SR# I. II. III. IV. DESCRIPTION List of NTDC Projects where Financing has been lined up List of NTDC future projects for which Financing is to be arranged. List of Power Dispersal Projects for Thermal Power Projects List of Power Dispersal Projects for large Hydro Power Plants. Table-1 Table-2 Table-3 Table4
Expected Estimated Approval Year of Cost Eqt. US$ by Financing commissi(Rs. in in Million ECNEC oning Million)
1966 33 22.10.2007 JICA 2011-12
2 3
2x250
2633 12524
44 149
JICA JICA
2011-12 2012-13
2x750
Two 500 kV S/C T/Lines for In/out of 500 kV Lahore Gujranwala S/C at Lahore New (50+50 km)
220 kV D/C T/Line for In/out of 220 kV NKLP-Ghazi Road at Lahore New. (50 km) 220 kV D/C T/Line for In/out of 220 kV NKLP-Wapda Town at Lahore New. (54km)
S.#
4- Shikarpur
500 kV
2x600
8049
96
JICA
2012-13
Expected TransforEstimated ASSOCIATED Eqt. US$ Year of mer Cost Approval TRANSMISSION in Financing commissiCapacity (Rs. in by ECNEC LINES Million oning (MVA) Million) 220 kV D/C T/L for In/out of MansheraIslamabad T/L (40 km) 220 kV D/C T/L from T.M Khan Road to Hala Road (30 km) 220 kV Chakdara Mardan (85 km)
2 source of supply to 5Islamabad University 2 Source of supply to Hala 6Road Grid Station 7nd
1090
13
2012-13
850
10
2012-13
220 kV Nowshera
2x160
830
10
2012-13
220 kV 8Chakdara
2X250
3270
38
2013-14
220 kV Mardan
9220 kV Burhan 220 kV Bund Rd 220kV Sarfaraz Nagar 220 kV Bahawalpur 500 kV Jamshoro 220 kV Quetta New
2x250
4x250 4x250 3x250 2x250 1x250 1x250
4550
54
2012-13
Expected Estimate Eqt. Year of d Cost Approval US$ in Financing commissi (Rs. in by ECNEC Million -oning Million)
10-
2x160
2900
35
ADB Tr-IV
2013-14
11-
220 kV Taxila.
2x250
2160
27
PC-I under preparation PC-I under preparation PC-I submitted to GoP PC-I cleared by CDWP on 18.03.2010
ADB Tr-IV
2013-14
2x160
1079
13
Iranian Loan
2013-14
13-
1x160 1x100
857
10
PMs Fund
2013-14
Interconnection of 1200 MW AES Imported coal 14based Power Plant near Karachi (Part-I)
24078
298
ADB Tr-III
2015-16
Table-2
34
2x250
2975
35
2012-13
3-
2x250
2380
28
2012-13
4-
4250 3825
50 45
2012-13
2012-13
7-
220 kV Gharo
2x250
4600
54
2012-13
Table-2
2x750
6600
78
2013-14
Table-2
2x750
In/Out of 220 kV Sh. Muhammadi-Shahibagh at Peshawar New (5 km) 14220 kV Kohat 2x250 220 kV Kohat Peshawar New (50 km)
5400
64
2014-15
6000
70
2014-15
15-
2x250
2700
31
2014-15
1617-
1x250
430
2014-15
2x250
1450
17
2015-16
Table-2
21-
2x250
In/Out of 220 kV Lahore Wapda Town D/C at Iqbal Town (20+20 km)
In/Out of 220 kV Mangala K.S.K at Gujranwala New (20 km) 220 kV Nokhar - Gujranwala New (50 kM)
2150
25
2015-16
22-
2x250
2900
34
2015-16
2324-
2x250 2x250
220 kV Pindi Bhattian Ind. Gujranwala (50 km) 220 kV Head Faqirian Ludewala (60 km)
2400 2400
28 28
2015-16 2015-16
2x250
1450
17
2015-16
2627-
2x250
3900
45
2015-16
1500
18
2015-16
28-
3825
45
2015-16
29-
2x250
1450
17
2015-16
Total:
82620
972
1-
Power Dispersal from 747 MW CCPP at Guddu Dispersal of Power from Uch-2 UAE Combined Cycle power plant at GTPS Faisalabad
2-
3000
35
2012-13
3-
1x160
1700
20
2012-13
4-
Interconnection of 1200 MW AES Imported coal based power near Karachi (Part-II)
170
2015-16
5-
Interconnection of 1200 MW Engro & 1200 MW PEPCOs Thar Coal Based Power Plants at Thar
Interconnection of 1200 MW Imported coal based PPIB and 1000 MW Imported Coal based PEPCOs power Plants at Karachi
7-
Switching station at Zahidan, Quetta and midpoint between Zahidan & Quetta 500 kV HVDC T/L from Pak-Afghan Border to Peshawar (71 km) 500 kV Converter Station Peshawar 220 kV Chashma New Bannu (125 km) In/out of 220 kV D.I. Kahan Jahurabad S/C at Chashma New (1 km)
40120
472
2015-16
8-
16065
189
2015-16
9-
3000
35
2016-17
10-
25500
300
2018-19
Total
299455
3523
Table-4 LIST OF POWER DISPERSAL PROJECTS FOR LARGE HYDRO POWER PLANTS
ASSOCIATED TRANSMISSION LINES 500 kV Neelum Jhelum Rawat S/C T/Line (110 km). 500 kV Neelum Jhelum Gujranwala S/C T/Line (235 km) 500 kV Karot Lahore New (270 km) 2Dispersal of Power from Karot HPP In/Out of 500 kV Neelum Jhelum Gujranwala at Karot (10 km) In/Out of 220 kV Peshawar Shahi Bagh at Munda (35 km) 13250 156 2015-16 19125 225 2015-16 ESTIMATED COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIONING
SR #.
NAME OF NEW SUBSTATIONS Dispersal of Power from 969 MW Neelum Jhelum Hydro Power Project to Rawat & Gujranwala
1-
3-
850
10
2016-17
Table-4 LIST OF POWER DISPERSAL PROJECTS FOR LARGE HYDRO POWER PLANTS
SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES 500 kV 225 km long Kohala Gujranwala S/C T/L ESTIMATED COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIONING
4-
Three 500 kV line bays at Kohala One 500 kV line bay at Gujranwala
Two 500 kV T/Lines 15 km each for in/out of 500 kV Neelum Jhelum Gujranwala at Kohala
500 kV Kohala Karot Gujranwala (240 km)
11000
130
2017-18
5-
11820
139
2017-18
Table-4
6-
Dispersal of Power from 4500 MW Diamer Basha HPP to Lahore with interconnection at Dasu and Gujar Khan
765 kV HVAC substations at Gujar Khan & Lahore with 765/500 kV 3x500 MVA T/Fs
500 MVAR SVC at Gujar Khan
Three 765 kV HVAC T/Ls from Basha to Gujar Khan (407 km long each) 113900 1340 2018-19
Two 765 kV HVAC T/Ls from Gujar Khan to Lahore (260 km long each)
Table-4
7-
Dispersal of Power from 5400 -7000 MW Bunji Hydro Power Project to Lahore with interconnection at Gujar Khan
126225
1485
2019-20
Total
296225
3485
PC-I for dispersal of Power from Neelum Jhelum HPP has been approved by ECNEC Studies are being carried out to ascertain the interconnection schemes for the projects at Sr. No: 2 to 7