Sunteți pe pagina 1din 82
Building and Construction Dewy irs Precast Concrete Elements GOOD INDUSTRY PRACTICES eur A cnc) eareWaecnecu tal) Lc Set out reference and offset lines for the positioning Put up temporary props to support the precast Application of non-shrink mortar to seal the gaps along the beam / slab elements bottom edge of the wall / column elements of precast elements during installation - | ‘ fe Set up formwork for the casting of joints Provide level pads (or shim plates) for panel setting Lift and rig the elements to designated For corrugated pine sleeve or splice sleeve location with wire ropes connection, apply non-shrink grout or proprietary ‘grout mix into the pipe inlets provided 1) Setting out For panels with in-situ joints, install the rebars as required Remove formwork when sufficient concrete ‘strength has been achieved Sealant Application Backer Rod Approved sealant or grout to be installed at joints of facade walls or external columns at later stage For external wall / column, fix the compressible form or Adjust and align the elements to position Keep the installed elements undisturbed backer rod on outer perimeter of wall / column and secure with props for at least 24 hours For details on the steps, please sefer to the Guide Book Precast Concrete Elements . GOOD INDUSTRY PRACTICES

S-ar putea să vă placă și