PULSE DISTRIBUTION

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M715
Sheet M714

CONTROL ROOM

OPTICAL

OPTICAL TO

RACK

ELECTRICAL CONVERTER

AE4821B

A
4157

-X234

1 .2

1 .1

1 .4

1 .3

+00GH001
5107

/M716.A1
-X234

GND

4 .4

4 .3

5110

/M716.B2

PLC-OSP

-K7

+00GH001
B-E13

4160

5109

PLC-OSP

-K6

+00GH001
B- E 12

4159

5108

PLC-OSP

B- E11

-K5

+00GH001

4158

B12

+U OUT

5139

/J001.C6

0V

A2

A1

A2

A1

A2

A1

IN-OF

09 E B+00GH001

A2

A2

14

13+

14

13+

14

13+

14

13+

14

13+

14

13+

TO IHR-1

TO IHR-2

2187

/M197.B5

2186

/M197.B5

2153

/M149.A5

2152

/M149.A5

2091

/M101.B5

/M101.B5

5104

-T7
2090

0V

/K026.E4

5140

4120

A2

GND

+U IN

/K026.E4

4 .2

4 .1

+00GH001

-X2
+00GH001
B- F 02

CONTROL SYSTEM OPTICAL FIBER NETWORK DIA


DWG.No.:-AS-D-GE-EO-0001

TO IHR-3

Date

0
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established PRANAV

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

5 SECOND
CLOCK PULSE DISTRIBUTION

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
M716
Sheet
M715

SYNCHRO KIT
FOR BEM340 FIP

OPTO ISOLATOR

SPARE TB

SPARE TB

SPARE TB

SPARE TB

SPARE TB

A
/M715.B7
-X234

2 .2

2 .1

2 .4

2 .3

3 .2

3 .1

3 .4

3 .3

+00GH001

/M715.B8
-X234

5 .2

5 .1

5 .4

5 .3

6 .2

6 .1

6 .4

6 .3

5112

A2

A1

14

13+

14

13+

14

13+

14

13+

4163

/K016.E7

/M209.A5

4168

A2

4093

A2

15 E B-

+00GH001

-K9
A2

A1

PLC-OSP

4162

5111
14 E B-

PLC-OSP

-K8

+00GH001

4161

+00GH001

TO FIELD CONTROLLER
-X233

1
+00GH001

M1

-X292
5141 1

M2

4179 2

SHIELDED CABLE
(1P X 0.5 SQ. MM)

/K026.E6
4121

5105

+00GH002

-K52

E /M706.B6

CR355

MZ295

PREFABRICATED CABLE
(1 METER)

B- H14

/K026.E6

-X233

2
+00GH001

-X291

E
2

4166

+00GH002
+00GH001

Date

1
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P.SAINI

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

5 SECOND
CLOCK PULSE DISTRIBUTION

AS-D-PH-EO-4001

19_Communication Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
Q101
Sheet
M716

BUS TIE BREAKER

BUS TIE BREAKER

BUS TIE BREAKER

BUS TIE BREAKER

SST 2 INCOMING

SST 2 INCOMING

SST 2 INCOMING

SST 2 INCOMING

20BFA00GS301

20BFA00GS301

20BFA00GS301

20BFA00GS301

20BFA00GS102

20BFA00GS102

20BFA00GS102

20BFA00GS102

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

OPEN & DRAW IN

DRAW OUT

TEST

CLOSE & DRAW IN

OPEN

DRAW IN

DRAW OUT

TEST

TYPICAL DIAGRAM
IF1
DWG:-AS-D-GE-EO-3401
SHEET NO:- 53/54

57

73

74

72

91

OF23

92

90

61 62

60

-X3 90

921

821
CE

CD2

CT2

91

89

99

922
924

CE

228
226

218
216
-X3 58 59

OF22

822
824

CT2
922
924

CD2
822
824

CE

238
236

821

215
OF21

235

TYPICAL DIAGRAM
TF1
DWG:-AS-D-GE-EO-3401
SHEET NO:- 212/213

225

20BFA00GH101
COLUMN NO:-G02
SST 2 INCOMING BREAKER 20BFA00GS102
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

921

20BFA00GH101
COLUMN NO:-G04
BUS TIE BREAKER 20BFA00GS301
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

100

98

117

118

116
+00GH101:G02

-X3 50

47

48

CLOSING
COIL

E
C+
Date
First Issue

revision

30/04/2010

140

54

53

52

51+00GH101:F02

20BFA00GH101
COLUMN NO:-F02
SST 1 INCOMING BREAKER 20BFA00GS101
DWG:-AS-D-GE-EO-3402
SHEET NO:-103
TYPICAL DIAGRAM
IF1
DWG:-AS-D-GE-EO-3401
SHEET NO:- 52, 53 & 54

CLOSE PB
C-

49

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

SST1 INCOMING BREAKER


20BFA00GS101

HEP BUJ 20CBA FS00 001

=20BFA

323 sheets

+00GH101

next sheet
Q102
Sheet
Q101

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

path

BUS TIE BREAKER

BUS TIE BREAKER

BUS TIE BREAKER

BUS TIE BREAKER

SST 1 INCOMING

SST 1 INCOMING

SST 1 INCOMING

SST 1 INCOMING

20BFA00GS301

20BFA00GS301

20BFA00GS301

20BFA00GS301

20BFA00GS101

20BFA00GS101

20BFA00GS101

20BFA00GS101

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

OPEN & DRAW IN

DRAW OUT

TEST

CLOSE & DRAW IN

OPEN

DRAW IN

DRAW OUT

TEST

TYPICAL DIAGRAM
IF1
DWG:-AS-D-GE-EO-3401
SHEET NO:- 53/54

-X3

64 65

63

76

77

75

94

OF23

248
246

CE

95

93

67

68

66

-X3 90

921

821
CE

CD2

CT2

91

89

99

922
924

OF24

822
824

CT3
932
934

238
236

832

CD3
834

CE

238
236

831

235
OF23

235

TYPICAL DIAGRAM
TF1
DWG:-AS-D-GE-EO-3401
SHEET NO:- 212/213

245

20BFA00GH101
COLUMN NO:-F02
SST 1 INCOMING BREAKER 20BFA00GS101
DWG:-AS-D-GE-EO-3402
SHEET NO:-103

931

20BFA00GH101
COLUMN NO:-G04
BUS TIE BREAKER 20BFA00GS301
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

100

98

117

+00GH101:G04

118

116
+00GH101:F02

-X3 50

47

48

CLOSING
COIL

140

54

53

52

51+00GH101:G02

20BFA00GH101
COLUMN NO:-G02
SST 2 INCOMING BREAKER 20BFA00GS102
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

CLOSE PB
C+

E
C-

49

TYPICAL DIAGRAM
IF1
DWG:-AS-D-GE-EO-3401
SHEET NO:- 52, 53 & 54

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

SST2 INCOMING BREAKER


20BFA00GS102

=20BFA

323 sheets

+00GH101

next sheet
Q103
Sheet
Q102

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

SST 1 INCOMING

SST 1 INCOMING

SST 1 INCOMING

SST 1 INCOMING

SST 2 INCOMING

SST 2 INCOMING

SST 2 INCOMING

SST 2 INCOMING

20BFA00GS101

20BFA00GS101

20BFA00GS101

20BFA00GS101

20BFA00GS102

20BFA00GS102

20BFA00GS102

20BFA00GS102

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

OPEN

DRAW IN

DRAW OUT

TEST

20BFA00GH101
COLUMN NO:-F02
SST 1 INCOMING BREAKER 20BFA00GS101
DWG:-AS-D-GE-EO-3402
SHEET NO:-103

20BFA00GH101
COLUMN NO:-G02
SST 2 INCOMING BREAKER 20BFA00GS102
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

TYPICAL DIAGRAM
IF1
DWG:-AS-D-GE-EO-3401
SHEET NO:- 53/54

TYPICAL DIAGRAM
IF1
DWG:-AS-D-GE-EO-3401
SHEET NO:- 52, 53 & 54

CDX1

CTX1

OF22

-X3 87

CTX1

CDX1

CE

228
226

CE

228
226

OF22

225

225

88

86

X2

X3

X1

X2

X3

-X3 87

X1

88

86

X2

X3

X1

X2

+00GH101:F02

X3

X1
+00GH101:G02

28

-X3

25

27

32

CLOSE PB
C-

31

30

29

112

113 +00GH101:G04

20BFA00GH101
COLUMN NO:-G04
BUS TIE BREAKER 20BFA00GS301
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

C+

CLOSING
COIL

26

TYPICAL DIAGRAM
TF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-211, 212 & 213

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

BUS TIE BREAKER


20BFA00GS301

=20BFA

323 sheets

+00GH101

next sheet
Q104
Sheet
Q103

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

HVAC BOARD INCOMER 1

HVAC BOARD INCOMER 1

HVAC BOARD INCOMER 1

HVAC BOARD INCOMER 1

20SAA01GS301

20SAA01GS301

20SAA01GS301

20SAA01GS301

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-C03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3413
SHEET NO:-102
TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-134/135

64

65

63

106

931
CT3

107

105

97

932
934

332
334

CD3
832
834

CE3

42
44

OF4

831

41

331

98

96

115

116

114

-X3

28

25

32

31

30

29+00GH101:C02

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-C02
20BFA00GS113
DWG:-AS-D-GE-EO-3402
SHEET NO:-100

CLOSE PB
C-

27

C+

CLOSING
COIL

26

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MAIN SWITCHBOARD
OUTGOING BREAKER 20BFA00GS113

=20BFA

323 sheets

+00GH101

next sheet
Q105
Sheet
Q104

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

SUBSTATION LV BOARD

MV CUBIALE 20BBA01GH101

MV CUBIALE 20BBA01GH101

INCOMER 1 80BFA00GS101

MAIN INCOMER 20BBA01GS301

EARTH SWITCH 20BBA01GS441

POSITION

POSITION

POSITION

OPEN

CLOSE

OPEN

SUBSTATION LV SWITCHBOARD
80BFA00GH101
COLUMN NO:-C04
INCOMER 1 CB 80BFA00GS101
DWG:-AS-D-GE-EO-3411
SHEET NO:-102

400V AC MV CUBICLE
20BBA01GH101
COLUMN NO:-A
SWY. SUPPLY NO. 1
DWG:-AS-D-GE-EO-3300
SHEET NO:-212

TYPICAL DIAGRAM
IF3
DWG:-AS-D-GE-EO-3401
SHEET NO:-093

OF11

-QT1

-QL1

112
114
-X3 98

10

111

99

-X4

97

11

12

19

20

+00GH101:C04

+01GH101:A

40

39

38

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-C04
20BFA00GS116
DWG:-AS-D-GE-EO-3402
SHEET NO:-100

CLOSING
COIL
C-

37

44

43

42

41+00GH101:C04

CLOSE PB

C+

-X3

TYPICAL DIAGRAM
OFP4M+N/2
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MAIN SWITCHBOARD
OUTGOING BREAKER 20BFA00GS116

=20BFA

323 sheets

+00GH101

next sheet
Q106
Sheet
Q105

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

INCOMING BREAKER

INCOMING BREAKER

INCOMING BREAKER

INCOMING BREAKER

20BFA01GS301

20BFA01GS301

20BFA01GS301

20BFA01GS301

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-C05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3403
SHEET NO:-101
TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:- 133/134

-X3 64

65

63

106

931
CT3

107

105

97

932
934

332
334

CD3
832
834

CE3

42
44

OF4

831

41

331

98

96

115

116

114
+01GH101:C05

-X3

28

25

CLOSE PB
CLOSING
COIL
C+

C-

26

27

32

31

30

29+00GH101:D02

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-D02
20BFA00GS111
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MAIN SWITCHBOARD
OUTGOING BREAKER 20BFA00GS111

=20BFA

323 sheets

+00GH101

next sheet
Q107
Sheet
Q106

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

CHILLER BOARD INCOMER 1

CHILLER BOARD INCOMER 1

CHILLER BOARD INCOMER 1

CHILLER BOARD INCOMER 1

20SAA02GS301

20SAA02GS301

20SAA02GS301

20SAA02GS301

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-C03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3414
SHEET NO:-102
TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-133/134

-X3 64

65

63

106

931
CT3

107

105

97

932
934

332
334

CD3
832
834

CE3

42
44

OF4

831

41

331

98

96

115

116

114
+02GH101:C03

-X3

28

25

C-

CLOSE PB
C+

CLOSING
COIL

26

27

32

31

30

29+00GH101:D04

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-D04
20BFA00GS114
DWG:-AS-D-GE-EO-3402
SHEET NO:-101

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MAIN SWITCHBOARD
OUTGOING BREAKER 20BFA00GS114

=20BFA

323 sheets

+00GH101

next sheet
Q108
Sheet
Q107

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

INCOMING BREAKER 1
20BFA02GS301
POSITION
OPEN

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3404
SHEET NO:-103
TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:- 113/ 114

121

122

124

OF12

-X3 96

97

95
+02GH101:E05

-X3

28

25

26

27

32

31

30

29+00GH101:E02

CLOSE PB

C-

C+

CLOSING
COIL

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-E02
20BFA00GS112
DWG:-AS-D-GE-EO-3402
SHEET NO:-102

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MAIN SWITCHBOARD
OUTGOING BREAKER 20BFA00GS112

=20BFA

323 sheets

+00GH101

next sheet
Q109
Sheet
Q108

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

DAM AUXI. BOARD INCOMER 1


40BFA00GS301
POSITION
OPEN

DAM AUXILLARY LV SWITCHBOARD


40BFA00GH101
COLUMN NO:-D05
INCOMER 1 CB 40BFA00GS301
DWG:-AS-D-GE-EO-3410
SHEET NO:- 103
TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:- 133

41

44

42

OF4

-X3 67

68

66
+00GH101:D05

-X3

28

25

26

27

32

31

30

29+00GH101:E04

CLOSE PB

C-

C+

CLOSING
COIL

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-E04
20BFA00GS115
DWG:-AS-D-GE-EO-3402
SHEET NO:-102

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MAIN SWITCHBOARD
OUTGOING BREAKER 20BFA00GS115

=20BFA

323 sheets

+00GH101

next sheet
Q110
Sheet
Q109

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

INCOMER 2 CB
20BFA02GS302
POSITION
OPEN

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3404
SHEET NO:-104
TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:-113

121

122

124

OF12

-X3 96

97

95
+02GH101:F05

-X3

28

25

26

27

32

31

30

29

+00GH101:H02

CLOSE PB

400VAC MAIN SWITCHBOARD 20BFA00GS119


DWG:-AS-D-GE-EO-3402
Local Control Board:-20BFA00GH101
COLUMN NO:-H02
SHEET NO:-105

C-

C+

CLOSING
COIL

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MAIN SWITCHBOARD
OUTGOING BREAKER 20BFA00GS119

=20BFA

323 sheets

+00GH101

next sheet
Q111
Sheet
Q110

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

INCOMING BREAKER

INCOMING BREAKER

INCOMING BREAKER

INCOMING BREAKER

20BFA01GS302

20BFA01GS302

20BFA01GS302

20BFA01GS302

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-D05
INCOMER 2 CB 20BFA01GS302
DWG:-AS-D-GE-EO-3403
SHEET NO:-102
TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:- 133

-X3 64

65

63

106

931
CT3

107

105

97

932
933

332
334

CD3
832
834

CE3

42
44

OF4

831

41

331

98

96

115

116

114
+01GH101:D05

-X3

28

25

26

27

32

31

30

29+00GH101:L02

CLOSE PB

C-

C+

CLOSING
COIL

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-L02
20BFA00GS118
DWG:-AS-D-GE-EO-3402
SHEET NO:-104

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-512

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MAIN SWITCHBOARD
OUTGOING BREAKER 20BFA00GS118

=20BFA

323 sheets

+00GH101

next sheet
Q112
Sheet
Q111

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

CHILLER BOARD INCOMER 2

CHILLER BOARD INCOMER 2

CHILLER BOARD INCOMER 2

CHILLER BOARD INCOMER 2

20SAA02GS302

20SAA02GS302

20SAA02GS302

20SAA02GS302

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-D03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3414
SHEET NO:-103
TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:- 133/134

-X3 64

65

63

106

931
CT3

107

105

97

932
933

332
334

CD3
832
834

CE3

42
44

OF4

831

41

331

98

96

115

116

114
+02GH101:D03

-X3

28

25

26

27

32

C+

CLOSING
COIL
C-

30

29+00GH101:L04

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-L04
20BFA00GS121
DWG:-AS-D-GE-EO-3402
SHEET NO:-106

CLOSE PB

31

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MAIN SWITCHBOARD
OUTGOING BREAKER 20BFA00GS121

=20BFA

323 sheets

+00GH101

next sheet
Q113
Sheet
Q112

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

HVAC BOARD INCOMER 2

HVAC BOARD INCOMER 2

HVAC BOARD INCOMER 2

HVAC BOARD INCOMER 2

20SAA01GS302

20SAA01GS302

20SAA01GS302

20SAA01GS302

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-D03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3413
SHEET NO:-103
TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-133/134

-X3 64

65

63

106

931
CT3

107

105

97

932
933

332
334

CD3
832
834

CE3

42
44

OF4

831

41

331

98

96

115

116

114
+01GH101:D03

-X3

28

25

26

27

32

31

30

29+00GH101:M02

CLOSE PB

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-M02
20BFA00GS120
DWG:-AS-D-GE-EO-3402
SHEET NO:-107

C-

C+

CLOSING
COIL

TYPICAL DIAGRAM
OFP4M+N/1
DWG:-AS-D-GE-EO-3401
SHEET NO:-511

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MAIN SWITCHBOARD
OUTGOING BREAKER 20BFA00GS120

=20BFA

323 sheets

+00GH101

next sheet
Q114
Sheet
Q113

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

SUBSTATION LV BOARD

MV CUBIALE 20BBA02GH101

MV CUBIALE 20BBA01GH101

INCOMER 2 80BFA00GS102

MAIN INCOMER 20BBA02GS301

EARTH SWITCH 20BBA02GS441

POSITION

POSITION

POSITION

OPEN

CLOSE

OPEN

SUBSTATION LV SWITCHBOARD
80BFA00GH101
COLUMN NO:-E04
INCOMER 2 CB 80BFA00GS102
DWG:-AS-D-GE-EO-3411
SHEET NO:-104

400V AC MV CUBICLE
20BBA02GH101
COLUMN NO:-A
SWY. SUPPLY NO.2
DWG:-AS-D-GE-EO-3301

TYPICAL DIAGRAM
IF3
DWG:-AS-D-GE-EO-3401
SHEET NO:-093

OF11

-QT1

-QL1

112
114
-X3 98

10

111

99

-X4

97

11

12

19

20

+00GH101:E04

+02GH101:A

40

39

38

37

400VAC MAIN SWITCHBOARD 20BFA00GH101


COLUMN NO:-M04
20BFA00GS123
DWG:-AS-D-GE-EO-3402
SHEET NO:-107

CLOSING
COIL
C-

44

43

42

41+00GH101:M04

CLOSE PB

E
C+

-X3

TYPICAL DIAGRAM
OFP4M+N/2
DWG:-AS-D-GE-EO-3401
SHEET NO:-532

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

MAIN SWITCHBOARD
OUTGOING BREAKER 20BFA00GS123

=20BFA

323 sheets

+00GH101

next sheet
Q115
Sheet
Q114

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

INCOMING BREAKER

INCOMING BREAKER

INCOMING BREAKER

INCOMING BREAKER

20BFA01GS302

20BFA01GS302

20BFA01GS302

20BFA01GS302

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-D05
INCOMER 2 CB 20BFA01GS302
DWG:-AS-D-GE-EO-3403
SHEET NO:-102
TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:- 133

218
216
-X3 79

921
CD2

CT2

80

78

94

922
923

CE
822
824

OF21

821

215

95

93

112

113

111
+01GH101:D05

-X3

49

46

CLOSE PB
C-

CLOSING
COIL
C+

47

48

53

52

51

50+01GH101:C05

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-C05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3403
SHEET NO:-101

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-133

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

COMMON AUXILIARIES BOARD


INCOMING BREAKER 20BFA01GS301

=20BFA

323 sheets

+01GH101

next sheet
Q116
Sheet
Q115

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

INCOMING BREAKER

INCOMING BREAKER

INCOMING BREAKER

INCOMING BREAKER

20BFA01GS301

20BFA01GS301

20BFA01GS301

20BFA01GS301

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-C05
INCOMER 1 CB 20BFA01GS301
DWG:-AS-D-GE-EO-3403
SHEET NO:-101
TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:- 133

218
216
-X3 79

921
CD2

CT2

80

78

94

922
924

CE
822
824

OF21

821

215

95

93

112

113

111
+01GH101:C05

-X3

49

46

CLOSE PB

C-

C+

CLOSING
COIL

47

48

53

52

51

50+01GH101:D05

COMMON AUXILLARIES LV SWITCHBOARD


20BFA01GH101
COLUMN NO:-D05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3403
SHEET NO:-102

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-133

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

COMMON AUXILIARIES BOARD


INCOMING BREAKER 20BFA01GS302

=20BFA

323 sheets

+01GH101

next sheet
Q117
Sheet
Q116

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

BUS TIE CB

BUS TIE CB

BUS TIE CB

BUS TIE CB

INCOMER 2 CB

INCOMER 2 CB

INCOMER 2 CB

INCOMER 2 CB

20BFA02GS303

20BFA02GS303

20BFA02GS303

20BFA02GS303

20BFA02GS302

20BFA02GS302

20BFA02GS302

20BFA02GS302

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

OPEN & DRAW IN

DRAW OUT

TEST

CLOSE & DRAW IN

OPEN

DRAW IN

DRAW OUT

TEST

TYPICAL DIAGRAM
TF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-212/213

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:-113/114

59

57

73

74

72

91

92

90

58

59

57

-X3 108

CE

921

821

109

107

120

922

CT2

121

119

138

924

CD2
822
824

OF22
228

CE
226

215

OF21

922
924

CT2

822
824

216

218

CD2

218
216

CE

OF21

-X3
58

821

215

225

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

921

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F02
BUS TIE CB GS303
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

139

137

+02GH101:F02

+02GH101:F05

-X3 75

72

160

73

74

79

78

77

76

161

+02GH101:E05

/Q118.E6
/Q118.E2
CLOSING
COIL

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3404
SHEET NO:-103

CLOSE PB

C-

C+

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:- 112 & 114

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

ESSENTIAL AUXILIARIES BOARD


INCOMING BREAKER 20BFA02GS301

=20BFA

323 sheets

+02GH101

next sheet
Q118
Sheet
Q117

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

INCOMER D/G CB

INCOMER D/G CB

INCOMER D/G CB

INCOMER D/G CB

20BFA02GS103

20BFA02GS103

20BFA02GS103

20BFA02GS103

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-G04
INCOMER D/G CB GS103
DWG:-AS-D-GE-EO-3404
SHEET NO:-104
TYPICAL DIAGRAM
IFDG
DWG:-AS-D-GE-EO-3401
SHEET NO:-193/194

-X3 87

88

86

102

921
922

CT2

103

101

120

924

CD2
822
824

CE

216

218

OF21

821

215

121

119
+02GH101:G04

-X3

162

159

/Q117.E8

+02GH101:E05

/Q117.E3

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3404
SHEET NO:-103

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:- 112 & 114

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

ESSENTIAL AUXILIARIES BOARD


INCOMING BREAKER 20BFA02GS301

=20BFA

323 sheets

+02GH101

next sheet
Q119
Sheet
Q118

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

BUS TIE CB

BUS TIE CB

BUS TIE CB

BUS TIE CB

INCOMER D/G CB

INCOMER D/G CB

INCOMER D/G CB

INCOMER D/G CB

20BFA02GS303

20BFA02GS303

20BFA02GS303

20BFA02GS303

20BFA02GS103

20BFA02GS103

20BFA02GS103

20BFA02GS103

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

OPEN & DRAW IN

DRAW OUT

TEST

CLOSE & DRAW IN

OPEN

DRAW IN

DRAW OUT

TEST

TYPICAL DIAGRAM
TF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-212/213

TYPICAL DIAGRAM
IFDG
DWG:-AS-D-GE-EO-3401
SHEET NO:-193/194

-X3
61

CTX1

CE

OF23

228
226

OF22

62

60

X2

X3

X1

X2

X3

X1

61

238

CDX1

CE

226

228

OF22

62

-X3 93

60

CDX3

CE

CTX3

236

225

235

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-G04
INCOMER D/G CB GS103
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

225

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F02
BUS TIE CB GS303
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

94

92

X2

X3

X1

X2

+02GH101:F02

X3

X1
+02GH101:G04

75
-X3

161

162

160

164

163 +02GH101:F05

/Q120.E6
/Q120.E7
/Q120.E1

+c

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

CLOSING
COIL
C-

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:-112/114

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

ESSENTIAL AUXILIARIES BOARD


INCOMING BREAKER 20BFA02GS302

=20BFA

323 sheets

+02GH101

next sheet
Q120
Sheet
Q119

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

INCOMER D/G CB

INCOMER D/G CB

INCOMER D/G CB

INCOMER D/G CB

INCOMER 1 CB

INCOMER 1 CB

INCOMER 1 CB

INCOMER 1 CB

20BFA02GS103

20BFA02GS103

20BFA02GS103

20BFA02GS103

20BFA02GS301

20BFA02GS301

20BFA02GS301

20BFA02GS301

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

OPEN

DRAW IN

DRAW OUT

TEST

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3404
SHEET NO:-103

TYPICAL DIAGRAM
IFDG
DWG:-AS-D-GE-EO-3401
SHEET NO:-193/194

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:- 113/ 114

-X3 87

88

86

X2

X3

X1

X2

X3

X1

-X3105

921
CD2

CT2

106

104

120

922

CE

121

119

924

OF21

821

CTX1
218

CDX1

822
824

CE

216

218

OF21

216

215

215

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-G04
INCOMER D/G CB GS103
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

138

+02GH101:G04

139

137
+02GH101:E05

159

73

+c

74

79

72

/Q119.E8

78

77

76+02GH101:F05

/Q119.E1

/Q119.E4

CLOSE PB

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

C+

-X3

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:-112/114

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

ESSENTIAL AUXILIARIES BOARD


INCOMING BREAKER 20BFA02GS302

=20BFA

323 sheets

+02GH101

next sheet
Q121
Sheet
Q120

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

BUS TIE CB

BUS TIE CB

BUS TIE CB

BUS TIE CB

INCOMER 2 CB

INCOMER 2 CB

INCOMER 2 CB

INCOMER 2 CB

20BFA02GS303

20BFA02GS303

20BFA02GS303

20BFA02GS303

20BFA02GS302

20BFA02GS302

20BFA02GS302

20BFA02GS302

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

OPEN & DRAW IN

DRAW OUT

TEST

CLOSE & DRAW IN

OPEN

DRAW IN

DRAW OUT

TEST

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F02
BUS TIE CB GS303
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

TYPICAL DIAGRAM
TF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-212/213

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:-113/114

-X3
64

65

63

X2

X3

X1

X2

X3

X1

-X3
64

235
OF23
238

CE

236

238

OF23

65

-X3 111

63

CE

CTX2

CDX2

236

CTX2

CDX2

CE

236

238

OF23

235

235

112

110

X2

X3

X1

X2

X3

+02GH101:F02

X1
+02GH101:F05

-X3

53

150

147

148

152

151

+02GH101:G04

/Q122.E1

C+

/Q122.E6

/Q122.E7

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-G04
INCOMER D/G CB GS103
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

CLOSING
COIL

C-

TYPICAL DIAGRAM
IFDG
DWG:-AS-D-GE-EO-3401
SHEET NO:-193/194

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

ESSENTIAL AUXILIARIES BOARD


DG INCOMING BREAKER 20BFA02GS103

=20BFA

323 sheets

+02GH101

next sheet
Q122
Sheet
Q121

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

INCOMER 1 CB

INCOMER 1 CB

INCOMER 1 CB

INCOMER 1 CB

INCOMER 2 CB

INCOMER 2 CB

INCOMER 2 CB

INCOMER 2 CB

20BFA02GS301

20BFA02GS301

20BFA02GS301

20BFA02GS301

20BFA02GS302

20BFA02GS302

20BFA02GS302

20BFA02GS302

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

OPEN

DRAW IN

DRAW OUT

TEST

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3404
SHEET NO:-103

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:- 113/ 114

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:-113/114

-X3 111

CTX2
248

OF24

112

110

X2

X3

X1

X2

X3

X1

CDX3

CE

CTX3

246

CDX2

CE

236

238

OF23

245

235

-X3114

115

113

X2

X3

X1

X2

X3

+02GH101:E05

X1
+02GH101:F05

149

-X3

51

52

57

/Q121.E4

56

55

54

/Q121.E8

50
+02GH101:G04

C+

/Q121.E2

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-G04
INCOMER D/G CB GS103
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

C+

CLOSE PB

TYPICAL DIAGRAM
IFDG
DWG:-AS-D-GE-EO-3401
SHEET NO:-193/194

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

ESSENTIAL AUXILIARIES BOARD


DG INCOMING BREAKER 20BFA02GS103

=20BFA

323 sheets

+02GH101

next sheet
Q123
Sheet
Q122

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

INCOMER 1 CB

INCOMER 1 CB

INCOMER 1 CB

INCOMER 1 CB

INCOMER 2 CB

INCOMER 2 CB

INCOMER 2 CB

INCOMER 2 CB

20BFA02GS301

20BFA02GS301

20BFA02GS301

20BFA02GS301

20BFA02GS302

20BFA02GS302

20BFA02GS302

20BFA02GS302

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

OPEN

DRAW IN

DRAW OUT

TEST

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-E05
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3404
SHEET NO:-103

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F05
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:- 113/ 114

TYPICAL DIAGRAM
IF4
DWG:-AS-D-GE-EO-3401
SHEET NO:-113/114

-X3108

CTX1
228

OF22

109

107

X2

X3

X1

X2

X3

-X3108

X1

CDX1

CE

CTX1

226

CDX1

CE

226

228

OF22

225

225

109

107

X2

X3

X1

X2

X3

X1

+02GH101:E05

+02GH101:F05

-X3 28

25

113

+c

30

29

26

+02GH101:F02

+c

/Q123A.E2

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F02
BUS TIE CB GS303
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

CLOSE PB

C-

31

/Q123A.E6

C+

CLOSING
COIL

32

TYPICAL DIAGRAM
TF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-212/213
Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

ESSENTIAL AUXILIARIES BOARD


BUS TIE BREAKER 20BFA02GS303

=20BFA

323 sheets

+02GH101

next sheet
Q123A
Sheet
Q123

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

INCOMER D/G CB

INCOMER D/G CB

INCOMER D/G CB

INCOMER D/G CB

20BFA02GS103

20BFA02GS103

20BFA02GS103

20BFA02GS103

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-G04
INCOMER D/G CB GS103
DWG:-AS-D-GE-EO-3404
SHEET NO:-104
TYPICAL DIAGRAM
IFDG
DWG:-AS-D-GE-EO-3401
SHEET NO:-193/194

225

228

CE

CDX2

CTX2

226

OF22

-X3 90

91

89

X2

X3

X1

X2

X3

X1
+02GH101:G04

-X3
27

/Q123.E8

112

+c

/Q123.E2

+02GH101:F02

+c

ESSENTIAL AUXILLARY LV SWITCHBOARD


20BFA02GH101
COLUMN NO:-F02
BUS TIE CB GS303
DWG:-AS-D-GE-EO-3404
SHEET NO:-104

TYPICAL DIAGRAM
TF1
DWG:-AS-D-GE-EO-3401
SHEET NO:-212/213

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

ESSENTIAL AUXILIARIES BOARD


BUS TIE BREAKER 20BFA02GS303

=20BFA

323 sheets

+02GH101

next sheet
Q124
Sheet
Q123A

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

HVAC BOARD INCOMER 2

HVAC BOARD INCOMER 2

HVAC BOARD INCOMER 2

HVAC BOARD INCOMER 2

20SAA01GS302

20SAA01GS302

20SAA01GS302

20SAA01GS302

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-D03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3413
SHEET NO:-103
TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-133/134

-X3 79

921
CD2

822
824

CT2

80

78

94

922
924

CE

21

218

OF21

821

215

95

93

112

113

111
+01GH101:D03

49

47

53

52

51

50

46

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-C03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3413
SHEET NO:-102

C-

CLOSING
COIL

48

+01GH101:C03

CLOSE PB

C+

-X3

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-132 & 134

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

HVAC BOARD
INCOMING BREAKER 20SAA01GS301

=20SAA

323 sheets

+01GH101

next sheet
Q125
Sheet
Q124

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

HVAC BOARD INCOMER 1

HVAC BOARD INCOMER 1

HVAC BOARD INCOMER 1

HVAC BOARD INCOMER 1

20SAA01GS301

20SAA01GS301

20SAA01GS301

20SAA01GS301

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-C03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3413
SHEET NO:-102
TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-134/135

-X3 79

921
CD2

822
824

CT2

80

78

94

922
924

CE

216

218

OF21

821

215

95

93

112

113

111
+01GH101:C03

49

47

53

52

51

50

46

PLANT HVAC LV SWITCHBOARD


20SAA01GH101
COLUMN NO:-D03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3413
SHEET NO:-103

CLOSING
COIL
C-

48

+01GH101:D03

CLOSE PB

C+

-X3

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-132 & 134

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

HVAC BOARD
INCOMING BREAKER 20SAA01GS302

=20SAA

323 sheets

+01GH101

next sheet
Q126
Sheet
Q125

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

CHILLER BOARD INCOMER 2

CHILLER BOARD INCOMER 2

CHILLER BOARD INCOMER 2

CHILLER BOARD INCOMER 2

20SAA02GS302

20SAA02GS302

20SAA02GS302

20SAA02GS302

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-D03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3414
SHEET NO:-103
TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:- 133/134

-X3 79

921
CT2

80

78

94

922
924

CD2
822
824

CE

216

218

OF21

821

215

95

93

112

113

111
+02GH101:D03

49

47

53

52

51

50

46

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-C03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3414
SHEET NO:-102

CLOSING
COIL
C-

48

+02GH101:C03

CLOSE PB

C+

-X3

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-132 & 134

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

CHILLER BOARD
INCOMING BREAKER 20SAA02GS301

=20SAA

323 sheets

+02GH101

next sheet
Q127
Sheet
Q126

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

CHILLER BOARD INCOMER 1

CHILLER BOARD INCOMER 1

CHILLER BOARD INCOMER 1

CHILLER BOARD INCOMER 1

20SAA02GS301

20SAA02GS301

20SAA02GS301

20SAA02GS301

POSITION

POSITION

POSITION

POSITION

OPEN

DRAW IN

DRAW OUT

TEST

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-C03
INCOMER 1 CB GS301
DWG:-AS-D-GE-EO-3414
SHEET NO:-102
TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:-133/134

-X3 79

921
CT2

80

78

94

922
924

CD2
822
824

CE

216

218

OF21

821

215

95

93

112

113

111
+02GH101:C03

49

47

48

53

52

51

50

46

CHILLER LV SWITCHBOARD
20SAA02GH101
COLUMN NO:-D03
INCOMER 2 CB GS302
DWG:-AS-D-GE-EO-3414
SHEET NO:-103

CLOSING
COIL
C-

+02GH101:D03

CLOSE PB

E
C+

-X3

TYPICAL DIAGRAM
IF5
DWG:-AS-D-GE-EO-3401
SHEET NO:- 132 & 134

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

CHILLER BOARD
INCOMING BREAKER 20SAA02GS302

=20SAA

323 sheets

+02GH101

next sheet
Q128
Sheet
Q127

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

FROM
MAIN LV SWITCHBOARD
20BFA00GH101

0,4kV

STEP DOWN TRANSFORMERS


20BFT03GT001

315k VA
ynd 11
AN
Ucc =4%

600/1A
P2

S2

S1

P1

4,16kV
C

TO
20BBA01GH101
M.V.CELL

-XM 1

400VAC MAIN SWITCHBOARD


20BFA00GH101
20BFA00GS116 (OFP4M+N/2)
COLUMN NO:-C03
DWG:-AS-D-GE-EO-3402

TYPICAL DIAGRAM
DWG: AS-D-GE-EO-3401
SHEET NO:- 530

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=.20BFT

INTERFACE
STEP DOWN TRANSFORMERS

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
Q129
Sheet
Q128

FROM
MAIN LV SWITCHBOARD
20BFA00GH101

0,4kV

STEP DOWN TRANSFORMERS


20BFT04GT001

315k VA
ynd 11
AN
Ucc =4%

600/1A
P2

S2

S1

P1

4,16kV
C

TO
20BBA02GH101
M.V.CELL

-XM 1

400VAC MAIN SWITCHBOARD


20BFA00GH101
20BFA00GS123 (OFP4M+N/2)
COLUMN NO:-M03
DWG:-AS-D-GE-EO-3402

TYPICAL DIAGRAM
DWG: AS-D-GE-EO-3401
SHEET NO:- 530

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=.20BFT

INTERFACE
STEP DOWN TRANSFORMERS

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
Q130
Sheet
Q129

DG BREAKER

DG BREAKER

DG BREAKER

DG BREAKER

DG BREAKER

20BFA02GS103

20BFA02GS103

20BFA02GS103

20BFA02GS103

20BFA02GS103

CLOSE COMMAND

OPEN COMMAND

POSITON

POSITON

READY TO OPERATE

FROM DG CUBICLE

FROM DG CUBICLE

OPEN

CLOSE

ESSENTIAL LV Switchboard
20BFA02GH101
COLUMN NO:-G04
DG Incoming CB GS103
DWG:-AS-D-GE-EO-3404
Sheet No:-105
TYPICAL DIAGRAM
IFDG
DWG:-AS-D-GE-EO-3401

A1

251

CE

OF24

-X3

34

35

38

248
246

-C
+C
C

252
254

PF
A2

-MX1a

A2

-XFa

A1

SHEET NO:- 192

SHEET NO:- 194

245

SHEET NO:- 193

-X3 96

39

97

95

126

127

125

+02GH101:G04

-X7

10

11

14

13 +00GH001

1500KVA DIESEL GENERATOR


LOCAL CONTROL CUBICLE
20BRV00GH101
DWG:-AS-D-SW-EO-3710
SHEET NO:-30

Date

2
First Issue

12

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=.20BFT

INTERFACE
DG TO CB (20BFA02GH101)

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

path

323 sheets
next sheet
Q131
Sheet
Q130

AUXILIARY CONTROLLER
20CBA00GH003
DWG:-AS-D-SW-EO-4001

SHEET NO:-6

SHEET NO:-515

TYPICAL DIAGRAM
IFDG
DWG:-AS-D-GE-EO-3401
Sheet No:-193

D15

ESSENTIAL LV Switchboard
20BFA02GH101
COLUMN NO:-G04
DG Incoming CB GS103
DWG:-AS-D-GE-EO-3404
Sheet No:-105

P/H AGENT RELEASE


CONTROL PANEL
20SGA00GH001
DWG:-HEP BUJ 20CYE0009

FA007.14
-R3

-SDE1

-K101

C15
20b

C-E07
-X3 58

19h

146

-X492

6
+00GH002

D
2195

2196
-X492

8
+00GH002

-X4

EMERGENCY
STOP
EXTERNAL
E

POWERHOUSE
1500KVA DIESEL GENERATOR
DWG:-AS-D-SW-EO-3710
CBCL NO:20BRV00GH101
SHEET NO:-29

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P.BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=.20BFT

INTERFACE
DG EMERGENCY STOP EXTERNAL

AS-D-PH-EO-4001

20_Interlocking Circuit

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W001
Sheet
Q131

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

240VAC-P

=20CBA +00GH001 -F3

J-D02

=20CBA +00GH001 -X901

F-B03

1001

H07V-K001_BU

Black

2.5

/K019.C2

#150693

=20CBA +00GH001 -B2

J-D01

=20CBA +00GH001 -F3

J-D02

1002

H07V-K001_BU

Black

2.5

/K019.D2

#150694

=20CBA +00GH001 -E1

J-D03

=20CBA +00GH001 -B2

J-D01

1003

H07V-K001_BU

Black

2.5

/K019.E2

240VAC-P

=20CBA +00GH001 -F1

J-A01

=20CBA +00GH001 -X901

F-B03

1004

H07V-K001_BU

Black

2.5

/K019.C3

#150696

=20CBA +00GH001 -B3

B-A01

=20CBA +00GH001 -F1

J-A01

1005

H07V-K001_BU

Black

2.5

/K019.D3

#150696

=20CBA +00GH001 -B3

B-A01

=20CBA +00GH001 -B4

C-A02

1006

H07V-K001_BU

Black

2.5

/K019.D3

#150696

=20CBA +00GH001 -B4

C-A02

=20CBA +00GH001 -B3

B-A01

1007

H07V-K001_BU

Black

2.5

/K019.D3

#150696

=20CBA +00GH001 -B3

B-A01

=20CBA +00GH001 -E2

C-A01

1008

H07V-K001_BU

Black

2.5

/K019.D3

240VAC-P

=20CBA +00GH001 -X901

F-B03

=20CBA +00GH001 -F18

F-C01

1009

H07V-K001_BU

Black

2.5

/K019.B4

#150696

=20CBA +00GH001 -X3

F-C02

=20CBA +00GH001 -F18

F-C01

1010

H07V-K001_BU

Black

2.5

/K019.E4

240VAC-P

=20CBA +00GH001 -X901

F-B03

=20CBA +00GH001 -F2

J-B01

1011

H07V-K001_BU

Black

2.5

/K019.B5

#150696

=20CBA +00GH001 -G1

D-B01

=20CBA +00GH001 -F2

J-B01

1012

H07V-K001_BU

Black

2.5

/K019.E5

240VAC-P

=20CBA +00GH002 -F21

J-D02

=20CBA +00GH002 -X901

F-B01

1013

H07V-K001_BU

Black

2.5

/K020.C2

#150698

=20CBA +00GH002 -B6

J-D01

=20CBA +00GH002 -F21

J-D02

1014

H07V-K001_BU

Black

2.5

/K020.D2

#150698

=20CBA +00GH002 -E3

J-D03

=20CBA +00GH002 -B6

J-D01

1015

H07V-K001_BU

Black

2.5

/K020.E2

240VAC-P

=20CBA +00GH002 -F19

J-A01

=20CBA +00GH002 -X901

F-B01

1016

H07V-K001_BU

Black

2.5

/K020.C3

#150705

=20CBA +00GH002 -B7

B-A01

=20CBA +00GH002 -F19

J-A01

1017

H07V-K001_BU

Black

2.5

/K020.D3

#150705

=20CBA +00GH002 -B7

B-A01

=20CBA +00GH002 -B8

C-A02

1018

H07V-K001_BU

Black

2.5

/K020.D3

240VAC-P

=20CBA +00GH002 -B7

B-A01

=20CBA +00GH002 -B8

C-A02

1019

H07V-K001_BU

Black

2.5

/K020.D3

240VAC-P

=20CBA +00GH002 -E4

C-A01

=20CBA +00GH002 -B7

B-A01

1020

H07V-K001_BU

Black

2.5

/K020.E3

240VAC-P

=20CBA +00GH002 -F34

F-C01

=20CBA +00GH002 -X901

F-B01

1021

H07V-K001_BU

Black

2.5

/K020.C4

#150698

=20CBA +00GH002 -X7

F-C02

=20CBA +00GH002 -F34

F-C01

1022

H07V-K001_BU

Black

2.5

/K020.E4

240VAC-P

=20CBA +00GH002 -X901

F-B01

=20CBA +00GH002 -F20

J-B01

1023

H07V-K001_BU

Black

2.5

/K020.B5

#150704

=20CBA +00GH002 -G2

D-B01

=20CBA +00GH002 -F20

J-B01

1024

H07V-K001_BU

Black

2.5

/K020.E5

240VAC-P

=20CBA +00GH003 -F37

J-D02

=20CBA +00GH003 -X901

F-B01

1025

H07V-K001_BU

Black

2.5

/K021.C2

#150708

=20CBA +00GH003 -B10

J-D01

=20CBA +00GH003 -F37

J-D02

1026

H07V-K001_BU

Black

2.5

/K021.D2

#150708

=20CBA +00GH003 -E5

J-D03

=20CBA +00GH003 -B10

J-D01

1027

H07V-K001_BU

Black

2.5

/K021.E2

240VAC-P

=20CBA +00GH003 -F35

J-A01

=20CBA +00GH003 -X901

F-B01

1028

H07V-K001_BU

Black

2.5

/K021.C3

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W002
Sheet
W001

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

#150710

=20CBA +00GH003 -B11

B-A01

=20CBA +00GH003 -F35

J-A01

1029

H07V-K001_BU

Black

2.5

/K021.D3

#150710

=20CBA +00GH003 -B11

B-A01

=20CBA +00GH003 -B12

C-A02

1030

H07V-K001_BU

Black

2.5

/K021.D3

#26958

=20CBA +00GH003 -B12

C-A02

=20CBA +00GH003 -B11

B-A01

1031

H07V-K001_BU

Black

2.5

/K021.D3

#26958

=20CBA +00GH003 -B11

B-A01

=20CBA +00GH003 -E6

C-A01

1032

H07V-K001_BU

Black

2.5

/K021.D3

240VAC-P

=20CBA +00GH003 -X901

F-B01

=20CBA +00GH003 -F41

F-C01

1033

H07V-K001_BU

Black

2.5

/K021.B4

#150712

=20CBA +00GH003 -X7

F-C02

=20CBA +00GH003 -F41

F-C01

1034

H07V-K001_BU

Black

2.5

/K021.E4

240VAC-P

=20CBA +00GH003 -X901

F-B01

=20CBA +00GH003 -F36

J-B01

1035

H07V-K001_BU

Black

2.5

/K021.B5

#150714

=20CBA +00GH003 -F36

J-B01

=20CBA +00GH003 -G3

D-B01

1036

H07V-K001_BU

Black

2.5

/K021.C5

240VAC-N

=20CBA +00GH001 -F3

J-D02

=20CBA +00GH001 -X901

F-B03

1501

H07V-K001_BU

Black

2.5

/K019.C2

#150695

=20CBA +00GH001 -F3

J-D02

=20CBA +00GH001 -E1

J-D03

1502

H07V-K001_BU

Black

2.5

/K019.C2

240VAC-N

=20CBA +00GH001 -F1

J-A01

=20CBA +00GH001 -X901

F-B03

1503

H07V-K001_BU

Black

2.5

/K019.C3

#150697

=20CBA +00GH001 -F1

J-A01

=20CBA +00GH001 -E2

C-A01

1504

H07V-K001_BU

Black

2.5

/K019.C3

240VAC-N

=20CBA +00GH001 -X901

F-B03

=20CBA +00GH001 -F18

F-C01

1505

H07V-K001_BU

Black

2.5

/K019.B4

#150697

=20CBA +00GH001 -X3

F-C02

=20CBA +00GH001 -F18

F-C01

1506

H07V-K001_BU

Black

2.5

/K019.E4

240VAC-N

=20CBA +00GH001 -X901

F-B03

10

=20CBA +00GH001 -F2

J-B01

1507

H07V-K001_BU

Black

2.5

/K019.B5

#150697

=20CBA +00GH001 -G1

D-B01

=20CBA +00GH001 -F2

J-B01

1508

H07V-K001_BU

Black

2.5

/K019.E5

240VAC-N

=20CBA +00GH002 -F21

J-D02

=20CBA +00GH002 -X901

F-B01

1509

H07V-K001_BU

Black

2.5

/K020.C2

#150701

=20CBA +00GH002 -F21

J-D02

=20CBA +00GH002 -E3

J-D03

1510

H07V-K001_BU

Black

2.5

/K020.C2

240VAC-N

=20CBA +00GH002 -F19

J-A01

=20CBA +00GH002 -X901

F-B01

1511

H07V-K001_BU

Black

2.5

/K020.C3

#150700

=20CBA +00GH002 -F19

J-A01

=20CBA +00GH002 -E4

C-A01

1512

H07V-K001_BU

Black

2.5

/K020.C3

240VAC-N

=20CBA +00GH002 -F34

F-C01

=20CBA +00GH002 -X901

F-B01

1513

H07V-K001_BU

Black

2.5

/K020.C4

#150702

=20CBA +00GH002 -X7

F-C02

=20CBA +00GH002 -F34

F-C01

1514

H07V-K001_BU

Black

2.5

/K020.E4

240VAC-N

=20CBA +00GH002 -F20

J-B01

=20CBA +00GH002 -X901

F-B01

10

1515

H07V-K001_BU

Black

2.5

/K020.C5

#150703

=20CBA +00GH002 -G2

D-B01

=20CBA +00GH002 -F20

J-B01

1516

H07V-K001_BU

Black

2.5

/K020.E5

240VAC-N

=20CBA +00GH003 -F37

J-D02

=20CBA +00GH003 -X901

F-B01

1517

H07V-K001_BU

Black

2.5

/K021.C2

#150709

=20CBA +00GH003 -F37

J-D02

=20CBA +00GH003 -E5

J-D03

1518

H07V-K001_BU

Black

2.5

/K021.C2

240VAC-N

=20CBA +00GH003 -F35

J-A01

=20CBA +00GH003 -X901

F-B01

1519

H07V-K001_BU

Black

2.5

/K021.C3

#150711

=20CBA +00GH003 -E6

C-A01

=20CBA +00GH003 -F35

J-A01

1520

H07V-K001_BU

Black

2.5

/K021.E3

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W003
Sheet
W002

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

240VAC-N

=20CBA +00GH003 -X901

F-B01

=20CBA +00GH003 -F41

F-C01

1521

H07V-K001_BU

Black

2.5

/K021.B4

#150713

=20CBA +00GH003 -X7

F-C02

=20CBA +00GH003 -F41

F-C01

1522

H07V-K001_BU

Black

2.5

/K021.E4

240VAC-N

=20CBA +00GH003 -X901

F-B01

=20CBA +00GH003 -F36

J-B01

1523

H07V-K001_BU

Black

2.5

/K021.B5

#150715

=20CBA +00GH003 -F36

J-B01

=20CBA +00GH003 -G3

D-B01

1524

H07V-K001_BU

Black

2.5

/K021.C5

+110VDC-1

=20CBA +00GH001 -X401

E-A01

=20CBA +00GH001 -F4

B-B01

2001

H07V-K001_BU

Grey

2.5

/K001.B2

+110VDC-1

=20CBA +00GH001 -X401

E-A01

=20CBA +00GH002 -X401

C-B01

2002

H07V-K001_BU

Grey

2.5

/K001.B2

+110VDC-2

=20CBA +00GH001 -X402

E-A02

=20CBA +00GH001 -F5

B-B03

2003

H07V-K001_BU

Grey

2.5

/K001.B3

+110VDC-2

=20CBA +00GH001 -X402

E-A02

=20CBA +00GH002 -X402

C-B02

2004

H07V-K001_BU

Grey

2.5

/K001.B3

#150661

=20CBA +00GH001 -F4

B-B01

=20CBA +00GH001 -K1

B-B02

A1

2005

H07V-K001_BU

Grey

2.5

/K001.B2

#150661

=20CBA +00GH001 -R2

F-A01

P2

=20CBA +00GH001 -F4

B-B01

2006

H07V-K001_BU

Grey

2.5

/K001.C2

#150663

=20CBA +00GH001 -F5

B-B03

=20CBA +00GH001 -K2

B-B04

A1

2007

H07V-K001_BU

Grey

2.5

/K001.B3

#150663

=20CBA +00GH001 -R2

F-A01

P3

=20CBA +00GH001 -F5

B-B03

2008

H07V-K001_BU

Grey

2.5

/K001.C2

#150679

=20CBA +00GH001 -X431

C-B01

=20CBA +00GH001 -R2

F-A01

P1

2009

H07V-K001_BU

Grey

2.5

/K001.D5

#150679

=20CBA +00GH001 -X431

C-B01

=20CBA +00GH001 -F6

B-C01

2010

H07V-K001_BU

Grey

/K001.D5

#150679

=20CBA +00GH001 -F7

B-C05

=20CBA +00GH001 -X431

C-B01

2011

H07V-K001_BU

Grey

/K001.E7

4J1+

=20CBA +00GH001 -F6

B-C01

=20CBA +00GH001 -T1

B-C02

2013

H07V-K001_BU

Grey

/K001.E6

4J2+

=20CBA +00GH001 -F7

B-C05

=20CBA +00GH001 -T2

B-C04

2014

H07V-K001_BU

Grey

/K001.E7

+110VDC-1

=20CBA +00GH002 -X401

C-B01

=20CBA +00GH002 -F22

B-B01

2018

H07V-K001_BU

Grey

2.5

/K006.B2

+110VDC-2

=20CBA +00GH002 -X402

C-B02

=20CBA +00GH002 -F23

B-B03

2019

H07V-K001_BU

Grey

2.5

/K006.B3

#150681

=20CBA +00GH002 -F22

B-B01

=20CBA +00GH002 -K11

B-B02

A1

2020

H07V-K001_BU

Grey

2.5

/K006.B2

#150681

=20CBA +00GH002 -R5

F-A01

P2

=20CBA +00GH002 -F22

B-B01

2021

H07V-K001_BU

Grey

2.5

/K006.C2

#150683

=20CBA +00GH002 -F23

B-B03

=20CBA +00GH002 -K12

B-B04

A1

2022

H07V-K001_BU

Grey

2.5

/K006.B3

#150683

=20CBA +00GH002 -F23

B-B03

=20CBA +00GH002 -R5

F-A01

P3

2023

H07V-K001_BU

Grey

2.5

/K006.B3

#150686

=20CBA +00GH002 -R5

F-A01

P1

=20CBA +00GH002 -X431

C-B03

2024

H07V-K001_BU

Grey

2.5

/K006.C2

#150686

=20CBA +00GH002 -X431

C-B03

=20CBA +00GH002 -F27

B-D01

2025

H07V-K001_BU

Grey

/K006.D5

#150686

=20CBA +00GH002 -X431

C-B03

=20CBA +00GH002 -F28

B-D05

2026

H07V-K001_BU

Grey

/K006.D5

#150686

=20CBA +00GH002 -X431

C-B03

=20CBA +00GH002 -F29

B-E01

2027

H07V-K001_BU

Grey

/K006.D5

#150686

=20CBA +00GH002 -X431

C-B03

=20CBA +00GH002 -F30

B-F01

2028

H07V-K001_BU

Grey

/K007.C1

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W004
Sheet
W003

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

#150686

=20CBA +00GH002 -X431

C-B03

=20CBA +00GH002 -F31

B-G01

2029

H07V-K001_BU

Grey

/K007.C1

#150686

=20CBA +00GH002 -X431

C-B03

=20CBA +00GH002 -F32

B-H01

2030

H07V-K001_BU

Grey

/K007.C1

#150686

=20CBA +00GH002 -X431

C-B03

=20CBA +00GH003 -X431

F-A01

2031

H07V-K001_BU

Grey

2.5

/K007.C5

4J3+

=20CBA +00GH002 -F27

B-D01

=20CBA +00GH002 -T12

B-D02

2032

H07V-K001_BU

Grey

/K006.E6

4J4+

=20CBA +00GH002 -F28

B-D05

=20CBA +00GH002 -T13

B-D04

2033

H07V-K001_BU

Grey

/K006.E7

4H1+

=20CBA +00GH002 -F29

B-E01

=20CBA +00GH002 -K14

B-E03

2034

H07V-K001_BU

Grey

/K006.E8

4H2+

=20CBA +00GH002 -F30

B-F01

=20CBA +00GH002 -K25

B-F03

2035

H07V-K001_BU

Grey

/K007.D2

4H3+

=20CBA +00GH002 -K36

B-G03

=20CBA +00GH002 -F31

B-G01

2036A

H07V-K001_BU

Grey

/K028.D5

4H8+

=20CBA +00GH002 -K41

B-H03

=20CBA +00GH002 -F32

B-H01

2037A

H07V-K001_BU

Grey

/K028.D7

#150686

=20CBA +00GH003 -X431

F-A01

=20CBA +00GH003 -F38

F-A02

2038

H07V-K001_BU

Grey

2.5

/K013.B1

4C+

=20CBA +00GH003 -X432

F-A03

=20CBA +00GH003 -F38

F-A02

2039

H07V-K001_BU

Grey

2.5

/K013.D2

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -X432

F-A03

2040

H07V-K001_BU

Grey

2.5

/M005.A2

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K55

C-B03

A7

2041

H07V-K001_BU

Grey

/M005.A2

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K54

C-B02

A7

2042

H07V-K001_BU

Grey

/M005.A2

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K57

C-B05

A7

2043

H07V-K001_BU

Grey

/M005.A2

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K56

C-B04

A7

2044

H07V-K001_BU

Grey

/M005.A2

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K66

C-B14

2045

H07V-K001_BU

Grey

/M005.A2

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K59

C-B07

A7

2046

H07V-K001_BU

Grey

/M005.A4

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K58

C-B06

A7

2047

H07V-K001_BU

Grey

/M005.A4

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K61

C-B09

A7

2048

H07V-K001_BU

Grey

/M005.A4

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K60

C-B08

A7

2049

H07V-K001_BU

Grey

/M005.A4

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K66

C-B14

2050

H07V-K001_BU

Grey

/M005.A4

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K63

C-B11

A7

2051

H07V-K001_BU

Grey

/M005.A6

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K62

C-B10

A7

2052

H07V-K001_BU

Grey

/M005.A6

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K65

C-B13

A7

2053

H07V-K001_BU

Grey

/M005.A6

4C+

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K64

C-B12

A7

2054

H07V-K001_BU

Grey

/M005.A6

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -X432

F-A03

2055

H07V-K001_BU

Grey

2.5

/M005.D2

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K69

C-C03

A7

2056

H07V-K001_BU

Grey

/M005.D2

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W005
Sheet
W004

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K68

C-C02

A7

2057

H07V-K001_BU

Grey

/M005.D2

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K71

C-C05

A7

2058

H07V-K001_BU

Grey

/M005.D2

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K70

C-C04

A7

2059

H07V-K001_BU

Grey

/M005.D2

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K80

C-C14

2060

H07V-K001_BU

Grey

/M005.D2

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K73

C-C07

A7

2061

H07V-K001_BU

Grey

/M005.D4

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K72

C-C06

A7

2062

H07V-K001_BU

Grey

/M005.D4

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K75

C-C09

A7

2063

H07V-K001_BU

Grey

/M005.D4

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K74

C-C08

A7

2064

H07V-K001_BU

Grey

/M005.D4

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K80

C-C14

2065

H07V-K001_BU

Grey

/M005.D4

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K77

C-C11

A7

2066

H07V-K001_BU

Grey

/M005.D6

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K76

C-C10

A7

2067

H07V-K001_BU

Grey

/M005.D6

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K79

C-C13

A7

2068

H07V-K001_BU

Grey

/M005.D6

4C+

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K78

C-C12

A7

2069

H07V-K001_BU

Grey

/M005.D6

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -X432

F-A03

2070

H07V-K001_BU

Grey

2.5

/M006.A2

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K83

C-D03

A7

2071

H07V-K001_BU

Grey

/M006.A2

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K82

C-D02

A7

2072

H07V-K001_BU

Grey

/M006.A2

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K85

C-D05

A7

2073

H07V-K001_BU

Grey

/M006.A2

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K84

C-D04

A7

2074

H07V-K001_BU

Grey

/M006.A2

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K94

C-D14

2075

H07V-K001_BU

Grey

/M006.A2

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K87

C-D07

A7

2076

H07V-K001_BU

Grey

/M006.A4

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K86

C-D06

A7

2077

H07V-K001_BU

Grey

/M006.A4

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K89

C-D09

A7

2078

H07V-K001_BU

Grey

/M006.A4

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K88

C-D08

A7

2079

H07V-K001_BU

Grey

/M006.A4

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K94

C-D14

2080

H07V-K001_BU

Grey

/M006.A4

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K91

C-D11

A7

2081

H07V-K001_BU

Grey

/M006.A6

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K90

C-D10

A7

2082

H07V-K001_BU

Grey

/M006.A6

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K93

C-D13

A7

2083

H07V-K001_BU

Grey

/M006.A6

4C+

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K92

C-D12

A7

2084

H07V-K001_BU

Grey

/M006.A6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W006
Sheet
W005

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

4C+

=20CBA +00GH003 -K108

C-E14

=20CBA +00GH003 -X432

F-A03

2085

H07V-K001_BU

Grey

2.5

/M006.D2

4C+

=20CBA +00GH003 -K108

C-E14

=20CBA +00GH003 -K108

C-E14

2086

H07V-K001_BU

Grey

/M006.D2

4C+

=20CBA +00GH003 -K108

C-E14

=20CBA +00GH003 -K108

C-E14

2087

H07V-K001_BU

Grey

/M006.D4

#150718

=20CBA +00GH003 -K55

C-B03

A9

=20CBA +00GH003 -K55

C-B03

A5

2088

H07V-K001_BU

Grey

/M101.C1

#150719

=20CBA +00GH003 -K55

C-B03

C1

=20CBA +00GH003 -K55

C-B03

A6

2089

H07V-K001_BU

Grey

/M101.C1

#33136

=20CBA +00GH003 -K55

C-B03

C2

=20CBA +00GH001 -K5

B-E11

14

2090

H07V-K001_BU

Grey

/M101.C1

#33137

=20CBA +00GH003 -K55

C-B03

A10

=20CBA +00GH001 -K5

B-E11

13+

2091

H07V-K001_BU

Grey

/M101.C1

#150720

=20CBA +00GH003 -K54

C-B02

A9

=20CBA +00GH003 -K54

C-B02

A5

2092

H07V-K001_BU

Grey

/M104.C1

#150721

=20CBA +00GH003 -K54

C-B02

C1

=20CBA +00GH003 -K54

C-B02

A6

2093

H07V-K001_BU

Grey

/M104.C1

#150722

=20CBA +00GH003 -K57

C-B05

A9

=20CBA +00GH003 -K57

C-B05

A5

2094

H07V-K001_BU

Grey

/M107.C1

#150723

=20CBA +00GH003 -K57

C-B05

A6

=20CBA +00GH003 -K57

C-B05

C1

2095

H07V-K001_BU

Grey

/M107.C1

#150724

=20CBA +00GH003 -K56

C-B04

A9

=20CBA +00GH003 -K56

C-B04

A5

2096

H07V-K001_BU

Grey

/M110.C1

#150725

=20CBA +00GH003 -K56

C-B04

A6

=20CBA +00GH003 -K56

C-B04

C1

2097

H07V-K001_BU

Grey

/M110.C1

#150726

=20CBA +00GH003 -K59

C-B07

A9

=20CBA +00GH003 -K59

C-B07

A5

2098

H07V-K001_BU

Grey

/M113.C1

#150727

=20CBA +00GH003 -K59

C-B07

A6

=20CBA +00GH003 -K59

C-B07

C1

2099

H07V-K001_BU

Grey

/M113.C1

#150728

=20CBA +00GH003 -K58

C-B06

A9

=20CBA +00GH003 -K58

C-B06

A5

2100

H07V-K001_BU

Grey

/M116.C1

#150729

=20CBA +00GH003 -K58

C-B06

A6

=20CBA +00GH003 -K58

C-B06

C1

2101

H07V-K001_BU

Grey

/M116.C1

#160551

=20CBA +00GH001 -K1

B-B02

11

=20CBA +00GH001 -K2

B-B04

11

2102

H07V-K001_BU

Grey

/M111.B3

#160551

=20CBA +00GH002 -K11

B-B02

11

=20CBA +00GH001 -K2

B-B04

11

2103

H07V-K001_BU

Grey

/M111.B5

#160551

=20CBA +00GH002 -K11

B-B02

11

=20CBA +00GH002 -K12

B-B04

11

2106

H07V-K001_BU

Grey

/M111.B5

#160549

=20CBA +00GH001 -K1

B-B02

14

=20CBA +00GH003 -K56

C-B04

C6

2113

H07V-K001_BU

Grey

/M111.B3

#160550

=20CBA +00GH001 -K2

B-B04

14

=20CBA +00GH003 -K56

C-B04

C7

2114

H07V-K001_BU

Grey

/M111.B4

#160556

=20CBA +00GH002 -K11

B-B02

14

=20CBA +00GH003 -K56

C-B04

C8

2117

H07V-K001_BU

Grey

/M111.B5

#160557

=20CBA +00GH002 -K12

B-B04

14

=20CBA +00GH003 -K56

C-B04

C9

2118

H07V-K001_BU

Grey

/M111.B6

#160542

=20CBA +00GH001 -B1

I-A01

=20CBA +00GH003 -K56

C-B04

C10

2124

H07V-K001_BU

Grey

/M111.B7

#160542

=20CBA +00GH001 -B1

I-A01

=20CBA +00GH002 -B5

I-A01

2125

H07V-K001_BU

Grey

/M111.B7

#160542

=20CBA +00GH002 -B5

I-A01

=20CBA +00GH003 -B9

I-A01

2126

H07V-K001_BU

Grey

/M111.B8

#160543

=20CBA +00GH002 -B5

I-A01

=20CBA +00GH003 -B9

I-A01

2127

H07V-K001_BU

Grey

/M111.B8

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W007
Sheet
W006

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

#160543

=20CBA +00GH001 -B1

I-A01

=20CBA +00GH002 -B5

I-A01

2128

H07V-K001_BU

Grey

/M111.B7

#160543

=20CBA +00GH001 -B1

I-A01

=20CBA +00GH003 -K56

C-B04

B10

2129

H07V-K001_BU

Grey

/M111.B7

#150730

=20CBA +00GH003 -K61

C-B09

A5

=20CBA +00GH003 -K61

C-B09

A9

2130

H07V-K001_BU

Grey

/M119.C1

#150731

=20CBA +00GH003 -K61

C-B09

A6

=20CBA +00GH003 -K61

C-B09

C1

2131

H07V-K001_BU

Grey

/M119.C1

#150732

=20CBA +00GH003 -K60

C-B08

A5

=20CBA +00GH003 -K60

C-B08

A9

2132

H07V-K001_BU

Grey

/M122.C1

#150733

=20CBA +00GH003 -K60

C-B08

A6

=20CBA +00GH003 -K60

C-B08

C1

2133

H07V-K001_BU

Grey

/M122.C1

#150734

=20CBA +00GH003 -K63

C-B11

A5

=20CBA +00GH003 -K63

C-B11

A9

2134

H07V-K001_BU

Grey

/M125.C1

#150735

=20CBA +00GH003 -K63

C-B11

A6

=20CBA +00GH003 -K63

C-B11

C1

2135

H07V-K001_BU

Grey

/M125.C1

#150736

=20CBA +00GH003 -K62

C-B10

A5

=20CBA +00GH003 -K62

C-B10

A9

2136

H07V-K001_BU

Grey

/M128.C1

#150737

=20CBA +00GH003 -K62

C-B10

A6

=20CBA +00GH003 -K62

C-B10

C1

2137

H07V-K001_BU

Grey

/M128.C1

#150738

=20CBA +00GH003 -K65

C-B13

A5

=20CBA +00GH003 -K65

C-B13

A9

2138

H07V-K001_BU

Grey

/M131.C1

#150739

=20CBA +00GH003 -K65

C-B13

A6

=20CBA +00GH003 -K65

C-B13

C1

2139

H07V-K001_BU

Grey

/M131.C1

#150740

=20CBA +00GH003 -K64

C-B12

A5

=20CBA +00GH003 -K64

C-B12

A9

2140

H07V-K001_BU

Grey

/M134.C1

#150741

=20CBA +00GH003 -K64

C-B12

A6

=20CBA +00GH003 -K64

C-B12

C1

2141

H07V-K001_BU

Grey

/M134.C1

#150742

=20CBA +00GH003 -K69

C-C03

A5

=20CBA +00GH003 -K69

C-C03

A9

2142

H07V-K001_BU

Grey

/M137.C1

#150743

=20CBA +00GH003 -K69

C-C03

A6

=20CBA +00GH003 -K69

C-C03

C1

2143

H07V-K001_BU

Grey

/M137.C1

#150744

=20CBA +00GH003 -K68

C-C02

A9

=20CBA +00GH003 -K68

C-C02

A5

2144

H07V-K001_BU

Grey

/M140.C1

#150745

=20CBA +00GH003 -K68

C-C02

A6

=20CBA +00GH003 -K68

C-C02

C1

2145

H07V-K001_BU

Grey

/M140.C1

#150746

=20CBA +00GH003 -K71

C-C05

A9

=20CBA +00GH003 -K71

C-C05

A5

2146

H07V-K001_BU

Grey

/M143.C1

#150747

=20CBA +00GH003 -K71

C-C05

A6

=20CBA +00GH003 -K71

C-C05

C1

2147

H07V-K001_BU

Grey

/M143.C1

#150748

=20CBA +00GH003 -K70

C-C04

A5

=20CBA +00GH003 -K70

C-C04

A9

2148

H07V-K001_BU

Grey

/M146.C1

#150749

=20CBA +00GH003 -K70

C-C04

A6

=20CBA +00GH003 -K70

C-C04

C1

2149

H07V-K001_BU

Grey

/M146.C1

#150750

=20CBA +00GH003 -K73

C-C07

A9

=20CBA +00GH003 -K73

C-C07

A5

2150

H07V-K001_BU

Grey

/M149.C1

#150751

=20CBA +00GH003 -K73

C-C07

A6

=20CBA +00GH003 -K73

C-C07

C1

2151

H07V-K001_BU

Grey

/M149.C1

#33138

=20CBA +00GH003 -K73

C-C07

C2

=20CBA +00GH001 -K6

B-E12

14

2152

H07V-K001_BU

Grey

/M149.C1

#33139

=20CBA +00GH003 -K73

C-C07

A10

=20CBA +00GH001 -K6

B-E12

13+

2153

H07V-K001_BU

Grey

/M149.C1

#150752

=20CBA +00GH003 -K72

C-C06

A9

=20CBA +00GH003 -K72

C-C06

A5

2154

H07V-K001_BU

Grey

/M152.C1

#150753

=20CBA +00GH003 -K72

C-C06

A6

=20CBA +00GH003 -K72

C-C06

C1

2155

H07V-K001_BU

Grey

/M152.C1

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W008
Sheet
W007

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

#150754

=20CBA +00GH003 -K75

C-C09

A9

=20CBA +00GH003 -K75

C-C09

A5

2156

H07V-K001_BU

Grey

/M155.C1

#150755

=20CBA +00GH003 -K75

C-C09

A6

=20CBA +00GH003 -K75

C-C09

C1

2157

H07V-K001_BU

Grey

/M155.C1

#150756

=20CBA +00GH003 -K74

C-C08

A5

=20CBA +00GH003 -K74

C-C08

A9

2158

H07V-K001_BU

Grey

/M158.C1

#150757

=20CBA +00GH003 -K74

C-C08

A6

=20CBA +00GH003 -K74

C-C08

C1

2159

H07V-K001_BU

Grey

/M158.C1

#150758

=20CBA +00GH003 -K77

C-C11

A9

=20CBA +00GH003 -K77

C-C11

A5

2160

H07V-K001_BU

Grey

/M161.C1

#150759

=20CBA +00GH003 -K77

C-C11

A6

=20CBA +00GH003 -K77

C-C11

C1

2161

H07V-K001_BU

Grey

/M161.C1

#150760

=20CBA +00GH003 -K76

C-C10

A9

=20CBA +00GH003 -K76

C-C10

A5

2162

H07V-K001_BU

Grey

/M164.C1

#150761

=20CBA +00GH003 -K76

C-C10

C1

=20CBA +00GH003 -K76

C-C10

A6

2163

H07V-K001_BU

Grey

/M164.C1

#150762

=20CBA +00GH003 -K79

C-C13

A9

=20CBA +00GH003 -K79

C-C13

A5

2164

H07V-K001_BU

Grey

/M167.C1

#150763

=20CBA +00GH003 -K79

C-C13

A6

=20CBA +00GH003 -K79

C-C13

C1

2165

H07V-K001_BU

Grey

/M167.C1

#150764

=20CBA +00GH003 -K78

C-C12

A5

=20CBA +00GH003 -K78

C-C12

A9

2166

H07V-K001_BU

Grey

/M170.C1

#150765

=20CBA +00GH003 -K78

C-C12

A6

=20CBA +00GH003 -K78

C-C12

C1

2167

H07V-K001_BU

Grey

/M170.C1

#150766

=20CBA +00GH003 -K83

C-D03

A9

=20CBA +00GH003 -K83

C-D03

A5

2168

H07V-K001_BU

Grey

/M173.C1

#150767

=20CBA +00GH003 -K83

C-D03

A6

=20CBA +00GH003 -K83

C-D03

C1

2169

H07V-K001_BU

Grey

/M173.C1

#150768

=20CBA +00GH003 -K82

C-D02

A5

=20CBA +00GH003 -K82

C-D02

A9

2170

H07V-K001_BU

Grey

/M176.C1

#150769

=20CBA +00GH003 -K82

C-D02

A6

=20CBA +00GH003 -K82

C-D02

C1

2171

H07V-K001_BU

Grey

/M176.C1

#150770

=20CBA +00GH003 -K85

C-D05

A5

=20CBA +00GH003 -K85

C-D05

A9

2172

H07V-K001_BU

Grey

/M179.C1

#150771

=20CBA +00GH003 -K85

C-D05

A6

=20CBA +00GH003 -K85

C-D05

C1

2173

H07V-K001_BU

Grey

0.5

/M179.C1

#150772

=20CBA +00GH003 -K84

C-D04

A9

=20CBA +00GH003 -K84

C-D04

A5

2174

H07V-K001_BU

Grey

/M182.C1

#150773

=20CBA +00GH003 -K84

C-D04

A6

=20CBA +00GH003 -K84

C-D04

C1

2175

H07V-K001_BU

Grey

/M182.C1

#150774

=20CBA +00GH003 -K87

C-D07

A5

=20CBA +00GH003 -K87

C-D07

A9

2176

H07V-K001_BU

Grey

/M185.C1

#150775

=20CBA +00GH003 -K87

C-D07

A6

=20CBA +00GH003 -K87

C-D07

C1

2177

H07V-K001_BU

Grey

/M185.C1

#150776

=20CBA +00GH003 -K86

C-D06

A5

=20CBA +00GH003 -K86

C-D06

A9

2178

H07V-K001_BU

Grey

/M188.C1

#150777

=20CBA +00GH003 -K86

C-D06

A6

=20CBA +00GH003 -K86

C-D06

C1

2179

H07V-K001_BU

Grey

/M188.C1

#150778

=20CBA +00GH003 -K89

C-D09

A5

=20CBA +00GH003 -K89

C-D09

A9

2180

H07V-K001_BU

Grey

/M191.C1

#150779

=20CBA +00GH003 -K89

C-D09

A6

=20CBA +00GH003 -K89

C-D09

C1

2181

H07V-K001_BU

Grey

/M191.C1

#150780

=20CBA +00GH003 -K88

C-D08

A5

=20CBA +00GH003 -K88

C-D08

A9

2182

H07V-K001_BU

Grey

/M194.C1

#150781

=20CBA +00GH003 -K88

C-D08

A6

=20CBA +00GH003 -K88

C-D08

C1

2183

H07V-K001_BU

Grey

/M194.C1

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W009
Sheet
W008

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

#150782

=20CBA +00GH003 -K91

C-D11

A5

=20CBA +00GH003 -K91

C-D11

A9

2184

H07V-K001_BU

Grey

/M197.C1

#150783

=20CBA +00GH003 -K91

C-D11

A6

=20CBA +00GH003 -K91

C-D11

C1

2185

H07V-K001_BU

Grey

/M197.C1

#33140

=20CBA +00GH003 -K91

C-D11

C2

=20CBA +00GH001 -K7

B-E13

14

2186

H07V-K001_BU

Grey

/M197.C1

#33141

=20CBA +00GH003 -K91

C-D11

A10

=20CBA +00GH001 -K7

B-E13

13+

2187

H07V-K001_BU

Grey

/M197.C1

#150784

=20CBA +00GH003 -K90

C-D10

A5

=20CBA +00GH003 -K90

C-D10

A9

2188

H07V-K001_BU

Grey

/M200.C1

#150785

=20CBA +00GH003 -K90

C-D10

A6

=20CBA +00GH003 -K90

C-D10

C1

2189

H07V-K001_BU

Grey

/M200.C1

#150786

=20CBA +00GH003 -K93

C-D13

A5

=20CBA +00GH003 -K93

C-D13

A9

2190

H07V-K001_BU

Grey

/M203.C1

#150787

=20CBA +00GH003 -K93

C-D13

A6

=20CBA +00GH003 -K93

C-D13

C1

2191

H07V-K001_BU

Grey

/M203.C1

#150788

=20CBA +00GH003 -K92

C-D12

A9

=20CBA +00GH003 -K92

C-D12

A5

2192

H07V-K001_BU

Grey

/M206.C1

#150789

=20CBA +00GH003 -K92

C-D12

A6

=20CBA +00GH003 -K92

C-D12

C1

2193

H07V-K001_BU

Grey

/M206.C1

#160551

=20CBA +00GH002 -K12

B-B04

11

=20CBA +00GH003 -K56

C-B04

B9

2194

H07V-K001_BU

Grey

/M111.B6

#170059

=20CBA +00GH002 -X492

F-A02

=20CBA +00GH002 -X492

F-A02

2195

H07V-K001_BU

Grey

/Q131.D4

#170059

=20CBA +00GH002 -X492

F-A02

=20CBA +00GH002 -X492

F-A02

2196

H07V-K001_BU

Grey

/Q131.D5

-110VDC-1

=20CBA +00GH001 -X401

E-A01

=20CBA +00GH001 -F4

B-B01

3001

H07V-K001_BU

Grey

2.5

/K001.B2

-110VDC-1

=20CBA +00GH001 -X401

E-A01

=20CBA +00GH002 -X401

C-B01

3002

H07V-K001_BU

Grey

2.5

/K001.B2

-110VDC-2

=20CBA +00GH001 -F5

B-B03

=20CBA +00GH001 -X402

E-A02

3003

H07V-K001_BU

Grey

2.5

/K001.B3

-110VDC-2

=20CBA +00GH001 -X402

E-A02

=20CBA +00GH002 -X402

C-B02

3004

H07V-K001_BU

Grey

2.5

/K001.B3

#150662

=20CBA +00GH001 -K1

B-B02

A2

=20CBA +00GH001 -F4

B-B01

3005

H07V-K001_BU

Grey

2.5

/K001.C1

#150662

=20CBA +00GH001 -F4

B-B01

=20CBA +00GH001 -R2

F-A01

N2

3006

H07V-K001_BU

Grey

2.5

/K001.B2

#150664

=20CBA +00GH001 -K2

B-B04

A2

=20CBA +00GH001 -F5

B-B03

3007

H07V-K001_BU

Grey

2.5

/K001.C4

#150664

=20CBA +00GH001 -F5

B-B03

=20CBA +00GH001 -R2

F-A01

N3

3008

H07V-K001_BU

Grey

2.5

/K001.B3

#150680

=20CBA +00GH001 -R2

F-A01

N1

=20CBA +00GH001 -X431

C-B01

3009

H07V-K001_BU

Grey

2.5

/K001.C2

#150680

=20CBA +00GH001 -X431

C-B01

=20CBA +00GH001 -F6

B-C01

3010

H07V-K001_BU

Grey

/K001.E5

#150680

=20CBA +00GH001 -X431

C-B01

=20CBA +00GH001 -F7

B-C05

3011

H07V-K001_BU

Grey

/K001.E5

4J1-

=20CBA +00GH001 -F6

B-C01

=20CBA +00GH001 -T1

B-C02

3013

H07V-K001_BU

Grey

/K001.E6

4J2-

=20CBA +00GH001 -F7

B-C05

=20CBA +00GH001 -T2

B-C04

3014

H07V-K001_BU

Grey

/K001.E7

-110VDC-1

=20CBA +00GH002 -F22

B-B01

=20CBA +00GH002 -X401

C-B01

3018

H07V-K001_BU

Grey

2.5

/K006.B2

-110VDC-2

=20CBA +00GH002 -F23

B-B03

=20CBA +00GH002 -X402

C-B02

3019

H07V-K001_BU

Grey

2.5

/K006.B3

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W010
Sheet
W009

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

#150682

=20CBA +00GH002 -F22

B-B01

=20CBA +00GH002 -K11

B-B02

A2

3020

H07V-K001_BU

Grey

2.5

/K006.B2

#150682

=20CBA +00GH002 -R5

F-A01

N2

=20CBA +00GH002 -F22

B-B01

3021

H07V-K001_BU

Grey

2.5

/K006.C2

#150684

=20CBA +00GH002 -K12

B-B04

A2

=20CBA +00GH002 -F23

B-B03

3022

H07V-K001_BU

Grey

2.5

/K006.C4

#150684

=20CBA +00GH002 -R5

F-A01

N3

=20CBA +00GH002 -F23

B-B03

3023

H07V-K001_BU

Grey

2.5

/K006.C2

#150687

=20CBA +00GH002 -R5

F-A01

N1

=20CBA +00GH002 -X431

C-B03

3024

H07V-K001_BU

Grey

2.5

/K006.C2

#150687

=20CBA +00GH002 -X431

C-B03

=20CBA +00GH002 -F27

B-D01

3025

H07V-K001_BU

Grey

/K006.D5

#150687

=20CBA +00GH002 -X431

C-B03

=20CBA +00GH002 -F28

B-D05

3026

H07V-K001_BU

Grey

/K006.D5

#150687

=20CBA +00GH002 -X431

C-B03

=20CBA +00GH002 -F29

B-E01

3027

H07V-K001_BU

Grey

/K006.D5

#150687

=20CBA +00GH002 -X431

C-B03

=20CBA +00GH002 -F30

B-F01

3028

H07V-K001_BU

Grey

/K007.D1

#150687

=20CBA +00GH002 -X431

C-B03

=20CBA +00GH002 -F31

B-G01

3029

H07V-K001_BU

Grey

/K007.D1

#150687

=20CBA +00GH002 -X431

C-B03

=20CBA +00GH002 -F32

B-H01

3030

H07V-K001_BU

Grey

/K007.D1

#150687

=20CBA +00GH002 -X431

C-B03

=20CBA +00GH003 -X431

F-A01

3031

H07V-K001_BU

Grey

2.5

/K007.D5

4J3-

=20CBA +00GH002 -F27

B-D01

=20CBA +00GH002 -T12

B-D02

3032

H07V-K001_BU

Grey

/K006.E6

4J4-

=20CBA +00GH002 -F28

B-D05

=20CBA +00GH002 -T13

B-D04

3033

H07V-K001_BU

Grey

/K006.E7

4H1-

=20CBA +00GH002 -F29

B-E01

=20CBA +00GH002 -K14

B-E03

3034

H07V-K001_BU

Grey

/K006.E8

4H2-

=20CBA +00GH002 -F30

B-F01

=20CBA +00GH002 -K25

B-F03

3035

H07V-K001_BU

Grey

/K007.D2

4H3-

=20CBA +00GH002 -K36

B-G03

=20CBA +00GH002 -F31

B-G01

3036A

H07V-K001_BU

Grey

/K028.D5

4H8-

=20CBA +00GH002 -K41

B-H03

=20CBA +00GH002 -F32

B-H01

3037A

H07V-K001_BU

Grey

/K028.D7

#150687

=20CBA +00GH003 -X431

F-A01

=20CBA +00GH003 -F38

F-A02

3038

H07V-K001_BU

Grey

2.5

/K013.B1

4C-

=20CBA +00GH003 -X432

F-A03

=20CBA +00GH003 -F38

F-A02

3039

H07V-K001_BU

Grey

2.5

/K013.D2

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -X432

F-A03

3040

H07V-K001_BU

Grey

2.5

/M005.A2

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K55

C-B03

A8

3041

H07V-K001_BU

Grey

/M005.A2

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K54

C-B02

A8

3042

H07V-K001_BU

Grey

/M005.A2

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K57

C-B05

A8

3043

H07V-K001_BU

Grey

/M005.A2

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K56

C-B04

A8

3044

H07V-K001_BU

Grey

/M005.A2

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K66

C-B14

3045

H07V-K001_BU

Grey

/M005.A2

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K59

C-B07

A8

3046

H07V-K001_BU

Grey

/M005.A4

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K58

C-B06

A8

3047

H07V-K001_BU

Grey

/M005.A4

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W011
Sheet
W010

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K61

C-B09

A8

3048

H07V-K001_BU

Grey

/M005.A4

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K60

C-B08

A8

3049

H07V-K001_BU

Grey

/M005.A4

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K66

C-B14

3050

H07V-K001_BU

Grey

/M005.A4

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K63

C-B11

A8

3051

H07V-K001_BU

Grey

/M005.A6

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K62

C-B10

A8

3052

H07V-K001_BU

Grey

/M005.A6

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K65

C-B13

A8

3053

H07V-K001_BU

Grey

/M005.A6

4C-

=20CBA +00GH003 -K66

C-B14

=20CBA +00GH003 -K64

C-B12

A8

3054

H07V-K001_BU

Grey

/M005.A6

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -X432

F-A03

3055

H07V-K001_BU

Grey

2.5

/M005.D2

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K69

C-C03

A8

3056

H07V-K001_BU

Grey

/M005.D2

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K68

C-C02

A8

3057

H07V-K001_BU

Grey

/M005.D2

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K71

C-C05

A8

3058

H07V-K001_BU

Grey

/M005.D2

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K70

C-C04

A8

3059

H07V-K001_BU

Grey

/M005.D2

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K80

C-C14

3060

H07V-K001_BU

Grey

/M005.D2

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K73

C-C07

A8

3061

H07V-K001_BU

Grey

/M005.D4

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K72

C-C06

A8

3062

H07V-K001_BU

Grey

/M005.D4

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K75

C-C09

A8

3063

H07V-K001_BU

Grey

/M005.D4

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K74

C-C08

A8

3064

H07V-K001_BU

Grey

/M005.D4

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K80

C-C14

3065

H07V-K001_BU

Grey

/M005.D4

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K77

C-C11

A8

3066

H07V-K001_BU

Grey

/M005.D6

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K76

C-C10

A8

3067

H07V-K001_BU

Grey

/M005.D6

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K79

C-C13

A8

3068

H07V-K001_BU

Grey

/M005.D6

4C-

=20CBA +00GH003 -K80

C-C14

=20CBA +00GH003 -K78

C-C12

A8

3069

H07V-K001_BU

Grey

/M005.D6

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -X432

F-A03

3070

H07V-K001_BU

Grey

2.5

/M006.A2

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K83

C-D03

A8

3071

H07V-K001_BU

Grey

/M006.A2

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K82

C-D02

A8

3072

H07V-K001_BU

Grey

/M006.A2

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K85

C-D05

A8

3073

H07V-K001_BU

Grey

/M006.A2

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K84

C-D04

A8

3074

H07V-K001_BU

Grey

/M006.A2

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K94

C-D14

3075

H07V-K001_BU

Grey

/M006.A2

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W012
Sheet
W011

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K87

C-D07

A8

3076

H07V-K001_BU

Grey

/M006.A4

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K86

C-D06

A8

3077

H07V-K001_BU

Grey

/M006.A4

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K89

C-D09

A8

3078

H07V-K001_BU

Grey

/M006.A4

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K88

C-D08

A8

3079

H07V-K001_BU

Grey

/M006.A4

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K94

C-D14

3080

H07V-K001_BU

Grey

/M006.A4

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K91

C-D11

A8

3081

H07V-K001_BU

Grey

/M006.A6

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K90

C-D10

A8

3082

H07V-K001_BU

Grey

/M006.A6

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K93

C-D13

A8

3083

H07V-K001_BU

Grey

/M006.A6

4C-

=20CBA +00GH003 -K94

C-D14

=20CBA +00GH003 -K92

C-D12

A8

3084

H07V-K001_BU

Grey

/M006.A6

4C-

=20CBA +00GH003 -X432

F-A03

=20CBA +00GH003 -K108

C-E14

3085

H07V-K001_BU

Grey

2.5

/K014.E1

4C-

=20CBA +00GH003 -K108

C-E14

=20CBA +00GH003 -K108

C-E14

3086

H07V-K001_BU

Grey

/M006.D4

4C-

=20CBA +00GH003 -K108

C-E14

=20CBA +00GH003 -K108

C-E14

3087

H07V-K001_BU

Grey

/M006.D4

+24VDC

=20CBA +00GH001 -R1

B-C03

I1

=20CBA +00GH001 -T1

B-C02

4001

H07V-K001_BU

Grey

2.5

/K003.C2

+24VDC

=20CBA +00GH001 -R1

B-C03

I2

=20CBA +00GH001 -T2

B-C04

4002

H07V-K001_BU

Grey

2.5

/K003.C2

#150954

=20CBA +00GH001 -R1

B-C03

O1

=20CBA +00GH001 -R1

B-C03

02

4003

H07V-K001_BU

Grey

2.5

/K003.C2

#150954

=20CBA +00GH001 -R1

B-C03

02

=20CBA +00GH001 -X432

C-B02

4004

H07V-K001_BU

Grey

2.5

/K003.C2

#150954

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F10

B-E01

4005

H07V-K001_BU

Grey

/K003.D4

#150954

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F14

B-G01

4006

H07V-K001_BU

Grey

/K003.D4

#150954

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F16

B-G05

4007

H07V-K001_BU

Grey

/K003.D4

#150954

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F11

B-E03

4008

H07V-K001_BU

Grey

/K004.D1

#150954

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F15

B-G03

4009

H07V-K001_BU

Grey

/K004.D1

#150954

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F17

B-G07

4010

H07V-K001_BU

Grey

/K004.D1

#150954

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F12

B-E05

4011

H07V-K001_BU

Grey

/K004.D5

#150954

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F9

B-D03

4012

H07V-K001_BU

Grey

2.5

/K004.D5

#150954

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F8

B-D01

4013

H07V-K001_BU

Grey

2.5

/K004.D5

#150954

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH002 -F33

E-A02

4014

H07V-K001_BU

Grey

/K005.D1

#150954

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F13

B-E07

4015

H07V-K001_BU

Grey

/K005.D1

#150689

=20CBA +00GH002 -T12

B-D02

=20CBA +00GH002 -R6

B-D03

I1

4016

H07V-K001_BU

Grey

2.5

/K009.B2

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W013
Sheet
W012

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

#150690

=20CBA +00GH002 -T13

B-D04

=20CBA +00GH002 -R6

B-D03

I2

4017

H07V-K001_BU

Grey

2.5

/K009.B3

#150983

=20CBA +00GH002 -R6

B-D03

02

=20CBA +00GH002 -R6

B-D03

O1

4018

H07V-K001_BU

Grey

2.5

/K009.C2

#150983

=20CBA +00GH002 -R6

B-D03

02

=20CBA +00GH002 -X231

C-C01

4019

H07V-K001_BU

Grey

2.5

/K009.C2

#150983

=20CBA +00GH002 -X231

C-C01

=20CBA +00GH002 -F25

B-C01

4020

H07V-K001_BU

Grey

2.5

/K009.D4

#150983

=20CBA +00GH002 -X231

C-C01

=20CBA +00GH002 -F26

B-C03

4021

H07V-K001_BU

Grey

2.5

/K009.D4

#150983

=20CBA +00GH002 -X231

C-C01

=20CBA +00GH002 -F24

B-B05

4022

H07V-K001_BU

Grey

/K009.D4

#150983

=20CBA +00GH002 -X231

C-C01

=20CBA +00GH003 -X231

F-A04

4023

H07V-K001_BU

Grey

2.5

/K010.D1

#150967

=20CBA +00GH002 -F25

B-C01

=20CBA +00GH002 -K13

B-C02

4024

H07V-K001_BU

Grey

2.5

/K024.B1

2X2+

=20CBA +00GH002 -F26

B-C03

=20CBA +00GH002 -K13

B-C02

4025

H07V-K001_BU

Grey

2.5

/K024.B2

2M+

=20CBA +00GH002 -F24

B-B05

=20CBA +00GH002 -X232

C-C02

4026

H07V-K001_BU

Grey

/K012.B1

2M+

=20CBA +00GH002 -X291

C-C04

=20CBA +00GH002 -X232

C-C02

4027

H07V-K001_BU

Grey

/K012.D2

#150983

=20CBA +00GH003 -X231

F-A04

=20CBA +00GH003 -F39

F-A05

4028

H07V-K001_BU

Grey

2.5

/K015.B1

#150983

=20CBA +00GH003 -X231

F-A04

=20CBA +00GH003 -F40

F-A07

4029

H07V-K001_BU

Grey

2.5

/K015.B1

2D+

=20CBA +00GH003 -F39

F-A05

=20CBA +00GH003 -X232

F-A06

4030

H07V-K001_BU

Grey

2.5

/K015.C2

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -X232

F-A06

4031

H07V-K001_BU

Grey

2.5

/M003.A2

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K55

C-B03

A1

4032

H07V-K001_BU

Grey

/M003.A2

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K54

C-B02

A1

4033

H07V-K001_BU

Grey

/M003.A2

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K57

C-B05

A1

4034

H07V-K001_BU

Grey

/M003.A2

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K56

C-B04

A1

4035

H07V-K001_BU

Grey

/M003.A2

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K53

C-B01

4036

H07V-K001_BU

Grey

/M003.A2

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K59

C-B07

A1

4037

H07V-K001_BU

Grey

/M003.A4

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K58

C-B06

A1

4038

H07V-K001_BU

Grey

/M003.A4

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K61

C-B09

A1

4039

H07V-K001_BU

Grey

/M003.A4

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K60

C-B08

A1

4040

H07V-K001_BU

Grey

/M003.A4

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K53

C-B01

4041

H07V-K001_BU

Grey

/M003.A4

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K63

C-B11

A1

4042

H07V-K001_BU

Grey

/M003.A6

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K62

C-B10

A1

4043

H07V-K001_BU

Grey

/M003.A6

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K65

C-B13

A1

4044

H07V-K001_BU

Grey

/M003.A6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W014
Sheet
W013

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

2D+

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K64

C-B12

A1

4045

H07V-K001_BU

Grey

/M003.A6

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -X232

F-A06

4046

H07V-K001_BU

Grey

2.5

/M003.D2

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K69

C-C03

A1

4047

H07V-K001_BU

Grey

/M003.D2

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K68

C-C02

A1

4048

H07V-K001_BU

Grey

/M003.D2

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K71

C-C05

A1

4049

H07V-K001_BU

Grey

/M003.D2

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K70

C-C04

A1

4050

H07V-K001_BU

Grey

/M003.D2

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K67

C-C01

4051

H07V-K001_BU

Grey

/M003.D2

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K73

C-C07

A1

4052

H07V-K001_BU

Grey

/M003.D4

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K72

C-C06

A1

4053

H07V-K001_BU

Grey

/M003.D4

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K75

C-C09

A1

4054

H07V-K001_BU

Grey

/M003.D4

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K74

C-C08

A1

4055

H07V-K001_BU

Grey

/M003.D4

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K67

C-C01

4056

H07V-K001_BU

Grey

/M003.D4

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K77

C-C11

A1

4057

H07V-K001_BU

Grey

/M003.D6

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K76

C-C10

A1

4058

H07V-K001_BU

Grey

/M003.D6

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K79

C-C13

A1

4059

H07V-K001_BU

Grey

/M003.D6

2D+

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K78

C-C12

A1

4060

H07V-K001_BU

Grey

/M003.D6

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -X232

F-A06

4061

H07V-K001_BU

Grey

2.5

/M004.A2

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K83

C-D03

A1

4062

H07V-K001_BU

Grey

/M004.A2

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K82

C-D02

A1

4063

H07V-K001_BU

Grey

/M004.A2

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K85

C-D05

A1

4064

H07V-K001_BU

Grey

/M004.A2

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K84

C-D04

A1

4065

H07V-K001_BU

Grey

/M004.A2

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K81

C-D01

4066

H07V-K001_BU

Grey

/M004.A2

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K87

C-D07

A1

4067

H07V-K001_BU

Grey

/M004.A4

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K86

C-D06

A1

4068

H07V-K001_BU

Grey

/M004.A4

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K89

C-D09

A1

4069

H07V-K001_BU

Grey

/M004.A4

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K88

C-D08

A1

4070

H07V-K001_BU

Grey

/M004.A4

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K81

C-D01

4071

H07V-K001_BU

Grey

/M004.A4

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K91

C-D11

A1

4072

H07V-K001_BU

Grey

/M004.A6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W015
Sheet
W014

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K90

C-D10

A1

4073

H07V-K001_BU

Grey

/M004.A6

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K93

C-D13

A1

4074

H07V-K001_BU

Grey

/M004.A6

2D+

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K92

C-D12

A1

4075

H07V-K001_BU

Grey

/M004.A6

2D+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -X232

F-A06

4076

H07V-K001_BU

Grey

2.5

/M004.D2

2D+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K97

C-E03

A1

4077

H07V-K001_BU

Grey

/M004.D2

2D+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K96

C-E02

A1

4078

H07V-K001_BU

Grey

/M004.D2

2D+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K99

C-E05

A1

4079

H07V-K001_BU

Grey

/M004.D2

2D+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K98

C-E04

A1

4080

H07V-K001_BU

Grey

/M004.D2

2D+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K97

C-E03

A5

4081

H07V-K001_BU

Grey

/M004.D2

2D+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K103

C-E09

A3

4082

H07V-K001_BU

Grey

/M004.D2

2D+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K95

C-E01

4083

H07V-K001_BU

Grey

/M004.D2

2D+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K101

C-E07

A1

4084

H07V-K001_BU

Grey

/M004.D4

2D+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K100

C-E06

A1

4085

H07V-K001_BU

Grey

/M004.D4

#160538

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH001 -S2

A-D02

4086

H07V-K001_BU

Grey

/M004.D4

#160538

=20CBA +00GH001 -S2

A-D02

=20CBA +00GH001 -S1

A-D01

4087

H07V-K001_BU

Grey

/M209.B7

2D+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH001 -T1

B-C02

13

4087A

H07V-K001_BU

Grey

/M004.D4

2D+

=20CBA +00GH001 -T2

B-C04

13

=20CBA +00GH001 -T1

B-C02

13

4087B

H07V-K001_BU

Grey

/M210.B5

2D+

=20CBA +00GH001 -T2

B-C04

13

=20CBA +00GH002 -T12

B-D02

13

4087C

H07V-K001_BU

Grey

/M210.B5

2D+

=20CBA +00GH002 -T12

B-D02

13

=20CBA +00GH002 -T13

B-D04

13

4087D

H07V-K001_BU

Grey

/M210.B6

2D+

=20CBA +00GH001 -T3

B-E02

=20CBA +00GH002 -T13

B-D04

13

4087E

H07V-K001_BU

Grey

/M211.B2

2D+

=20CBA +00GH001 -T3

B-E02

=20CBA +00GH001 -T4

B-E04

4087F

H07V-K001_BU

Grey

/M211.B2

2D+

=20CBA +00GH001 -T4

B-E04

=20CBA +00GH001 -T5

B-E06

4087G

H07V-K001_BU

Grey

/M211.B3

#160538

=20CBA +00GH001 -S1

A-D01

=20CBA +00GH002 -X234

C-C03

4090

H07V-K001_BU

Grey

/M210.B2

2D+

=20CBA +00GH003 -X232

F-A06

=20CBA +00GH001 -K8

B-E14

13+

4093

H07V-K001_BU

Grey

2.5

/K016.D5

2A+

=20CBA +00GH003 -X233

F-A08

=20CBA +00GH003 -F40

F-A07

4094

H07V-K001_BU

Grey

2.5

/K018.D1

2A+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -X233

F-A08

4095

H07V-K001_BU

Grey

2.5

/M004.D6

2A+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K103

C-E09

A1

4096

H07V-K001_BU

Grey

/M004.D6

2A+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K102

C-E08

A1

4097

H07V-K001_BU

Grey

/M004.D6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W016
Sheet
W015

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

2A+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K105

C-E11

A1

4098

H07V-K001_BU

Grey

/M004.D6

2A+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K104

C-E10

A1

4099

H07V-K001_BU

Grey

/M004.D6

2A+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K107

C-E13

A1

4100

H07V-K001_BU

Grey

/M004.D6

2A+

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K106

C-E12

A1

4101

H07V-K001_BU

Grey

/M004.D6

#160533

=20CBA +00GH001 -T3

B-E02

=20CBA +00GH001 -F10

B-E01

4102

H07V-K001_BU

Grey

/K022.E2

#160533

=20CBA +00GH001 -T3

B-E02

=20CBA +00GH001 -T3

B-E02

4103

H07V-K001_BU

Grey

/K022.E2

2N2+

=20CBA +00GH001 -F11

B-E03

=20CBA +00GH001 -T4

B-E04

4104

H07V-K001_BU

Grey

/K022.C4

2N2+

=20CBA +00GH001 -T4

B-E04

=20CBA +00GH001 -T4

B-E04

4105

H07V-K001_BU

Grey

/K022.E4

#160534

=20CBA +00GH001 -T5

B-E06

=20CBA +00GH001 -F12

B-E05

4106

H07V-K001_BU

Grey

/K022.E6

#160534

=20CBA +00GH001 -T5

B-E06

=20CBA +00GH001 -T5

B-E06

4107

H07V-K001_BU

Grey

/K022.E6

2N4+

=20CBA +00GH001 -F14

B-G01

=20CBA +00GH001 -T8

B-G02

4108

H07V-K001_BU

Grey

/K023.C2

2N5+

=20CBA +00GH001 -F15

B-G03

=20CBA +00GH001 -T9

B-G04

4109

H07V-K001_BU

Grey

/K023.C4

2N4+

=20CBA +00GH001 -F16

B-G05

=20CBA +00GH001 -T10

B-G06

4110

H07V-K001_BU

Grey

/K023.C6

2N5+

=20CBA +00GH001 -F17

B-G07

=20CBA +00GH001 -T11

B-G08

4111

H07V-K001_BU

Grey

/K023.C8

2I1+

=20CBA +00GH001 -F9

B-D03

=20CBA +00GH001 -K3

B-D02

4112

H07V-K001_BU

Grey

2.5

/K024.B4

2I2+

=20CBA +00GH001 -F8

B-D01

=20CBA +00GH001 -P1

A-C01

4113

H07V-K001_BU

Grey

2.5

/K024.B5

2N8+

=20CBA +00GH002 -F33

E-A02

=20CBA +00GH002 -X233

E-A01

4114

H07V-K001_BU

Grey

/K025.B1

2N8+

=20CBA +00GH002 -X233

E-A01

=20CBA +00GH002 -T14

E-A03

J1+

4115

H07V-K001_BU

Grey

/K025.C1

2N8+

=20CBA +00GH002 -X233

E-A01

=20CBA +00GH002 -T15

E-A05

J1+

4116

H07V-K001_BU

Grey

/K025.C1

2T+

=20CBA +00GH001 -F13

B-E07

=20CBA +00GH001 -X231

C-B03

4117

H07V-K001_BU

Grey

/K026.B1

2T+

=20CBA +00GH001 -X231

C-B03

=20CBA +00GH001 -T6

B-E08

4118

H07V-K001_BU

Grey

/K026.D1

2T+

=20CBA +00GH001 -X231

C-B03

=20CBA +00GH001 -K4

B-E10

14

4119

H07V-K001_BU

Grey

/K026.D1

2T+

=20CBA +00GH001 -X231

C-B03

=20CBA +00GH001 -T7

B-E09

4120

H07V-K001_BU

Grey

/K026.D1

2T+

=20CBA +00GH001 -X231

C-B03

=20CBA +00GH001 -K9

B-E15

14

4121

H07V-K001_BU

Grey

/K026.D5

#150830

=20CBA +00GH002 -X234

C-C03

=20CBA +00GH002 -K45

B-H07

4122

H07V-K001_BU

Grey

0.5

/M209.B4

#33130

=20CBA +00GH002 -X234

C-C03

=20CBA +00GH002 -K45

B-H07

4123

H07V-K001_BU

Grey

0.5

/M209.B5

#150795

=20CBA +00GH002 -X234

C-C03

=20CBA +00GH002 -K45

B-H07

4124

H07V-K001_BU

Grey

0.5

/M209.B6

#150938

=20CBA +00GH002 -X234

C-C03

=20CBA +00GH002 -K45

B-H07

4125

H07V-K001_BU

Grey

0.5

/M209.B7

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W017
Sheet
W016

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

#150808

=20CBA +00GH002 -X234

C-C03

=20CBA +00GH002 -K45

B-H07

4126

H07V-K001_BU

Grey

0.5

/M210.B2

#160538

=20CBA +00GH002 -X234

C-C03

=20CBA +00GH002 -K45

B-H07

4127

H07V-K001_BU

Grey

0.5

/M210.B3

#160539

=20CBA +00GH002 -X234

C-C03

=20CBA +00GH002 -K45

B-H07

4128

H07V-K001_BU

Grey

0.5

/M210.B4

#160540

=20CBA +00GH002 -X234

C-C03

=20CBA +00GH002 -K45

B-H07

4129

H07V-K001_BU

Grey

0.5

/M210.B5

#160541

=20CBA +00GH002 -X234

C-C03

10

=20CBA +00GH002 -K45

B-H07

10

4130

H07V-K001_BU

Grey

0.5

/M210.B6

#151179

=20CBA +00GH002 -X234

C-C03

11

=20CBA +00GH002 -K45

B-H07

11

4131

H07V-K001_BU

Grey

0.5

/M210.B8

#160535

=20CBA +00GH002 -X234

C-C03

12

=20CBA +00GH002 -K45

B-H07

12

4132

H07V-K001_BU

Grey

0.5

/M211.B2

#160536

=20CBA +00GH002 -X234

C-C03

13

=20CBA +00GH002 -K45

B-H07

13

4133

H07V-K001_BU

Grey

0.5

/M211.B3

#160537

=20CBA +00GH002 -X234

C-C03

14

=20CBA +00GH002 -K45

B-H07

14

4134

H07V-K001_BU

Grey

0.5

/M211.B4

#150812

=20CBA +00GH002 -X234

C-C03

15

=20CBA +00GH002 -K45

B-H07

15

4135

H07V-K001_BU

Grey

0.5

/M211.B5

#150813

=20CBA +00GH002 -X234

C-C03

16

=20CBA +00GH002 -K45

B-H07

16

4136

H07V-K001_BU

Grey

0.5

/M211.B6

#150814

=20CBA +00GH002 -X234

C-C03

17

=20CBA +00GH002 -K45

B-H07

17

4137

H07V-K001_BU

Grey

0.5

/M211.B8

#150797

=20CBA +00GH003 -K97

C-E03

A7

=20CBA +00GH003 -K96

C-E02

A5

4138

H07V-K001_BU

Grey

/M501.B1

#150798

=20CBA +00GH003 -K96

C-E02

A7

=20CBA +00GH003 -K99

C-E05

A5

4139

H07V-K001_BU

Grey

/M504.B1

#150827

=20CBA +00GH003 -K99

C-E05

A7

=20CBA +00GH003 -K98

C-E04

A5

4140

H07V-K001_BU

Grey

/M507.B1

#150828

=20CBA +00GH003 -K98

C-E04

A7

=20CBA +00GH003 -K101

C-E07

A5

4141

H07V-K001_BU

Grey

/M510.B1

#150829

=20CBA +00GH003 -K101

C-E07

A7

=20CBA +00GH003 -K100

C-E06

A5

4142

H07V-K001_BU

Grey

/M513.B1

#150830

=20CBA +00GH003 -K100

C-E06

A7

=20CBA +00GH002 -X234

C-C03

4143

H07V-K001_BU

Grey

/M516.B1

#150831

=20CBA +00GH003 -K103

C-E09

A4

=20CBA +00GH003 -K102

C-E08

A3

4144

H07V-K001_BU

Grey

/M601.C1

#150832

=20CBA +00GH003 -K102

C-E08

A4

=20CBA +00GH003 -K105

C-E11

A3

4145

H07V-K001_BU

Grey

/M603.C1

#150833

=20CBA +00GH003 -K105

C-E11

A4

=20CBA +00GH003 -K104

C-E10

A3

4146

H07V-K001_BU

Grey

/M605.C1

#150834

=20CBA +00GH003 -K104

C-E10

A4

=20CBA +00GH003 -K107

C-E13

A3

4147

H07V-K001_BU

Grey

/M607.C1

#150835

=20CBA +00GH003 -K107

C-E13

A4

=20CBA +00GH003 -K106

C-E12

A3

4148

H07V-K001_BU

Grey

/M609.C1

#150795

=20CBA +00GH003 -K106

C-E12

A4

=20CBA +00GH002 -X234

C-C03

4149

H07V-K001_BU

Grey

/M611.C1

#150951

=20CBA +00GH001 -T6

B-E08

=20CBA +00GH001 -K4

B-E10

A1

4150

H07V-K001_BU

Grey

/M714.D4

#150952

=20CBA +00GH001 -T6

B-E08

=20CBA +00GH001 -K4

B-E10

A2

4151

H07V-K001_BU

Grey

/M714.D4

2T-

=20CBA +00GH001 -X232

C-B04

=20CBA +00GH001 -R3

B-E16

4152

H07V-K001_BU

Grey

/M714.B6

#150942

=20CBA +00GH001 -X232

C-B04

=20CBA +00GH001 -R3

B-E16

4153

H07V-K001_BU

Grey

/M714.C6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W018
Sheet
W017

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

#150942

=20CBA +00GH001 -X232

C-B04

=20CBA +00GH001 -K10

C-C01

TXA+

4154

H07V-K001_BU

Grey

/M714.C6

#27073

=20CBA +00GH001 -K4

B-E10

13+

=20CBA +00GH001 -K10

C-C01

TXB-

4155

H07V-K001_BU

Grey

/M714.C5

#150992

=20CBA +00GH001 -T7

B-E09

=20CBA +00GH001 -X234

C-B06

4157

H07V-K001_BU

Grey

/M715.C3

#150992

=20CBA +00GH001 -X234

C-B06

=20CBA +00GH001 -K5

B-E11

A1

4158

H07V-K001_BU

Grey

/M715.B4

#150992

=20CBA +00GH001 -K6

B-E12

A1

=20CBA +00GH001 -X234

C-B06

4159

H07V-K001_BU

Grey

/M715.B6

#150992

=20CBA +00GH001 -X234

C-B06

=20CBA +00GH001 -K7

B-E13

A1

4160

H07V-K001_BU

Grey

/M715.B4

#150992

=20CBA +00GH001 -X234

C-B06

=20CBA +00GH001 -K8

B-E14

A1

4161

H07V-K001_BU

Grey

/M716.B1

#150992

=20CBA +00GH001 -X234

C-B06

=20CBA +00GH001 -K9

B-E15

A1

4162

H07V-K001_BU

Grey

/M716.B1

#150943

=20CBA +00GH001 -X233

C-B05

=20CBA +00GH001 -K9

B-E15

13+

4163

H07V-K001_BU

Grey

/M716.D4

4164

H07V-K001_BU

Grey

4165

H07V-K001_BU

Grey

#150943

=20CBA +00GH001 -X233

C-B05

=20CBA +00GH001 -X291

C-B07

4166

H07V-K001_BU

Grey

/M716.E4

#33130

=20CBA +00GH001 -K8

B-E14

14

=20CBA +00GH002 -X234

C-C03

4168

H07V-K001_BU

Grey

/M716.C2

#150938

=20CBA +00GH001 -S2

A-D02

10

=20CBA +00GH002 -X234

C-C03

4177

H07V-K001_BU

Grey

/M209.B7

#150808

=20CBA +00GH001 -S1

A-D01

=20CBA +00GH002 -X234

C-C03

4178

H07V-K001_BU

Grey

/M210.B2

#160539

=20CBA +00GH001 -T1

B-C02

14

=20CBA +00GH002 -X234

C-C03

4178A

H07V-K001_BU

Grey

/M210.B4

#160540

=20CBA +00GH001 -T2

B-C04

14

=20CBA +00GH002 -X234

C-C03

4178B

H07V-K001_BU

Grey

/M210.B5

#160541

=20CBA +00GH002 -T12

B-D02

14

=20CBA +00GH002 -X234

C-C03

10

4178C

H07V-K001_BU

Grey

/M210.B6

#151179

=20CBA +00GH002 -T13

B-D04

14

=20CBA +00GH002 -X234

C-C03

11

4178D

H07V-K001_BU

Grey

/M210.B8

#160535

=20CBA +00GH001 -T3

B-E02

=20CBA +00GH002 -X234

C-C03

12

4178E

H07V-K001_BU

Grey

/M211.B2

#160536

=20CBA +00GH001 -T4

B-E04

=20CBA +00GH002 -X234

C-C03

13

4178F

H07V-K001_BU

Grey

/M211.B3

#160537

=20CBA +00GH001 -T5

B-E06

=20CBA +00GH002 -X234

C-C03

14

4178G

H07V-K001_BU

Grey

/M211.B4

#150943

=20CBA +00GH002 -X292

C-C05

=20CBA +00GH002 -K52

B-H14

M2

4179

H07V-K001_BU

Grey

/M716.E2

#160538

=20CBA +00GH001 -S1

A-D01

=20CBA +00GH001 -S1

A-D01

4180

H07V-K001_BU

Grey

/M210.B2

#160538

=20CBA +00GH001 -S1

A-D01

=20CBA +00GH002 -X234

C-C03

4181

H07V-K001_BU

Grey

/M210.B3

2M+

=20CBA +00GH002 -X291

C-C04

=20CBA +00GH002 -X293

F-D01

4182

H07V-K001_BU

Grey

/K012.D2

2M+

=20CBA +00GH002 -X291

C-C04

=20CBA +00GH002 -X293

F-D01

4183

H07V-K001_BU

Grey

/K012.D2

2M+

=20CBA +00GH002 -X291

C-C04

=20CBA +00GH002 -X293

F-D01

4184

H07V-K001_BU

Grey

/K012.D2

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W019
Sheet
W018

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

#150953

=20CBA +00GH001 -T2

B-C04

=20CBA +00GH001 -T1

B-C02

5001

H07V-K001_BU

Grey

2.5

/K003.B3

#150953

=20CBA +00GH001 -T2

B-C04

=20CBA +00GH001 -X432

C-B02

5002

H07V-K001_BU

Grey

2.5

/K003.B3

#150953

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F10

B-E01

5003

H07V-K001_BU

Grey

/K003.D4

#150953

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F14

B-G01

5004

H07V-K001_BU

Grey

/K003.D4

#150953

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F16

B-G05

5005

H07V-K001_BU

Grey

/K003.D4

#150953

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F11

B-E03

5006

H07V-K001_BU

Grey

/K004.D1

#150953

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F15

B-G03

5007

H07V-K001_BU

Grey

/K004.D1

#150953

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F17

B-G07

5008

H07V-K001_BU

Grey

/K004.D1

#150953

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F12

B-E05

5009

H07V-K001_BU

Grey

/K004.D5

#150953

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F9

B-D03

5010

H07V-K001_BU

Grey

2.5

/K004.D5

#150953

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F8

B-D01

5011

H07V-K001_BU

Grey

2.5

/K004.D5

#150953

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH002 -F33

E-A02

5012

H07V-K001_BU

Grey

/K005.D1

#150953

=20CBA +00GH001 -X432

C-B02

=20CBA +00GH001 -F13

B-E07

5013

H07V-K001_BU

Grey

/K005.D1

#150991

=20CBA +00GH002 -T12

B-D02

=20CBA +00GH002 -T13

B-D04

5014

H07V-K001_BU

Grey

2.5

/K009.B2

#150991

=20CBA +00GH002 -T13

B-D04

=20CBA +00GH002 -X231

C-C01

5015

H07V-K001_BU

Grey

2.5

/K009.B3

#150991

=20CBA +00GH002 -X231

C-C01

=20CBA +00GH002 -F25

B-C01

5016

H07V-K001_BU

Grey

2.5

/K009.D4

#150991

=20CBA +00GH002 -X231

C-C01

=20CBA +00GH002 -F26

B-C03

5017

H07V-K001_BU

Grey

2.5

/K009.D4

#150991

=20CBA +00GH002 -X231

C-C01

=20CBA +00GH002 -F24

B-B05

5018

H07V-K001_BU

Grey

/K009.D4

#150991

=20CBA +00GH002 -X231

C-C01

=20CBA +00GH003 -X231

F-A04

5019

H07V-K001_BU

Grey

2.5

/K010.D1

#150968

=20CBA +00GH002 -F25

B-C01

=20CBA +00GH002 -K13

B-C02

5020

H07V-K001_BU

Grey

2.5

/K024.B1

2X2-

=20CBA +00GH002 -F26

B-C03

=20CBA +00GH002 -K13

B-C02

5021

H07V-K001_BU

Grey

2.5

/K024.B2

2M-

=20CBA +00GH002 -F24

B-B05

=20CBA +00GH002 -X232

C-C02

5022

H07V-K001_BU

Grey

/K012.B1

2M-

=20CBA +00GH002 -X291

C-C04

=20CBA +00GH002 -X232

C-C02

5023

H07V-K001_BU

Grey

/K012.D2

#150991

=20CBA +00GH003 -X231

F-A04

=20CBA +00GH003 -F39

F-A05

5024

H07V-K001_BU

Grey

2.5

/K015.B1

#150991

=20CBA +00GH003 -X231

F-A04

=20CBA +00GH003 -F40

F-A07

5025

H07V-K001_BU

Grey

2.5

/K015.B1

2D-

=20CBA +00GH003 -F39

F-A05

=20CBA +00GH003 -X232

F-A06

5026

H07V-K001_BU

Grey

2.5

/K015.C2

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -X232

F-A06

5027

H07V-K001_BU

Grey

2.5

/M003.A2

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K55

C-B03

A2

5028

H07V-K001_BU

Grey

/M003.A2

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W020
Sheet
W019

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K54

C-B02

A2

5029

H07V-K001_BU

Grey

/M003.A2

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K57

C-B05

A2

5030

H07V-K001_BU

Grey

/M003.A2

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K56

C-B04

A2

5031

H07V-K001_BU

Grey

/M003.A2

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K53

C-B01

5032

H07V-K001_BU

Grey

/M003.A2

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K59

C-B07

A2

5033

H07V-K001_BU

Grey

/M003.A4

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K58

C-B06

A2

5034

H07V-K001_BU

Grey

/M003.A4

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K61

C-B09

A2

5035

H07V-K001_BU

Grey

/M003.A4

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K60

C-B08

A2

5036

H07V-K001_BU

Grey

/M003.A4

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K53

C-B01

5037

H07V-K001_BU

Grey

/M003.A4

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K63

C-B11

A2

5038

H07V-K001_BU

Grey

/M003.A6

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K62

C-B10

A2

5039

H07V-K001_BU

Grey

/M003.A6

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K65

C-B13

A2

5040

H07V-K001_BU

Grey

/M003.A6

2D-

=20CBA +00GH003 -K53

C-B01

=20CBA +00GH003 -K64

C-B12

A2

5041

H07V-K001_BU

Grey

/M003.A6

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -X232

F-A06

5042

H07V-K001_BU

Grey

2.5

/M003.D2

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K69

C-C03

A2

5043

H07V-K001_BU

Grey

/M003.D2

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K68

C-C02

A2

5044

H07V-K001_BU

Grey

/M003.D2

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K71

C-C05

A2

5045

H07V-K001_BU

Grey

/M003.D2

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K70

C-C04

A2

5046

H07V-K001_BU

Grey

/M003.D2

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K67

C-C01

5047

H07V-K001_BU

Grey

/M003.D2

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K73

C-C07

A2

5048

H07V-K001_BU

Grey

/M003.D4

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K72

C-C06

A2

5049

H07V-K001_BU

Grey

/M003.D4

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K75

C-C09

A2

5050

H07V-K001_BU

Grey

/M003.D4

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K74

C-C08

A2

5051

H07V-K001_BU

Grey

/M003.D4

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K67

C-C01

5052

H07V-K001_BU

Grey

/M003.D4

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K77

C-C11

A2

5053

H07V-K001_BU

Grey

/M003.D6

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K76

C-C10

A2

5054

H07V-K001_BU

Grey

/M003.D6

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K79

C-C13

A2

5055

H07V-K001_BU

Grey

/M003.D6

2D-

=20CBA +00GH003 -K67

C-C01

=20CBA +00GH003 -K78

C-C12

A2

5056

H07V-K001_BU

Grey

/M003.D6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W021
Sheet
W020

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -X232

F-A06

5057

H07V-K001_BU

Grey

2.5

/M004.A2

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K83

C-D03

A2

5058

H07V-K001_BU

Grey

/M004.A2

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K82

C-D02

A2

5059

H07V-K001_BU

Grey

/M004.A2

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K85

C-D05

A2

5060

H07V-K001_BU

Grey

/M004.A2

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K84

C-D04

A2

5061

H07V-K001_BU

Grey

/M004.A2

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K81

C-D01

5062

H07V-K001_BU

Grey

/M004.A2

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K87

C-D07

A2

5063

H07V-K001_BU

Grey

/M004.A4

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K86

C-D06

A2

5064

H07V-K001_BU

Grey

/M004.A4

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K89

C-D09

A2

5065

H07V-K001_BU

Grey

/M004.A4

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K88

C-D08

A2

5066

H07V-K001_BU

Grey

/M004.A4

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K81

C-D01

5067

H07V-K001_BU

Grey

/M004.A4

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K91

C-D11

A2

5068

H07V-K001_BU

Grey

/M004.A6

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K90

C-D10

A2

5069

H07V-K001_BU

Grey

/M004.A6

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K93

C-D13

A2

5070

H07V-K001_BU

Grey

/M004.A6

2D-

=20CBA +00GH003 -K81

C-D01

=20CBA +00GH003 -K92

C-D12

A2

5071

H07V-K001_BU

Grey

/M004.A6

2D-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -X232

F-A06

5072

H07V-K001_BU

Grey

2.5

/M004.D2

2D-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K97

C-E03

A11

5073

H07V-K001_BU

Grey

/M004.D2

2D-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K96

C-E02

A11

5074

H07V-K001_BU

Grey

/M004.D2

2D-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K99

C-E05

A11

5075

H07V-K001_BU

Grey

/M004.D2

2D-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K98

C-E04

A11

5076

H07V-K001_BU

Grey

/M004.D2

2D-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K95

C-E01

5077

H07V-K001_BU

Grey

/M004.D2

2D-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K101

C-E07

A11

5078

H07V-K001_BU

Grey

/M004.D4

2D-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K100

C-E06

A11

5079

H07V-K001_BU

Grey

/M004.D4

2D-

=20CBA +00GH003 -X232

F-A06

=20CBA +00GH002 -X234

C-C03

5080

H07V-K001_BU

Grey

2.5

/K016.E5

2A-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -X233

F-A08

5081

H07V-K001_BU

Grey

2.5

/M004.D6

2A-

=20CBA +00GH003 -X233

F-A08

=20CBA +00GH003 -F40

F-A07

5082

H07V-K001_BU

Grey

2.5

/K018.D1

2A-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K103

C-E09

A2

5083

H07V-K001_BU

Grey

/M004.D6

2A-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K102

C-E08

A2

5084

H07V-K001_BU

Grey

/M004.D6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W022
Sheet
W021

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

2A-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K105

C-E11

A2

5085

H07V-K001_BU

Grey

/M004.D6

2A-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K104

C-E10

A2

5086

H07V-K001_BU

Grey

/M004.D6

2A-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K107

C-E13

A2

5087

H07V-K001_BU

Grey

/M004.D6

2A-

=20CBA +00GH003 -K95

C-E01

=20CBA +00GH003 -K106

C-E12

A2

5088

H07V-K001_BU

Grey

/M004.D6

2N1-

=20CBA +00GH001 -F10

B-E01

=20CBA +00GH001 -T3

B-E02

5089

H07V-K001_BU

Grey

/K022.C2

2N1-

=20CBA +00GH001 -T3

B-E02

=20CBA +00GH001 -T3

B-E02

5089A

H07V-K001_BU

Grey

/K022.E2

2N2-

=20CBA +00GH001 -T4

B-E04

=20CBA +00GH001 -F11

B-E03

5090

H07V-K001_BU

Grey

/K022.E4

2N2-

=20CBA +00GH001 -T4

B-E04

=20CBA +00GH001 -T4

B-E04

5090A

H07V-K001_BU

Grey

/K022.E4

2N3-

=20CBA +00GH001 -T5

B-E06

=20CBA +00GH001 -F12

B-E05

5091

H07V-K001_BU

Grey

/K022.E6

2N3-

=20CBA +00GH001 -T5

B-E06

=20CBA +00GH001 -T5

B-E06

5091A

H07V-K001_BU

Grey

/K022.E6

2N4-

=20CBA +00GH001 -F14

B-G01

=20CBA +00GH001 -T8

B-G02

5092

H07V-K001_BU

Grey

/K023.C2

2N5-

=20CBA +00GH001 -F15

B-G03

=20CBA +00GH001 -T9

B-G04

5093

H07V-K001_BU

Grey

/K023.C4

2N4-

=20CBA +00GH001 -F16

B-G05

=20CBA +00GH001 -T10

B-G06

5094

H07V-K001_BU

Grey

/K023.C6

2N5-

=20CBA +00GH001 -F17

B-G07

=20CBA +00GH001 -T11

B-G08

5095

H07V-K001_BU

Grey

/K023.C8

2I1-

=20CBA +00GH001 -F9

B-D03

=20CBA +00GH001 -K3

B-D02

5096

H07V-K001_BU

Grey

2.5

/K024.B4

2I2-

=20CBA +00GH001 -F8

B-D01

=20CBA +00GH001 -P1

A-C01

5097

H07V-K001_BU

Grey

2.5

/K024.B5

2N8-

=20CBA +00GH002 -F33

E-A02

=20CBA +00GH002 -X233

E-A01

5098

H07V-K001_BU

Grey

/K025.B1

2N8-

=20CBA +00GH002 -X233

E-A01

=20CBA +00GH002 -T14

E-A03

J1-

5099

H07V-K001_BU

Grey

/K025.C1

2N8-

=20CBA +00GH002 -X233

E-A01

=20CBA +00GH002 -T15

E-A05

J1-

5100

H07V-K001_BU

Grey

/K025.C1

2T-

=20CBA +00GH001 -F13

B-E07

=20CBA +00GH001 -X231

C-B03

5101

H07V-K001_BU

Grey

/K026.B1

2T-

=20CBA +00GH001 -X231

C-B03

=20CBA +00GH001 -T6

B-E08

5102

H07V-K001_BU

Grey

/K026.D1

2T-

=20CBA +00GH001 -X231

C-B03

=20CBA +00GH001 -X232

C-B04

5103

H07V-K001_BU

Grey

/K026.D1

2T-

=20CBA +00GH001 -X231

C-B03

=20CBA +00GH001 -T7

B-E09

5104

H07V-K001_BU

Grey

/K026.D1

2T-

=20CBA +00GH001 -X231

C-B03

=20CBA +00GH001 -X291

C-B07

5105

H07V-K001_BU

Grey

/K026.D5

2D-

=20CBA +00GH002 -K45

B-H07

=20CBA +00GH002 -X234

C-C03

5106

H07V-K001_BU

Grey

0.5

/M209.F1

#150993

=20CBA +00GH001 -T7

B-E09

=20CBA +00GH001 -X234

C-B06

5107

H07V-K001_BU

Grey

/M715.C3

#150993

=20CBA +00GH001 -K5

B-E11

A2

=20CBA +00GH001 -X234

C-B06

5108

H07V-K001_BU

Grey

/M715.B5

#150993

=20CBA +00GH001 -K6

B-E12

A2

=20CBA +00GH001 -X234

C-B06

5109

H07V-K001_BU

Grey

/M715.B6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
W023
Sheet
W022

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

#150993

=20CBA +00GH001 -X234

C-B06

=20CBA +00GH001 -K7

B-E13

A2

5110

H07V-K001_BU

Grey

/M715.B4

#150993

=20CBA +00GH001 -X234

C-B06

=20CBA +00GH001 -K8

B-E14

A2

5111

H07V-K001_BU

Grey

/M716.B2

#150993

=20CBA +00GH001 -X234

C-B06

=20CBA +00GH001 -K9

B-E15

A2

5112

H07V-K001_BU

Grey

/M716.B2

#151103

=20CBA +00GH001 -T1

B-C02

PE

{4}

5113

H07V-K001_BU

Green-Yellow

2.5

/K003.B2

#151104

=20CBA +00GH001 -T2

B-C04

PE

{4}

5114

H07V-K001_BU

Green-Yellow

2.5

/K003.B3

#151105

=20CBA +00GH002 -T12

B-D02

PE

{4}

5115

H07V-K001_BU

Green-Yellow

2.5

/K009.B2

#151106

=20CBA +00GH002 -T13

B-D04

PE

{4}

5116

H07V-K001_BU

Green-Yellow

2.5

/K009.B3

#151107

=20CBA +00GH001 -X3

F-C02

GND

{4}

5117

H07V-K001_BU

Green-Yellow

2.5

/K019.E4

#151108

=20CBA +00GH002 -X7

F-C02

GND

{4}

5118

H07V-K001_BU

Green-Yellow

2.5

/K020.E4

#151109

=20CBA +00GH003 -X7

F-C02

GND

{4}

5119

H07V-K001_BU

Green-Yellow

2.5

/K021.E4

#151111

=20CBA +00GH001 -T8

B-G02

GND

{4}

5120

H07V-K001_BU

Green-Yellow

2.5

/K023.E2

#151112

=20CBA +00GH001 -T9

B-G04

GND

{4}

5121

H07V-K001_BU

Green-Yellow

2.5

/K023.E4

#151113

=20CBA +00GH001 -T10

B-G06

GND

{4}

5122

H07V-K001_BU

Green-Yellow

2.5

/K023.E6

#151114

=20CBA +00GH001 -T11

B-G08

GND

{4}

5123

H07V-K001_BU

Green-Yellow

2.5

/K023.E8

#151115

=20CBA +00GH002 -K13

B-C02

GND

{4}

5124

H07V-K001_BU

Green-Yellow

2.5

/K024.D1

#151116

=20CBA +00GH002 -K13

B-C02

GND

{4}

5125

H07V-K001_BU

Green-Yellow

2.5

/K024.D1

#151117

=20CBA +00GH001 -K3

B-D02

GND

{4}

5126

H07V-K001_BU

Green-Yellow

2.5

/K024.D4

#151118

=20CBA +00GH001 -P1

A-C01

GND

{4}

5127

H07V-K001_BU

Green-Yellow

2.5

/K024.D5

#151119

=20CBA +00GH002 -K14

B-E03

{4}

5128

H07V-K001_BU

Green-Yellow

2.5

/K028.D1

#151120

=20CBA +00GH002 -K25

B-F03

{4}

5129

H07V-K001_BU

Green-Yellow

2.5

/K028.D3

#151122

=20CBA +00GH002 -K41

B-H03

{4}

5130

H07V-K001_BU

Green-Yellow

2.5

/K028.D7

#151123

=20CBA +00GH002 -K36

B-G03

{4}

5131

H07V-K001_BU

Green-Yellow

2.5

/K028.D5

#151125

=20CBA +00GH002 -A2

B-F02

GND

{4}

5132

H07V-K001_BU

Green-Yellow

2.5

/M001.D2

#151124

=20CBA +00GH002 -A1

B-E02

GND

{4}

5133

H07V-K001_BU

Green-Yellow

2.5

/M001.A2

#151126

=20CBA +00GH002 -A3

B-G02

GND

{4}

5134

H07V-K001_BU

Green-Yellow

2.5

/M002.A2

#151127

=20CBA +00GH002 -A4

B-H02

GND

{4}

5135

H07V-K001_BU

Green-Yellow

2.5

/M002.D2

GND

=20CBA +00GH003 -K103

C-E09

13

13

5136

H07V-K001_BU

Green-Yellow

2.5

/M601.C1

#151128

=20CBA +00GH001 -T6

B-E08

{4}

5137

H07V-K001_BU

Green-Yellow

2.5

/M714.D4

Date

2
First Issue

revision

30/04/2010

=20CBA +00GH003 -K102

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

HEP BUJ 20CBA FS00 001

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

C-E08

path

323 sheets
next sheet
W024
Sheet
W023

INTERNAL WIRE LIST


A

Wires
signal

From location

Geo. mark

Terminal

To location

Geo. mark

Terminal

Number

Type

Colour

Cross-section

Sheet-map

#151129

=20CBA +00GH001 -T6

B-E08

{4}

5138

H07V-K001_BU

Green-Yellow

2.5

/M714.D4

#151130

=20CBA +00GH001 -T7

B-E09

{4}

5139

H07V-K001_BU

Green-Yellow

2.5

/M715.C3

#151131

=20CBA +00GH001 -T7

B-E09

{4}

5140

H07V-K001_BU

Green-Yellow

2.5

/M715.C3

2T-

=20CBA +00GH002 -K52

B-H14

M1

5141

H07V-K001_BU

Grey

/M716.E2

#26749

=20CBA +00GH002 -G2

D-B01

GR

{4}

5143

H07V-K001_BU

Green-Yellow

2.5

/K020.E5

#151110

=20CBA +00GH001 -G1

D-B01

GR

{4}

5144

H07V-K001_BU

Green-Yellow

2.5

/K019.E5

#26762

=20CBA +00GH003 -G3

D-B01

GR

{4}

5145

H07V-K001_BU

Green-Yellow

2.5

/K021.E5

#160558

=20CBA +00GH003 -K103

C-E09

A6

{4}

5146

H07V-K001_BU

Green-Yellow

2.5

/M601.C1

#160559

=20CBA +00GH003 -K102

C-E08

A6

{4}

5147

H07V-K001_BU

Green-Yellow

2.5

/M603.C1

#160565

=20CBA +00GH003 -K105

C-E11

A6

{4}

5148

H07V-K001_BU

Green-Yellow

2.5

/M605.C1

#160561

=20CBA +00GH003 -K104

C-E10

A6

{4}

5149

H07V-K001_BU

Green-Yellow

2.5

/M607.C1

#160562

=20CBA +00GH003 -K107

C-E13

A6

{4}

5150

H07V-K001_BU

Green-Yellow

2.5

/M609.C1

#160563

=20CBA +00GH003 -K106

C-E12

A6

{4}

5151

H07V-K001_BU

Green-Yellow

2.5

/M611.C1

2M-

=20CBA +00GH002 -X293

F-D01

=20CBA +00GH002 -X291

C-C04

5152

H07V-K001_BU

Grey

/K012.D2

2M-

=20CBA +00GH002 -X291

C-C04

=20CBA +00GH002 -X293

F-D01

5153

H07V-K001_BU

Grey

/K012.D2

2M-

=20CBA +00GH002 -X291

C-C04

=20CBA +00GH002 -X293

F-D01

5154

H07V-K001_BU

Grey

/K012.D2

2M-

=20CBA +00GH002 -X291

C-C04

=20CBA +00GH002 -X291

C-C04

5155

H07V-K001_BU

Grey

/K012.D2

2M-

=20CBA +00GH002 -X291

C-C04

=20CBA +00GH002 -X291

C-C04

5156

H07V-K001_BU

Grey

/K012.D2

=20CBA +00GH002 -X292

C-C05

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

=20CBA

INTERNAL WIRE LISTS

AS-D-PH-EO-4001

26_Internal wire list

Repl. by

HEP BUJ 20CBA FS00 001

path

323 sheets
next sheet
X101
Sheet
W024

Placement in
Schematics

Terminal type

potential

target
external

-X231
terminal number

cable designations

terminal strip

2T+

D2.5/5.4L

/K026.D1

2T+

D2.5/5.4L

/K026.D5

2T+

D2.5/5.4L

/K027.D1

2T-

D2.5/5.4L

/K026.D1

2T-

D2.5/5.4L

/K026.D5

2T-

D2.5/5.4L

/K027.D1

jumpers

Cable type

D2.5/5.4L

D2.5/5.4L

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH001

next sheet
X102
Sheet
X101

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Terminal type

Placement in
Schematics

potential

target
external

-X232
terminal number

cable designations

terminal strip

2T-

M4/6

/M714.B6

#150942

M4/6

/M714.C6

jumpers

Cable type

M4/6

M4/6

M4/6

M4/6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH001

next sheet
X103
Sheet
X102

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Terminal type

Placement in
Schematics

potential

target
external

-X233
terminal number

cable designations

terminal strip

#150943

M4/6

/M716.D4

#150943

M4/6

/M716.E4

jumpers

Cable type

M4/6

M4/6

M4/6

M4/6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH001

next sheet
X104
Sheet
X103

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Placement in
Schematics

Terminal type

potential

target
external

-X234
terminal number

cable designations

terminal strip

#150992

D2.5/5.4L

/M715.B4

#150992

D2.5/5.4L

/M716.B1

#150992

D2.5/5.4L

/M716.B4

#150993

D2.5/5.4L

/M715.B4

#150993

D2.5/5.4L

/M716.B2

#150993

D2.5/5.4L

/M716.B5

jumpers

Cable type

D2.5/5.4L

D2.5/5.4L

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH001

next sheet
X105
Sheet
X104

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Terminal type

Placement in
Schematics

2T-

M4/6

/M716.E3

=20CBA +00GH002 -X292 :2

#150943

M4/6

/M716.E3

jumpers

potential

=20CBA +00GH002 -X292 :1

target
external

-X291
terminal number

cable designations

terminal strip

Cable type

M4/6

M4/6

M4/6

M4/6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH001

next sheet
X106
Sheet
X105

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

=20BUB +02GH101 :XP(-)


C

Placement in
Schematics

=20BUB +02GH101 :XP(+)

Terminal type

potential

target
external

-X401
terminal number

cable designations

terminal strip

+110VDC-1

M4/6

/K001.B2

+110VDC-1

M4/6

/K001.B2

+110VDC-1

M4/6

/K001.B2

-110VDC-1

M4/6

/K001.B2

-110VDC-1

M4/6

/K001.B2

-110VDC-1

M4/6

/K001.B2

jumpers

Cable type

M4/6

M4/6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH001

next sheet
X107
Sheet
X106

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

=20BUB +02GH101 :XP(-)


C

Placement in
Schematics

=20BUB +02GH101 :XP(+)

Terminal type

potential

target
external

-X402
terminal number

cable designations

terminal strip

+110VDC-2

M4/6

/K001.B3

+110VDC-2

M4/6

/K001.B3

+110VDC-2

M4/6

/K001.B3

-110VDC-2

M4/6

/K001.B3

-110VDC-2

M4/6

/K001.B3

-110VDC-2

M4/6

/K001.B3

jumpers

Cable type

M4/6

M4/6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH001

next sheet
X108
Sheet
X107

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Terminal type

Placement in
Schematics

potential

target
external

-X431
terminal number

cable designations

terminal strip

#150679

D2.5/5.4L

/K001.D5

#150679

D2.5/5.4L

/K002.D1

#150680

D2.5/5.4L

/K001.E5

#150680

D2.5/5.4L

/K002.E1

jumpers

Cable type

D2.5/5.4L

D2.5/5.4L

D2.5/5.4L

D2.5/5.4L

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH001

next sheet
X109
Sheet
X108

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Placement in
Schematics

Terminal type

potential

target
external

-X432
terminal number

cable designations

terminal strip

#150954

D2.5/5.4L

/K003.D4

#150954

D2.5/5.4L

/K004.D1

#150954

D2.5/5.4L

/K004.D5

#150954

D2.5/5.4L

/K005.D1

#150954

D2.5/5.4L

/K005.D5

#150953

D2.5/5.4L

/K003.D4

#150953

D2.5/5.4L

/K004.D1

#150953

D2.5/5.4L

/K004.D5

#150953

D2.5/5.4L

/K005.D1

10

#150953

D2.5/5.4L

/K005.D5

jumpers

Cable type

11

D2.5/5.4L

12

D2.5/5.4L

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH001

next sheet
X110
Sheet
X109

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Placement in
Schematics

Terminal type

potential

target
external

-X901
terminal number

cable designations

terminal strip

240VAC-P

M10/10

/K019.B2

240VAC-P

M10/10

/K019.B3

240VAC-P

M10/10

/K019.B4

240VAC-P

M10/10

/K019.B5

240VAC-P

M10/10

/K019.B6

jumpers

Cable type

M10/10

240VAC-N

M10/10

/K019.B2

240VAC-N

M10/10

/K019.B3

240VAC-N

M10/10

/K019.B4

10

240VAC-N

M10/10

/K019.B5

11

240VAC-N

M10/10

/K019.B6

12

M10/10

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH001

next sheet
X201
Sheet
X110

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Placement in
Schematics

Terminal type

potential

target
external

-X231
terminal number

cable designations

terminal strip

#150983

D2.5/5.4L

/K009.D4

#150983

D2.5/5.4L

/K010.D1

#150983

D2.5/5.4L

/K010.D5

#150991

D2.5/5.4L

/K009.D4

#150991

D2.5/5.4L

/K010.D1

#150991

D2.5/5.4L

/K010.D5

jumpers

Cable type

D2.5/5.4L

D2.5/5.4L

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH002

next sheet
X202
Sheet
X201

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Terminal type

Placement in
Schematics

potential

target
external

-X232
terminal number

cable designations

terminal strip

2M+

D2.5/5.4L

/K012.C1

2M+

D2.5/5.4L

/K012.C4

2M-

D2.5/5.4L

/K012.C1

2M-

D2.5/5.4L

/K012.C5

jumpers

Cable type

D2.5/5.4L

D2.5/5.4L

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH002

next sheet
X203
Sheet
X202

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Terminal type

Placement in
Schematics

potential

target
external

-X233
terminal number

cable designations

terminal strip

2N8+

D2.5/5.4L

/K025.C1

2N8-

D2.5/5.4L

/K025.C1

jumpers

Cable type

D2.5/5.4L

D2.5/5.4L

D2.5/5.4L

D2.5/5.4L

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH002

next sheet
X204
Sheet
X203

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

terminal strip

Date
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

2D-

M4/6

/M209.B1

#150830

M4/6

/M209.B4

#33130

M4/6

/M209.B5

#150795

M4/6

/M209.B6

#150938

M4/6

/M209.B7

#150808

M4/6

/M210.B2

#160538

M4/6

/M210.B3

#160539

M4/6

/M210.B4

#160540

M4/6

/M210.B5

10

#160541

M4/6

/M210.B6

11

#151179

M4/6

/M210.B8

12

#160535

M4/6

/M211.B2

13

#160536

M4/6

/M211.B3

14

#160537

M4/6

/M211.B4

15

#150812

M4/6

/M211.B5

16

#150813

M4/6

/M211.B6

17

#150814

M4/6

/M211.B8

18

M4/6

19

M4/6

20

M4/6

21

M4/6

TERMINAL PLAN

HEP BUJ 20CBA FS00 001

=20CBA

323 sheets

+00GH002

next sheet
X205
Sheet
X204

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

Placement in
Schematics

Terminal type

-X234

potential

target
external

terminal number

cable designations

jumpers

Cable type

path

Placement in
Schematics

Terminal type

potential

target
external

-X291
terminal number

cable designations

terminal strip

2M+

M4/6

/K012.D2

2M-

M4/6

/K012.D2

2M+

M4/6

/K012.D2

2M-

M4/6

/K012.D2

2M+

M4/6

/K012.D2

2M-

M4/6

/K012.D2

jumpers

Cable type

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH002

next sheet
X206
Sheet
X205

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Terminal type

Placement in
Schematics

2T-

M4/6

/M716.E2

=20CBA +00GH001 -X291 :2

#150943

M4/6

/M716.E2

jumpers

potential

=20CBA +00GH001 -X291 :1

target
external

-X292
terminal number

cable designations

terminal strip

Cable type

M4/6

M4/6

M4/6

M4/6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH002

next sheet
X207
Sheet
X206

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Placement in
Schematics

Terminal type

potential

target
external

-X293
terminal number

cable designations

terminal strip

2M+

M4/6

/K012.D2

2M-

M4/6

/K012.D2

2M+

M4/6

/K012.D2

2M-

M4/6

/K012.D2

2M+

M4/6

/K012.D2

2M-

M4/6

/K012.D2

jumpers

Cable type

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH002

next sheet
X208
Sheet
X207

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Placement in
Schematics

Terminal type

potential

target
external

-X401
terminal number

cable designations

terminal strip

+110VDC-1

M4/6

/K006.B2

+110VDC-1

M4/6

/K006.B2

+110VDC-1

M4/6

/K006.B2

-110VDC-1

M4/6

/K006.B2

-110VDC-1

M4/6

/K006.B2

-110VDC-1

M4/6

/K006.B2

jumpers

Cable type

M4/6

M4/6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH002

next sheet
X209
Sheet
X208

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Placement in
Schematics

Terminal type

potential

target
external

-X402
terminal number

cable designations

terminal strip

+110VDC-2

M4/6

/K006.B3

+110VDC-2

M4/6

/K006.B3

+110VDC-2

M4/6

/K006.B3

-110VDC-2

M4/6

/K006.B3

-110VDC-2

M4/6

/K006.B3

-110VDC-2

M4/6

/K006.B3

jumpers

Cable type

M4/6

M4/6

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH002

next sheet
X210
Sheet
X209

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

=20CBA +00GH003 -X431 :2

Placement in
Schematics

=20CBA +00GH003 -X431 :1

Terminal type

potential

target
external

-X431
terminal number

cable designations

terminal strip

#150686

D2.5/5.4L

/K006.D5

#150686

D2.5/5.4L

/K007.C1

#150686

D2.5/5.4L

/K007.C5

#150686

D2.5/5.4L

/K008.D1

#150687

D2.5/5.4L

/K006.D5

#150687

D2.5/5.4L

/K007.D1

#150687

D2.5/5.4L

/K007.D5

#150687

D2.5/5.4L

/K008.D1

jumpers

Cable type

D2.5/5.4L

10

D2.5/5.4L

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH002

next sheet
X211
Sheet
X210

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

terminal strip

potential

target
external

-X432
terminal number

cable designations

Placement in
Schematics

Terminal type

jumpers

Cable type

D2.5/5.4L

D2.5/5.4L

D2.5/5.4L

D2.5/5.4L

D2.5/5.4L

D2.5/5.4L

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH002

next sheet
X212
Sheet
X211

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

-X492
Terminal type

Placement in
Schematics

=20SGA +00GH001 -XX :20b

#170059

M4/6

/Q131.D4

=20SGA +00GH001 -XX :19h

#169511

M4/6

/Q131.D4

=20CBA+00GH003 -K101. :C15

#169511

M4/6

/Q131.D5

=20CBA +00GH003 -K101 :D15

+110VDC

M4/6

/Q131.D5

=20BFA +02GH101 -X3 :58

+110VDC

M4/6

/Q131.D5

=20BFA +02GH101 -X3 :146

#170059

M4/6

/Q131.D5

=20BRV +00GH101 -X4 :4

#170059

M4/6

/Q131.D4

=20BRV +00GH101 -X4 :3

#170059

M4/6

/Q131.D5

target
external

jumpers

potential

terminal number

cable designations

terminal strip

Cable type

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH002

next sheet
X213
Sheet
X212

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Placement in
Schematics

Terminal type

potential

target
external

-X901
terminal number

cable designations

terminal strip

240VAC-P

M10/10

/K020.B2

240VAC-P

M10/10

/K020.B3

240VAC-P

M10/10

/K020.B4

240VAC-P

M10/10

/K020.B5

240VAC-P

M10/10

/K020.B6

jumpers

Cable type

M10/10

240VAC-N

M10/10

/K020.B2

240VAC-N

M10/10

/K020.B3

240VAC-N

M10/10

/K020.B4

10

240VAC-N

M10/10

/K020.B5

11

240VAC-N

M10/10

/K020.B6

12

M10/10

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH002

next sheet
X301
Sheet
X213

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Terminal type

Placement in
Schematics

potential

target
external

-X231
terminal number

cable designations

terminal strip

#150983

D2.5/5.4L

/K015.B1

#150991

D2.5/5.4L

/K015.B1

jumpers

Cable type

D2.5/5.4L

D2.5/5.4L

D2.5/5.4L

D2.5/5.4L

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH003

next sheet
X302
Sheet
X301

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Placement in
Schematics

Terminal type

potential

target
external

-X232
terminal number

cable designations

terminal strip

2D+

D2.5/5.4L

/K016.D1

2D+

D2.5/5.4L

/K016.D5

2D+

D2.5/5.4L

/K017.D1

2D-

D2.5/5.4L

/K016.E1

2D-

D2.5/5.4L

/K016.E5

2D-

D2.5/5.4L

/K017.E1

jumpers

Cable type

D2.5/5.4L

D2.5/5.4L

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH003

next sheet
X303
Sheet
X302

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Terminal type

Placement in
Schematics

potential

target
external

-X233
terminal number

cable designations

terminal strip

2A+

D2.5/5.4L

/K018.D1

2A+

D2.5/5.4L

/K018.D5

2A-

D2.5/5.4L

/K018.D1

2A-

D2.5/5.4L

/K018.D5

jumpers

Cable type

D2.5/5.4L

D2.5/5.4L

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH003

next sheet
X304
Sheet
X303

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Terminal type

Placement in
Schematics

potential

target
external

-X431
terminal number

cable designations

terminal strip

#150686

D2.5/5.4L

/K013.B1

#150687

D2.5/5.4L

/K013.B1

jumpers

Cable type

D2.5/5.4L

D2.5/5.4L

D2.5/5.4L

D2.5/5.4L

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH003

next sheet
X305
Sheet
X304

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Placement in
Schematics

Terminal type

potential

target
external

-X432
terminal number

cable designations

terminal strip

4C+

D2.5/5.4L

/K013.D2

4C+

D2.5/5.4L

/K014.D1

4C+

D2.5/5.4L

/K014.D5

4C-

D2.5/5.4L

/K013.D2

4C-

D2.5/5.4L

/K014.E1

4C-

D2.5/5.4L

/K014.E5

jumpers

Cable type

D2.5/5.4L

D2.5/5.4L

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH003

next sheet
X306
Sheet
X305

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Placement in
Schematics

Terminal type

potential

target
external

-X901
terminal number

cable designations

terminal strip

240VAC-P

M10/10

/K021.B2

240VAC-P

M10/10

/K021.B3

240VAC-P

M10/10

/K021.B4

240VAC-P

M10/10

/K021.B5

240VAC-P

M10/10

/K021.B6

240VAC-N

M10/10

/K021.B2

240VAC-N

M10/10

/K021.B3

240VAC-N

M10/10

/K021.B4

240VAC-N

M10/10

/K021.B5

10

240VAC-N

M10/10

/K021.B6

jumpers

Cable type

11

M10/10

12

M10/10

Date

2
First Issue

revision

Customer

GOVERNMENT OF UGANDA

Established P. BHATT

30/04/2010

Project name

BUJAGALI HYDROELECTRIC POWER PROJECT

Checked

GUIOT

Alstom order number 1104

Approved

DELAGE

Origin

We reserve all rights in this document and in the information contained therein. Reproduction, use or
disclosure to third parties without express authority is strictly forbidden. ALSTOM

Repl. f.

TERMINAL PLAN

=20CBA

323 sheets

+00GH003

next sheet

AS-D-PH-EO-4001

27_Terminal Plan

Repl. by

HEP BUJ 20CBA FS00 001

path

Sheet
X306

S-ar putea să vă placă și