LEMCO S.A.R.L.

Project : DOUGHAN CLINIC

Final Selection SYSTEM 1 Date:31-07-09 Refrigerent: R410A

VRV AC UNITS SCHEDULE Nominal Total Capacity Sensible Capacity Capacity KW at BTU/HR at 22 C BTU/HR at 22 C Q'ty 27c partial load operation partial load operation 1

REF. Outdoor Unit CU-1 Indoor Units FCU-1 FCU-2 FCU-3 FCU-21 FCU-22 FCU-23 Total Capacity

LOCATION

TOTAL CAP. KW

SENSIBLE CAP. KW

MODEL Outdoor Unit

ROOF Pediatric Operatory 2 Pediatric Dentist Office 1 Pediatric Operatory 1 Sterilization Pediatric Operatory 3 Corridor

PUHY-P300 Indoor Units

33.5

28.74

4.4 3.4 4.6 6.3 4.8 6.9 30.40

3.5 2.4 3.6 4.6 4.0 6.6 24.70

PDFY-P50 PEFY-P40 VMS PEFY-P50 VMS PDFY-P63 PEFY-P50 VMS PDFY-P80 Total Capacity

5.6 4.5 5.6 7.1 5.6 9.0 37.40

4.69 3.77 4.69 5.95 4.69 7.54 31.33

3.63 2.89 3.53 4.54 3.53 5.59 23.71

1 1 1 1 1 1 6

% By Capacity of Indoor Units to Outdoor Units 1.12% The design indoor temperature are: 22C DB- 15.4C WB-50%RH. The design outdoor temperature are:35C DB. Correction factor by pipes are calculated. Outdoor is located on the roof. 1.09%

LEMCO S.A.R.L. Project : DOUGHAN CLINIC

Final Selection SYSTEM 2 Date:31-07-09 Refrigerent: R410A

VRV AC UNITS SCHEDULE TOTAL CAP. KW SENSIBLE CAP. KW Nominal Capacity KW at 27c Total Capacity Sensible Capacity BTU/HR at 22 C BTU/HR at 22 C Q'ty partial load operation partial load operation 1

REF. Outdoor Unit CU-2 Indoor Units FCU-5 FCU-6 FCU-7 FCU-8 FCU-10 FCU-23 FCU-23 Total Capacity

LOCATION

MODEL Outdoor Unit

ROOF Orthodontics Operatory 2 Orthodontics Operatory 1 Orthodontics Office Administration Orthodontics Operatory 3 Corridor Corridor

PUHY-P400 Indoor Units

45.0

38.99

4.3 7.5 2.6 2.6 6.8 6.9 6.9 37.60

3.5 6.7 2.0 2.0 6.0 6.6 6.6 33.40

PEFY-P50 VMS PDFY-P80 PEFY-P32 VMS PEFY-P32 VMS PDFY-P80 PDFY-P80 PDFY-P80 Total Capacity

5.6 9.0 3.6 3.6 9.0 9.0 9.0 48.80

4.73 7.61 3.04 3.04 7.61 7.61 7.61 41.25

3.55 5.62 2.40 2.40 5.62 5.62 5.62 30.83

1 1 1 1 1 1 1 7

% By Capacity of Indoor Units to Outdoor Units 1.08% The design indoor temperature are: 22C DB- 15.4C WB-50%RH. The design outdoor temperature are:35C DB. Correction factor by pipes are calculated. Outdoor is located on the roof. 1.06%

LEMCO S.A.R.L. Project : DOUGHAN CLINIC

Final Selection SYSTEM 3 Date:31-07-09 Refrigerent: R410A

VRV AC UNITS SCHEDULE Nominal Capacity KW at 27c Total Capacity Sensible Capacity BTU/HR at 22 C BTU/HR at 22 C Q'ty partial load operation partial load operation 1

REF. Outdoor Unit CU-3 Indoor Units FCU-12 FCU-13 FCU-14 FCU-15 FCU-16 FCU-17 FCU-23 FCU-23 FCU-23 Total Capacity

LOCATION

TOTAL CAP. KW

SENSIBLE CAP. KW

MODEL Outdoor Unit

ROOF

PUHY-P400 Indoor Units

45.0

39.73

Bleaching Room Surgery Room Endo Operatory General Dentist Operatory 1 General Dentist Office 2 General Dentist Operatory 2 Corridor Corridor Corridor

2.7 2.8 4.6 5.0 2.9 3.2 6.9 6.9 6.9 41.90

2.1 2.0 3.8 4.1 2.3 2.6 6.6 6.6 6.6 36.70

PEFY-P32 PEFY-P32 VMS PEFY-P50 VMS PEFY-P50 VMS PEFY-P32 VMS PEFY-P40 VMS PDFY-P80 PDFY-P80 PDFY-P80 Total Capacity

3.6 3.6 5.6 5.6 3.6 4.5 9.0 9.0 9.0 53.50

3.02 3.02 4.70 4.70 3.02 3.78 7.56 7.56 7.56 44.92

2.45 2.39 3.54 3.54 2.39 2.90 5.60 5.60 5.60 34.01

1 1 1 1 1 1 1 1 1 9

% By Capacity of Indoor Units to Outdoor Units 1.19% The design indoor temperature are: 22C DB- 15.4C WB-50%RH. The design outdoor temperature are:35C DB. Correction factor by pipes are calculated. Outdoor is located on the roof. 1.13%

LEMCO S.A.R.L. Project name: DOUGHAN CLINIC Final Selection DX Refrigerent:R22 DX REQUIRED UNITS SCHEDULE TOTAL CAP.BTU/HR 11.0 6.0 2.4 7.0 MITSUBISHI ELECTRIC Units Schedule TOTAL CAP.BTU/HR AFTER CORRECTION BY PIPES AND TEMPERATURE 8.0 5.2 3.2 8.0 Date:31-07-09

REF.

LOCATION

MODEL

Q'ty

FCU-18 FCU-19 FCU-24 FCU-25

Dentist Lounge Staff Lounge I.T Room Mechanical Room

MSH-A30 MSH-A18 MSH-A13 MSH-A18

1 1 2 1

The design indoor temperature are: 22C DB- 15.4C WB-50%RH. The design outdoor temperature are: 35C DB.