NOTES: 1. CAPACITY CONTROL (BY TURBINE SPEED CONTROL) WILL BE PRIMARY. 2.

ANTI SURGE WILL PROTECT THE COMPRESSOR DURING OPERATING CONDITIONS (FROM CLOSURE OF VALVES ON THE COMPRESSOR DISCHARGE). 3. ROUTING FROM COMPRESSOR DISCHARGE WILL ALLOW CAPACITY CONTROL DURING TURNDOWN SCENARIOS.

TRAIN 2 TRAIN 3

FC SWEET DEHYDRATED GAS Inlet- 190 MMSCFD Max @ 1000 psig GT


C-2006

3230 PSIG
V-2016

95 MMSCFD CM

CAPACITY CONTROL (NOTE 1)

E-2011

TRAIN 3 TRAIN 2

PC GAS EXPORT METERING PACKAGE 100 MMSCFD GAS TO PIPELINE EXPORT @ 2200 psig

FC
30 MMSCFD RISER GAS LIFT GAS LIFT @ 2200 psig

TURRET

FC

60 MMSCFD DOWNHOLE GAS LIFT GAS LIFT @ 3200 psig