VRV AC UNITS SCHEDULE Nominal Total Capacity Sensible Capacity Capacity KW at BTU/HR at 22 C BTU/HR at 22 C Q'ty 27c partial load operation partial load operation 1
REF. Outdoor Unit CU-1 Indoor Units FCU-1 FCU-2 FCU-3 FCU-21 FCU-22 FCU-23 Total Capacity
LOCATION
TOTAL CAP. KW
SENSIBLE CAP. KW
ROOF Pediatric Operatory 2 Pediatric Dentist Office 1 Pediatric Operatory 1 Sterilization Pediatric Operatory 3 Corridor
33.5
28.74
PDFY-P50 PEFY-P40 VMS PEFY-P50 VMS PDFY-P63 PEFY-P50 VMS PDFY-P80 Total Capacity
1 1 1 1 1 1 6
% By Capacity of Indoor Units to Outdoor Units 1.12% The design indoor temperature are: 22C DB- 15.4C WB-50%RH. The design outdoor temperature are:35C DB. Correction factor by pipes are calculated. Outdoor is located on the roof. 1.09%
VRV AC UNITS SCHEDULE TOTAL CAP. KW SENSIBLE CAP. KW Nominal Capacity KW at 27c Total Capacity Sensible Capacity BTU/HR at 22 C BTU/HR at 22 C Q'ty partial load operation partial load operation 1
REF. Outdoor Unit CU-2 Indoor Units FCU-5 FCU-6 FCU-7 FCU-8 FCU-10 FCU-23 FCU-23 Total Capacity
LOCATION
ROOF Orthodontics Operatory 2 Orthodontics Operatory 1 Orthodontics Office Administration Orthodontics Operatory 3 Corridor Corridor
45.0
38.99
PEFY-P50 VMS PDFY-P80 PEFY-P32 VMS PEFY-P32 VMS PDFY-P80 PDFY-P80 PDFY-P80 Total Capacity
1 1 1 1 1 1 1 7
% By Capacity of Indoor Units to Outdoor Units 1.08% The design indoor temperature are: 22C DB- 15.4C WB-50%RH. The design outdoor temperature are:35C DB. Correction factor by pipes are calculated. Outdoor is located on the roof. 1.06%
VRV AC UNITS SCHEDULE Nominal Capacity KW at 27c Total Capacity Sensible Capacity BTU/HR at 22 C BTU/HR at 22 C Q'ty partial load operation partial load operation 1
REF. Outdoor Unit CU-3 Indoor Units FCU-12 FCU-13 FCU-14 FCU-15 FCU-16 FCU-17 FCU-23 FCU-23 FCU-23 Total Capacity
LOCATION
TOTAL CAP. KW
SENSIBLE CAP. KW
ROOF
45.0
39.73
Bleaching Room Surgery Room Endo Operatory General Dentist Operatory 1 General Dentist Office 2 General Dentist Operatory 2 Corridor Corridor Corridor
2.7 2.8 4.6 5.0 2.9 3.2 6.9 6.9 6.9 41.90
2.1 2.0 3.8 4.1 2.3 2.6 6.6 6.6 6.6 36.70
PEFY-P32 PEFY-P32 VMS PEFY-P50 VMS PEFY-P50 VMS PEFY-P32 VMS PEFY-P40 VMS PDFY-P80 PDFY-P80 PDFY-P80 Total Capacity
3.6 3.6 5.6 5.6 3.6 4.5 9.0 9.0 9.0 53.50
3.02 3.02 4.70 4.70 3.02 3.78 7.56 7.56 7.56 44.92
2.45 2.39 3.54 3.54 2.39 2.90 5.60 5.60 5.60 34.01
1 1 1 1 1 1 1 1 1 9
% By Capacity of Indoor Units to Outdoor Units 1.19% The design indoor temperature are: 22C DB- 15.4C WB-50%RH. The design outdoor temperature are:35C DB. Correction factor by pipes are calculated. Outdoor is located on the roof. 1.13%
LEMCO S.A.R.L. Project name: DOUGHAN CLINIC Final Selection DX Refrigerent:R22 DX REQUIRED UNITS SCHEDULE TOTAL CAP.BTU/HR 11.0 6.0 2.4 7.0 MITSUBISHI ELECTRIC Units Schedule TOTAL CAP.BTU/HR AFTER CORRECTION BY PIPES AND TEMPERATURE 8.0 5.2 3.2 8.0 Date:31-07-09
REF.
LOCATION
MODEL
Q'ty
1 1 2 1
The design indoor temperature are: 22C DB- 15.4C WB-50%RH. The design outdoor temperature are: 35C DB.