Sunteți pe pagina 1din 110

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Acknowledgement
First and foremost, the team would like to thank almighty God. Then the team would like to thank to the project coordinator, Mr. Kasahun for the valuable guidance and advice. He inspired us greatly to work in this project. His willingness to motivate us contributed tremendously to the project. Besides, the team would like to thank the authority of ArbaMinch University (AMU) for providing us with a good environment and facilities to complete the project. Also, the team would like to take this opportunity to thank to the department of computer Science for offering this subject, developing this final year project. It gave us an opportunity to participate and learn about the operation of bank system. Finally, an honorable mention goes to Mr. Mehari the project main advisor, Mr. Nebiyat and Miss. Tigist our project co advisor they help us in developing this project by giving advice and comment how to precede and the team want to thank the manager of the bank Mr. Daniel who helps us by giving detail information of the bank operation. Without helps of the particular persons that mentioned above, we would face many difficulties while doing this project.

Abstract
Currently the bank is performing its task manually, so considering the problem of manual operation of the bank this project will try to solve the problem by automating the manual operation of the
Final year project Page 1

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

bank system. The proposed project will solve operation problems that can be occur in the existing system like depositing, Withdrwing, loaning, transferring money from one account to another account. The manual operation requires long time and much human power to complete a task .So the proposed project is going to avoid such problems.

CHAPTER ONE
Introduction
Now a day it is better if every activity is done using new technology in order to fulfill the need of human being, Organization, Enterprise etc . As todays world is present at the computations time so, in order to be the winner from those computation you must have use the technology. For example by this time there are many
Final year project Page 2

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

organizations and each organizations needs to be preferable, computable, work on faster way on faster way in order to satisfy users interest etc they should have facilitate their activities in computerized way. In Arba Minch there is a Dashen Bank branch which is using manual operation to give services to the customer . 1.1. Background of the company The new economic policy introduced in November, 1991 caused the culmination of the command economic heralding the establishment of a market oriented one. This policy change created an opportunity and a conducive environment for the emergence of private financial institutions aimed at the bringing a meaningful economic role in the development efforts of the country. Dashen Bank was established as per the intent of the new policy and the Ethiopian investment code. It came into existence on September 20, 1995 according to the commercial code of Ethiopia, 1960, and the licensing and supervision of banking business proclamation No. 84/1994. The first founding members were 11 businessmen and professional that agreed to combine their financial resources and expertise to form this new private bank.

The rationale behind its name, "Dashen Bank"

"Ras Dashen" is the highest mountain of Ethiopia. It is also the habitat of rare wild animals; the Walia Ibex, the Gelada Baboon, and the Lammergeyer - the beautiful bone breaker eagle. These unique characteristics of the mountain coincided with the interest of the founders of the Bank and prompted them to adopt this great name and epitomize their aspiration. Rightly, reaching the top of banking business in dynamic and competitive business environment symbolized the highest peak, while the unique and efficient services the bank caters for the public through state -of-the-art computer technology and carefully selected and trained man-power equated with the rare wild animals. Today, indeed, reliability, efficiency and modernity are the hallmark and the bank's distinguishing features which make them synonymous with Dashen Bank as much as the rare animals are synonymous with Ras-Dashen Mountain. The bank gives the following services to the customers
Final year project Page 3

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Saving money Depositing money Withdraw of the deposit money Loaning and Repayment of money Money transfer (internal and external) Some special services depending on conditions
Vision of the bank

1.1.1


1.1.2

To become a world class bank. To satisfy customers by giving a very fast service
Mission of the bank

The mission of the bank is to play a major role in the financial service cost-effectively for all sectors of the economy and thereby support the long term development of the country.

1.2

Streangth and weakness of the existing system


The workers give service for the customers in a smooth manner. Eventhough they are using manual system they will try to complete the customers

1.2.1 Streangth of the existing system

need in a short time.

1.2.2

weakness of the existing system


All the necessary records of the above management activities are kept manually on papers

and stored in a file cabinet which are exposed for different physical hazards like fire, flood and the access time of the data is slow Frequent error generation which leads to unnecessary rework

1.3 BACKGROUND OF THE PROJECT


Background of the project is directed on the Arbaminch branch Dashen Bank of Ethiopia that

facilitates and provides different service to foreigners as well as local peoples by providing different activities related to the banks operation like money deposit ,loan and money transfer

1.3.1 Team composition


Role
Final year project
Description Assigned To

Page 4

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Project Manager

Oversees the project and ensures that it meets its objective in time, function, and cost according to the project plan Writing a code and design the system Design the information system and ensure the system conforms to information systems standards and analyze the system requirement Design the project structure and interface

Girum Bekele

Programming/Coding

Fisseha Megersa
Girum Bekele

System Analyst

Nebiyu Alehegn Yonas Baye

System Design

Liyew Mesele and Natnael Otoro

Table 1.1 team composition


1.3

Statment of the Problem

Dashen bank of Ethiopia, Arbaminch branch is totally depends on the manual transaction of processes. So the organization faces a lot of problems in terms of cost, time, reliability, and efficiency.

1. Cost:When the existing transaction process problem is described according to its cost which includes: a. Improper cost of materials: - Which is expensed to buy paper, pen, and ruler. To the minimum the bank has five departments all want these materials for their work.

Final year project

Page 5

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

b. Human power: - The organization wants many clerks to provide fast and good service for its clients. 2. Time: - Since all function depends on human task, it consumes more time. Speed is one of the major problems of the existing manual system. 3. Reliability: - The other basic problem of the bank is lack of reliability. When clerks registers clients and calculates the money manually they may make mistakes which reduce the reliability of the existing manual operation. 4. Efficiency: - Since everything is done manually there might be errors when performing transactions like calculating an interest, deposit amount, withdrawal amount.

1.5 Objective of the project


When the project is initiated it has objectives to be in goal at the end of the project. The project objectives divide in to two groups. These are: 1. General objective and

2. Specific objectives To describe general and specific objectives:

1.5.1 General objective:

The general objective of the proposed project is to automate the current manual system of the

dashen bank of Ethiopia, Arbaminch branch.

1.5.2 Specific objective: The specific objective of the proposed project is:
1. To computerize registration of customer. 2.

To computerize the interest calculation for the deposit and Return of loaned money by the customer.

Final year project

Page 6

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

3. To computerize transfer of money in the bank (from one customer account to another),

deposit, Loan, and withdrawal. 4. Reducing manual errors by computerizing mathematical operations taken over there by the clerks.

1.6 Feasibility Analysis


The team analyzes the feasibility the proposed project according to the outcome that will happen after the development of the system. The team tried to divide these feasibility studies as:-

1.6.1 Operational Feasibility


The proposed project is accepted by the organization (Dashen bank) and it improves the activity of the bank by replaying the proper quality data, increase throughput response time, and increase efficiency of work in the bank. All in all, it replies proper solution for the operations that the workers of the bank are performing to carryout the task that they want to perform.

1.6.2 Technical Feasibilty


The proposed system is simple to use by the employees to perform a specific operation that is any employee having know how of computer operation can use the system. The training will be given for the new clerk to have know how for the system. The necessary hardware and software will provide by the organization for them.

1.6.3 Economic Feasibilty


Economically the proposed project doesnt cost much more and also the materials to implement the system doesnt cost great amount of money.

1.6.3.1 Cost Benefit Analysis A. Tangible Benefits


Since this project going to computerize there will be reduction of cost for materials used for manual operation: paper, pen, human power, space needed to record, and save data storage & time that the team can be induced or bring on during in the manual system. Final year project Page 7

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

The team calculated the corresponding tangible benefits based on the technique called the Time Value of
Money (TVM).

Cost reduction for material


materials cost for the current system

Item

Quantity per month

Unit price

Total Price per year

Papers Pen Ticket and receipt Total material cost

8 packet 4 packet 50 packet

80 Birr 50 Birr 10 Birr

7680 Birr 3200 Birr 60000 Birr 70880 Birr

Table 1.2 materials cost for the current system

Table 1.3 materials cost for the new system materials cost for the new system when deploys

Item

Quantity per month

Unit price

Total Price per year

Papers Pen Ticket and receipt


Final year project

4 packet 2 packet 50 packet

80 Birr 50 Birr 10 Birr

1000 Birr 1100 Birr 600 Birr 2700 Birr


Page 8

Total material cost

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Labor Cost
Role 2 System Analyst 2 system Designer 2 programmer
Total Labor Cost

Salary(For single) 5000 5500 5100

Total 10000 Birr 11000 Birr 10200 Birr

31200 Birr
Table 1.4 Labor Cost

Difference b/n before and after deployment money required for payment Cost Reduction for materials = 70880 birr 2700 birr = 68180 birr The total profit of the new system =68180birr from materials - 31200 birr for labor=36980

TP=36980 B. Intangible Benefit


The bank system provides the following intageble benefits:

Increase information accuracy in critical operation Information processing efficiency Saving loss of documents Increased speed of activity Increased flexibility, and On time information

1.6.3.2 Cost of the Project


Final year project Page 9

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

a)

Tangible costs

The tangible costs to be incurred in developing the system are:i. ii. Hardware development cost Software development cost Key words: Salvage value: is the value that if you buy a computer, what will the price of the computer after 1 year and what is the price in the past 1 year. Reduction: decreasing in price within a short period. Life expectance (LE): the time in which software/other material to be access. Miscellaneous Cost: Cost for extra items Hardware cost

Item hp computer Laptop Printer CD-ROM

Quantity 6 1 1 2

Unit price 5500 Birr 10,000 Birr 5,000 Birr 16 Birr

Total Price 33000 Birr 10,000 Birr 5,000 Birr 32 Birr 48032 Birr

Total hardware cost

Final year project

Page 10

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Table 1.5 Hardware cost

Salvage value=total hardware development cost/life expectancy (LE) for the software per year)*LE/month 12months*time to develop the software Salvage Value = (48032/5 year) x3 month 12 month Salvage Value = 12879.6 Yearly reduction Cost = (21466-12879.6)/5 years (LE) Yearly reduction Cost = 1717.28 Monthly reduction Cost = 1717.28/12 months Monthly reduction Cost = 143.106

Final year project

Page 11

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Hardware improvement Cost = 143.1066x3 months

Software Cost

Item SQLserver2005 Microsoft Windows XP Professional Microsoft Office 2007 Visio Microsoft Visual studio. Net Total Software Cost

Price 1000 Birr 1400 Birr

160 Birr 100 Birr 4000 Birr 6660 Birr

Final year project

Page 12

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Table 1.6 software cost

Hardware improvement Cost =429.3198birr Salvage Value = (6660/5 yrs) x 3 months 12 month Salvage Value = 333 Cost = 6660-333 / 5 yrs. (life expectancy) Yearly reduction Cost = 1265.4 Monthly reduction Cost =1265.4 / 12 months Monthly reduction Cost = 105.45 Software improvement Cost = 105.45x 3months Software improvement Cost = 316.35birr
Total cost of the project =48032 birr for hardware cost +6660 birr software cost

=54692 birr
The difference b/n total profit form new system and cost of the project =99380 birr for total

profit 54692 birr for cost of project

= 44688

b)Intangible costs
The intangible costs to be incurred or deserved and earn in developing the system are:

Human Knowledge Work satisfaction

1.6.3.3 Cost Breakdown


Beside tangible and intangible costs, the team breakdown cost of system development into two: one time cost and recurrent cost.

Final year project

Page 13

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

One time cost: Is a cost with project up and developments or system startup. This mean that it refers to those associated with project initiation and development cost and the startup of the system. The cost typing encompasses activities such as system development, new hardware & software purchase or system startup user training, and system or data conversion. Recurrent cost: Recurrent costs are those incurred for goods and services in the course of a budget year, and which must be regularly replaced since the team is developing this project for academic purpose the team may not gain any income.

1.6.4

Schedule Feasibility

All the team members expect that the project will be completed within the time frame stated, so that the system will be feasible regarding the schedule. The Project schedule is shown in the following Diagram

Final year project

Page 14

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Activities

Timeline schedule 1 we ek 2 -3 week 4-5 week 6-8 Week 9-10 week End of 9th Week

Project Proposal Requirement Analysis Phase System & Object Design Implementatio n

Testing

Documentation And project submission Table 1.7 Timeline schedule

1.6.4 Political Feasibility


Since from the beginning the proposed project is politically feasible, that is different people such as the manager, clerks and other employees of the bank have good approach and view towards the
Final year project Page 15

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

project and they encourage the team by giving good ideas to keep efficient result at the end of the project.

1.7 Scope and Limitation of the project


Since dashen bank performs its basic tasks manually the scope of this project is to develop and emplemet widow based system that works on network in the bank using work group computers.which will avoid the problems associated with the manual processing. Scope of the project Depositing money Loaning money Transfering money Withdrawing money The project also excludes the followings

Human resource management system of the bank & Finance system

1.7 Significances of the project


The proposed project is usefull for the bank to perform its activity in a simplified way.Since the bank is using the manual system for its operation it takes time and much human power so when it is become automted the bank can perform its task in a short period of time and little human power with little resource consumption.so the project is crucial for the bank .

1.8 Target Beneficiaries of the system


The beneficiaries of the proposed system will be all the society/who want to be the client of the bank who reside around Arbaminch town and other foriegn investers.
Final year project Page 16

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

1.9 Tools and Methodologies Used Methodologies


Methodology of the project concentrates on the different method, tools and instruments for data collection, which helps for the fulfillment of the study.

1.9.1 Data collection method


To get a precise data from customers the team will use the following fact finding techniques. Those are: Interview : - to get the basic information and background information about the existing banking system, the team will interview the bank manager and some customer about the services that are assigned to them, and the problems associates with that environment. Observation: - Here the team will use to revise some data entry forms and repots associates with the banking process. Document analysis: - To get more information about the bank we refer books, documents and other reading materials about the dashen bank.

1.9. 2 System Analysis and Design methodology


Among the different methodologies available the team plan to use the object oriented design methodology for the development of the system. Because it is best way to construct, manage and assemble objects that are implement in the system, and the composition of objects and collaboration between objects on the system. Object oriented design methodology has two phases:Object Oriented Analysis (OOA): During this phase the team will look at the problem domain, and with the aim of producing a conceptual model of the information that exists in the area which will be analyzed. And this Model the functions of the system (use case modeling), identifying the business objects, organize the objects and also the relationship between them and finally model the behavior of the objects.
Final year project Page 17

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Object Oriented Design (OOD): During this phase Model object interactions and behaviors that support the use case scenario, and finally update object model to reflect the implementation environment. And also transforms the conceptual model produced in object-oriented analysis to take account of the constraints imposed to the proposed system format, so that the team will use this phase to refine the use case model to reflect the implementation environment.

1.9.3 Development Tools


In this project the following system development tools are use

Microsoft visual studio 2008: to design the graphical user interface and the whole application. Microsoft SQL server 2005: for designing the database.

Microsoft VISIO2003: for designing UML diagrams associated with the project. Microsoft office 2007: for documenting the corresponding deliverables associated with the project.

1.9.4 System Development Environment


The team will use windows 7 and window xp operating system to develop the system and the environment is .net framework of visual studio 2008, SQL Server .the language is vb.net

1.9.5 Requirements structuring and Data modeling tools


Since the team is being using an Object Oriented System Development methodology for structuring requirements and modeling the data, the team used a Unified modeling language (UML). The team used UML- diagrams for requirements structuring as well as data modeling.

1.9.6 Testing Procedures


Before directly deploying this system, the team will perform different testing for its functionality and meeting customers need. First the team tests each unit at each phase. So, if a problem is encountered it will immediately fixed. Then the team will perform an integration testing to check whether the system meets all the functional requirements. System will be tested using the following system testing procedures. Alpha testing:-In this testing method, the system will tested by giving the correct input. It is tested by a customer at the developer Site.

Final year project

Page 18

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Beta testing: -In this testing method, team will force the system to be tested for incorrect data input. The System will be tested by the customer at their actual work place. If any failures occurred while testing the system in all the above testing methods, the team will take immediate correction beginning where this fault occurred before jumping to next work so that it will meet the goal. If all the above testing methods are carried out and find to be valid the system will directly deployed. Unit testing:-After developing an individual program module or component it would test it to ensure that it works according to the specification, operates within acceptable parameters, and meets the appropriate standards. Integration Testing:-When a number of components are complete; it will test to ensure that they integrate well with each other, the operating system, and other components. Quality Assurance (system) testing:-After preceded the above testing strategies the whole system will test with the participation of some other people. Behind that some questionnaires will prepared for them on how they get the system.

1.9.7 Implementation
The proposed system will implement parallel with the existing system until the awareness of the workers and customers towards the proposed system improved

1.9.8 Limitation Of the project


Due to shortage of time the team unable to complete the following functionalities The system do not perform cash exchange
The system does not support international money transfer services like western union

service etc.

1.9.7 Risk Assumption and Constraints Although the team Members planning to complete the project in a given dead line, the team may encounter unexpected problem or risk that can be either artificial or natural disaster. Such as:Final year project Page 19

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Unfortunate failure of system Power problem and virus attack

To handle this problem the team has some method to resist not completely but partially by using back up mechanisms. Therefore whatever situation happen or occurred that hinder during the progression of the project the team try best to do what expected from us and reform it. Assumption The teams assume that the power and internet connection are available

CHAPTER TWO
2.1 Introduction

to the existing system

Dashen bank provides diferent banking services for the customers.services like depositing,loaning,and money transfer for the customers. Eventhough the bank is using the manual operation system,it has been giving good services for the customers.

2.2 Players of the existing system


players of the existing system are the following As the team has tried to mention in the previous chapter, the proposed system have many back side advancement over the existing system in many ways. Also the existing system is not securely supported system since it is manual; it needs number of labor to manage overall function of the system and it is not effective and clear. Existing system incorporates high number of labor (players) as compare with proposed system.
Final year project Page 20

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

User of the bank (customers) :- includes any individual who wants to get the service from

the bank(first registered as the bank client to get services which are given there).

Employes(bank Clerks) :- includes individuals who are agents of the bank to provide

services which are requested by the customer.

The bank manager:-Administers all the transactions done by the clerks.

2.3. Major Function of the Existing System with Clear Input, Process and Outputs
The following section summerizes the basic functions with their clear input,process and output Depositing money Input:recieve customers information Process:checks the information Output:deliver the deposit reciept to the customer

Loaning money
Input:recieving the customers information Process:check the information validity
Page 21

Final year project

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Output:deliver the loan reciept to the customer

Transfering money
Input:recieving the customers information Process: checking the information validity Output:deliver the reciept to the customer

2.4. Business Rule


This part specifies and gives somewhat understanding of activities which are being done in the existing system in terms of business rule. First of all the client will make contact with the counter to run his need. All customers should provide all the information which required by the Bank. Different forms and documents like registration form, saving form, deposit form and withdrawal forms should be fulfilled by the client depending on his/her need.
To open new account the client must come up with the minimum reqquirement of 50

birr with other basic information which can identify the customer
When a client take a loan from the bank by registering the loan returning date, if the

client cant return on that day he/she could penalized

2.5 Report generated in the existing system


In which includes reports that generated by the clerks to the Manager About daily registration of

customers, also daily transactions done by the clerk on each departments; in deposit, withdrawal, and loan.

2.6 Forms, Documents used in the existing system


The forms uses in the existing system are: Depositing form

Final year project

Page 22

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 2.1 Depositing form

Loan application form

Final year project

Page 23

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 2.2 Loan application form

Withdrawal form

Final year project

Page 24

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 2.3 Withdrawal form


Loan form

Figure 2.4 Loan form

2.7 Problem of the Existing System


The performance of any system is required to exhibit to meet the needs of users of that system. The current systems performance is weak, this is due to the following reasons: - first the acceptable throughput rate is relatively high i.e. the time required from initiation to completion of a particular task is relatively high.
Final year project Page 25

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

The existing system has the problem of handling information becouse since it uses

manual system to store the recordes there is less secure and less reliable. The main input of the existing system is the customers information.this input is

redudant because it is written by hand and inflexible because when the customer fill the form if the error ocurres changing the form is the only choice. Due to the operation that is done by the hand most of the activities are prone to high

consumption of resources like papers, man power, time etc. This makes the current system inefficient while utilizing resources. There should be a mechanism that reduce wastage of resources and that make the system to be efficient.

2.8 Practices to be preserved from existing system


From the existing system the following are practices to be preserve System procedures The governing rule and regulation Formalities of the customer The business rules of the bank

2.9 Alternative options to address the problems of existing system


The Team Members have different alternative options to solve problems faced with the existing system. These are: Business project re engineering (BPR) for the current system.
The new proposed system Final year project Page 26

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

From the above alternative option the team members chose the new proposed system which is the proposed system. The main purpose of new system that the team is going to develop is in order to solve problems that faced the existing system in the functioning of the bank system, and it includes:-

Changing the whole manual system in to automated system without affecting the structure
of the company.

Developing easily accessible documents that is clear to employees when accessing data Avoiding wastage of time that the manual system can take during searching materials by
the computerized system

2.10. System Requirements of the New System 2.10.1 Functional requirements


Data manipulation on customer information ,on money deposit, withdrawal (i.e. save, update ,and delete) Perform calculation for interests paid by the customer at loan return time, and for the deposited money. Report generation by the clerk to the manager Security of the system(privilege , username and password )

2.10.2 Non-Functional Requirements


The following are the non functional requirements associated with the new system. The system must be error free while operating with a huge set of data. The system must be user friendly The system must be able to communicate users at different location. The system must recover immediately when a user enters erroneous data. The system must have a good response time.
Final year project Page 27

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

The system must be compatible with any environment.

CHAPTER THREE
SYSTEM ANALYSIS
Introduction

Final year project

Page 28

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

This section consists of the modeling of the proposed system using object oriented methodology by applying unified modeling language (UML). All the activities performed by the actors (such as the customer, clerk and the administrator) are analyzed by using different modeling diagrams. These diagrams include use case diagram, sequence diagram, activity diagram, and conceptual diagram.

3.2 System Requirement Specifications (SRS) 3.2.1 Use case diagram

Figure 3.1 use case diagram for bank automation system

Use case documentation


Use case documentation for Login

Final year project

Page 29

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Name Identifier Description Actors Precondition Post condition Basic course of action:

Login UC :01 To login a user in to the system to get and/or provide services Clerks and the manager The users have a user name and password. The user will login in to the system Actor action Step 1. The user wants to login into the system. Step 2. The user inputs his/her user name and password into the system via UI 01 Security Login Screen. Step 4. The use case ends. System response Step 3. The system verifies the user is eligible to login into the system according to business rule BR 01 Determine Eligibility to Login.

Alternate course of action:

A3: The user name does not exist. A.4: The system determines that the user name does not exist in t A.2: The system increments the number of frailer by one. A.5: The system informs the user the unavailability of his/her user name. A.6: The use case ends.

2. Use case documentation for New Client Registration Name Identifier Description Registration UC:02 This process is initialized when new client come to the bank to get services of
Page 30

Final year project

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

saving (deposit money) in the bank. Actors Precondition Client and Clerk client should come with all required information that needed for registration

Post condition Basic course of action:

If the client fulfills all required information that set by the bank and met with bank policy, then customer will be registered. Actor action Step1. The clerk select department System response

Step 5. If the required information provided by the client is validated Step2. The clerk successfully logged in and verified, then client will be registered. Step 3.Client should bring the required information by filling the application form. Step 4.Clerk enter the required information of the client to the system Step 6. The use case ends

Alternate course of action:

A.5 If the customer did not come with the required information (or one of the required information of the client is not satisfied), then the customer will not be registered, and the system asks the client to come with a full information.

3. Use case documentation for Money withdraw Name Identifier Description withdrawal UC:03 This process is initialized when customer need to withdraw money from his A/c in the bank
Page 31

Final year project

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Actors Precondition Post condition Basic course of action:

Clerk client should be registered and should have saving account If the client fulfill all requirement, then they can withdraw money Actor action Step1. The clerk select department Step2. The clerk successfully logged in Step 3. client should fulfill the requirement Step 4. The clerk should search for the existence of the A/c. Step 5. The clerk checks whether the client fulfills the requirements and enters the attributes. Step 8. If the required information is provided and validate, then client will withdraw the money for the client. Step 9. Use case end. System response Step 6.The system validate whether the given information is true or not Step7. The system calculates and set the A/c balance of the client after withdraw.

Alternate course of action:

A.6 If the client did not fulfill the requirement(not registered and have no saving account),then cannot withdraw the money A.7 use case end

4. Use case documentation for Money Deposit


Name Identifier Description Actors Precondition
Final year project

Deposit UC:04 This process is initialized when customer need to add money to his saving account in the bank System user and customer Customer should be registered and should have saving account
Page 32

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Post condition Basic course of action:

If the customer fulfill all requirement, then they can add money to his saving account Actor action Step1. The clerk select department Step 2. The clerk should successfully logged in Step 3. Client should fulfill the requirement for depositing money Step 3. The clerk checks that whether the client fulfills the requirements. Step4. The clerk enters client A/C No. to search its existence Step 6. If the required information is provided and validate, then the client current money he will be come with is added to his saving account. Step 7. Use case end. System response Step 5.The system validates and verifies whether the given information is true or not.

Alternate course of action:

A.1 If the client did not fulfill the requirement (not registered and have no saving account),then cannot add money to their saving account

Final year project

Page 33

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Name Identifier Description

Loan UC:05 This process is initialized when a client is come to loan money from the bank.

Actor Precondition:

Client and clerk The client come to loan money by filling an application form that is given there. On that application form the client fill the amount of money he wants to loan and the guarantee (property or valuable persons will be registered) and the time interval for returning the money could be registered on the application form. The application number and all needed information are registered and the money is given to the applicant.

Post condition:

Basic course of action:

Actor Action Step1. The clerk select department Step 2. The clerk should successfully logged in

System response Step 5.The system validate whether the given information is valid or

not according to the Step 3. Client should fulfill the requirement and bring the application bank rule. form to the clerk to loan the money.

Step 4: the clerk enters all the


required data to the system

Step 6: The required information provided is validated and verified, and then the requested money is given to the applicant. Step 7 .use case ends.

Alternate course of action:


Final year project

A.1 If the client application form is not come with the required information when validated, the process should not take and he/she will be asked to come with full and reliable information. Page 34

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

6. Use case documentation for Money Return

Name Identifier Description

Return UC:06 This process is initialized when the client come to the bank to return the money he loaned from the bank.

Actor precondition

clerk Loaning money from the bank by registering the return date (interval) and rate of interest to be paid to the bank.

post condition Basic course of action

Return the money on the date guaranteed. Actor action Step1. The clerk select department Step 2. The clerk should successfully logged in Step 3.the client come with the money he/she promise to return & with the interest (from the day he loaned to the he come to return). Step 4. The clerk enters the lone number the suggested loan number and search the information. Step6. The clerk enters money with the calculated interest value to the system. Step 8. use case end System response Step 5. The system validate whether the given information is true or not. Step 7. The system calculates the return balance and adds it to the bank balance, and then subtracts the returned money from the lone balance other than the interest.

Alternate course of action


Final year project

A1. The client will not be fulfill the required data for returning the transaction cant operate. A2. If the client has not loaned money the process cannot take.
Page 35

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

7. Use case documentation for Money Transfer


Name Identifier Description Actors precondition Post condition Basic Course of action Transfer UC:07 This is initialized when the client of the bank come to get this service(he wants transfer money to other A/c in the bank) Clerk Client should come with an interest to transfer money If the client A/c is there if the bank the client has to transfer the money. Actor action System Response Step1. The clerk select department Step2. The clerk successfully logged in Step 3.The client should come with an account that he/she wants to transfer money to that A/c. Step 4. The clerk enters both clients A/c No. (the A/c No. of a person who transfer and who has transferred to) to search the existence their A/c in the bank. Step 6.The clerk enters the amount of
Final year project Page 36

Step 5.The system checks whether the client is registered before (i.e. if he has an A/C in the bank). Step7. The system checks if the requested money to be transferred is less than or equal to the existing balance in the A/C. And then perform the transaction and update both A/c balances.

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

money to be transferred to. Step 8 .use case ends. Alternate course of action

9. Use case documentation for Loan Application


Name Identifier description Get_ loan Form UC:08 This process is initialized when a person wants to loan money from the bank ( loaner) Client and clerk The client should come with an interest to loan money and fulfilling all requirement i.e. listed on the loan application form Loaning money Actor action Step1.The clerk select the department Step2.The clerk success fully logged in Step3. The client should bring the application form by filling all listed requirements on it . Step4 the clerk enters the data to the system Step 6. Use case end Alternate Course of action A.1 If the application form is not filled correctly the transaction cant operates System response Step 5. The system checks whether the data is varied or not and verify it.

Actor precondition

Post

condition

Basic course of action

Final year project

Page 37

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

10. Use case documentation for Handles clerk information


Name Identifier Description clerk info. UC:09 This is used for adding (create a new clerk) when new clerk come to the bank, delete and modify clerk information because this is privilege of the manager. Manager 1) For adding clerk New clerk should be come (employed) to the bank. 2) For deleting clerk When a clerk leaves the bank his/her A\C information will be deleted. 3) Modify clerk For security depending on the principle of the bank in a definite time interval (monthly, in 3 or 6 month) the system manager has the right to modify clerk information.

Actor precondition

Post condition

1)For adding clerk A new clerk will be added when he is employed to the bank. 2) For deleting clerk A\C Clerk A\C is deleted because somebody (a clerk) leave the bank. 3) For modifying A\C -A clerk A\C is modified

Final year project

Page 38

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Basic course of action

1) For adding clerk Step1.The clerk comes with all information (fulfill all required information by the system) to be an employee of the bank Step2.The manager enters all information needed to the system. 2) For deleting clerk A\C Step1.The manager assures whether the clerk leave the bank or not. Step2.The manager removes all information (A\C) of the clerk. Step4. end of use case Actor Action: 3) Modify the clerk A\C Step1.The manager checks the period of an A\C when to modify it or any time he wants. Step2.The manager will be set the information to be modified (and enter to the system) Step4.end of use case

System response Step3. If all the required information about the clerk is registered the system validate it.

System response Step3.The system validate if the clerk is deleted or not.

System response: Step3.The system validates the clerk A\C if it is.

Alternate Course of action

A.1 If there is no new clerk come as employee to one of the department to the bank add, delete and modify process cant take. A.2. If all the information about the clerk is not fulfilled the process cant take.

Final year project

Page 39

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

11. Use case documentation for Handles clerk information


Name Identifier Branch info. UC:10 This is used for adding(create a new branch), delete branch, or edit when new clerk come to the bank because he is privilege of the manager to register new clerk new account because he/she is the only person to do this transaction. Actor precondition Manager 1) For adding Branch When new bank branch is opened that bank information will be added (registered). 2) For deleting Branch When a bank is closed from giving any service to its client that branch will be deleted. 3) Modify Branch When information is changed to the bank(like its name, branch number )

Post condition

1)For adding Branch A new branch bank will be added to the database. 2) For deleting Branch The branch information will be deleted. 3) For modifying Branch

Basic course of action

A branch bank information will be modified 1) For adding Branch System response Step1.The branch fulfills service providing criteria it should be added( when it is opened) Step2.The manager enters all information Step3. If all the required information about the branch is registered the system validate it.

Final year project

Page 40

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

needed to the system. Step4. The branch will be opened. Step5. Use case end. 2) For deleting Branch Step1.The manager assures whether the branch has to close the branch or not. Step2.The manager removes (deletes) all information of the branch bank. Step4. The branch will be deleted (removed). Step5. end of use case Actor Action: 3) Modify the Branch Step1.The manager checks the any attribute that is changed in the bank when to modify it or any time he wants. Step2.The manager will be set the information to be modified and enter to the system. Step4. The branch information will be modified as needed. Step5. end of use case Alternate Course of action A.1 If there is no new clerk come as employee to one of the department to the bank add, delete and modify process cant take. A.2. If all the information about the clerk is not fulfilled the process cant take. System response: Step3.The system validates the attribute to be modified System response Step3.The system validate if the branch is deleted or not.

12. Use case documentation for generate report


Name
Final year project

Generate Report
Page 41

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Identifier Description

UC:11 This process is initialized when system user and manager want to generate report about the tasks performed on the system System user and manager The manager need to view report about the customers and tasks performed in the system The report is generated by the system user and viewed by the manager Actor action Step 1.System user want to generate report Step 2.System user enter the required information to the system Step 5.The manager view the required report and help the decision making process System response Step 3.The system check entered information Step 4.The system generates report about the services given in the Bank within limited time.

Actors Precondition Post condition Basic course of action:

Alternate course of action:

A.1 If the system user dont generate the report, the manager cannot view the required report

3.3. Sequence Diagram


1. Sequence Diagram for login

Final year project

Page 42

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.2. Sequence Diagram for login

2. Sequence Diagram for Customer Registration

Final year project

Page 43

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.3. Sequence Diagram for Customer Registration

3. Sequence withdrawal

Final year project

Page 44

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.4. Sequence Diagram for Money Withdrawal

4 .Sequence Diagram for Money Deposit

Final year project

Page 45

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.5. Sequence Diagram for Money Deposit

Final year project

Page 46

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

5. Sequence Diagram for Money Loan

Figure 3.6. Sequence Diagram for Money Loan

Final year project

Page 47

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

6. Sequence diagram for Money return

Figure 3.6. Sequence Diagram for Money Return

Final year project

Page 48

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

7. Sequence Diagram for Report Generation

3.4 Activity Diagram


Final year project Page 49

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

1. Activity Diagram for login

Figure 3.7. Activity Diagram for Login

2. Activity Diagram for Client registration

Final year project

Page 50

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.8. Activity Diagram for Client Registration

3. Activity Diagram for Money deposit

Final year project

Page 51

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.9. Activity Diagram for Money Deposit

4. Activity Diagram for Money withdraw

Final year project

Page 52

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.10. Activity Diagram for Money Withdrawal

5. Activity Diagram for Money Return

Final year project

Page 53

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.11. Activity Diagram for Money Return

6. Activity Diagram for Money lone

Final year project

Page 54

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.12. Activity Diagram for Money Lone

7. Activity Diagram for Transfer

Final year project

Page 55

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.13. Activity Diagram for Money Transfer

8. Activity for compute interest

Final year project

Page 56

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.13. Activity Diagram for compute interest

3.2.5 Analysis Class Diagram of the Bank System


Final year project Page 57

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

1. Conceptual diagram for report generation

Final year project

Page 58

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.14. Conceptual diagram for report generation 2. Conceptual diagram for Money return registration

Figure 3.15. Conceptual diagram for Money return

3. Conceptual diagram for customer Registration

Final year project

Page 59

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.16. Conceptual diagram for customer Registration


4. Conceptual diagram for deposit generation

Figure 3.17. Conceptual diagram for deposit


5. Conceptual diagram for withdrawal

Final year project

Page 60

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.18. Conceptual diagram for Withdrawal


6. Conceptual diagram for Money transfer

Figure 3.19. Conceptual diagram for Transfer

7. Conceptual diagram for loan generation

Final year project

Page 61

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

Figure 3.20. Conceptual diagram for Money Loan


8. Conceptual diagram for authentication

Figure 3.21. Conceptual diagram for authentication

3.2.6 User Interface Prototyping


Designing Interface
Final year project Page 62

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

The main outputs from the designing of the human interface are forms and reports. In this system depending on the concerned form and report as follows designed. With the three specification narrative overview, sample design, and testing and usability assessment. The narrative over view provide a general overview of the characteristics of the target user, task, and environmental factor in which the form or report will be used. In the second section of the specification, a sample design of form is shown. This design is developed using VB.NET tools. The final section of the specification provides all testing and usability assessment information. a. Narrative Overview Form: User: Task: System: Environment: b. Sample Design Login All users Securing the system by providing password and user name Microsoft Windows Standard office environment

c. Testing and usability assessment user rated perception(all user) Table: Design specification for login.

Final year project

Page 63

July 1, 2010

DASHEN BANK AUTOMATION SYSTEM

c. Narrative Overview Form: User: Task: System: Environment: Client Registration All clerks registering all information of the client Microsoft Windows Standard office environment

b. Sample Design

c. Testing and usability assessment user rated perception(average 3 users)

Table: Design specification for Client Registration

Final year project

Page 64

3.2.7. Supplementary specification


Business rule
Name: determine eligibility to login Identifier: BR1 Description: The system should be used only by authorized persons, since there is a sensitive data that should not be altered by anybody. Therefore, only users having valid user name and password can login to a system Name: The customer should have to give all necessary information to be registered and to be a client of the bank Identifier: BR2 Description: during registration the customer should give all required information in order to be registered and to get services from the bank

Name: the customer should appear physically itself Identifier: BR3 Description: the customer should appear physically by himself/herself, that means cannot performed by agent Name: the customer should provide a minimum of 50 birr for saving registration Identifier: BR4 Description: the customer should have a minimum of 50 birr which kept in the account after the registration. Name: the customer should have in his/her account a minimum of 50 birr when withdrawing money (i.e. the minimum bank balance of the client to be in the saving account). Identifier: BR5

Description: the customer should have a minimum of 50 birr which kept in the account after the withdraw. Name: the customer account should be closed when his/her balance value become 0 birr. Identifier: BR6 Description: when a client is registered as a customer of the bank he has balance that kept in the bank, if 0 birr bank balance means the customer also dont want to get the service. So the bank manager deletes the account of the client from the bank. Name: the loan customer should be an account holder Identifier: BR7 Description: Any customers want to get loan from the bank, first they should be account holder in the bank Name: record may not be repeatedly stored Identifier: BR8 Description: for the sake of consistency and removal of data redundancy which leads to wastage of storage memory, it is necessary to remove redundancy whenever necessary Name: field emptiness Identifier:-BR 9 Description:-it is not allowed to leave a field empty before performing any operation Name: determine eligibility to see reports Identifier:-BR 10 Description:-it is not allowed to see all reports unless he/she is the manager. Name: determine eligibility to update Identifier:-BR 12 Description:-updating the clerk, client and branch information is not allowed for all other than the manager.

Name: determine eligibility to Add Identifier:-BR 13 Description:-addition of an item is not allowed unless the item is found in the database currently

Name: Interest calculation Identifier:-BR 14 Description:-the interest of an account balance is calculated annually for all clients depending on the amount of the balance in their account (it is calculated in percentile). This process also take when a client return the money he/she loaned from the bank.

CHAPTER FOUR SYSTEM DESIGN 4.1. Introduction


This project is designed in a manner that solves the problems of the organization by minimizing the work load that appears on the employees because of the existing manual system. It provides more efficient, reliable and time saving system. In this project design the team will try to show: How the project is designed

What are tasks done under the whole project The different modules and their way of functioning are described here. Generally, the project will be designed by addressing all of the above criteria of project design. It is designed to simplify functions of the manual system and it is capable of doing large amount of works in short period of time with more accuracy and reliability. Generally this project design will describe how the project is designed, what tasks done under this project and different modules and their way of functioning. The goal of system design according to the proposed project is to manage complexity by dividing the system into smaller, manageable pieces and to increase the system: Efficiency: the system doing something well and thoroughly without waste of money and time. Flexibility : the system able to change to suite new condition or situation Security: the system should be secured, i.e. not allow unauthorized users to access the system. Reliability: the system should be reliable.

4.2 Class type architecture

Figure 4.1 class type architecture

4.3

Class Modeling

Figure 4.2 class modeling

4.4 State chart modeling


4.4.1 Stat chart diagram for security login

Figure 4.3 Stat chart diagrams for security login

4.4.2 Stat chart diagram for customer registration

Figure 4.4 Stat chart diagram for customer registration

4.2.1

Stat chart diagram for withdrawal

Figure 4.5 Stat chart diagram for withdrawal

4.2.1

Stat chart diagram for Deposit

Figure 4.6 Stat chart diagram for Deposit

4.2.1

Stat chart diagram for report

Figure 4.7 Stat chart diagram for report

4.2.1

Stat chart diagram for transfer

Figure 4.8 Stat chart diagram for transfer

4.2.1

Stat chart diagram for return

Figure 4.9 State chart diagram for return

4.2.1

Stat chart diagram for loan

Figure 4.10 Stat chart diagram for loan

IV.5

Collaboration Modeling

Collaboration diagram for system login

Figure 4.11 Collaboration diagram for system login

Collaboration diagram for customer registration

Figure 4.12 Collaboration diagram for customer registration

Collaboration diagram for money deposit

Figure 4.13 Collaboration diagram for money deposit

Collaboration diagram for money withdrawal

Figure 4.14 Collaboration diagram for money withdrawal

Collaboration diagram for money loan

Figure 4.15 Collaboration diagram for money loan

Collaboration diagram of money return

Figure 4.16 Collaboration diagram of money return

Collaboration diagram for money transfer

Figure 4.17 Collaboration diagram for money transfer

IV.6 Component Modeling

Figure 4.18 Component Modeling

I.3

Deployment modeling
A Deployment diagram shows processors, devices, and connections. Each model contains single Deployment diagram which shows the connections between its processors and devices, and the allocation of its processes to processors.

Window server

Figure 4.19Deployment modeling

4.8. Persistence modeling

Figure 4.20 Persistence modeling

4.9 User Interface Design


In this sub title of the project the team tried to show some of the user interfaces that exist in the system.

Among these: 1. Security login user interface 2. New customer registration user interface 3. Money deposit user interface 4. Money withdrawal user interface 5. Money Loan user interface 6. Money Transfer user interface: 7. Security login user interface

Main form of the System

1. Security login user interface

2. New customer registration user interface

3. Money deposit user interface

4. Money withdrawal user interface

5. Money Transfer user interface

6. Money Loan user interface

CHAPTER FIVE

5.1

Implementation and Testing

System implementation and operation


During implementation and operation, physical design specification must be turned into working computer code, and then the code is tested until most of the errors have been detected and corrected. The system is installed, user sites are prepared for new system and user must come totally on the new system rather than the existing one to get there work done. There are some managerial activities in this, coding, testing, and installation

5.3 Coding
Coding is the process whereby the physical design specification created by the designers is turned in to working computer code by the programmer. Modern language that used is vb.net.

Sample code for the system

'Customer Registration Save Button code


Private Sub Registerbtn_Click(ByVal sender As System.Object, ByVal e As System.EventArgs) Handles Button1.Click Dim cid As String cid = Me.textaccountn.Text.ToUpper If textaccountn.Text = "" And Me.textFname.Text = "" And textaccountn.Text = "" And textaccountn.Text = "" And textpobxe.Text = "" Then MsgBox("Please Fill The customer Information ", MsgBoxStyle.Information, ) Me.textaccountn.Focus() Exit Sub End If If textaccountn.Text = "" Then MsgBox("Please Enter An Account No ", MsgBoxStyle.Information, ) textaccountn.Focus() Exit Sub End If cheak() Dim controlID As String controlID = Me.textaccountn.Text Dim dtrowusergeneralinfo As DataRow Dim foundAt = 0 Dim flag As Char = "n" If ((Me.textaccountn.TextLength <> 0) And (Me.textaccountn.Text.Length <> 0)) Then Try For Each dtrowusergeneralinfo In DTcustomer.Rows Dim CuID As String = dtrowusergeneralinfo.Item("AccountNo") If (Me.textaccountn.Text.ToUpper = CuID.ToUpper) Then flag = "y" Else foundAt += 1 End If Next Catch ex As Exception

MsgBox(ex.Message) End Try End If Try conn.Open() dacustomer.Fill(dss, "Customer") conn.Close() DTcustomer = dss.Tables("Customer") Catch ex As Exception End Try Try If (flag = "n") Then 'If the Id does not already exist Dim rowAdd As DataRow rowAdd = DTcustomer.NewRow rowAdd("FirstName") = Me.textFname.Text rowAdd("MiddleName") = Me.textMnamee.Text rowAdd("LastName") = Me.textLnamee.Text rowAdd("Age") = Me.textagee.Text rowAdd("Sex") = Me.combsexx.Text rowAdd("AccountNo") = Me.textaccountn.Text rowAdd("Address") = Me.textAddree.Text rowAdd("Postalcode") = Me.textpobxe.Text rowAdd("MobilePhone") = textmobilepe.Text rowAdd("AccountType") = textAcouTypee.Text rowAdd("DateJoind") = DateTimePicker4.Text rowAdd("Nationality") = cmbnationnal.Text rowAdd("MaritalStatus") = cmbMarital.Text rowAdd("BranchNo") = Me.cmbbranchNo.Text rowAdd("CurrencyType") = cmbcurrency.Text rowAdd("CampanyName") = TextBox1.Text rowAdd("HoueNo") = TextBox2.Text rowAdd("Kebele") = TextBox3.Text DTcustomer.Rows.Add(rowAdd) Try Dim cmdbldr As New SqlCommandBuilder(dacustomer) conn.Open() dacustomer.Update(dss, "Customer") conn.Close() MsgBox("You Are Finished your task on this Form Successfully, CONTINUE !", MsgBoxStyle.Information) texvisualizer() Deposit.Show() Me.Hide() clear() textaccountn.Focus() Catch ex As Exception MsgBox(ex.Message) End Try Else MsgBox("The ID You Entered""" & controlID & """Is Already Exist Please Enter New ID ", MsgBoxStyle.Information, ) textaccountn.Focus() Me.textaccountn.Clear() Exit Sub End If

Catch ex As Exception End Try End Sub

'Customer Balance Deposit Sample Code


Private Sub Depositbtn_Click(ByVal sender As System.Object, ByVal e As System.EventArgs) Handles Button1.Click Dim cmdselect2 As New SqlCommand cmdselect2.CommandText = "SELECT * FROM BankBranchs WHERE BranchNo='" & txtbranch.Text & "'" cmdselect2.CommandType = CommandType.Text dabranch.SelectCommand = cmdselect2 cmdselect2.Connection = conn conn.Open() dabranch.Fill(dss, "BankBranchs") conn.Close() If dss.Tables("BankBranchs").Rows.Count > 0 Then Dim cmdupdate As New SqlCommand cmdupdate.CommandText = "UPDATE BankBranchs SET TotalBalance='" & dss.Tables("BankBranchs").Rows(0)(16) + textedepamount.Text & "' where BranchNo='" & txtbranch.Text & "'" cmdupdate.CommandType = CommandType.Text dabranch.UpdateCommand = cmdupdate cmdupdate.Connection = conn dss.Tables("BankBranchs").Clear() conn.Open() dabranch.UpdateCommand.ExecuteNonQuery() conn.Close() Else MessageBox.Show("The movie is not found!!", "Error", MessageBoxButtons.OK, MessageBoxIcon.Error) End If Dim cmdselect22 As New SqlCommand cmdselect2.CommandText = "SELECT * FROM deposited WHERE AccountNo='" & ComboBox1.Text & "'" cmdselect2.CommandType = CommandType.Text dadeposit.SelectCommand = cmdselect2 cmdselect2.Connection = conn conn.Open() dadeposit.Fill(dss, "deposited") conn.Close() If dss.Tables("deposited").Rows.Count > 0 Then Dim cmdupdate2 As New SqlCommand cmdupdate2.CommandText = "UPDATE deposited SET OpeningBalance='" & dss.Tables("deposited").Rows(0)(1) + textedepamount.Text + CDbl(TextBox9.Text) & "' where AccountNo='" & ComboBox1.Text & "'" cmdupdate2.CommandType = CommandType.Text dadeposit.UpdateCommand = cmdupdate2 cmdupdate2.Connection = conn dss.Tables("deposited").Clear() conn.Open()

dadeposit.UpdateCommand.ExecuteNonQuery() conn.Close() MsgBox("Customer succesfuly Deposited Money!!!!", MsgBoxStyle.Information) Else MessageBox.Show("The movie is not found!!", "Error", MessageBoxButtons.OK, MessageBoxIcon.Error) End If End Sub

Interest

Calculation Button Sample Code

Private Sub InterestCalculatebtn_Click(ByVal sender As System.Object, ByVal e As System.EventArgs) Handles Button6.Click Try Dim P, I, A, R As Single R = TextBox8.Text P = TextBox1.Text Dim T As Integer Dim txtDate1 As Date = CType(Me.TextBox2.Text, Date) Dim txtDate2 As Date = CType(Me.DateTimePicker1.Text, Date) Dim MyDifference As TimeSpan MyDifference = txtDate2.Subtract(txtDate1) ' find the number of days apart MessageBox.Show(MyDifference.Days) ' Display to the user T = MyDifference.Days If T > 0 Then 'T = MyDifference.Days I = R * (P * T) / 36500 Else MsgBox("There is No Interst ", MsgBoxStyle.Information) TextBox9.Text = "0" 'I = P * R End If A=P+I TextBox10.Text = T TextBox9.Text = I 'TextBox3.Text = A Dim val2 As Double = CDbl(TextBox10.Text) If val2 = 364 / 2 Then MsgBox("This is six Month Deposit Interst", MsgBoxStyle.Information) ElseIf val2 = 365 Then MsgBox("This is one year Deposit Interst", MsgBoxStyle.Information) End If Catch ex As Exception End Try End Sub

Sample Module Code for All Forms to the Database connection


Imports System.Data Imports System.Data.SqlClient

Module module1 ''VideoNew Dim conn As New SqlConnection("data source=GirumPc; initial catalog=Bankinautomation; integrated security=True") 'Dim conn As New SqlConnection("Network Library=DBMSSOCN;data source=10.144.30.140,1433;initial catalog=Bankinautomation;integrated security=True") Public dabranch As New SqlDataAdapter("select * from BankBranchs", conn) Public daloan As New SqlDataAdapter("select * from tablloannew", conn) Public dawithdrow As New SqlDataAdapter("select * from Withdrowtable", conn) Public dadeposit As New SqlDataAdapter("select * from deposited", conn) Public datransfer As New SqlDataAdapter("select * from transferrrrrr", conn) Public dacustomer As New SqlDataAdapter("select * from Customer", conn) Public dausers As New SqlDataAdapter("select * from Users", conn) Public dauserlogin As New SqlDataAdapter("select * from UserLogin", conn) Public dacheque As New SqlDataAdapter("select * from chequeDeposit", conn) Public dausermanager As New SqlDataAdapter("select * from UserManager", conn) Public dapicture As New SqlDataAdapter("select * from picturetale", conn) Public dss As New DataSet Public dtmovie As New DataTable End Module

Sample code for login


Public Sub password() Dim cmdselectrt As New SqlCommand Dim ENCRYPTPASSINSERT, ENCRYPTPASSINSERTuser As String ENCRYPTPASSINSERTuser = stringunTMD5(txtusername.Text) ENCRYPTPASSINSERT = stringTMD5(txtpassword.Text) cmdselectrt.CommandText = "SELECT * FROM UserManager WHERE UserName ='" & ENCRYPTPASSINSERTuser & "'COLLATE SQL_Latin1_General_Cp1_CS_AS AND Password ='" & ENCRYPTPASSINSERT & "'COLLATE SQL_Latin1_General_Cp1_CS_AS " cmdselectrt.CommandType = CommandType.Text dausermanager.SelectCommand = cmdselectrt cmdselectrt.Connection = conn dss.Clear() conn.Open() dausermanager.Fill(dss, "UserManager") conn.Close() If dss.Tables("UserManager").Rows.Count > 0 Then Dim cmdselectt As New SqlCommand cmdselectt.CommandText = "SELECT * FROM UserManager WHERE Privillagre ='" & dss.Tables("UserManager").Rows(0)(2) & "'" cmdselectt.CommandType = CommandType.Text dausermanager.SelectCommand = cmdselectt cmdselectt.Connection = conn dss.Clear() conn.Open() dausermanager.Fill(dss, "UserManager") conn.Close() If dss.Tables("UserManager").Rows.Count > 0 Then If dss.Tables("UserManager").Rows(0)(2) = "Clerk " Then Dashen_Bank_Automation_System.Show() Dashen_Bank_Automation_System.ClerkRegistrationToolStripMenuItem.Visible = False Dashen_Bank_Automation_System.EditMenu.Visible = False Dashen_Bank_Automation_System.ReportToolStripMenuItem.Visible = False

Me.Close() Else Dashen_Bank_Automation_System.Show() Dashen_Bank_Automation_System.NewToolStripMenuItem.Visible = True Dashen_Bank_Automation_System.EditMenu.Visible = True Dashen_Bank_Automation_System.WindowsMenu.Visible = False Dashen_Bank_Automation_System.ToolsMenu.Visible = False Dashen_Bank_Automation_System.CustomerRegistrationToolStripMenuItem.Visible = False Dashen_Bank_Automation_System.TansferToolStripMenuItem.Visible = False Dashen_Bank_Automation_System.LoanToolStripMenuItem.Visible = False Dashen_Bank_Automation_System.ClerkRegistrationToolStripMenuItem.Visible = True Dashen_Bank_Automation_System.ReportToolStripMenuItem.Visible = True Me.Close() End If Else txtpassword.Text = "Invalid password privilage !!!!" 'Label7.Show() End If Else Label8.Show() txtpassword.Clear() txtpassword.Focus() End If End Sub Private Sub withdrow_login_Load(ByVal sender As System.Object, ByVal e As System.EventArgs) Handles MyBase.Load conn.Open() dausermanager.Fill(dss, "UserManager") conn.Close() DTcustomer = dss.Tables("UserManager") End Sub Private Sub btnok_Click(ByVal sender As System.Object, ByVal e As System.EventArgs) Handles btnok.Click Dim cmdselect3 As New SqlCommand Dim ENCRYPTPASSINSERTus As String ENCRYPTPASSINSERTus = stringTMD(txtusername.Text) cmdselect3.CommandText = "SELECT * FROM UserManager WHERE UserName ='" & ENCRYPTPASSINSERTus & "'" cmdselect3.CommandType = CommandType.Text dausermanager.SelectCommand = cmdselect3 cmdselect3.Connection = conn dss.Clear() conn.Open() dausermanager.Fill(dss, "UserManager") conn.Close() If dss.Tables("UserManager").Rows.Count > 0 Then Dim cmdselect As New SqlCommand cmdselect.CommandText = "SELECT * FROM UserManager WHERE Privillagre ='" & dss.Tables("UserManager").Rows(0)(2) & "'" cmdselect.CommandType = CommandType.Text dausermanager.SelectCommand = cmdselect cmdselect.Connection = conn dss.Clear() conn.Open()

dausermanager.Fill(dss, "UserManager") conn.Close() If dss.Tables("UserManager").Rows.Count > 0 Then password() Else txtusername.Text = "Invalid user name privilage !!!!" txtusername.Clear() txtusername.Focus() End If Else Label7.Show() txtusername.Clear() txtusername.Focus() End If End Sub

Sample code Encryption And Decryption


Private Function stringTMD(ByVal content As String) As String Dim M5 As New Security.Cryptography.MD5CryptoServiceProvider Dim Bytestring() As Byte = System.Text.Encoding.ASCII.GetBytes(content) Bytestring = M5.ComputeHash(Bytestring) Dim Finalstring As String = Nothing For Each bt As Byte In Bytestring Finalstring &= bt.ToString("x2") Next Return Finalstring End Function Private Function stringTMD5(ByVal content As String) As String Dim M5 As New Security.Cryptography.MD5CryptoServiceProvider Dim Bytestring() As Byte = System.Text.Encoding.ASCII.GetBytes(content) Bytestring = M5.ComputeHash(Bytestring) Dim Finalstring As String = Nothing For Each bt As Byte In Bytestring Finalstring &= bt.ToString("x2") Next Return Finalstring End Function Private Function stringunTMD5(ByVal content As String) As String Dim M5 As New Security.Cryptography.MD5CryptoServiceProvider Dim Bytestring() As Byte = System.Text.Encoding.ASCII.GetBytes(content) Bytestring = M5.ComputeHash(Bytestring) Dim Finalstring As String = Nothing For Each bt As Byte In Bytestring Finalstring &= bt.ToString("x2") Next Return Finalstring End Function

5.4 Testing
Once code has begun, the testing process can begin and proceed in parallel.AS each program module is produced, it can be tested individually, as part of the larger program, and then as part of larger system. The following are different testing strategies.

Unit testing
Particularly each form and report with concerned database is tested by a specific data. In this only the team can illustrate the output of error in a specific manipulation.

Integration testing
By combining each individual form and report with their concerned database us tested by giving general date. From this the team can understand that how the system work using the separate module

Validation Testing or System Testing It is the final step of testing. In this the team members tests the entire system as a whole with all
forms, code, modules. This form of testing is popularly known as Black Box testing or System tests. In this the team members tests all the functionalities in the System. All errors in the forms, functions, modules are tested.

5.5 Training
The organization will give necessary trainings for the new employees to make them aware of how to use the system.

5.6. Installation
Installation is the process during which the current system is replaced by the new system. This includes conversion of existing data, software, documentation, and working producers to this consistent with the new system. In this system used parallel installation approach. Installation Guide Insert software package CD on CD Rome Double click on the Package or right Click on the Package and then Click Open

Fill the required information In the Installation Click NextNext

Select Every Users Access the system

Click Next Follow the instruction in the installation process. Finally click Finish Button

Now you are finished the installation of the software Click StartAll Programsthen Select the Shortcut (Dashen Bank Automation System) in the Program files. Then perform your operations.

CHAPTER SIX
6.1 Conclusion
It is known that developing software for such a big organization is not easy. But the team have tried our best and developed interesting system for transaction management system of a Dashen Bank. It is flexible, accurate and attractive to access, update, delete, and producing report for any data that is found in the database with easy GUI approach. The manual effort and time required to complete the registration process was greatly reduced and the system notifies when loan return date expired and the amount of money to be paid as penalty depending on the bank rule. These are a few of the main works of the system. In addition to these, there are many works which are not mentioned here. Generally, the team confidently can say that the software is completed successfully with negligible errors. Finally the team expects the software will change the general business atmosphere of the Organization and market it more profitable than the previous manual system

6.2 Recommendation
First of all the project team would like to thank all computer science staff members. And then the team would like to recommend that the department must give the chance for the students to start earlier the project because only one semester is not enough to finalize and to give life to the project. The other thing is the department must set power reservation electronic equipments in the lab because there is power fluctuation and which kills the time. Also the department (concerning bodies) must follow up both the students (each team) and project advisors how they are proceeding and what difficulties they are facing at project development time. From our project side the team would like to recommend that, if any of the successors who want work on bank automation system could must finish the functionalities such as:

visa card system International money transfer systems like Western union Money exchange(like changing Dollar with Birr and others) Transfer of money from one branch to another

The above listed functionalities that the team left is because of time limitation.

Glossary

UML TVM LE

Unified Modeling Language Time Value of Money Life Experience

OOA OOD

Object Oriented Analysis Object Oriented Design

SQL-

Standard Query Language

VB.NET -Visual Basic dot Net DB BPRDashen Bank Business Project Re Engineering

References

Whitten Bentley Dittman , System Analysis and Design Methods, Tata McGraw Hill Edition, 6th Edition Addison Wesley - Visual Basic .NET Power Coding A Programmers Introduction to Visual Basic.NET Mastering Visual Basic .NET Database Programming Addison Wesley - Database Access with Visual Basic .NET Other Reference Books From Library and Internet

S-ar putea să vă placă și