Sunteți pe pagina 1din 1

VISPL/RITES/Ma-er Ghat to Dhapa/ Shifting of 150 mm dia Water Supply Main from ch.8000 to ch.

7850 at Silver spring site /285, Dt: 13.04.2012. To, The D.G.M., RITES LTD., 56, C.R.AVENUE, KOLKATA 700 012 Dear Sir, Sub:-Hindrances due to existing 150 mm dia Water Supply pipe at Silver spring area in between ch. 8000 and ch. 7850 Ref: - Laying of Inlet water line from Ma-er Ghat (Bagbazar) to Dhapa (WTP) Ref: -: i) Work Order NO: DG (WS)/44/2010-11, Dt: 23.08.2010 This is for your kind information that we are at present laying the M.S. Water pipe line at Silver spring area. Now it has been observed that the existing 150 mm dia Water supply pipeline is converging towards the center of the road. As a result, the gap between the water supply pipeline and the existing sewer pipe line is 0.8m to 1.0 m in between ch. 8000 to ch.7850 which makes very difficult to lay our pipeline in that particular stretch. You are hereby requested to shift the 150 mm dia water pipeline for the above mentioned stretch so that we can continue our pipe line work. One alignment drawing showing details of underground utilities are enclosed herewith for your kind perusal.

This is for your kind information and necessary early action. Thanking you,

Yours faithfully, M/s Vishwa Infrastructure and Services Pvt.Ltd.

Gopal Ghosh Authorized Signatory Enclo: As above C.C To: 1. The Executive Engineer(W.S-1),79,Bidhan Sarani,Kolkata-700006

S-ar putea să vă placă și