WORK METHOD STATEMENT (WMS) SUBMISSION REVIEW FORM PROJECT : THE PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 1 THE

MUADZAM SHAH CATTLE RESEARCH AND INNOVATION CENTRE, PAHANG DARUL MAKMUR. : ECERDC - P010/0396 : MARIMAS SDN. BHD DATE : 27/01/2012 01

REVISION :

CONTRACT NO. CONTRACTOR

DESCRIPTION OF ITEM : WORK METHOD STATEMENT - BITUMINOUS WATERPROOFING FOR FLAT ROOF REFERENCE NO. NOTES : MSB/MCRIC/WMS/0036 :

CONSULTANT'S COMMENTS : (Please add separate sheet if space is insufficiect)

STATUS

A B C

REVIEWED & ACCEPTED REVIEW & RESUBMIT REJECTED DESIGNATION : :

Note: Please tick ( / ) on the relevant status

NAME SIGNATURE

: DATE :

KLCCPSB'S COMMENTS : (Please add separate sheet if space is insufficiect)

STATUS

A B C

REVIEWED & ACCEPTED REVIEW & RESUBMIT REJECTED DESIGNATION : :

Note: Please tick ( / ) on the relevant status

NAME SIGNATURE

: DATE :

ECERDC / E.R COMMENTS : (Please add separate sheet if space is insufficiect)

STATUS

A B C

REVIEWED & ACCEPTED REVIEW & RESUBMIT REJECTED DESIGNATION : :

Note: Please tick ( / ) on the relevant status

NAME SIGNATURE

: DATE :

PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 1 OF THE MUADZAM SHAH CATTLE RESEARCH AND INNOVATION CENTRE PAHANG DARUL MAKMUR CONTRACT NO: ECERDC-P010/0396 MARIMAS SDN.BHD. (Company no. 85438-H) WORK METHOD STATEMENT FOR BITUMINOUS WATER PROOFING REV 01

WORK METHOD OF STATEMENT BITUMINOUS WATERPROOFING FOR FLAT ROOF (TNB SUBSTATION) PRODUCT : Nitoproof 1000

1.0 INTRODUCTION

This work method statement covers the applying bituminous waterproofing work for flat roof at TNB Substation for Proposed Construction and Completion of Package 1 of The Muadzam Shah Cattle Research and Innovation Centre, Pahang Darul Makmur.

This work method statement provides information concerning method of application to ensure compliance with contract requirements and drawings besides to perform safe working environment and compliance to the safety requirements.

2.0 SCOPE OF WORK

Nitoproof 1000 from FOSROC shall be used in accordance with the manufacturers current application instructions. For more information of the product, kindly refer to Cut Sheet Submission reference no. MSB/MCRIC/CS/0119. (Refer to Attachment 1)

3.0 WORK SEQUENCE FLOW Surface preparation Application of Nitoproof 1000 1st coat

Application of Nitoproof 1000 2nd coat

Cement render

PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 1 OF THE MUADZAM SHAH CATTLE RESEARCH AND INNOVATION CENTRE PAHANG DARUL MAKMUR CONTRACT NO: ECERDC-P010/0396 MARIMAS SDN.BHD. (Company no. 85438-H) WORK METHOD STATEMENT FOR BITUMINOUS WATER PROOFING REV 01

4.0 WORK METHODOLOGY

The works shall be carried out by FOSROC waterproofing specialist and shall be carried out in accordance with the manufacturers specification.

4.1 Surface Preparation

All surfaces to be waterproofed should be clean, sound and dry. The surface shall be clean of oil, grease and all loosely adhering particles by using wire brushing. The surface shall ensure free of surface water or bleeding.

4.2 Application of Nitoproof 1000

The drum contained with Nitoproof 1000 shall be stirred thoroughly. The surface shall be applied with the full coat of Nitoproof 1000 by using brush, roller or spray equipment prior to application of second coat at right angle to the first. However, the first coat shall be dried fully before application of second coat.

4.3 Laying of Cement Render

Nitoproof 1000 should not be left exposed to UV light for more than 14 days. So that, laying of cement render is a must with the thickness as per drawing / specification with the periods. At the corner part, floor rendering must be fillet angle to prevent leakage.

PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 1 OF THE MUADZAM SHAH CATTLE RESEARCH AND INNOVATION CENTRE PAHANG DARUL MAKMUR CONTRACT NO: ECERDC-P010/0396 MARIMAS SDN.BHD. (Company no. 85438-H) WORK METHOD STATEMENT FOR BITUMINOUS WATER PROOFING REV 01

5.0 SAFETY AND ENVIRONMENTAL

5.1 Safety

1) All workers shall provide with PPE (Personal Protective Equipment) and shall be worn everytime they are enter the site. Safety Manager / Safety Supervisor shall ensure all the workers wear all the safety equipments provided. 2) Impervious gloves and barrier cream should be used when handling these products. 3) Eye protection should be worn. If accidental eye contamination occurs, wash thoroughly with plenty of water and seek medical advice. 4) If the product contacted with skin occurs, it must be removed before curing takes place. Wash out with an industrial skin cleaner followed by plenty of soap and water. 5) Safety Manager / Safety Supervisor shall ensure that the activity shall be carried out in a safe manner. 6) All workers shall be advised to report any accident or injury to supervisor and proper treatment to be obtained. 7) The Safety Supervisor / Safety Manager shall ensure that the workers understand the safety regulations and explain in detail in particular hazards, where the workers are working and the precaution to be taken to ensure their safety.

5.2 Environmental

1) All workers shall educate on good environmental management practices and well disciplined to environment. 2) The garbage bin shall be provided at the working area and Supervisor shall ensure its must be collected regularly and disposed off at the approved dumpsite.

PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 1 OF THE MUADZAM SHAH CATTLE RESEARCH AND INNOVATION CENTRE PAHANG DARUL MAKMUR CONTRACT NO: ECERDC-P010/0396 MARIMAS SDN.BHD. (Company no. 85438-H) WORK METHOD STATEMENT FOR BITUMINOUS WATER PROOFING REV 01

3) Safety Manager/Supervisor shall ensure that no open burning of construction or

domestic wastes is practiced.


4) All workers shall ensure that all tools and equipment machinery are in good condition to avoid any oil leakage that could harm to environment.

5) Open burning of construction and domestic wastes on the site premises is strictly prohibited 6) All tools and equipment shall be maintained in good working order and sited away from sensitive properties.