0 evaluări0% au considerat acest document util (0 voturi)
515 vizualizări12 pagini
The proposed work involves 1,330 linear feet of stream bank stabilization improvements. Existing riprap and rubble will be relocated to the base of the new wall. An 80 ft. Long fish lunker structure will be replaced by a 100 ft long fish llunker structure. The purpose of the project is to stabilize and restore the east riverbank slope.
The proposed work involves 1,330 linear feet of stream bank stabilization improvements. Existing riprap and rubble will be relocated to the base of the new wall. An 80 ft. Long fish lunker structure will be replaced by a 100 ft long fish llunker structure. The purpose of the project is to stabilize and restore the east riverbank slope.
Drepturi de autor:
Attribution Non-Commercial (BY-NC)
Formate disponibile
Descărcați ca PDF, TXT sau citiți online pe Scribd
The proposed work involves 1,330 linear feet of stream bank stabilization improvements. Existing riprap and rubble will be relocated to the base of the new wall. An 80 ft. Long fish lunker structure will be replaced by a 100 ft long fish llunker structure. The purpose of the project is to stabilize and restore the east riverbank slope.
Drepturi de autor:
Attribution Non-Commercial (BY-NC)
Formate disponibile
Descărcați ca PDF, TXT sau citiți online pe Scribd