OBJECTIVES
ALERT ABOUT IMPORTANCE OF PRESERVATION
ASSISST IN IMPLEMENTING PRESERVATION
POLICIES ASSISST IN SOLUTION OF PERFORMANCE PROBLEM PROVIDE A TOOL FOR ASSESSING THE QUALITY OF PERFORMANCE
PRESERVATION
IT IS PROECESS OF UPKEEP OF SPARES AND
EQUIPMENTS IN SYSTEMATIC MANNER SO THAT ITS TECHNICAL & CHEMICAL ATTRIBUTES / CHARACTERISTICS ARE MAINTAINED ; AND THAT IT IS READILY AVAILABLE FOR USE/ INSTALLATION
PRESERVATION OF MATERIALS
WHY TO PRESERVE
WHAT TO PRESERVE WHERE TO PRESERVE WHEN TO PRESERVE HOW TO PRESERVE
WHAT TO PRESERVE
EVALUATE MATERIAL COST EVALUATE MATERIAL USEABILITY EVALUATE MATERIAL COMPOSITION Classify material for preservation * Machined surface (Class-A) * un-machined surface (Class-B) * Threaded surface (Class-C) * Control & Instrumentation (Class-D)
10
WHEN TO PRESERVE
POWER PLANT PHASE DURING ERECTION
BASED UPON SPARE NEED AND ITS STORAGE
11
HOW TO PRESERVE
FACTORS AFFECTING MATERIAL: HEAT ,
HOISTURE AND DUST STORAGE TYPE: P-TYPE Q-TYPE R-TYPE PT-TYPE RT-TYPE
12
P-TYPE STORAGE
13
Q-TYPE STORAGE
14
Q-TYPE
15
PT-TYPE
16
RT-TYPE
17
LONG TERM STORAGE OF POWER PLANT & EQUIPMENTS : GENERAL CONSIDERATION & PRESERVATION
COS-ISO-00-OGN/OPS/SYST/017/LMI
18
19
20
21
22
STORE PRESERVATION
SN SPARES
1 2 COLUMN, CHANNEL, ANGLES PIPE AND TUBES
TYPE OF STORAGE
OPEN STORAGE - Q TYPE OPEN STORAGE - Q TYPE CLOSED STORAGE-P TYPE CLOSED-P TYPE OPEN TARPAULIN OT TYPE CLOSED P-TYPE
23
3 4 5 6
VALVES AND ACTUATORS PUMP, SHAFT , IMPELLERS AND GEAR BOXES FAN IMPELLER, SUCTION CHAMBERS , COAL MILL PARTS BOILER TUBES
COLOUR CODE
RED-YELLOW YELLOW
3
4 5 6
SA213T91
SA213 GR T11 SA213 GR T22 SA213 GR TP347H
GREEN-YELLOW
ALUMUNIUM-YELLOW GREEN-RED BLACK-YELLOW
24
STORE PRESERVATION
SN SPARES
7 8 9 10 11 ESP COLLECTING ELECTRODE AND APH HEATING ELEMENTS ROTOR OF TURBINE / GENERATOR /HT MOTORS AND TURBINE BLADES ANTI-FRICTION AND FRICTION BEARING GEAR BOXES AND MOTORS TRANSFORMERS , WINDING COILS AND ELECTRICAL SPARES CONTROL AND INSTRUMENTATION
TYPE OF STORAGE
CLOSED STORAGE - P TYPE CLOSED STORAGE -P TYPE INDOOR CLOSED STORAGE -P TYPE CLOSED-P TYPE CLOSED STORAGE P TYPE IN CLOSED SHED-PT TYPE
12
25
LUBRICANT STORAGE
26
STORE PRESERVATION
SN SPARES
13 14 15 16 17 LUBRICATING AND COOLING OILS WELDING ELECTRODES REFRACTORY & INSULATION MATERIALS CEMENTS ACTIVATED CARBON
TYPE OF STORAGE
SEMI-CLOSED STORAGE - Q TYPE CLOSED STORAGE -P TYPE INDOOR CLOSED STORAGE -P TYPE CLOSED STORAGE -P TYPE CLOSED STORAGE P TYPE OPEN SPACE- RTYPE
18
CHLORINE CYLINDERS
27
STORE PRESERVATION
SN SPARES
19 BULK CHEMICALS LIKE AMMONIA, HYDRAZINE, PHOSPHATE CAUSTICS RUBBER LINED PIPES , RUBBER AND SPARES OF RUBBERS
TYPE OF STORAGE
CLOSED STORAGE -P TYPE CLOSED STORAGE -P TYPE
20
28
CLASS OF PRESERVATION
A- CLASS
a) TRP HE 1706 b) TRP HE 1710 c) TRP HE 1712 d) SILICAGEL BS2540 E) VCI PAPER f) EVAPORATIVE PROTECTION COATINGS
29
THEDRY REPRESERVED SURFACE TO BE WRAPPED ITH VCI PAPER WITH ACTIVE SIDE FACING SURFACE
FINALLY IT TO BE WRAPPED WITH AL FOIL AND ADHESIVE TAPE TO BE APPLIED FOR SEALING
30
B-CLASS PRESERVATIVES
RED OXIDE ZINC PRIMERS
ALMUNIUM PAINTS SYNTHETIC ENAMEL PAINTS;RED/YELLOW/GREY STEAM WASHABLE PAINTS EVAPORATIVE PROTECTION COATINGS
31
TO REMOVE DUST, DIRT , SCALE ETC PAINT WITHIN 3 -5 HOURS SINGLE OR MULTIPLE COAT BASED UPON NEED SPRAY OR MANUAL COATING ADJUSTING NEED OF COATING STEAM SIDE CONDESNER TO BE PAINTED WITH WASHABLE PAINTS
32
STORAGE AND PRESERVATION OF GENERATOR STATOR & ROTOR FOR A LONG TIME
THE STATOR AND ROTOR HAS TO BE TOTALLY
ENCLOSED CONDITION WITH DRY ATMOSHPERE IT SHOULD BE ABOVE 1 FOOT HIGH OF GROUND IT SHOULD BE PRESERVED IN DRY N2 PRESSURE OF 0.5 KG/CM2 AND PRESSURE TO BE MONITORED DAILY THE ROTOR SHOULD BE STORED IN VACCUM SEALED PACKING IN DRY SEALED DUST FREE STORAGE
33
STORAGE AND PRESERVATION OF GENERATOR STATOR & ROTOR FOR A LONG TIME
THE STATOR AND ROTOR HAS TO BE TOTALLY
ENCLOSED CONDITION WITH DRY ATMOSHPERE IT SHOULD BE ABOVE 1 FOOT HIGH OF GROUND IT SHOULD BE PRESERVED IN DRY N2 PRESSURE OF 0.5 KG/CM2 AND PRESSURE TO BE MONITORED DAILY THE ROTOR SHOULD BE STORED IN VACCUM SEALED PACKING IN DRY SEALED DUST FREE STORAGE
34
DRAINED OF WATER AND HOT AIR TO BE BLOWN TO ENSURE IT IS DRY NO OF SILICA GEL PACKING TO BE PROVIDED FOR PRESERVATION AT END SILICA GEL TO BE REPLACED FEROM TIME TO TIME IR VALUE TO BE MEASURED EVERY MONTH AND IF IT IS <16 MEGA OHM; HOT AIR BLOWING IS TO BE CARRIED OUT THE ROTOR TO BE KEPT AWAY FROM MOISTURE FREE FROM MOISTURE AND SEALANT HEALTHINESS IS TO BE TAKEN ALONG WITH ACTION OF STATOR FOR MOISTURE CONTROL
35
CASE STUDY
TAPP
500 MW RWE
36
37