Sunteți pe pagina 1din 19

ETAP

Page:

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Electrical Transient Analyzer Program


Optimal Capacitor Placement

Number of Buses:

Number of Branches:

Loading Category (1):

Design

Generation Category (1):

Design

Charger Loading:

Design

Swing
1

V-Control
0

Load
23

Total
24

XFMR2
0

XFMR3
0

Reactor
0

Line/Cable
23

Impedance
0

Tie PD
0

Total
23

OCP Objective

Energy Based on

Energy Cost ($/kWh)

Planning Period (Years)

Interest Rate (%)

Power Factor Correction

Average Energy Cost

0.09

10

7.00

Load Stages

Time Distribution of Load (%)

Maximum
Average
Minimum

25
55
20

Global Load Diversity Factor (%)

Maximum No. of Iterations:

99

Precision of Solution:

0.000100

System Frequency:

50 Hz

Unit System:

Metric

Project Filename:

domafinal

Output Filename:

C:\ETAP 600\domafinal\Untitled.CA1

125
80

ETAP

Page:

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Adjustments
Apply
Tolerance

Individual

Adjustments

/Global

Transformer Impedance:

Yes

Individual

Reactor Impedance:

Yes

Individual

Overload Heater Resistance:

No

Transmission Line Length:

No

Cable Length:

No

Apply

Individual

Adjustments

/Global

Transmission Line Resistance:

Yes

Individual

Cable Resistance:

Yes

Individual

Temperature Correction

Percent

Degree C

ETAP

Page:

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Bus Input Data


(Average Loading without Load Diversity Factor)
Load
Bus
ID

Constant kVA

Initial Voltage
kV

Sub-sys

% Mag.

Ang.

Bus1

20.000

Bus2

20.000

Bus3
Bus4

MW

100.0

0.0

100.0

0.0

0.020

0.015

20.000

100.0

0.0

0.427

0.281

20.000

100.0

0.0

0.215

0.082

Bus5

20.000

100.0

0.0

0.640

0.464

Bus6

20.000

100.0

0.0

0.520

0.390

Bus7

20.000

100.0

0.0

0.252

0.156

Bus8

20.000

100.0

0.0

0.893

0.554

Bus9

20.000

100.0

0.0

0.264

0.097

Bus10

20.000

100.0

0.0

0.277

0.234

Bus11

20.000

100.0

0.0

0.157

0.074

Bus12

20.000

100.0

0.0

Bus13

20.000

100.0

0.0

0.323

0.201

Bus14

20.000

100.0

0.0

0.156

0.055

Bus15

20.000

100.0

0.0

0.085

0.053

Bus16

20.000

100.0

0.0

0.322

0.233

Bus17

20.000

100.0

0.0

0.085

0.053

Bus18

20.000

100.0

0.0

0.618

0.415

Bus19

20.000

100.0

0.0

Bus20

20.000

100.0

0.0

0.370

0.229

Bus21

20.000

100.0

0.0

0.123

0.045

Bus22

20.000

100.0

0.0

0.277

0.086

Bus23

20.000

100.0

0.0

0.933

0.613

Bus24

20.000

100.0

0.0

0.419

0.259

7.376

4.589

Total Number of Buses: 24

Generation Bus
ID
Bus1

kV
20.000

Mvar

MW

Sub-sys
1

Constant I

Mvar

0.000

Voltage
Type

Swing

Constant Z

MW

0.000

Generation

% Mag.

Angle

100.0

0.0

MW

0.000

Mvar

0.000

Generic

Mvar

0.000

MW

0.000

Mvar Limits
% PF

Max

Min

0.000

Mvar

0.000

ETAP

Page:

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Line/Cable Input Data


Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)
Length

Line/Cable
ID

Library

% Tol.

#/Phase

3250.0

0.0

75

0.192970

0.144000

Line2

300.0

0.0

75

0.176034

0.236121

Line3

5.0

0.0

75

0.283300

0.380000

Line4

208.0

0.0

75

0.283300

0.120000

Line5

1000.0

0.0

75

0.283300

0.380000

Line6

500.0

0.0

75

0.283300

0.120000

Line7

600.0

0.0

75

0.283300

0.120000

Line8

450.0

0.0

75

0.459610

0.235560

Line9

400.0

0.0

75

0.680000

0.380000

Line10

1000.0

0.0

75

0.680000

0.380000

Line11

500.0

0.0

75

0.680000

0.380000

Line12

400.0

0.0

75

0.680000

0.380000

Line13

800.0

0.0

75

0.680000

0.380000

Line14

200.0

0.0

75

0.680000

0.380000

Line15

700.0

0.0

75

0.422532

0.236121

Line16

100.0

0.0

75

0.680000

0.380000

Line17

90.0

0.0

75

0.680000

0.380000

Line18

500.0

0.0

75

0.680000

0.380000

Line19

800.0

0.0

75

0.680000

0.380000

Line20

950.0

0.0

75

0.680000

0.380000

Line21

250.0

0.0

75

0.680000

0.380000

Line22

302.0

0.0

75

0.680000

0.380000

Line23

500.0

0.0

75

0.680000

0.380000

Line / Cable resistances are listed at the specified temperatures.

Size

Adj. (m)

Line1

T (C)

ETAP

Page:

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Branch Connections
CKT/Branch

Connected Bus ID

ID

Type

From Bus

% Impedance, Pos. Seq., 100 MVA Base


To Bus

Line1

Line

Bus1

Bus2

15.68

11.70

19.56

Line2

Line

Bus2

Bus3

1.32

1.77

2.21

Line3

Line

Bus3

Bus4

0.04

0.05

0.06

Line4

Line

Bus4

Bus5

1.47

0.62

1.60

Line5

Line

Bus5

Bus6

7.08

9.50

11.85

Line6

Line

Bus6

Bus7

3.54

1.50

3.85

Line7

Line

Bus7

Bus8

4.25

1.80

4.62

Line8

Line

Bus8

Bus9

5.17

2.65

5.81

Line9

Line

Bus9

Bus10

6.80

3.80

7.79

Line10

Line

Bus9

Bus11

17.00

9.50

19.47

Line11

Line

Bus11

Bus12

8.50

4.75

9.74

Line12

Line

Bus12

Bus13

6.80

3.80

7.79

Line13

Line

Bus14

Bus12

13.60

7.60

15.58

Line14

Line

Bus15

Bus14

3.40

1.90

3.89

Line15

Line

Bus16

Bus15

7.39

4.13

8.47

Line16

Line

Bus17

Bus16

1.70

0.95

1.95

Line17

Line

Bus18

Bus17

1.53

0.86

1.75

Line18

Line

Bus19

Bus18

8.50

4.75

9.74

Line19

Line

Bus19

Bus20

13.60

7.60

15.58

Line20

Line

Bus21

Bus20

16.15

9.03

18.50

Line21

Line

Bus22

Bus21

4.25

2.38

4.87

Line22

Line

Bus19

Bus23

5.13

2.87

5.88

Line23

Line

Bus23

Bus24

8.50

4.75

9.74

ETAP

Page:

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Bus Constraints
% PF
Bus ID

Min.

Max.

Bus3

95

100

Bus5

95

100

Bus6

95

100

Bus7

95

100

Bus8

95

100

Bus10

95

100

Bus13

95

100

Bus16

95

100

Bus18

95

100

Bus20

95

100

Bus23

95

100

Bus24

95

100

Allow Over Compensation for PF Correction: No

Capacitor Information Data


Cost
Max. Voltage

Bank Size

kV

kvar

Max. No. Of
Banks

Purchase
$/kvar

Installation
$

Operation
$/Bank per Year

0.480

100

10

10.00

600.00

100.00

0.600

100

10

10.00

600.00

100.00

2.400

200

10

20.00

800.00

200.00

4.800

200

10

20.00

800.00

200.00

6.640

200

10

20.00

800.00

200.00

12.470

300

10

30.00

800.00

300.00

13.800

300

10

30.00

1000.00

300.00

15.100

300

10

30.00

1000.00

300.00

20.800

100

10

20.00

1200.00

150.00

24.900

400

10

40.00

1200.00

400.00

ETAP

Page:

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

MAXIMUM LOADING-LOAD FLOW REPORT

Bus
ID

Voltage

Generation

20.000

100.000

0.0

9.643

2.227

Bus2

9.643

2.227

285.7

97.4

Bus2

20.000

98.231

-0.5

0.025

0.019

Bus1

-9.489

-2.113

285.7

97.6

Bus3

9.464

2.094

284.9

97.6

Bus2

-9.451

-2.077

284.9

97.7

Bus4

8.918

2.014

269.1

97.5

Bus3

-8.917

-2.014

269.1

97.5

Bus5

8.648

1.911

260.7

97.6

Bus4

-8.636

-1.906

260.7

97.7

Bus4

20.000

98.066

98.062

-0.5

-0.5

Mvar

MW

Mvar

0.534

0.269

ID

0.063

0.103

Bus5

20.000

97.919

-0.6

0.800

0.101

Bus6

20.000

97.180

-0.9

0.650

0.110

Bus7

20.000

96.894

-1.0

0.315

0.101

Bus8

20.000

96.568

-1.0

1.116

0.133

Bus9

20.000

96.227

-1.0

0.330

0.121

MW

XFMR

* Bus1

20.000

MW

Load Flow

% Mag.

Bus3

Ang.

Load

kV

Mvar

Amp

% PF

Bus6

7.836

1.805

237.1

97.4

Bus5

-7.789

-1.741

237.1

97.6

Bus7

7.139

1.631

217.5

97.5

Bus6

-7.118

-1.623

217.5

97.5

Bus8

6.803

1.521

207.7

97.6

Bus7

-6.781

-1.512

207.7

97.6

Bus9

5.665

1.379

174.3

97.2

Bus8

-5.646

-1.370

174.3

97.2

Bus10

0.346

0.107

10.9

95.5

Bus11

4.970

1.141

153.0

97.5

Bus10

20.000

96.198

-1.0

0.346

0.107

Bus9

-0.346

-0.107

10.9

95.5

Bus11

20.000

95.236

-1.2

0.196

0.092

Bus9

-4.922

-1.114

153.0

97.5

Bus12

4.726

1.022

146.6

97.7

Bus11

-4.704

-1.009

146.6

97.8

Bus13

0.404

0.072

12.5

98.5

Bus14

4.300

0.938

134.1

97.7

Bus12

20.000

94.764

-1.3

Bus13

20.000

94.732

-1.3

0.404

0.072

Bus12

-0.404

-0.072

12.5

98.5

Bus14

20.000

94.072

-1.4

0.195

0.069

Bus12

-4.271

-0.921

134.1

97.8

Bus15

4.076

0.852

127.8

97.9

Bus14

-4.069

-0.849

127.8

97.9

Bus16

3.963

0.782

124.2

98.1

Bus15

-3.949

-0.775

124.2

98.1

Bus15

20.000

93.907

-1.5

0.106

0.066

Bus16

20.000

93.561

-1.5

0.403

0.116

Bus17

20.000

93.490

-1.5

0.106

0.066

Bus17

3.547

0.659

111.3

98.3

Bus16

-3.544

-0.657

111.3

98.3

Bus18

3.438

0.591

107.7

98.6

-3.436

-0.590

107.7

98.6

Bus18

20.000

93.428

-1.6

0.773

0.082

Bus17
Bus19

2.663

0.507

83.8

98.2

Bus19

20.000

93.160

-1.6

Bus18

-2.656

-0.503

83.8

98.3

Bus20

0.965

0.278

31.1

96.1

Bus23

1.692

0.225

52.9

99.1

Bus19

-0.963

-0.277

31.1

96.1

Bus21

0.501

0.164

16.4

95.0

Bus20

20.000

92.996

-1.6

0.463

0.113

% Tap

ETAP

Page:

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Bus
ID
Bus21

Voltage
kV

% Mag.

20.000

92.893

Generation

Ang.
-1.6

MW

Load

Mvar
0

MW
0

0.154

Load Flow
Mvar
0.056

ID

MW

XFMR
Mvar

Amp

% PF

Bus20

-0.500

-0.164

16.4

95.0

Bus22

0.346

0.108

11.3

95.5

Bus22

20.000

92.875

-1.7

0.346

0.108

Bus21

-0.346

-0.108

11.3

95.5

Bus23

20.000

93.060

-1.6

1.166

0.160

Bus19

-1.690

-0.224

52.9

99.1

Bus24

0.524

0.064

16.4

99.3

Bus24

20.000

93.009

-1.7

0.524

0.064

Bus23

-0.524

-0.064

16.4

99.3

* Indicates a voltage-regulated bus (voltage controlled by generator, SVC or transformer LTC, or swing type machine connected to it), therefore it is not considered as candidate bus and not
considered for voltage constraint in capacitor placement.
# Indicates a bus with a load mismatch of more than 0.1 MVA

% Tap

ETAP

Page:

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

AVERAGE LOADING-LOAD FLOW REPORT

Bus
ID

Voltage

Generation

20.000

100.000

0.0

7.629

0.856

Bus2

7.629

0.856

221.6

99.4

Bus2

20.000

98.707

-0.4

0.020

0.015

Bus1

-7.537

-0.787

221.6

99.5

Bus3

7.517

0.772

221.0

99.5

Bus3

20.000

98.592

-0.5

0.427

-0.011

Bus2

-7.509

-0.762

221.0

99.5

Bus4

7.082

0.772

208.6

99.4

Bus4

20.000

98.589

-0.5

0.215

0.082

Bus3

-7.082

-0.772

208.6

99.4

Bus5

6.867

0.690

202.1

99.5

Bus4

-6.859

-0.687

202.1

99.5

Bus6

6.219

0.708

183.5

99.4

Bus5

-6.191

-0.669

183.5

99.4

Bus7

5.671

0.663

168.2

99.3

-5.659

-0.658

168.2

99.3

Bus6

20.000

98.482

97.968

-0.5

-0.9

Mvar

MW

Mvar

0.640

0.520

ID

-0.021

0.006

MW

XFMR

* Bus1

20.000

MW

Load Flow

% Mag.

Bus5

Ang.

Load

kV

Mvar

Amp

% PF

Bus7

20.000

97.753

-0.9

0.252

0.060

Bus6
Bus8

5.407

0.598

160.6

99.4

Bus8

20.000

97.507

-0.9

0.893

-0.016

Bus7

-5.394

-0.592

160.6

99.4

Bus9

4.501

0.609

134.5

99.1

Bus9

20.000

97.252

-1.0

0.264

0.097

Bus8

-4.489

-0.603

134.5

99.1

Bus10

0.277

0.045

8.3

98.7

Bus11

3.948

0.461

118.0

99.3

Bus10

20.000

97.231

-1.0

0.277

0.045

Bus9

-0.277

-0.045

8.3

98.7

Bus11

20.000

96.517

-1.2

0.157

0.074

Bus9

-3.920

-0.445

118.0

99.4

Bus12

3.763

0.371

113.1

99.5

Bus12

20.000

96.168

-1.3

Bus11

-3.750

-0.364

113.1

99.5

Bus13

0.323

0.016

9.7

99.9

Bus14

3.427

0.348

103.4

99.5

Bus13

20.000

96.144

-1.3

0.323

0.016

Bus12

-0.323

-0.016

9.7

99.9

Bus14

20.000

95.656

-1.4

0.156

0.055

Bus12

-3.409

-0.338

103.4

99.5

Bus15

3.253

0.283

98.6

99.6

Bus15

20.000

95.535

-1.4

0.085

0.053

Bus14

-3.249

-0.281

98.6

99.6

Bus16

3.164

0.228

95.9

99.7

Bus15

-3.156

-0.223

95.9

99.8

Bus17

2.834

0.172

86.0

99.8

Bus16

-2.833

-0.171

86.0

99.8

Bus18

2.748

0.118

83.4

99.9

-2.746

-0.117

83.4

99.9

Bus16

Bus17

20.000

20.000

95.280

95.228

-1.5

-1.5

Bus18

20.000

95.183

-1.5

Bus19

20.000

94.985

-1.6

0.322

0.085

0.051

0.053

0.618

-0.038

Bus17
Bus19

2.128

0.155

64.7

99.7

Bus18

-2.124

-0.153

64.7

99.7

Bus20

0.771

0.181

24.1

97.4

Bus23

1.353

-0.028

41.1

-100.0

% Tap

ETAP

Page:

10

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Bus
ID
Bus20

Bus21

Voltage
kV

% Mag.

20.000

94.860

20.000

94.779

Generation

Ang.
-1.6

-1.6

MW

Load

Mvar
0

MW
0

0.370

0.123

Load Flow
Mvar
0.049

0.045

Bus22

20.000

94.765

-1.6

0.277

0.086

Bus23

20.000

94.913

-1.6

0.933

-0.018

Bus24

20.000

94.876

-1.6

0.419

-0.011

ID

MW

XFMR
Mvar

Amp

Bus19

-0.770

-0.180

24.1

97.4

Bus21

0.400

0.131

12.8

95.0

Bus20

-0.400

-0.131

12.8

95.0

Bus22

0.277

0.086

8.8

95.5

Bus21

-0.277

-0.086

8.8

95.5

Bus19

-1.352

0.029

41.1

-100.0

Bus24

0.419

-0.011

12.8

-100.0

Bus23

-0.419

0.011

12.8

-100.0

* Indicates a voltage-regulated bus (voltage controlled by generator, SVC or transformer LTC, or swing type machine connected to it), therefore it is not considered as candidate bus and not
considered for voltage constraint in capacitor placement.
# Indicates a bus with a load mismatch of more than 0.1 MVA

% PF

% Tap

ETAP

Page:

11

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

MINIMUM LOADING-LOAD FLOW REPORT

Bus
ID

Voltage

Generation

20.000

100.000

0.0

6.058

-0.211

Bus2

6.058

-0.211

175.0

-99.9

Bus2

20.000

99.078

-0.4

0.016

0.012

Bus1

-6.000

0.254

175.0

-99.9

Bus3

5.984

-0.266

174.5

-99.9

Bus2

-5.979

0.272

174.5

-99.9

Bus4

5.638

-0.203

164.5

-99.9

Bus3

-5.638

0.203

164.5

-99.9

Bus5

5.466

-0.269

159.6

-99.9

-5.461

0.271

159.6

-99.9
-100.0

Bus4

20.000

99.003

99.001

-0.5

-0.5

Mvar

MW

Mvar

0.342

0.172

ID

-0.069

0.066

MW

XFMR

* Bus1

20.000

MW

Load Flow

% Mag.

Bus3

Ang.

Load

kV

Mvar

Amp

% PF

Bus5

20.000

98.921

-0.5

0.512

-0.118

Bus4
Bus6

4.949

-0.153

144.5

Bus6

20.000

98.583

-0.8

0.416

-0.077

Bus5

-4.931

0.177

144.5

-99.9

Bus7

4.515

-0.100

132.3

-100.0

-4.508

0.103

132.3

-100.0

Bus7

20.000

98.422

-0.8

0.202

0.028

Bus6
Bus8

4.306

-0.131

126.4

-100.0

Bus8

20.000

98.239

-0.9

0.714

-0.136

Bus7

-4.298

0.135

126.4

-100.0

Bus9

3.584

0.001

105.3

100.0

Bus9

20.000

98.050

-0.9

0.211

0.078

Bus8

-3.577

0.002

105.3

100.0

Bus10

0.222

-0.005

6.5

-100.0

Bus11

3.144

-0.075

92.6

-100.0

Bus10

20.000

98.035

-1.0

0.222

-0.005

Bus9

-0.222

0.005

6.5

-100.0

Bus11

20.000

97.513

-1.1

0.126

0.059

Bus9

-3.126

0.085

92.6

-100.0

Bus12

3.001

-0.144

88.9

-99.9

Bus11

-2.993

0.148

88.9

-99.9

Bus13

0.258

-0.028

7.7

-99.4

Bus12

20.000

97.258

-1.2

Bus14

2.734

-0.120

81.2

-99.9

Bus13

20.000

97.241

-1.2

0.258

-0.028

Bus12

-0.258

0.028

7.7

-99.4

Bus14

20.000

96.886

-1.4

0.125

0.044

Bus12

-2.724

0.126

81.2

-99.9

Bus15

2.599

-0.170

77.6

-99.8

Bus14

-2.596

0.172

77.6

-99.8

Bus16

2.528

-0.214

75.7

-99.6

Bus15

-2.523

0.217

75.7

-99.6

Bus17

2.266

-0.216

68.0

-99.5

Bus16

-2.265

0.217

68.0

-99.5

Bus18

2.197

-0.259

66.1

-99.3

-2.196

0.260

66.1

-99.3

Bus15

20.000

96.798

-1.4

0.068

0.042

Bus16

20.000

96.614

-1.5

0.258

0.000

Bus17

20.000

96.576

-1.5

0.068

0.042

Bus18

20.000

96.544

-1.5

0.494

-0.134

Bus17
Bus19

1.702

-0.126

51.0

-99.7

Bus19

20.000

96.400

-1.6

Bus18

-1.699

0.127

51.0

-99.7

Bus20

20.000

96.305

-1.6

0.296

-0.002

Bus20

0.617

0.103

18.7

98.6

Bus23

1.082

-0.230

33.1

-97.8

Bus19

-0.616

-0.103

18.7

98.6

Bus21

0.320

0.105

10.1

95.0

% Tap

ETAP

Page:

12

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Bus
ID
Bus21

Voltage
kV

% Mag.

20.000

96.241

Generation

Ang.
-1.6

MW

Load

Mvar
0

MW
0

0.098

Load Flow
Mvar
0.036

ID

MW

XFMR
Mvar

Amp

% PF

Bus20

-0.320

-0.105

10.1

95.0

Bus22

0.222

0.069

7.0

95.5

Bus22

20.000

96.230

-1.6

0.222

0.069

Bus21

-0.222

-0.069

7.0

95.5

Bus23

20.000

96.349

-1.6

0.746

-0.160

Bus19

-1.081

0.231

33.1

-97.8

Bus24

0.335

-0.071

10.3

-97.8

Bus24

20.000

96.323

-1.6

0.335

-0.071

Bus23

-0.335

0.071

10.3

-97.8

* Indicates a voltage-regulated bus (voltage controlled by generator, SVC or transformer LTC, or swing type machine connected to it), therefore it is not considered as candidate bus and not
considered for voltage constraint in capacitor placement.
# Indicates a bus with a load mismatch of more than 0.1 MVA

% Tap

ETAP

Page:

13

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Bus Loading Summary Report (Max. Loading)

Bus
ID

Bus Total Load


kV

Rated Amp

MW

Mvar

MVA

% PF

Amp

Bus1

20.000

9.643

2.227

9.897

97.4

285.7

Bus2

20.000

9.489

2.113

9.722

97.6

285.7

Bus3

20.000

9.451

2.365

9.743

97.0

286.8

Bus4

20.000

8.917

2.014

9.142

97.5

269.1

Bus5

20.000

8.636

2.385

8.960

96.4

264.1

Bus6

20.000

7.789

2.119

8.072

96.5

239.8

Bus7

20.000

7.118

1.716

7.322

97.2

218.2

Bus8

20.000

6.781

2.072

7.091

95.6

212.0

Bus9

20.000

5.646

1.370

5.810

97.2

174.3

Bus10

20.000

0.346

0.293

0.453

76.4

13.6

Bus11

20.000

4.922

1.114

5.047

97.5

153.0

Bus12

20.000

4.704

1.009

4.811

97.8

146.6

Bus13

20.000

0.404

0.251

0.476

84.9

14.5

Bus14

20.000

4.271

0.921

4.369

97.8

134.1

Bus15

20.000

4.069

0.849

4.157

97.9

127.8

Bus16

20.000

3.949

0.950

4.062

97.2

125.3

Bus17

20.000

3.544

0.657

3.605

98.3

111.3

Bus18

20.000

3.436

1.026

3.586

95.8

110.8

Bus19

20.000

2.656

0.503

2.703

98.3

83.8

Bus20

20.000

0.963

0.450

1.063

90.6

33.0

Bus21

20.000

0.500

0.164

0.526

95.0

16.4

Bus22

20.000

0.346

0.108

0.363

95.5

11.3

Bus23

20.000

1.690

0.830

1.883

89.7

58.4

Bus24

20.000

0.524

0.324

0.616

85.1

19.1

% Loading

ETAP

Page:

14

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Branch Loading Summary Report

ID

Transformer

Cable & Reactor

CKT / Branch
Type

Ampacity
(Amp)

* Indicates a branch with operating load exceeding the branch capability.

Loading
Amp

Capability
(MVA)

Loading (input)
MVA

Loading (output)
MVA

ETAP

Page:

15

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Branch Losses Summary Report (Max. Loading)

CKT / Branch
ID

From-To Bus Flow


MW

Mvar

To-From Bus Flow


MW

Mvar

Losses
kW

% Bus Voltage
kvar

From

To

Vd
% Drop
in Vmag

Line1

9.643

2.227

-9.489

-2.113

153.6

114.6

100.0

98.2

1.77

Line2

9.464

2.094

-9.451

-2.077

12.9

17.2

98.2

98.1

0.16

Line3

8.918

2.014

-8.917

-2.014

0.3

0.4

98.1

98.1

0.00

Line4

8.648

1.911

-8.636

-1.906

12.0

5.1

98.1

97.9

0.14

Line5

7.836

1.805

-7.789

-1.741

47.8

64.1

97.9

97.2

0.74

Line6

7.139

1.631

-7.118

-1.623

20.1

8.5

97.2

96.9

0.29

Line7

6.803

1.521

-6.781

-1.512

22.0

9.3

96.9

96.6

0.33

Line8

5.665

1.379

-5.646

-1.370

18.8

9.7

96.6

96.2

0.34

Line9

0.346

0.107

-0.346

-0.107

0.1

0.1

96.2

96.2

0.03

Line10

4.970

1.141

-4.922

-1.114

47.7

26.7

96.2

95.2

0.99

Line11

4.726

1.022

-4.704

-1.009

21.9

12.2

95.2

94.8

0.47

Line12

0.404

0.072

-0.404

-0.072

0.1

0.1

94.8

94.7

0.03

Line13

4.300

0.938

-4.271

-0.921

29.3

16.4

94.8

94.1

0.69

Line14

4.076

0.852

-4.069

-0.849

6.7

3.7

94.1

93.9

0.16

Line15

3.963

0.782

-3.949

-0.775

13.7

7.6

93.9

93.6

0.35

Line16

3.547

0.659

-3.544

-0.657

2.5

1.4

93.6

93.5

0.07

Line17

3.438

0.591

-3.436

-0.590

2.1

1.2

93.5

93.4

0.06

Line18

2.663

0.507

-2.656

-0.503

7.2

4.0

93.4

93.2

0.27

Line19

0.965

0.278

-0.963

-0.277

1.6

0.9

93.2

93.0

0.16

Line22

1.692

0.225

-1.690

-0.224

1.7

1.0

93.2

93.1

0.10

Line20

0.501

0.164

-0.500

-0.164

0.5

0.3

93.0

92.9

0.10

Line21

0.346

0.108

-0.346

-0.108

0.1

0.0

92.9

92.9

0.02

Line23

0.524

0.064

-0.524

-0.064

0.3

0.2

93.1

93.0

0.05

423.0

304.6

ETAP

Page:

16

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Optimal Capacitor Placement Results


Candidate Buses

Capacitor Information
Operating Voltage

Cost ($)

Nominal kV

% Mag.

Angle

% PF

Rated
kvar/Bank

Total kvar

Installation

Bus3

20.000

98.066

-0.54

99.3

100.000

20.800

300.000

1200.00

6000.00

450.00

Bus5

20.000

97.919

-0.56

99.2

100.000

20.800

500.000

1200.00

10000.00

750.00

Bus6

20.000

97.180

-0.93

98.6

100.000

20.800

400.000

1200.00

8000.00

600.00

Bus7

20.000

96.894

-0.96

95.2

100.000

20.800

100.000

1200.00

2000.00

150.00

Bus8

20.000

96.568

-0.99

99.3

100.000

20.800

600.000

1200.00

12000.00

900.00

Bus10

20.000

96.198

-1.04

95.5

100.000

20.800

200.000

1200.00

4000.00

300.00

Bus13

20.000

94.732

-1.31

98.5

100.000

20.800

200.000

1200.00

4000.00

300.00

Bus16

20.000

93.561

-1.53

96.1

100.000

20.800

200.000

1200.00

4000.00

300.00

Bus18

20.000

93.428

-1.56

99.4

100.000

20.800

500.000

1200.00

10000.00

750.00

Bus20

20.000

92.996

-1.64

97.1

100.000

20.800

200.000

1200.00

4000.00

300.00

Bus23

20.000

93.060

-1.64

99.1

100.000

20.800

700.000

1200.00

14000.00

1050.00

Bus24

20.000

93.009

-1.65

99.3

100.000

20.800

300.000

1200.00

6000.00

450.00

42

4200.000

14400.00

84000.00

6300.00

ID

Total

Rated kV

# of Banks

Purchase

Oper./Year

ETAP

Page:

17

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Optimal Capacitor Placement Cost Summary


Cost ($)
Year

Installation

Saving ($)
Operation

Loss Reduction

Yearly Profit

Accumulative Profit

98400.00

6300.00

97446.86

-7253.14

-7253.14

0.00

6741.00

104268.10

97527.14

90274.00

0.00

7212.87

111566.90

104354.00

194628.00

0.00

7717.77

119376.60

111658.80

306286.80

0.00

8258.02

127733.00

119474.90

425761.80

0.00

8836.08

136674.30

127838.20

553600.00

0.00

9454.60

146241.50

136786.80

690386.90

0.00

10116.42

156478.40

146361.90

836748.80

0.00

10824.57

167431.80

156607.30

993356.10

10

0.00

11582.29

179152.10

167569.80

1160926.00

ETAP

Page:

18

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

Branch Capacity Release Report


Branch

Capacity Release (MVA)

ID

Type

Maximum Loading

Minimum Loading

Average Loading

Line1

Line

1.583

1.116

1.385

Line2

Line

1.569

1.105

1.373

Line3

Line

1.464

1.040

1.285

Line4

Line

1.462

1.026

1.278

Line5

Line

1.238

0.889

1.094

Line6

Line

1.080

0.786

0.959

Line7

Line

1.031

0.745

0.913

Line8

Line

0.827

0.617

0.742

Line9

Line

0.091

0.068

0.082

Line10

Line

0.724

0.531

0.647

Line11

Line

0.710

0.511

0.631

Line12

Line

0.065

0.044

0.057

Line13

Line

0.631

0.459

0.564

Line14

Line

0.630

0.450

0.560

Line15

Line

0.616

0.431

0.544

Line16

Line

0.537

0.370

0.471

Line17

Line

0.527

0.352

0.458

Line18

Line

0.369

0.261

0.327

Line19

Line

0.061

0.056

0.059

Line22

Line

0.306

0.181

0.257

Line20

Line

0.000

0.000

0.000

Line21

Line

0.000

0.000

0.000

Line23

Line

0.088

0.051

0.073

15.611

11.090

13.758

Total

ETAP

Page:

19

Date:

18-03-2012

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Project:

6.0.0

Location:

Filename:

Study Case: OCP


domafinal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND (Max. Loading)

MW

Mvar

MVA

% PF

Source (Swing Buses):

9.643

2.227

9.897

Source (Non-Swing Buses):

0.000

0.000

0.000

Total Demand:

9.643

2.227

9.897

97.43 Lagging

Total Motor Load:

9.220

5.737

10.859

84.91 Lagging

Total Static Load:

0.000

-3.814

3.814

0.00 Lagging

Total Constant I Load:

0.000

0.000

0.000

Total Generic Load:

0.000

0.000

0.000

Apparent Losses:

0.423

0.305

System Mismatch:

0.000

0.000

Number of Iterations: 3

97.43 Lagging

S-ar putea să vă placă și