Sunteți pe pagina 1din 3

MANUFACTURING GEC MANUFACTURING GEC MODEL EM 610B SERIAL/EQUIP.

NO UNIT # 2 CUSTOMER ASTA KERAMASAN ENERGI, PT HI JOB# INSPECTED BY : HERMAWAN D. SAKSONO REPORT NO : PT LEVEL
QTY

PENETRANT TESTING REPORT

: I
PART NO.

DATE
ITEM DESCRIPTION

: SEPT 24, 2011


TEST PERFORMED: Initial Latest Repair

1SET/ 10EA

TRANSITION PIECE # 2

Procedur No : Witness on test/ Defective areas by : GENERAL PENETRANT DESCRIPTION FUORESCENT (Magnaflux RED DYE SKL-SP1) OTHER TEST AREA:

WELD & HAZ AREA

PENETRANT DWELL TIME: 15 MINUTES 30 MINUTES

COMPOSITION: COLOR CONTRAS: REMOVER: DRYING: PETROLEUM BASE SOLVENT WIPE FUORESCENT MANUAL DRIER AMBIENT TEMP. DRYING RED WATER BASE WATER RINSEABLE OTHERS DEVELOPER APPLICATION: AQUEOUS NON AQUEOUS OTHER OTHERS OTHER

INSPECTION RESULT : FOUND NO CRACKS INDICATION, EXCEPT 2EA (#6.1 & #6.7) POROSITY, SEE PHOTOGRAPH ON ATTACHMENT :
HERMAWAN D. SAKSONO
INSPECTOR SIGNATURE

QC COMMENT :

APPROVED BY :

16

MANUFACTURING GEC MODEL EM 610B SERIAL/EQUIP.NO UNIT # 2 CUSTOMER ASTA KERAMASAN ENERGI, PT HI JOB# INSPECTED BY : HERMAWAN D. SAKSONO REPORT NO : PT LEVEL : I
Fig. 2

PENETRANT TESTING REPORT

DATE

: SEPT 24, 2011

Fig. 3

Fig.1 Penetrant Inspection on Transition Piece

Fig.2 Location of Porosity on TP # 6.1

Fig.3 Location of Porosity on HAZ TP # 6.1

Fig.4 Typical of Porosity on HAZ TP # 6.1

17

MANUFACTURING GEC MODEL EM 610B SERIAL/EQUIP.NO UNIT # 2 CUSTOMER ASTA KERAMASAN ENERGI, PT HI JOB# INSPECTED BY : HERMAWAN D. SAKSONO REPORT NO : PT LEVEL : I DATE : SEPT 24, 2011

PENETRANT TESTING REPORT

Fig. 6

Fig.5 Location of Porosity on HAZ TP # 6.7

Fig.6 Typical of Porosity on HAZ TP # 6.7

SITE MANAGER PT. ASTA KERAMASAN ENERGY

MAINTENANCE MANAGER PT. ASTA KERAMASAN ENERGY

PROJECT MANAGER PT. PJBS INSPECTOR

Moch. Hosen

Catur Wahyu Hidayat

Mudjito

Hermawan DS

18