Sunteți pe pagina 1din 16

RESUMEN DEL AVANCE DE OBRA REPROGRAMADO VS EJECUTADO

MONTO DE OBRA (INCLUYE ADICIONAL) =

440547.91

AVANCE REPROGRAMADO

MES
INICIO DE VALORIZACION
FIN DE VALORIZACION

NUMERO DE DIAS
% AVANCE REPROGRAMADO
MONTO REPROGRAMADO
MONTO ACUMULADO REPROGRAMADO
% AVANCE REPROGRAMADO ACUMULADO

ENERO

FEBRERO

MARZO

ABRIL

MAYO

08/01/12
31/01/12

01/02/12
29/02/12

01/03/12
31/03/12

01/04/12
30/04/12

01/04/12
05/04/12

TOTAL

18.97%

25.00%

26.72%

25.86%

3.45%

116.00
100.00%

83,552.19

110,136.98

117,732.63

113,934.80

15,191.31

440,547.91

83,552.19

193,689.17

311,421.80

425,356.60

440,547.91

18.97%

43.97%

70.69%

96.55%

100.00%

440,547.91
100.00%

22.00

29.00

31.00

30.00

4.00

AVANCE EJECUTADO ESPERADO

MES
INICIO DE VALORIZACION
FIN DE VALORIZACION

NUMERO DE DIAS
MONTO EJECUTADO
% AVANCE EJECUTADO
MONTO ACUMULADO EJECUTADO
% AVANCE EJECUTADO ACUMULADO

ENERO

FEBRERO

MARZO

ABRIL

MAYO

08/01/12
31/01/12

01/02/12
29/02/12

01/03/12
31/03/12

01/04/12
30/04/12

01/04/12
05/04/12

22.00
117,788.93

29.00
116,015.88

31.00
29,117.92

30.00
162,433.87

4.00
15,191.31

TOTAL

116.00
440,547.91

26.74%

26.33%

6.61%

36.87%

3.45%

100.00%

117,788.93

233,804.81

262,922.73

425,356.60

440,547.91

26.74%

53.07%

59.68%

96.55%

100.00%

440,547.91
100.00%

AVANCE EJECUTADO A LA FECHA

MES
INICIO DE VALORIZACION
FIN DE VALORIZACION

NUMERO DE DIAS
MONTO EJECUTADO
% AVANCE EJECUTADO
MONTO ACUMULADO EJECUTADO
% AVANCE EJECUTADO ACUMULADO

ENERO

FEBRERO

MARZO

ABRIL

MAYO

08/01/12
31/01/12

01/02/12
29/02/12

01/03/12
31/03/12

20/04/12

01/04/12
05/04/12

22.00
117,788.93

29.00
116,015.88

31.00
29,117.92

30.00
32,819.37

4.00
15,191.31

26.74%

26.33%

6.61%

7.45%

3.45%

117,788.93

233,804.81

262,922.73

295,742.10

310,933.40

26.74%

53.07%

59.68%

67.13%

70.58%

ENERO
18.97%

FEBRERO
25.00%

MARZO
26.72%

ABRIL
25.86%

MAYO
3.45%

83,552.19

110,136.98

117,732.63

113,934.80

15,191.31

TOTAL

116.00
310,933.40
310,933.40

AVANCES REPROGRAMADO VS EJECUTADO

MES
% CRONOGRAMA REPROGRAMADO
MONTO REPROGRAMADO
% AVANCE EJECUTADO ESPERADO
MONTO AVANCE EJECUTADO ESPERADO
CONCLUSION

26.74%

26.33%

6.61%

117,788.93

116,015.88

29,117.92

ADELANTADA

MEDIANA
ADELANTADA

ATRAZADA
EXTREMO

TOTAL
100.00%
440,547.91

36.87%

3.45%

100%

162,433.87

15,191.31

440,547.91

ATRAZADA
EXTREMO A LA
FECHA

SE CONCLUYE QUE:
LA EMPRESA CONSTRUCTORA PRESENTA UN ATRAZO DE OBRA EN :

11.01%

SE RECOMIENDA QUE:
LA EMPRESA CONSTRUCTORA DEBE TENER UN AVANCE FISICO ESPERADO, PARA LLEGAR RITMO NORMAL=

29.42%

GOBIERNO REGIONAL DE LIMA


CRONOGRAMA VALORIZADO ADICIONAL
A.D.S. ADS PROCEDIMIENTO CLASICO 33-2011/GRL/CEP (convocatoria : 1) ADJUDICACION DIRECTA SELECTIVA
O B R A ACONDICIONAMIENTO DE LA RUTA CULTURAL Y ECOTURISTICA DE LAS PLAYAS DE LA PROVINCIA DE BARRANCA
CONTRATISTA : MARBET E.I.R.L
SUPERVISOR : ING. ALFONSO D. CUEVA VASQUEZ

PROPIETARIO GERENCIA DE DESARROLLO ECONOMICO DEL GOBIERNO REGIONAL DE LIMA


UBICACIN LIMA - BARRANCA - PATIVILCA-CCPP HUAYTO
ITEM

DESCRIPCION

I.- PRESUPUESTO DE PARTIDAS DEDUCTIVA


01 OBRAS PROVISIONALES
01.05 CERCADO PROVISIONAL DE ESTERAS
04 VEREDAS
04.01 ENCOFRADO Y DESENCOFRADO VEREDAS
04.02 CONCRETO VEREDA f'c= 175 kg/cm2 E=4" PASTA 1:2
04.03 CONCRETO SARDINEL VEREDA f'c= 175 kg/cm
04.04 CURADO DE CONCRETO
04.05 JUNTA ASFALTICA P/VEREDA
05 RAMPAS
05.01 ENCOFRADO Y DESENCOFRADO RAMPAS
05.02 CONCRETO RAMPA MINUSVALIDOS f'c = 175 KG/CM2
06 PISOS Y PAVIMENTOS
06.01 EMBOQUILLADO
06.01.01 EMBOQUILLADO P/BANCA

VALOR REFERENCIAL

UND

METRA

5.31

m2
m3

MESES

PRECIO

PRESUP

ABRIL

MAYO

10.44

55.42

55.42

0.00

42.28

28.45

1,202.89

1,202.89

0.00

12.14

354.66

4,306.99

4,306.99

0.00

m3

9.56

354.66

3,389.13

3,389.13

0.00

m2

123.69

1.27

157.09

157.09

0.00

167.51

5.89

986.63

986.63

0.00

0.00

0.00

m2

0.16

32.83

5.25

5.25

0.00

m3

1.60

354.66

567.46

567.46

0.00

7.16

3.22

23.06

23.06

0.00

06.01.01.01

CONFORMACION Y COMPACTACION DE LA SUB RASANTE MANUAL

m2

06.01.01.02

BASE DE AFIRMADO e=4"

m2

7.16

6.38

45.68

45.68

0.00

06.01.01.03

LOSA DE CONCRETO f 'c=140 kg/cm2 P/EMBOQUILLADO e=7 cm.

m2

35.80

21.60

773.28

773.28

0.00

06.01.01.04

PISO EMBOQUILLADO DE PIEDRA MEZCLA 1:4 (SEGUN PLANO)

m2

35.80

35.26

1,262.31

1,262.31

0.00

06.01.01.05

CURADO DE CONCRETO

m2

35.80

1.27

45.47

45.47

0.00

06.01.03

EMBOQUILLADO P/ESTACIONAMIENTO

06.01.03.03

LOSA DE CONCRETO f'c=210 kg/cm2 P/EMBOQUILLADO e = 0.10 m.

m2

122.55

31.40

3,848.07

3,848.07

0.00

06.01.03.04

PAVIMENTO EMBOQUILLADO C/MORTERO 1:3 (SEGUN PLANO)

m2

122.55

25.92

3,176.50

3,176.50

0.00

06.01.03.05
06.02

CURADO DE CONCRETO

m2

122.55

1.27

155.64

155.64

0.00

SARDINEL P/ESTACIONAMIENTO (0.15x0.35) TIPO I

06.02.01

EXCAVACION MANUAL P/SARDINEL

m3

0.33

23.06

7.61

7.61

0.00

06.02.02

ACERO fy=4200 kg/cm2 GRADO 60

kg

32.96

4.34

143.06

143.06

0.00

06.02.03

ENCOFRADO Y DESENCOFRADO SARDINEL P/ BANCA TIPO I

m2

18.30

32.83

600.79

600.79

0.00

06.02.04

CONCRETO SARDINEL SUMERGIDO f'c= 175 kg/cm2 (0.15x0.35)

m3

0.47

354.66

166.69

166.69

0.00

06.02.05

JUNTA DE DILATACION C/ASFALTO (ARENA 1:3) E=1" (0.15x0.35)

11.00

7.11

78.21

78.21

0.00

06.03
06.03.01

SARDINEL P/ESTACIONAMIENTO (0.15x0.20) TIPO II


EXCAVACION MANUAL P/SARDINEL

m3

1.50

23.06

34.59

34.59

0.00

06.03.02

ACERO fy=4200 kg/cm2 GRADO 60

kg

115.22

4.34

500.05

500.05

0.00

06.03.03

ENCOFRADO Y DESENCOFRADO SARDINEL P/ BANCA TIPO III

m2

3.32

32.83

109.00

109.00

0.00

06.03.04

CONCRETO SARDINEL SUMERGIDO f'c= 175 kg/cm2 (0.15x0.20)

m3

1.50

354.66

531.99

531.99

0.00

06.03.05

JUNTA DE DILATACION C/ASFALTO (ARENA 1:3) E=1" (0.15x0.20)

25.00

4.65

116.25

116.25

0.00

GOBIERNO REGIONAL DE LIMA


CRONOGRAMA VALORIZADO ADICIONAL
A.D.S. ADS PROCEDIMIENTO CLASICO 33-2011/GRL/CEP (convocatoria : 1) ADJUDICACION DIRECTA SELECTIVA
O B R A ACONDICIONAMIENTO DE LA RUTA CULTURAL Y ECOTURISTICA DE LAS PLAYAS DE LA PROVINCIA DE BARRANCA
CONTRATISTA : MARBET E.I.R.L
SUPERVISOR : ING. ALFONSO D. CUEVA VASQUEZ

PROPIETARIO GERENCIA DE DESARROLLO ECONOMICO DEL GOBIERNO REGIONAL DE LIMA


UBICACIN LIMA - BARRANCA - PATIVILCA-CCPP HUAYTO
ITEM

DESCRIPCION

06.04

VALOR REFERENCIAL

UND

METRA

MESES

PRECIO

PRESUP

ABRIL

MAYO

ADOQUINES DE CONCRETO P/VEREDAS

06.04.03
06.04.04
06.04.05
06.05
06.05.07
07
07.01
08
08.02
08.02.01
8.03

CAMA DE ARENA 0.05m

m2

50.08

4.14

207.33

207.33

0.00

ADOQUINES DE COLOR AMARILLO

m2

30.09

56.12

1,688.65

1,688.65

0.00

ADOQUINES DE COLOR ROJO

m2

19.99

56.12

1,121.84

1,121.84

0.00

m2

15.35

132.50

2,033.88

2,033.88

0.00

203.10

6.46

1,312.03

1,312.03

0.00

mod

2.00

1,210.96

2,421.92

2,421.92

0.00

08.03.10

TERRAZO ARTISTICO EN PLATAFORMA DE PEDESTAL

m2

2.52

166.21

418.85

418.85

0.00

789.77

3.70

2,922.14

2,922.14

0.00

09

TERRAZO
PISO TERRAZO COLOR AMARILLO
PINTURA EN SEALIZACION
PINTADO DE VEREDA LATERAL
EQUIPAMIENTO
TACHOS ECOLOGICOS
CONTENEDOR ECOLOGICO
ESCULTURA DE CAMARON

TRATAMIENTO DE AREAS VERDES

09.01

PREPARACION DE TERRENO NATURAL

m2

09.02

COLOCACION DE TIERRA DE CHACRA

m3

52.65

22.53

1,186.25

1,186.25

0.00

09.03
09.04
09.05
09.06
10

INSTALACION DE CESPED

m2

1,244.22

9.23

11,484.15

11,484.15

0.00

SEMBRIO DE LENTIJAS + SANGUINARIAS

m2

44.33

14.48

641.90

641.90

0.00

SEMBRIO DE PONCIANAS

3.00

28.02

84.06

84.06

0.00

SEMBRIO DE TULIPAN AFRICANO

5.00

28.02

140.10

140.10

0.00

10.06

pza

1.00

166.25

166.25

166.25

0.00

10.07

CAJA DE CONCRETO DE 0.30 X 0.30 MORTERO C:A 1:4 CON TAPA DE FIERRO
FUNDIDO PARA VALVULA
CAJA DE CONCRETO DE 0.30 X 0.30 MORTERO C:A 1:4 CON TAPA DE FIERRO
FUNDIDO PARA GRIFO

pza

2.00

166.25

332.50

332.50

0.00

10.08

LLAVE DE RIEGO CON GRIFO DE 3/4"

pza

2.00

61.67

123.34

123.34

0.00

10.09

VALVULAS DE COMPUERTA DE BRONCE DE 3/4"

pza

1.00

100.21

100.21

100.21

0.00

10.10

SUMINISTRO E INSTALACION DE SERVICIO AGUA POTABLE

glb

0.50

850.00

425.00

425.00

0.00

160.54

1,123.78

1,123.78

0.00

11

INSTALACIONES SANITARIAS

INSTALACIONES ELECTRICAS

11.06

SUMINISTRO E INSTALACION DE DUCTOS EN ZONAS DE VIAS

7.00

11.09

BASE DE CIMIENTO P/POSTES

5.00

86.73

433.65

433.65

0.00

11.10

POSTE ORNAMENTAL SEGUN DISEO (SIMPLE)

0.45

796.47

358.41

358.41

0.00

11.11

POSTE ORNAMENTAL SEGUN DISEO (DOBLE)

2.00

867.52

1,735.04

1,735.04

0.00

11.12

COLOCACION DE LUMINARIAS

17.00

325.68

5,536.56

5,536.56

0.00

11.13

COLOCACION DE TEMPORIZADORES

4.00

88.19

352.76

352.76

0.00

11.15

MURETE PORTAMEDIDOR

0.20

254.95

50.99

50.99

0.00

11.16

SUMINISTRO E INSTALACION DE MEDIDOR ELECTRICO

glb

1.00

1,800.00

1,800.00

1,800.00

0.00

11.18

MONTAJE DE TABLERO TERMOMAGNETICO

0.90

989.98

890.98

890.98

0.00

11.20

MEDICION DE RESISTIBILIDAD EN BAJA TENSION

1.00

450.00

450.00

450.00

0.00

GOBIERNO REGIONAL DE LIMA


CRONOGRAMA VALORIZADO ADICIONAL
A.D.S. ADS PROCEDIMIENTO CLASICO 33-2011/GRL/CEP (convocatoria : 1) ADJUDICACION DIRECTA SELECTIVA
O B R A ACONDICIONAMIENTO DE LA RUTA CULTURAL Y ECOTURISTICA DE LAS PLAYAS DE LA PROVINCIA DE BARRANCA
CONTRATISTA : MARBET E.I.R.L
SUPERVISOR : ING. ALFONSO D. CUEVA VASQUEZ
PROPIETARIO GERENCIA DE DESARROLLO ECONOMICO DEL GOBIERNO REGIONAL DE LIMA
UBICACIN LIMA - BARRANCA - PATIVILCA-CCPP HUAYTO
VALOR REFERENCIAL
ITEM
DESCRIPCION

UND

METRA

PRECIO

MESES

PRESUP

ABRIL

MAYO

II.- PRESUPUESTO DE PARTIDAS ADICIONALES


01
01.01

C0NSTRUCCION DE PILETA
ESTRUCTURAS

01.01.01

Trazo y replanteo en Terreno Normal con Equipo - Pileta

m2

27.34

0.81

22.15

22.15

0.00

01.01.02

EXCAVACION MANUAL A NIVEL DE CIMENTACION - Pileta

m3

9.57

23.06

220.68

220.68

0.00

01.01.03

Solado Concreto F'c = 100 Kg/cm2 h=2"

m2

27.34

10.60

289.80

289.80

0.00

01.01.04

Pileta - Concreto F'c= 210 Kg/cm2 E=0.15 m

m3

6.27

322.75

2,023.64

2,023.64

0.00

01.01.05

Pileta - Encofrado y desencofrado

m2

43.14

47.40

2,044.84

2,044.84

0.00

01.01.06

Pileta - Acero de Refuerzo Fy = 4200 kg/cm2

kg

322.42

4.34

1,399.30

1,399.30

0.00

01.01.07

Curado de Concreto

m2

50.52

1.28

64.67

64.67

0.00

01.02

ARQUITECTURA

01.02.01

ESCULTURA DE CAMARON INCL. PINTADO (Se adjunta


diseo tipico)

Und

1.00

5006.23

5,006.23

1,001.25

4,004.98

01.02.02

Tarrajeo en exterior e interiores

m2

40.61

17.14

696.06

696.06

0.00

01.02.03

ENCHAPE DE CERAMICO DE 30 x 30 CON PEGAMENTO

m2

60.31

53.52

3,227.79

2,905.01

322.78

01.03

INSTALACIONES ELECTRICAS

01.03.01

FAROS SUB ACUATICOS DE 252 LEDS COLORES ACERO


INOXIDABLE

Und

4.00

1018.80

4,075.20

2,037.60

2,037.60

01.03.02

TRANSFORMADOR DE 300W-220 VTS - 12 VOLTIOS

Und

1.00

155.61

155.61

155.61

0.00

01.03.03

ACCESORIOS PARA SISTEMA DE CIRCULACION DE AGUA

Und

1.00

306.13

306.13

306.13

0.00

01.03.04

Suministro, tendido e instalacin de tuberia PVC SAP


D=3/4"

24.20

3.20

77.44

77.44

0.00

01.03.05

CONDUCTOR THW 2.5 MM2

50.40

6.66

335.66

335.66

0.00

01.04

INSTALACION SANITARIAS

01.04.01

Suministro e instalacin de Tuberia PVC C-10 de 1"

Und

2.30

45.97

105.73

105.73

0.00

01.04.02

BOQUILLA DE BRONCE DE 1/2" - MODELO SIMPLE

Und

10.00

127.95

1,279.50

1,279.50

0.00

01.04.03

BOQUILLA DE BRONCE MODELO ABANICO DE 1"

Und

4.00

329.36

1,317.44

1,317.44

0.00

21.50

3.35

72.03

72.03

0.00

01.04.04

Suministro e instalacin de tubera de PVC 1" clase 10


para agua

01.04.05

REJILLA DE FONDO PVC DE 8"

Und

1.00

90.90

90.90

90.90

0.00

01.04.06

DESNATADOR PVC DE 6"

Und

1.00

259.85

259.85

259.85

0.00

GOBIERNO REGIONAL DE LIMA


CRONOGRAMA VALORIZADO ADICIONAL
A.D.S. ADS PROCEDIMIENTO CLASICO 33-2011/GRL/CEP (convocatoria : 1) ADJUDICACION DIRECTA SELECTIVA
O B R A ACONDICIONAMIENTO DE LA RUTA CULTURAL Y ECOTURISTICA DE LAS PLAYAS DE LA PROVINCIA DE BARRANCA
CONTRATISTA : MARBET E.I.R.L
SUPERVISOR : ING. ALFONSO D. CUEVA VASQUEZ

PROPIETARIO GERENCIA DE DESARROLLO ECONOMICO DEL GOBIERNO REGIONAL DE LIMA


UBICACIN LIMA - BARRANCA - PATIVILCA-CCPP HUAYTO
ITEM

DESCRIPCION

VALOR REFERENCIAL

MESES

PRECIO

PRESUP

ABRIL

MAYO

UND

METRA

01.04.07

Suministro e instalacin de Tuberia agua PVC 2" (TUB. DE


SUCCION)

21.53

3.80

81.81

81.81

0.00

01.04.08

Suministro e instalacin de Tuberia agua PVC 1 1/2" (TUB


DE IMPULSION)

4.80

3.80

18.24

18.24

0.00

01.04.09

SALIDA DE LIMPIEZA 2" PVC SAL

1.00

182.16

182.16

182.16

0.00

02

EQUIPAMIENTO DE BANCAS

02.01

Bancas Urbanas segun diseo adjunto

Und

20.00

370.00

7,400.00

2,960.00

4,440.00

03

PERGOLAS DE MADERA
m3

1.21

199.36

241.23

241.23

0.00

p2

400.00

10.05

4,020.00

2,412.00

1,608.00

p2

461.73

9.99

4,612.68

2,767.61

1,845.07

p2

260.04

9.99

2,597.80

1,558.68

1,039.12

Und

72.00

12.16

875.52

525.31

350.21

03.01

03.02

03.03

03.04

Cimentacion de Parante de Bancas- Concreto F'c= 140


Kg/cm2
PARANTE DE MADERA DE 4"x5" INCL. Pintado esmalte
acrilico
VIGAS DE AMARRE DE MADERA (Segun detalle) INCL.
Pintado esmalte acrilico
VIGUETAS DE MADERA (Segun detalle) INCL. Pintado
esmalte acrilico

03.05

PLATINA Y ANGULO

04

CONSTRUCCION DE CASETA DE BOMBEO

04.01

ESTRUCTURAS

04.01.01

Trazo y replanteo en Terreno Normal con Equipo - Caseta

m2

6.00

1.27

7.62

7.62

0.00

04.01.02

Excavacion Manual a Nivel de cimentacion - Caseta

m3

6.30

23.26

146.54

146.54

0.00

04.01.03

Solado Concreto F'c = 100 Kg/cm2 h=2", p/adoquin de


veredas

m2

4.50

10.60

47.70

47.70

0.00

04.01.04

Caseta - Concreto F'c= 175 Kg/cm2, incluye nc curado

m3

4.24

315.27

1,336.74

1,336.74

0.00

04.01.05

Caseta - Encofrado y desencofrado

m2

43.72

23.51

1,027.86

1,027.86

0.00

04.01.06

Caseta - Acero de Refuerzo Fy = 4200 kg/cm2

kg

168.68

4.34

732.07

732.07

0.00

04.02

ARQUITECTURA

04.02.01

TARRAJEO EN EXTERIOR E INTERIOR

m2

31.04

27.21

844.60

844.60

0.00

04.02.02

PINTURA LATEX DOS MANOS EN EXTERIOR

m2

31.04

4.93

153.03

153.03

0.00

04.02.03

Puerta metlica con plancha de fierro negra incluye


pintado+Chapa forte

m2

0.84

413.08

346.99

0.00

346.99

04.03

INSTALACIONES SANITARIAS

04.03.01

Suministro e Inst de Equipo de Bombeo

1.00

886.95

886.95

886.95

0.00

7.40

28.54

211.20

211.20

0.00

7.00

3.30

23.10

23.10

0.00

8.50

13.34

113.39

113.39

0.00

8.40

12.84

107.86

107.86

0.00

32.70

2.04

66.71

66.71

0.00

04.03.02

04.03.03

04.03.04

04.03.05
04.03.06

Suministro e instalacin de tubera de PVC 3/4" clase 10


para agua
Suministro e instalacin de tubera de PVC 1 1/2" Clase
10 (Succion)
Suministro e instalacin de tubera de PVC 1 1/2" clase
10 (Impulsion)
Suministro e instalacin de tubera de PVC 1" clase 10
(Impulsion)
Prueba Hidrulica Tubera PVC agua

GOBIERNO REGIONAL DE LIMA


CRONOGRAMA VALORIZADO ADICIONAL
A.D.S. ADS PROCEDIMIENTO CLASICO 33-2011/GRL/CEP (convocatoria : 1) ADJUDICACION DIRECTA SELECTIVA
O B R A ACONDICIONAMIENTO DE LA RUTA CULTURAL Y ECOTURISTICA DE LAS PLAYAS DE LA PROVINCIA DE BARRANCA
CONTRATISTA : MARBET E.I.R.L
SUPERVISOR : ING. ALFONSO D. CUEVA VASQUEZ
PROPIETARIO GERENCIA DE DESARROLLO ECONOMICO DEL GOBIERNO REGIONAL DE LIMA
UBICACIN LIMA - BARRANCA - PATIVILCA-CCPP HUAYTO
VALOR REFERENCIAL
ITEM
DESCRIPCION
04.04

INSTALACION ELECTRICAS

04.04.01

TABLERO ELECTROBOMBA (CONTROL AUTOMATICO)

04.04.02

04.04.03

SUMINISTRO E INSTALACION DE EQUIPO DE


ELECTROBOMBAS
Salida de techo P/luminaria C/Tubo SEL y alambre THW
2.5 mm2

PRECIO

MESES

PRESUP

ABRIL

MAYO

UND

METRA

Und

1.00

736.00

736.00

736.00

0.00

glb

1.00

144.31

144.31

144.31

0.00

pto

1.00

25.33

25.33

25.33

0.00

303.60

0.00

04.04.04

SALIDA P/ELECTROBOMBA CON CABLE THW 4 MM2

pto

3.00

101.20

303.60

04.04.05

Artefacto luminaria de 100 W incluye colocacin

Und

1.00

2.63

2.63

05

VARIOS

05.01

Solado Concreto F'c = 100 Kg/cm2 h=2", p/adoquin de


veredas

m2

50.18

10.60

531.91

531.91

0.00

05.02

CONTRAPISO DE 48 MM-P/TERRAZO

m2

41.40

22.04

912.46

912.46

0.00

05.03

TERRAZO COLOR ROJO

m2

41.40

124.01

5,134.01

5,134.01

0.00

05.04

TACHOS ECOLOGICOS

Und

2.00

1207.61

2,415.22

0.00

2,415.22

05.05

BASE DE ASTAS

3.00

98.16

294.48

294.48

0.00

05.06

ASTA PARA BANDERAS INCL. (EPOXICO+ACRILICO)

Und

3.00

601.67

1,805.01

0.00

1,805.01

05.07

LIMPIEZA DE LA OBRA INCLUYE CERA DE ADOQUIN DE


VEREDA

m2

41.40

10.85

449.19

05.08

Flete Terrestre

glb

1.00

819.01

819.01

819.01

0.00

124,557.25

103,890.45

20,666.80

GASTOS GENERALES (12%)

14,946.87

12,466.85

2,480.02

UTILIDADES (10%)

12,455.73

10,389.05

2,066.68

SUBTOTAL

151,959.85

126,746.35

25,213.50

FACTOR DE RELACION FR=

151,959.85

126,746.35

25,213.50

27,352.77

22,814.34

4,538.43

179,313.43

149,561.50

29,751.93

COSTO DIRECTO

IGV (18%)
PRESUPUESTO TOTAL

2.63

449.19

VEREDAS
ENCOFRADO Y DESENCOFRADO VEREDAS
CONCRETO VEREDA f'c= 175 kg/cm2 E=4" PASTA 1:2
CONCRETO SARDINEL VEREDA f'c= 175 kg/cm
CURADO DE CONCRETO
JUNTA ASFALTICA P/VEREDA
RAMPAS
ENCOFRADO Y DESENCOFRADO RAMPAS
CONCRETO RAMPA MINUSVALIDOS f'c = 175 KG/CM2
PISOS Y PAVIMENTOS
EMBOQUILLADO
EMBOQUILLADO P/BANCA

7
7
7
7
4

470.34
60.97
61.73
925.72
239.30

28.45
354.66
354.66
1.27
5.89

13,381.17
21,623.62
21,893.16
1,175.66
1,409.48

428.06
48.83
52.17
802.03
71.79

12,178.28
17,316.63
18,504.03
1,018.57
422.84

0.00
0.00
0.00
0.00
21.54

0.00
0.00
0.00
0.00
126.85

0.00%
0.00%
0.00%
0.00%
30.00%

428.06
48.83
52.17
802.03
93.33

12,178.28
17,316.63
18,504.03
1,018.57
549.70

42.28
12.14
9.56
123.69
145.97

1,202.89
4,306.99
3,389.13
157.09
859.78

4
4

0.33
1.60

32.83
354.66

10.83
567.46

0.17
0.00

5.58
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.17
0.00

5.58
0.00

0.16
1.60

5.25
567.46

CONFORMACION Y COMPACTACION DE LA SUB RASANTE MANUAL

35.80

3.22

115.28

28.64

92.22

7.16

23.06

20.00%

35.80

115.28

0.00

0.00

BASE DE AFIRMADO e=4"

35.80

6.38

228.40

28.64

182.72

7.16

45.68

20.00%

35.80

228.40

0.00

0.00

LOSA DE CONCRETO f 'c=140 kg/cm2 P/EMBOQUILLADO e=7 cm.

35.80

21.60

773.28

0.00

0.00

35.80

773.28

100.00%

35.80

773.28

0.00

0.00

PISO EMBOQUILLADO DE PIEDRA MEZCLA 1:4 (SEGUN PLANO)

35.80

35.26

1,262.31

0.00

0.00

35.80

1,262.31

100.00%

35.80

1,262.31

0.00

0.00

CURADO DE CONCRETO

35.80

1.27

45.47

0.00

0.00

35.80

45.47

100.00%

35.80

45.47

0.00

0.00

LOSA DE CONCRETO f'c=210 kg/cm2 P/EMBOQUILLADO e = 0.10 m.

122.55

31.40

3,848.07

0.00

0.00

122.55

3,848.07

100.00%

122.55

3,848.07

0.00

0.00

PAVIMENTO EMBOQUILLADO C/MORTERO 1:3 (SEGUN PLANO)

122.55

25.92

3,176.50

0.00

0.00

30.64

794.12

25.00%

30.64

794.12

91.91

2,382.37

CURADO DE CONCRETO
SARDINEL P/ESTACIONAMIENTO (0.15x0.35) TIPO I

122.55

1.27

155.64

0.00

0.00

61.28

77.82

50.00%

61.28

77.82

61.28

77.82

EXCAVACION MANUAL P/SARDINEL

1.23

23.06

28.36

0.90

20.75

0.33

7.61

26.83%

1.23

28.36

0.00

0.00

ACERO fy=4200 kg/cm2 GRADO 60

120.04

4.34

520.97

87.08

377.92

32.96

143.05

27.46%

120.04

520.96

0.00

0.01

ENCOFRADO Y DESENCOFRADO SARDINEL P/ BANCA TIPO I

35.10

32.83

1,152.33

16.80

551.54

18.30

600.79

52.14%

35.10

1,152.33

0.00

0.00

CONCRETO SARDINEL SUMERGIDO f'c= 175 kg/cm2 (0.15x0.35)

1.73

354.66

613.56

1.26

446.87

0.47

166.69

27.17%

1.73

613.56

0.00

0.00

JUNTA DE DILATACION C/ASFALTO (ARENA 1:3) E=1" (0.15x0.35)

11.00

7.11

78.21

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

11.00

78.21

SARDINEL P/ESTACIONAMIENTO (0.15x0.20) TIPO II


EXCAVACION MANUAL P/SARDINEL

1.50

23.06

34.59

0.00

0.00

1.50

34.59

100.00%

1.50

34.59

0.00

0.00

ACERO fy=4200 kg/cm2 GRADO 60

115.22

4.34

500.05

0.00

0.00

115.22

500.05

100.00%

115.22

500.05

0.00

0.00

ENCOFRADO Y DESENCOFRADO SARDINEL P/ BANCA TIPO III

3.32

32.83

109.00

0.00

0.00

3.32

109.00

100.00%

3.32

109.00

0.00

0.00

CONCRETO SARDINEL SUMERGIDO f'c= 175 kg/cm2 (0.15x0.20)

1.50

354.66

531.99

0.00

0.00

1.50

531.99

100.00%

1.50

531.99

0.00

0.00

JUNTA DE DILATACION C/ASFALTO (ARENA 1:3) E=1" (0.15x0.20)

25.00

4.65

116.25

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

25.00

116.25

2
3
3

50.08
30.09
19.99

4.14
56.12
56.12

207.33
1,688.65
1,121.84

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

50.08
30.09
19.99

207.33
1,688.65
1,121.84

28.41

132.50

3,764.33

13.06

1,730.45

0.00

0.00

0.00%

13.06

1,730.45

15.35

2,033.88

203.10

6.46

1,312.03

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

203.10

1,312.03

2.00

1,210.96

2,421.92

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

2.00

2,421.92

PREPARACION DE TERRENO NATURAL

1,316.28

3.70

4,870.24

526.51

1,948.09

0.00

0.00

0.00%

526.51

1,948.09

789.77

2,922.14

INSTALACION DE CESPED
SEMBRIO DE LENTIJAS + SANGUINARIAS
SEMBRIO DE PONCIANAS
SEMBRIO DE TULIPAN AFRICANO
INSTALACIONES SANITARIAS
CAJA DE CONCRETO DE 0.30 X 0.30 MORTERO C:A 1:4 CON TAPA DE FIERRO
FUNDIDO PARA VALVULA

6
2
2
1

1,244.22
44.33
3.00
5.00

9.23
14.48
28.02
28.02

11,484.15
641.90
84.06
140.10

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

1,244.22
44.33
3.00
5.00

11,484.15
641.90
84.06
140.10

100.00%
100.00%
100.00%
100.00%

1,244.22
44.33
3.00
5.00

11,484.15
641.90
84.06
140.10

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

1.00

166.25

166.25

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

1.00

166.25

EMBOQUILLADO P/ESTACIONAMIENTO

ADOQUINES DE CONCRETO P/VEREDAS


CAMA DE ARENA 0.05m
ADOQUINES DE COLOR AMARILLO
ADOQUINES DE COLOR ROJO
TERRAZO
PISO TERRAZO COLOR AMARILLO
PINTURA EN SEALIZACION
PINTADO DE VEREDA LATERAL
EQUIPAMIENTO
TACHOS ECOLOGICOS
CONTENEDOR ECOLOGICO
TRATAMIENTO DE AREAS VERDES

CAJA DE CONCRETO DE 0.30 X 0.30 MORTERO C:A 1:4 CON TAPA DE FIERRO
FUNDIDO PARA GRIFO

2.00

166.25

332.50

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

2.00

LLAVE DE RIEGO CON GRIFO DE 3/4"

2.00

61.67

123.34

0.00

0.00

1.00

61.67

50.00%

1.00

61.67

1.00

61.67

VALVULAS DE COMPUERTA DE BRONCE DE 3/4"

1.00

100.21

100.21

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

1.00

100.21

SUMINISTRO E INSTALACION DE SERVICIO AGUA POTABLE

1.00

850.00

850.00

0.50

425.00

0.20

170.00

20.00%

0.70

595.00

0.30

255.00

CAJA DE PASE DE CONCRETO

12.00

122.14

0.00

9.60

1,172.54

0.00

0.00

0.00%

9.60

1,172.54

2.40

-1,172.54

SUMINISTRO E INSTALACION DE DUCTOS EN ZONAS DE VIAS

7.00

160.54

1,123.78

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

7.00

1,123.78

POSTE ORNAMENTAL SEGUN DISEO (SIMPLE)

9.00

796.47

7,168.23

8.55

6,809.82

0.00

0.00

0.00%

8.55

6,809.82

0.45

358.41

POSTE ORNAMENTAL SEGUN DISEO (DOBLE)

4.00

867.52

3,470.08

2.00

1,735.04

1.00

867.52

25.00%

3.00

2,602.56

1.00

867.52

COLOCACION DE LUMINARIAS

17.00

325.68

5,536.56

0.00

0.00

17.00

5,536.56

100.00%

17.00

5,536.56

0.00

0.00

COLOCACION DE TEMPORIZADORES

4.00

88.19

352.76

0.00

0.00

4.00

352.76

100.00%

4.00

352.76

0.00

0.00

SUMINISTRO E INSTALACION DE MEDIDOR ELECTRICO

1.00

1,800.00

1,800.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

1.00

1,800.00

MONTAJE DE TABLERO TERMOMAGNETICO

1.00

989.98

989.98

0.10

99.00

0.00

0.00

0.00%

0.10

99.00

0.90

890.98

MEDICION DE RESISTIBILIDAD EN BAJA TENSION

1.00

450.00

450.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

1.00

450.00

332.50

INSTALACIONES ELECTRICAS

GOBIERNO REGIONAL DE LIMA

VALORIZACION MENSUAL N 04 (ADICIONAL)


MONT.CONT.:
PLAZO :
F. INICIO :
F. TERMINO :

A.D.S. ADS PROCEDIMIENTO CLASICO 33-2011/GRL/CEP (convocatoria : 1) ADJUDICACION DIRECTA SELECTIVA


O B R A ACONDICIONAMIENTO DE LA RUTA CULTURAL Y ECOTURISTICA DE LAS PLAYAS DE LA PROVINCIA DE BARRANCA
CONTRATISTA : MARBET E.I.R.L
SUPERVISOR : ING. ALFONSO D. CUEVA VASQUEZ

402,018.13
90.00 DAS NAT.
9-Jan-12
8-Apr-12

MONT.CONT.ADICIONAL:
PLAZO ADICIONAL:
F. INICIO ADICIONAL:
F. TERMINO ADICIONAL:

440,547.90
26 DAS NAT.
9-Apr-12
5-May-12

PROPIETARIO GERENCIA DE DESARROLLO ECONOMICO DEL GOBIERNO REGIONAL DE LIMA


UBICACIN LIMA - BARRANCA - PATIVILCA-CCPP HUAYTO
ITEM

DESCRIPCION

VALOR REFERENCIAL

UND

METRA

PRECIO

ANTERIOR

PRESUP

METRA

ACTUAL

VALORIZ.

METRA

AVANCE
ACTUAL (%)

VALORIZ.

ACUMULADO
METRA

SALDO

VALORIZ.

METRA

VALORIZ.

I.- PRESUPUESTO DE PARTIDAS DEDUCTIVA


01 OBRAS PROVISIONALES
01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40m

1.00

648.70

648.70

1.00

648.70

0.00

0.00

0.00%

1.00

648.70

0.00

0.00

01.02
01.03

CASETA PROVISIONAL P/GUARDIANIA Y/O DEPOSITO

mes

3.00

1,000.00

3,000.00

3.00

3,000.00

0.00

0.00

0.00%

3.00

3,000.00

0.00

0.00

IMPLEMENTOS DE SEALIZACION Y SEGURIDAD

mes

3.00

1,444.86

4,334.58

3.00

4,334.58

0.00

0.00

0.00%

3.00

4,334.58

0.00

0.00

01.04

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS YHERRAMIENTAS

glb

1.00

4,220.00

4,220.00

1.00

4,220.00

0.00

0.00

0.00%

1.00

4,220.00

0.00

0.00

01.05
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
02.08
03
03.01
03.02

CERCADO PROVISIONAL DE ESTERAS

106.16

10.44

1,108.31

100.85

1,052.89

0.00

0.00

0.00%

100.85

1,052.89

5.31

55.42

m2

TRABAJOS PRELIMINARES
2,802.89

0.91

2,550.63

2,802.89

2,550.63

0.00

0.00

0.00%

2,802.89

2,550.63

0.00

0.00

TALA Y RETIRO DE ARBOLES

10.00

59.64

596.40

10.00

596.40

0.00

0.00

0.00%

10.00

596.40

0.00

0.00

DEMOLICION DE BANCAS DE CONCRETO

11.00

45.11

496.21

11.00

496.21

0.00

0.00

0.00%

11.00

496.21

0.00

0.00

DEMOLICION DE VEREDA e =0.10 m. C/EQUIPO

m2

975.50

5.43

5,296.97

975.50

5,296.97

0.00

0.00

0.00%

975.50

5,296.97

0.00

0.00

DEMOLICION DE MURO DE LADRILLO EN JARDINERAS

m2

63.26

7.52

475.72

63.26

475.72

0.00

0.00

0.00%

63.26

475.72

0.00

0.00

5.00

524.78

2,623.90

5.00

2,623.90

0.00

0.00

0.00%

5.00

2,623.90

0.00

0.00

LIMPIEZA DE TERRENO MANUAL

DESMONTAJE DE POSTE DE CONCRETO


TRAZO, NIVELACION Y REPLANTEO

m2

2,549.97

0.95

2,422.47

2,549.97

2,422.47

0.00

0.00

0.00%

2,549.97

2,422.47

0.00

0.00

ACARREO INTERNO DE MATERIAL EXCAVADO Y OTROS DP = 30 M.

m3

126.55

17.29

2,188.05

126.55

2,188.05

0.00

0.00

0.00%

126.55

2,188.05

0.00

0.00

CORTE DE TERRENO P/VEREDA

m3

26.79

24.25

649.66

26.79

649.66

0.00

0.00

0.00%

26.79

649.66

0.00

0.00

RELLENO CON MATERIAL DE PRESTAMO

m3

699.07

25.65

17,931.15

699.07

17,931.15

0.00

0.00

0.00%

699.07

17,931.15

0.00

0.00

03.03

CONFORMACION Y COMPACTACION DE LA SUB RASANTE MANUAL P/VEREDAS

m2

925.72

2.74

2,536.47

925.72

2,536.47

0.00

0.00

0.00%

925.72

2,536.47

0.00

0.00

03.04

BASE DE AFIRMADO e=4"

m2

925.72

6.38

5,906.09

925.72

5,906.09

0.00

0.00

0.00%

925.72

5,906.09

0.00

0.00

03.05

ELIMINACION DE MATERIAL EXCEDENTE, c/VOLQUETE CARGUIO MANUAL D=5


Km.
VEREDAS

m3

406.93

33.19

13,506.01

406.93

13,506.01

0.00

0.00

0.00%

406.93

13,506.01

0.00

0.00

ENCOFRADO Y DESENCOFRADO VEREDAS

m2

470.34

28.45

13,381.17

428.06

12,178.28

0.00

0.00

0.00%

428.06

12,178.28

42.28

1,202.89

CONCRETO VEREDA f'c= 175 kg/cm2 E=4" PASTA 1:2

m3

60.97

354.66

21,623.62

48.83

17,316.63

0.00

0.00

0.00%

48.83

17,316.63

12.14

4,306.99

CONCRETO SARDINEL VEREDA f'c= 175 kg/cm

m3

61.73

354.66

21,893.16

52.17

18,504.03

0.00

0.00

0.00%

52.17

18,504.03

9.56

3,389.13

CURADO DE CONCRETO

m2

925.72

1.27

1,175.66

802.03

1,018.57

0.00

0.00

0.00%

802.03

1,018.57

123.69

157.09

JUNTA ASFALTICA P/VEREDA

239.30

5.89

1,409.48

71.79

422.84

21.54

126.85

30.00%

93.33

549.70

145.97

859.78

ENCOFRADO Y DESENCOFRADO RAMPAS

m2

0.33

32.83

10.83

0.17

5.58

0.00

0.00

0.00%

0.17

5.58

0.16

5.25

CONCRETO RAMPA MINUSVALIDOS f'c = 175 KG/CM2

m3

1.60

354.66

567.46

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

1.60

567.46

04
04.01
04.02
04.03
04.04
04.05
05
05.01
05.02

MOVIMIENTO DE TIERRAS

RAMPAS

GOBIERNO REGIONAL DE LIMA

VALORIZACION MENSUAL N 04 (ADICIONAL)


MONT.CONT.:
PLAZO :
F. INICIO :
F. TERMINO :

A.D.S. ADS PROCEDIMIENTO CLASICO 33-2011/GRL/CEP (convocatoria : 1) ADJUDICACION DIRECTA SELECTIVA


O B R A ACONDICIONAMIENTO DE LA RUTA CULTURAL Y ECOTURISTICA DE LAS PLAYAS DE LA PROVINCIA DE BARRANCA
CONTRATISTA : MARBET E.I.R.L
SUPERVISOR : ING. ALFONSO D. CUEVA VASQUEZ

402,018.13
90.00 DAS NAT.
9-Jan-12
8-Apr-12

MONT.CONT.ADICIONAL:
PLAZO ADICIONAL:
F. INICIO ADICIONAL:
F. TERMINO ADICIONAL:

440,547.90
26 DAS NAT.
9-Apr-12
5-May-12

PROPIETARIO GERENCIA DE DESARROLLO ECONOMICO DEL GOBIERNO REGIONAL DE LIMA


UBICACIN LIMA - BARRANCA - PATIVILCA-CCPP HUAYTO
ITEM

06
06.01
06.01.01

DESCRIPCION

VALOR REFERENCIAL

UND

METRA

PRECIO

ANTERIOR

PRESUP

METRA

ACTUAL

VALORIZ.

METRA

AVANCE
ACTUAL (%)

VALORIZ.

ACUMULADO
METRA

SALDO

VALORIZ.

METRA

VALORIZ.

PISOS Y PAVIMENTOS
EMBOQUILLADO
EMBOQUILLADO P/BANCA

06.01.01.01

CONFORMACION Y COMPACTACION DE LA SUB RASANTE MANUAL

m2

35.80

3.22

115.28

28.64

92.22

7.16

23.06

20.00%

35.80

115.28

0.00

0.00

06.01.01.02

BASE DE AFIRMADO e=4"

m2

35.80

6.38

228.40

28.64

182.72

7.16

45.68

20.00%

35.80

228.40

0.00

0.00

06.01.01.03

LOSA DE CONCRETO f 'c=140 kg/cm2 P/EMBOQUILLADO e=7 cm.

m2

35.80

21.60

773.28

0.00

0.00

35.80

773.28

100.00%

35.80

773.28

0.00

0.00

06.01.01.04

PISO EMBOQUILLADO DE PIEDRA MEZCLA 1:4 (SEGUN PLANO)

m2

35.80

35.26

1,262.31

0.00

0.00

35.80

1,262.31

100.00%

35.80

1,262.31

0.00

0.00

06.01.01.05
06.01.02

CURADO DE CONCRETO

m2

35.80

1.27

45.47

0.00

0.00

35.80

45.47

100.00%

35.80

45.47

0.00

0.00

06.01.02.01

EXCAVACION MANUAL P/SARDINEL

m3

2.35

23.06

54.19

2.35

54.19

0.00

0.00

0.00%

2.35

54.19

0.00

0.00

06.01.02.02

ENCOFRADO Y DESENCOFRADO SARDINEL P/ BANCA TIPO III

m2

5.36

32.83

175.97

5.36

175.97

0.00

0.00

0.00%

5.36

175.97

0.00

0.00

06.01.02.03

CONCRETO SARDINEL SUMERGIDO f'c= 175 kg/cm2 (0.15x0.30)

m3

2.92

3,254.66

9,503.61

2.92

9,503.61

0.00

0.00

0.00%

2.92

9,503.61

0.00

0.00

06.01.02.04

JUNTA DE DILATACION C/ASFALTO (ARENA 1:3) E=1" (0.15x0.30)

21.00

5.87

123.27

21.00

123.27

0.00

0.00

0.00%

21.00

123.27

0.00

0.00

06.01.03

SARDINEL P/ BANCA (0.15x0.30) TIPO III

EMBOQUILLADO P/ESTACIONAMIENTO

06.01.03.01

CONFORMACION Y COMPACTACION DE LA SUB RASANTE MANUAL

m2

122.55

3.22

394.61

122.55

394.61

0.00

0.00

0.00%

122.55

394.61

0.00

0.00

06.01.03.02

BASE DE AFIRMADO e=6"

m2

122.55

8.14

997.56

122.55

997.56

0.00

0.00

0.00%

122.55

997.56

0.00

0.00

06.01.03.03

LOSA DE CONCRETO f'c=210 kg/cm2 P/EMBOQUILLADO e = 0.10 m.

m2

122.55

31.40

3,848.07

0.00

0.00

122.55

3,848.07

100.00%

122.55

3,848.07

0.00

0.00

06.01.03.04

PAVIMENTO EMBOQUILLADO C/MORTERO 1:3 (SEGUN PLANO)

m2

122.55

25.92

3,176.50

0.00

0.00

30.64

794.12

25.00%

30.64

794.12

91.91

2,382.37

06.01.03.05
06.02

CURADO DE CONCRETO

m2

122.55

1.27

155.64

0.00

0.00

61.28

77.82

50.00%

61.28

77.82

61.28

77.82

m3

1.23

23.06

28.36

0.90

20.75

0.33

7.61

26.83%

1.23

28.36

0.00

0.00

SARDINEL P/ESTACIONAMIENTO (0.15x0.35) TIPO I

06.02.01

EXCAVACION MANUAL P/SARDINEL

06.02.02

ACERO fy=4200 kg/cm2 GRADO 60

kg

120.04

4.34

520.97

87.08

377.92

32.96

143.05

27.46%

120.04

520.96

0.00

0.01

06.02.03

ENCOFRADO Y DESENCOFRADO SARDINEL P/ BANCA TIPO I

m2

35.10

32.83

1,152.33

16.80

551.54

18.30

600.79

52.14%

35.10

1,152.33

0.00

0.00

06.02.04

CONCRETO SARDINEL SUMERGIDO f'c= 175 kg/cm2 (0.15x0.35)

m3

1.73

354.66

613.56

1.26

446.87

0.47

166.69

27.17%

1.73

613.56

0.00

0.00

06.02.05

JUNTA DE DILATACION C/ASFALTO (ARENA 1:3) E=1" (0.15x0.35)

11.00

7.11

78.21

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

11.00

78.21

06.03
06.03.01

SARDINEL P/ESTACIONAMIENTO (0.15x0.20) TIPO II


EXCAVACION MANUAL P/SARDINEL

m3

1.50

23.06

34.59

0.00

0.00

1.50

34.59

100.00%

1.50

34.59

0.00

0.00

06.03.02

ACERO fy=4200 kg/cm2 GRADO 60

kg

115.22

4.34

500.05

0.00

0.00

115.22

500.05

100.00%

115.22

500.05

0.00

0.00

06.03.03

ENCOFRADO Y DESENCOFRADO SARDINEL P/ BANCA TIPO III

m2

3.32

32.83

109.00

0.00

0.00

3.32

109.00

100.00%

3.32

109.00

0.00

0.00

06.03.04

CONCRETO SARDINEL SUMERGIDO f'c= 175 kg/cm2 (0.15x0.20)

m3

1.50

354.66

531.99

0.00

0.00

1.50

531.99

100.00%

1.50

531.99

0.00

0.00

06.03.05

JUNTA DE DILATACION C/ASFALTO (ARENA 1:3) E=1" (0.15x0.20)

25.00

4.65

116.25

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

25.00

116.25

GOBIERNO REGIONAL DE LIMA

VALORIZACION MENSUAL N 04 (ADICIONAL)


MONT.CONT.:
PLAZO :
F. INICIO :
F. TERMINO :

A.D.S. ADS PROCEDIMIENTO CLASICO 33-2011/GRL/CEP (convocatoria : 1) ADJUDICACION DIRECTA SELECTIVA


O B R A ACONDICIONAMIENTO DE LA RUTA CULTURAL Y ECOTURISTICA DE LAS PLAYAS DE LA PROVINCIA DE BARRANCA
CONTRATISTA : MARBET E.I.R.L
SUPERVISOR : ING. ALFONSO D. CUEVA VASQUEZ

402,018.13
90.00 DAS NAT.
9-Jan-12
8-Apr-12

MONT.CONT.ADICIONAL:
PLAZO ADICIONAL:
F. INICIO ADICIONAL:
F. TERMINO ADICIONAL:

440,547.90
26 DAS NAT.
9-Apr-12
5-May-12

PROPIETARIO GERENCIA DE DESARROLLO ECONOMICO DEL GOBIERNO REGIONAL DE LIMA


UBICACIN LIMA - BARRANCA - PATIVILCA-CCPP HUAYTO
ITEM

DESCRIPCION

06.04

VALOR REFERENCIAL

UND

METRA

PRECIO

ANTERIOR

PRESUP

METRA

ACTUAL

VALORIZ.

METRA

AVANCE
ACTUAL (%)

VALORIZ.

ACUMULADO
METRA

SALDO

VALORIZ.

METRA

VALORIZ.

ADOQUINES DE CONCRETO P/VEREDAS

06.04.01

CONFORMACION Y COMPACTACION DE LA SUB RASANTE MANUAL

m2

91.58

3.22

294.89

91.58

294.89

0.00

0.00

0.00%

91.58

294.89

0.00

06.04.02
06.04.03
06.04.04
06.04.05
06.05
06.05.01

BASE DE AFIRMADO e=4"

m2

91.58

6.38

584.28

91.58

584.28

0.00

0.00

0.00%

91.58

584.28

0.00

0.00

CAMA DE ARENA 0.05m

m2

50.08

4.14

207.33

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

50.08

207.33

ADOQUINES DE COLOR AMARILLO

m2

30.09

56.12

1,688.65

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

30.09

1,688.65

ADOQUINES DE COLOR ROJO

m2

19.99

56.12

1,121.84

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

19.99

1,121.84

CORTE SUPERFICIAL MANUAL

m3

5.22

26.28

137.18

5.22

137.18

0.00

0.00

0.00%

5.22

137.18

0.00

0.00

06.05.02

CONFORMACION Y COMPACTACION DE LA SUB RASANTE MANUAL

m2

76.86

3.22

247.49

76.86

247.49

0.00

0.00

0.00%

76.86

247.49

0.00

0.00

06.05.03
06.05.04
06.05.05
06.05.06
06.05.07
06.05.08
07
07.01
08
08.01
08.01.01
08.01.02
08.02
08.02.01
8.03
08.03.01
08.03.02

BASE DE AFIRMADO e=4"

m2

76.86

6.38

490.37

76.86

490.37

0.00

0.00

0.00%

76.86

490.37

0.00

0.00

FALSO PISO DE CONCRETO F'C= 140 kg/cm2 - E=3"

m2

76.86

28.23

2,169.76

76.86

2,169.76

0.00

0.00

0.00%

76.86

2,169.76

0.00

0.00

CONTRAPISO DE 48 mm

m2

76.86

22.02

1,692.46

76.86

1,692.46

0.00

0.00

0.00%

76.86

1,692.46

0.00

0.00

PISO TERRAZO COLOR ROJO

m2

48.45

130.65

6,329.99

48.45

6,329.99

0.00

0.00

0.00%

48.45

6,329.99

0.00

0.00

PISO TERRAZO COLOR AMARILLO

m2

28.41

132.50

3,764.33

13.06

1,730.45

0.00

0.00

0.00%

13.06

1,730.45

15.35

2,033.88

PISO TERRAZO ARTISTICO P/CAMARON

m2

27.39

283.32

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

27.39

0.00

203.10

6.46

1,312.03

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

203.10

1,312.03

BANCA TIPO 1 (segun diseo)

20.00

409.30

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

20.00

0.00

BANCA TIPO 2 (segun diseo)

8.00

89.96

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

8.00

0.00

0.00

TERRAZO

PINTURA EN SEALIZACION
PINTADO DE VEREDA LATERAL
EQUIPAMIENTO
BANCAS

TACHOS ECOLOGICOS

mod

2.00

1,210.96

2,421.92

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

2.00

2,421.92

EXCAVACION MANUAL

m3

6.08

27.72

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

6.08

0.00

SOLADOS CONCRETO f'c=100 kg/cm2 h=2"

m2

8.68

10.57

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

8.68

0.00

08.03.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

50.48

4.34

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

50.48

0.00

08.03.04

CONCRETO CICLOPEO f'c=140 kg/cm2 + 70 % PM.

m3

5.21

309.64

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

5.21

0.00

08.03.05

ENCOFRADO Y DESENCOFRADO DE PLATAFORMA

m2

5.83

47.96

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

5.83

0.00

08.03.06

CONCRETO f'c=175 kg/cm2

m3

3.47

354.66

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

3.47

0.00

08.03.07

ENCOFRADO Y DESENCOFRADO PARA PEDESTAL CIRCULARI

m2

1.65

41.34

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

1.65

0.00

08.03.08

CONCRETO f'c=210 kg/cm2 P/ESCULTURA

m3

0.21

368.39

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.21

0.00

08.03.09

TARRAJEO FROTACHADO

m2

13.76

16.96

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

13.76

0.00

08.03.10

TERRAZO ARTISTICO EN PLATAFORMA DE PEDESTAL

m2

2.52

166.21

418.85

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

2.52

418.85

08.03.11

ESCULTURA DE CAMARON (SEGUN DISEO)

est

3.00

2,405.00

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

3.00

0.00

2,922.14

09

CONTENEDOR ECOLOGICO
ESCULTURA DE CAMARON

TRATAMIENTO DE AREAS VERDES

09.01

PREPARACION DE TERRENO NATURAL

m2

1,316.28

3.70

4,870.24

526.51

1,948.09

0.00

0.00

0.00%

526.51

1,948.09

789.77

09.02

COLOCACION DE TIERRA DE CHACRA

m3

131.63

22.53

2,965.62

78.98

1,779.37

52.65

1,186.25

40.00%

131.63

2,965.63

0.00

0.00

09.03
09.04
09.05
09.06
10

INSTALACION DE CESPED

m2

1,244.22

9.23

11,484.15

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

1,244.22

11,484.15

SEMBRIO DE LENTIJAS + SANGUINARIAS

641.90

10.01
10.02

m2

44.33

14.48

641.90

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

44.33

SEMBRIO DE PONCIANAS

3.00

28.02

84.06

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

3.00

84.06

SEMBRIO DE TULIPAN AFRICANO

5.00

28.02

140.10

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

5.00

140.10

EXCAVACION DE ZANJA HASTA H= 1.00 M.

60.00

20.75

1,245.00

60.00

1,245.00

0.00

0.00

0.00%

60.00

1,245.00

0.00

0.00

REFINE Y NIVELACION ZANJA a = 0.40 m.

60.00

2.34

140.40

60.00

140.40

0.00

0.00

0.00%

60.00

140.40

0.00

0.00

INSTALACIONES SANITARIAS

GOBIERNO REGIONAL DE LIMA

VALORIZACION MENSUAL N 04 (ADICIONAL)


MONT.CONT.:
PLAZO :
F. INICIO :
F. TERMINO :

A.D.S. ADS PROCEDIMIENTO CLASICO 33-2011/GRL/CEP (convocatoria : 1) ADJUDICACION DIRECTA SELECTIVA


O B R A ACONDICIONAMIENTO DE LA RUTA CULTURAL Y ECOTURISTICA DE LAS PLAYAS DE LA PROVINCIA DE BARRANCA
CONTRATISTA : MARBET E.I.R.L
SUPERVISOR : ING. ALFONSO D. CUEVA VASQUEZ

402,018.13
90.00 DAS NAT.
9-Jan-12
8-Apr-12

MONT.CONT.ADICIONAL:
PLAZO ADICIONAL:
F. INICIO ADICIONAL:
F. TERMINO ADICIONAL:

440,547.90
26 DAS NAT.
9-Apr-12
5-May-12

PROPIETARIO GERENCIA DE DESARROLLO ECONOMICO DEL GOBIERNO REGIONAL DE LIMA


UBICACIN LIMA - BARRANCA - PATIVILCA-CCPP HUAYTO
ITEM

DESCRIPCION

VALOR REFERENCIAL

UND

METRA

PRECIO

ANTERIOR

PRESUP

METRA

ACTUAL

VALORIZ.

METRA

AVANCE
ACTUAL (%)

VALORIZ.

ACUMULADO
METRA

SALDO

VALORIZ.

METRA

VALORIZ.

10.03

CAMA DE APOYO

60.00

2.12

127.20

60.00

127.20

0.00

0.00

0.00%

60.00

127.20

0.00

0.00

10.04

RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP EN SISTEMA DE RIEGO

60.00

16.86

1,011.60

60.00

1,011.60

0.00

0.00

0.00%

60.00

1,011.60

0.00

0.00

10.05

RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO

m3

1.25

12.89

16.11

1.25

16.11

0.00

0.00

0.00%

1.25

16.11

0.00

0.00

10.06

pza

1.00

166.25

166.25

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

1.00

166.25

10.07

CAJA DE CONCRETO DE 0.30 X 0.30 MORTERO C:A 1:4 CON TAPA DE FIERRO
FUNDIDO PARA VALVULA
CAJA DE CONCRETO DE 0.30 X 0.30 MORTERO C:A 1:4 CON TAPA DE FIERRO
FUNDIDO PARA GRIFO

pza

2.00

166.25

332.50

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

2.00

332.50

10.08

LLAVE DE RIEGO CON GRIFO DE 3/4"

pza

2.00

61.67

123.34

0.00

0.00

1.00

61.67

50.00%

1.00

61.67

1.00

61.67

10.09

VALVULAS DE COMPUERTA DE BRONCE DE 3/4"

pza

1.00

100.21

100.21

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

1.00

100.21

10.10

SUMINISTRO E INSTALACION DE SERVICIO AGUA POTABLE

glb

1.00

850.00

850.00

0.50

425.00

0.20

170.00

20.00%

0.70

595.00

0.30

255.00

GOBIERNO REGIONAL DE LIMA

VALORIZACION MENSUAL N 04 (ADICIONAL)


MONT.CONT.:
PLAZO :
F. INICIO :
F. TERMINO :

A.D.S. ADS PROCEDIMIENTO CLASICO 33-2011/GRL/CEP (convocatoria : 1) ADJUDICACION DIRECTA SELECTIVA


O B R A ACONDICIONAMIENTO DE LA RUTA CULTURAL Y ECOTURISTICA DE LAS PLAYAS DE LA PROVINCIA DE BARRANCA
CONTRATISTA : MARBET E.I.R.L
SUPERVISOR : ING. ALFONSO D. CUEVA VASQUEZ

402,018.13
90.00 DAS NAT.
9-Jan-12
8-Apr-12

MONT.CONT.ADICIONAL:
PLAZO ADICIONAL:
F. INICIO ADICIONAL:
F. TERMINO ADICIONAL:

440,547.90
26 DAS NAT.
9-Apr-12
5-May-12

PROPIETARIO GERENCIA DE DESARROLLO ECONOMICO DEL GOBIERNO REGIONAL DE LIMA


UBICACIN LIMA - BARRANCA - PATIVILCA-CCPP HUAYTO
ITEM

DESCRIPCION

11

VALOR REFERENCIAL

UND

METRA

PRECIO

ANTERIOR

PRESUP

METRA

ACTUAL

VALORIZ.

METRA

AVANCE
ACTUAL (%)

VALORIZ.

ACUMULADO
METRA

SALDO

VALORIZ.

METRA

VALORIZ.

INSTALACIONES ELECTRICAS

11.01
11.02
11.03

EXCAVACION MANUAL

m3

83.14

27.72

2,304.64

83.14

2,304.64

0.00

0.00

0.00%

83.14

2,304.64

0.00

0.00

REFINE DE ZANJA

251.00

12.03

3,019.53

251.00

3,019.53

0.00

0.00

0.00%

251.00

3,019.53

0.00

0.00

CAMA DE APOYO

251.00

2.12

532.12

251.00

532.12

0.00

0.00

0.00%

251.00

532.12

0.00

0.00

11.04

CAJA DE PASE DE CONCRETO

12.00

122.14

0.00

9.60

0.00

0.00

0.00

0.00%

9.60

0.00

2.40

0.00

11.05

TENDIDO DE CABLE NYY 3x16 mm2

261.00

24.93

6,506.73

261.00

6,506.73

0.00

0.00

0.00%

261.00

6,506.73

0.00

0.00

11.06

SUMINISTRO E INSTALACION DE DUCTOS EN ZONAS DE VIAS

7.00

160.54

1,123.78

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

7.00

1,123.78

11.07

RELLENO COMPACTADO CON MATERIAL PROPIO EN ZANJAS

m3

94.13

11.80

1,110.73

94.13

1,110.73

0.00

0.00

0.00%

94.13

1,110.73

0.00

0.00

11.08

RED DE ACOMETIDA

glb

1.00

1,250.00

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

11.09

BASE DE CIMIENTO P/POSTES

13.00

86.73

1,127.49

8.00

693.84

5.00

433.65

38.46%

13.00

1,127.49

0.00

0.00

11.10

POSTE ORNAMENTAL SEGUN DISEO (SIMPLE)

9.00

796.47

7,168.23

8.55

6,809.82

0.00

0.00

0.00%

8.55

6,809.82

0.45

358.41

11.11

POSTE ORNAMENTAL SEGUN DISEO (DOBLE)

4.00

867.52

3,470.08

2.00

1,735.04

1.00

867.52

25.00%

3.00

2,602.56

1.00

867.52

11.12

COLOCACION DE LUMINARIAS

17.00

325.68

5,536.56

0.00

0.00

17.00

5,536.56

100.00%

17.00

5,536.56

0.00

0.00

11.13

COLOCACION DE TEMPORIZADORES

4.00

88.19

352.76

0.00

0.00

4.00

352.76

100.00%

4.00

352.76

0.00

0.00

11.14

COLOCACION DE DICROICOS DE 70 W

4.00

247.10

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

4.00

0.00

11.15

MURETE PORTAMEDIDOR

1.00

254.95

254.95

0.80

203.96

0.20

50.99

0.00%

1.00

254.95

0.00

0.00

11.16

SUMINISTRO E INSTALACION DE MEDIDOR ELECTRICO

glb

1.00

1,800.00

1,800.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

1.00

1,800.00

11.17

COLOCACION DE TABLEROS TERMICOS

1.00

721.55

721.55

1.00

721.55

0.00

0.00

0.00%

1.00

721.55

0.00

0.00

11.18

MONTAJE DE TABLERO TERMOMAGNETICO

1.00

989.98

989.98

0.10

99.00

0.00

0.00

0.00%

0.10

99.00

0.90

890.98

11.19

POZO PUESTA A TIERRA PARA 5 OHMIOS

1.00

1,088.92

1,088.92

1.00

1,088.92

0.00

0.00

0.00%

1.00

1,088.92

0.00

0.00

11.20

MEDICION DE RESISTIBILIDAD EN BAJA TENSION

1.00

450.00

450.00

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

1.00

450.00

12

MITIGACION HE IMPACTO AMBIENTAL

12.01

LETRINA PROVISIONAL

2.00

350.00

700.00

2.00

700.00

0.00

0.00

0.00%

2.00

700.00

0.00

0.00

12.02

ACOPIO DE RESIDUOS SOLIDOS INC. ACARREO

8.00

28.30

226.40

8.00

226.40

0.00

0.00

0.00%

8.00

226.40

0.00

0.00

12.03

MANGUERA PARA REGADIO Y MITIGACION DE POLVO.

8.00

60.44

483.52

8.00

483.52

0.00

0.00

0.00%

8.00

483.52

0.00

0.00

glb

1.00

2,054.90

2,054.90

1.00

2,054.90

0.00

0.00

0.00%

1.00

2,054.90

0.00

0.00

13

FLETE TERRESTRE

13.01

FLETE TERRESTRE

GOBIERNO REGIONAL DE LIMA

VALORIZACION MENSUAL N 04 (ADICIONAL)


MONT.CONT.:
PLAZO :
F. INICIO :
F. TERMINO :

A.D.S. ADS PROCEDIMIENTO CLASICO 33-2011/GRL/CEP (convocatoria : 1) ADJUDICACION DIRECTA SELECTIVA


O B R A ACONDICIONAMIENTO DE LA RUTA CULTURAL Y ECOTURISTICA DE LAS PLAYAS DE LA PROVINCIA DE BARRANCA
CONTRATISTA : MARBET E.I.R.L
SUPERVISOR : ING. ALFONSO D. CUEVA VASQUEZ

402,018.13
90.00 DAS NAT.
9-Jan-12
8-Apr-12

MONT.CONT.ADICIONAL:
PLAZO ADICIONAL:
F. INICIO ADICIONAL:
F. TERMINO ADICIONAL:

440,547.90
26 DAS NAT.
9-Apr-12
5-May-12

PROPIETARIO GERENCIA DE DESARROLLO ECONOMICO DEL GOBIERNO REGIONAL DE LIMA


UBICACIN LIMA - BARRANCA - PATIVILCA-CCPP HUAYTO
ITEM

DESCRIPCION

VALOR REFERENCIAL

UND

METRA

PRECIO

ANTERIOR

PRESUP

METRA

VALORIZ.

ACTUAL
METRA

AVANCE
ACTUAL (%)

VALORIZ.

ACUMULADO
METRA

SALDO

VALORIZ.

METRA

VALORIZ.

II.- PRESUPUESTO DE PARTIDAS ADICIONALES


01
01.01

C0NSTRUCCION DE PILETA
ESTRUCTURAS

01.01.01

Trazo y replanteo en Terreno Normal con Equipo - Pileta

m2

27.34

0.81

22.15

27.34

22.15

1.00

27.34

22.15

0.00

0.00

01.01.02

EXCAVACION MANUAL A NIVEL DE CIMENTACION - Pileta

m3

9.57

23.06

220.68

9.57

220.68

1.00

9.57

220.68

0.00

0.00

01.01.03

Solado Concreto F'c = 100 Kg/cm2 h=2"

m2

27.34

10.60

289.80

0.00

0.00

0.00

0.00

0.00

27.34

289.80

01.01.04

Pileta - Concreto F'c= 210 Kg/cm2 E=0.15 m

m3

6.27

322.75

2023.64

0.00

0.00

0.00

0.00

0.00

6.27

2023.64

01.01.05

Pileta - Encofrado y desencofrado

m2

43.14

47.40

2044.84

0.00

0.00

0.00

0.00

0.00

43.14

2044.84

01.01.06

Pileta - Acero de Refuerzo Fy = 4200 kg/cm2

kg

322.42

4.34

1399.30

64.48

279.86

0.20

64.48

279.86

257.94

1119.44

01.01.07

Curado de Concreto

m2

50.52

1.28

64.67

0.00

0.00

0.00

0.00

0.00

50.52

64.67

01.02

ARQUITECTURA

01.02.01

ESCULTURA DE CAMARON INCL. PINTADO (Se adjunta


diseo tipico)

Und

1.00

5006.23

5006.23

0.00

0.00

0.00

0.00

0.00

1.00

5006.23

01.02.02

Tarrajeo en exterior e interiores

m2

40.61

17.14

696.06

0.00

0.00

0.00

0.00

0.00

40.61

696.06

01.02.03

ENCHAPE DE CERAMICO DE 30 x 30 CON PEGAMENTO

m2

60.31

53.52

3227.79

0.00

0.00

0.00

0.00

0.00

60.31

3227.79

01.03

INSTALACIONES ELECTRICAS

01.03.01

FAROS SUB ACUATICOS DE 252 LEDS COLORES ACERO


INOXIDABLE

Und

4.00

1018.80

4075.20

0.00

0.00

0.00

0.00

0.00

4.00

4075.20

01.03.02

TRANSFORMADOR DE 300W-220 VTS - 12 VOLTIOS

Und

1.00

155.61

155.61

0.00

0.00

0.00

0.00

0.00

1.00

155.61

01.03.03

ACCESORIOS PARA SISTEMA DE CIRCULACION DE AGUA

Und

1.00

306.13

306.13

0.00

0.00

0.00

0.00

0.00

1.00

306.13

01.03.04

Suministro, tendido e instalacin de tuberia PVC SAP


D=3/4"

24.20

3.20

77.44

0.00

0.00

0.00

0.00

0.00

24.20

77.44

01.03.05

CONDUCTOR THW 2.5 MM2

50.40

6.66

335.66

0.00

0.00

0.00

0.00

0.00

50.40

335.66

01.04

INSTALACION SANITARIAS

01.04.01

Suministro e instalacin de Tuberia PVC C-10 de 1"

Und

2.30

45.97

105.73

0.00

0.00

0.00

0.00

0.00

2.30

105.73

01.04.02

BOQUILLA DE BRONCE DE 1/2" - MODELO SIMPLE

Und

10.00

127.95

1279.50

0.00

0.00

0.00

0.00

0.00

10.00

1279.50

01.04.03

BOQUILLA DE BRONCE MODELO ABANICO DE 1"

Und

4.00

329.36

1317.44

0.00

0.00

0.00

0.00

0.00

4.00

1317.44

21.50

3.35

72.03

0.00

0.00

0.00

0.00

0.00

21.50

72.03

01.04.04

Suministro e instalacin de tubera de PVC 1" clase 10


para agua

01.04.05

REJILLA DE FONDO PVC DE 8"

Und

1.00

90.90

90.90

0.00

0.00

0.00

0.00

0.00

1.00

90.90

01.04.06

DESNATADOR PVC DE 6"

Und

1.00

259.85

259.85

0.00

0.00

0.00

0.00

0.00

1.00

259.85

GOBIERNO REGIONAL DE LIMA

VALORIZACION MENSUAL N 04 (ADICIONAL)


MONT.CONT.:
PLAZO :
F. INICIO :
F. TERMINO :

A.D.S. ADS PROCEDIMIENTO CLASICO 33-2011/GRL/CEP (convocatoria : 1) ADJUDICACION DIRECTA SELECTIVA


O B R A ACONDICIONAMIENTO DE LA RUTA CULTURAL Y ECOTURISTICA DE LAS PLAYAS DE LA PROVINCIA DE BARRANCA
CONTRATISTA : MARBET E.I.R.L
SUPERVISOR : ING. ALFONSO D. CUEVA VASQUEZ

402,018.13
90.00 DAS NAT.
9-Jan-12
8-Apr-12

MONT.CONT.ADICIONAL:
PLAZO ADICIONAL:
F. INICIO ADICIONAL:
F. TERMINO ADICIONAL:

440,547.90
26 DAS NAT.
9-Apr-12
5-May-12

PROPIETARIO GERENCIA DE DESARROLLO ECONOMICO DEL GOBIERNO REGIONAL DE LIMA


UBICACIN LIMA - BARRANCA - PATIVILCA-CCPP HUAYTO
ITEM

DESCRIPCION

VALOR REFERENCIAL

UND

METRA

01.04.07

Suministro e instalacin de Tuberia agua PVC 2" (TUB. DE


SUCCION)

21.53

01.04.08

Suministro e instalacin de Tuberia agua PVC 1 1/2" (TUB


DE IMPULSION)

4.80

01.04.09

SALIDA DE LIMPIEZA 2" PVC SAL

1.00

02

EQUIPAMIENTO DE BANCAS

02.01

Bancas Urbanas segun diseo adjunto

Und

20.00

03

PERGOLAS DE MADERA
m3

03.01

03.02

03.03

03.04

Cimentacion de Parante de Bancas- Concreto F'c= 140


Kg/cm2
PARANTE DE MADERA DE 4"x5" INCL. Pintado esmalte
acrilico
VIGAS DE AMARRE DE MADERA (Segun detalle) INCL.
Pintado esmalte acrilico
VIGUETAS DE MADERA (Segun detalle) INCL. Pintado
esmalte acrilico

PRECIO

ANTERIOR

PRESUP

METRA

VALORIZ.

ACTUAL
METRA

AVANCE
ACTUAL (%)

VALORIZ.

ACUMULADO
METRA

SALDO

VALORIZ.

METRA

VALORIZ.

81.81

0.00

0.00

0.00

0.00

0.00

21.53

3.80

18.24

0.00

0.00

0.00

0.00

0.00

4.80

18.24

182.16

182.16

0.00

0.00

0.00

0.00

0.00

1.00

182.16

370.00

7400.00

0.00

0.00

0.00

0.00

0.00

20.00

7400.00

1.21

199.36

241.23

0.00

0.00

0.00

0.00

0.00

1.21

241.23

p2

400.00

10.05

4020.00

0.00

0.00

0.00

0.00

0.00

400.00

4020.00

p2

461.73

9.99

4612.68

0.00

0.00

0.00

0.00

0.00

461.73

4612.68

p2

260.04

9.99

2597.80

0.00

0.00

0.00

0.00

0.00

260.04

2597.80

Und

72.00

12.16

875.52

0.00

0.00

0.00

0.00

0.00

72.00

875.52

6.00

1.27

7.62

0.00

0.00

0.00

0.00

0.00

6.00

7.62

0.00

0.00

0.00

0.00

6.30

146.54

4.50

47.70

3.80

81.81

03.05

PLATINA Y ANGULO

04

CONSTRUCCION DE CASETA DE BOMBEO

04.01

ESTRUCTURAS

04.01.01

Trazo y replanteo en Terreno Normal con Equipo - Caseta

m2

04.01.02

Excavacion Manual a Nivel de cimentacion - Caseta

m3

6.30

23.26

146.54

0.00

04.01.03

Solado Concreto F'c = 100 Kg/cm2 h=2", p/adoquin de


veredas

m2

4.50

10.60

47.70

0.00

0.00

0.00

0.00

0.00

04.01.04

Caseta - Concreto F'c= 175 Kg/cm2, incluye nc curado

m3

4.24

315.27

1336.74

0.00

0.00

0.00

0.00

0.00

4.24

1336.74

04.01.05

Caseta - Encofrado y desencofrado

m2

43.72

23.51

1027.86

0.00

0.00

0.00

0.00

0.00

43.72

1027.86

04.01.06

Caseta - Acero de Refuerzo Fy = 4200 kg/cm2

kg

168.68

4.34

732.07

0.00

0.00

0.00

0.00

0.00

168.68

732.07

04.02

ARQUITECTURA

04.02.01

TARRAJEO EN EXTERIOR E INTERIOR

m2

31.04

27.21

844.60

0.00

0.00

0.00

0.00

0.00

31.04

844.60

04.02.02

PINTURA LATEX DOS MANOS EN EXTERIOR

m2

31.04

4.93

153.03

0.00

0.00

0.00

0.00

0.00

31.04

153.03

04.02.03

Puerta metlica con plancha de fierro negra incluye


pintado+Chapa forte

m2

0.84

413.08

346.99

0.00

0.00

0.00

0.00

0.00

0.84

346.99

04.03

INSTALACIONES SANITARIAS

04.03.01

Suministro e Inst de Equipo de Bombeo

04.03.02

04.03.03

04.03.04

04.03.05
04.03.06

Suministro e instalacin de tubera de PVC 3/4" clase 10


para agua
Suministro e instalacin de tubera de PVC 1 1/2" Clase
10 (Succion)
Suministro e instalacin de tubera de PVC 1 1/2" clase
10 (Impulsion)
Suministro e instalacin de tubera de PVC 1" clase 10
(Impulsion)
Prueba Hidrulica Tubera PVC agua

1.00

886.95

886.95

0.00

0.00

0.00

0.00

0.00

1.00

886.95

7.40

28.54

211.20

0.00

0.00

0.00

0.00

0.00

7.40

211.20

7.00

3.30

23.10

0.00

0.00

0.00

0.00

0.00

7.00

23.10

8.50

13.34

113.39

0.00

0.00

0.00

0.00

0.00

8.50

113.39

8.40

12.84

107.86

0.00

0.00

0.00

0.00

0.00

8.40

107.86

32.70

2.04

66.71

0.00

0.00

0.00

0.00

0.00

32.70

66.71

GOBIERNO REGIONAL DE LIMA

VALORIZACION MENSUAL N 04 (ADICIONAL)


MONT.CONT.:
PLAZO :
F. INICIO :
F. TERMINO :

A.D.S. ADS PROCEDIMIENTO CLASICO 33-2011/GRL/CEP (convocatoria : 1) ADJUDICACION DIRECTA SELECTIVA


O B R A ACONDICIONAMIENTO DE LA RUTA CULTURAL Y ECOTURISTICA DE LAS PLAYAS DE LA PROVINCIA DE BARRANCA
CONTRATISTA : MARBET E.I.R.L
SUPERVISOR : ING. ALFONSO D. CUEVA VASQUEZ

402,018.13
90.00 DAS NAT.
9-Jan-12
8-Apr-12

MONT.CONT.ADICIONAL:
PLAZO ADICIONAL:
F. INICIO ADICIONAL:
F. TERMINO ADICIONAL:

440,547.90
26 DAS NAT.
9-Apr-12
5-May-12

PROPIETARIO GERENCIA DE DESARROLLO ECONOMICO DEL GOBIERNO REGIONAL DE LIMA


UBICACIN LIMA - BARRANCA - PATIVILCA-CCPP HUAYTO
ITEM

DESCRIPCION

04.04

INSTALACION ELECTRICAS

04.04.01

TABLERO ELECTROBOMBA (CONTROL AUTOMATICO)

04.04.02

04.04.03

SUMINISTRO E INSTALACION DE EQUIPO DE


ELECTROBOMBAS
Salida de techo P/luminaria C/Tubo SEL y alambre THW
2.5 mm2

VALOR REFERENCIAL

UND

METRA

PRECIO

ANTERIOR

PRESUP

METRA

ACTUAL

VALORIZ.

METRA

AVANCE
ACTUAL (%)

VALORIZ.

ACUMULADO
METRA

SALDO

VALORIZ.

METRA

VALORIZ.

Und

1.00

736.00

736.00

0.00

0.00

0.00

0.00

0.00

1.00

736.00

glb

1.00

144.31

144.31

0.00

0.00

0.00

0.00

0.00

1.00

144.31

pto

1.00

25.33

25.33

0.00

0.00

0.00

0.00

0.00

1.00

25.33

04.04.04

SALIDA P/ELECTROBOMBA CON CABLE THW 4 MM2

pto

3.00

101.20

303.60

0.00

0.00

0.00

0.00

0.00

3.00

303.60

04.04.05

Artefacto luminaria de 100 W incluye colocacin

Und

1.00

2.63

2.63

0.00

0.00

0.00

0.00

0.00

1.00

2.63

05

VARIOS

05.01

Solado Concreto F'c = 100 Kg/cm2 h=2", p/adoquin de


veredas

m2

50.18

10.60

531.91

50.18

531.91

1.00

50.18

531.91

0.00

0.00

05.02

CONTRAPISO DE 48 MM-P/TERRAZO

m2

41.40

22.04

912.46

41.40

912.46

1.00

41.40

912.46

0.00

0.00

05.03

TERRAZO COLOR ROJO

m2

41.40

124.01

5134.01

24.84

3080.41

0.60

24.84

3080.41

16.56

2053.60

05.04

TACHOS ECOLOGICOS

Und

2.00

1207.61

2415.22

0.00

0.00

0.00

0.00

0.00

2.00

2415.22

05.05

BASE DE ASTAS

3.00

98.16

294.48

0.00

0.00

0.00

0.00

0.00

3.00

294.48

05.06

ASTA PARA BANDERAS INCL. (EPOXICO+ACRILICO)

Und

3.00

601.67

1805.01

0.00

0.00

0.00

0.00

0.00

3.00

1805.01

05.07

LIMPIEZA DE LA OBRA INCLUYE CERA DE ADOQUIN DE


VEREDA

m2

41.40

10.85

449.19

0.00

0.00

0.00

0.00

0.00

41.40

449.19

Flete Terrestre

glb

1.00

819.01

0.00

0.00

0.00

0.00

1.00

05.08

0.00

819.01

819.01

306,021.05

181,463.41

22,797.29

204,260.70

101,759.98

GASTOS GENERALES (12%)

36,722.53

21,775.61

2,735.67

24,511.28

12,211.20

UTILIDADES (10%)

30,602.11

18,146.34

2,279.73

20,426.07

10,176.00

SUBTOTAL

373,345.68

221,385.69

27,813.02

249,198.38

124,147.51

FACTOR DE RELACION FR=

373,345.68

221,385.69

27,813.02

249,198.38

124,147.51

67,202.22

39,849.42

5,006.34

44,855.71

22,346.55

440,547.90

261,235.11

32,819.37

294,054.09

146,494.06

COSTO DIRECTO

IGV (18%)
PRESUPUESTO TOTAL

S-ar putea să vă placă și