Sunteți pe pagina 1din 4

Financial losses

Our main clients are IT/ITES sector. Continuous

power supply essential for development of Software, loss of operation for a minutes means loss of millions of rupees to these companies. Loss on account of manpower cost due to non availability of power is Rs 500/- per person per hour. Cots of raw power per person per hour is Rs 6/-. A company employing 500 person on one floor will lose Rs 6.5 crore per annum if daily avg. power interruption is 1 hour.

Other problems with poor quality of Power


Un expected Power supply failure
Equipment failure & Malfunctioning Reduction in Lifetime of equipment

Damage to sensitive equipments


Increase in system losses Health issues with reduced efficiency of personnel Oversized installations Electronic communication interference

Quarkcity Energy is committed to provide to its clients


High Quality Clean and Stable Power supply Power factor controlled(true Sinusoidal) No Harmonic Distortion No load unbalance (i.e Spike/Dip) UPS for Continuous and uninterrupted backup power Quantity of Power (i.e. 11 kv means 11 kv) Generators as power backup & Diesel Storage Essential Services through DG Feed 24x7 dedicated support services Continuous and guaranteed supply for 8650 hours

S-ar putea să vă placă și