Sunteți pe pagina 1din 34

CONCRETO ARMADO I ING.

FRANCISCO SERRANO FLORES

PREDIMENSIONAMIENTO DE ELEMENTOS ESTRUCTURALES:

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

P O R T IC O S E C U N D A R IO

4.50m

P O R T IC O P R IN C IP A L

D
C O C IN A
4.00m

E S T U D IO

4 3 2 1

S H

H A LL
3.80m

C O M E D O R

B
2.15m

1 5 14 13 1 2 1 1 1 0 9 8 7 6 5 4 3 2

B A R S A LA

A
2 .8 0 m 2 .8 0 m 1 .1 5 m

2 "3

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

PREDIMENSIONAMIENTO DE VIGAS:

VIGA PRINCIPAL: At 4.25 = = 0.2125 0.25 m 20 20 h b = h = 2(b) = 2(0.2125) = 0.425 0.45 m 2 bxh = 25 cm x 45 cm b=

Si consideramos una sobrecarga de 200 Kg/m2: L 2.80 = = 0.233 0.25 m 12 12 h 0.25 b= = = 0.125 0.15 m 2 2 bxh = 15 cm x 25 cm pero bmin = 0.25m h= Segn el Ing. Antonio Blanco: Si L 4m bxh = 25 cm x 40 cm
0.25 m

0.45 m

Entonces las dimensiones de nuestra viga principal son:

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

VIGA SECUNDARIA: At 1.4 = = 0.07 0.1 m 20 20 h b = h = 2(b) = 2(0.1) = 0.20 m 2 bxh = 10 cm x 20 cm pero bmin = 0.25m b=

Si consideramos una sobrecarga de 200 Kg/m2: L 3.80 = = 0.317 0.35 m 12 12 L 4.50 h= = = 0.375 0.40 m 12 12 h 0.40 b= = = 0.20 m 2 2 bxh = 20 cm x 40 cm pero h=

bmin = 0.25m

Segn el Ing. Antonio Blanco: Si L 4m bxh = 25 cm x 40 cm


0.25 m

0.40 m

Entonces las dimensiones de nuestra viga secundaria son:

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

PREDIMENSIONAMIENTO DE LOSA ALIGERADA:

Considerando una sobrecarga de 200 Kg/m2 y considerando ensanches mnimos por razn econmica, se tiene: L 4.50 = = 0.173 0.20 m 26 26

h=

Adems se puede considerar h = 20 cm para losas con luces comprendidas entre 4.0 m y 5.50 m

Entonces las dimensiones de nuestra losa aligerada son:

5 cm

20 cm

10 cm

30 cm

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

PREDIMENSIONAMIENTO DE COLUMNAS: Ya que el proyevto presente comprende una edificacin de 3 pisos, tenemos que usar el criterio del Doctor Antonio Blanco para el predimencionamiento de las columnas. Donde:

Ag =

Pn 0.45 * f / c a 1.5 Tn / m 2 ) * At * n

Pn = (1Tn / m 2

Ag = rea total de la columna F`c = 210 kg/cm2 At = rea tributaria de la columna n = Numero de pisos.

Pn = 1.5 * 11.9 * 3 = 53.55 55 Tn Ag =


Pero:

55000 = 582 600 cm 2 0.45 * 210

bmin x d min = 25cm x 25cm = 625 cm 2


25 cm Entonces las dimensiones de nuestra columna son: 25 cm

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

ANLISIS ESTRUCTURAL DE PORTICOS:

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

METRADO DE CARGAS:

PORTICO PRINCIPAL:

SEGUNDO NIVEL:
Peso Especifico 2400

P. P. VIGA

b 0.25

h 0.45

Kg/m 270

P. P. ALIGERADO

Peso Especifico 300

Ancho Tributario 4.25

Kg/m 1275

P. P. PISO TERMINADO

Peso Especifico 100

Ancho Tributario 4.25

Kg/m 425

Peso Especifico P. TABIQUERIA SOBRE EL EJE 19

Ancho 15

Alto 2.15

Kg/m 612.75

P. TABIQUERIA PARALELA SEGUNDO TRAMO

Peso Anch Dist. al Especifico o Alto Eje 19 15 2.15 2.7

Dist. al Portico 4

Kg/m 199.14

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

TERCER NIVEL:
Peso Especifico 2400

P. P. VIGA

b 0.25

h 0.45

Kg/m 270

P. P. ALIGERADO

Peso Especifico 300

Ancho Tributario 4.25

Kg/m 1275

P. P. PISO TERMINADO

Peso Especifico 100

Ancho Tributario 4.25

Kg/m 425

Peso Especifico P. TABIQUERIA SOBRE EL EJE 19

Ancho 15

Alto 2.15

Kg/m 612.75

P. TABIQUERIA PERPENDICULAR PRIMER TRAMO

Peso Anch Especifico o 19 15

Alto 2.15

Dist. al Eje 1.15

Kg 704.66

P. TABIQUERIA PERPENDICULAR SEGUNDO TRAMO

Peso Anch Especifico o 19 15

Alto 2.15

Dist. al Eje 0.7

Kg 428.93

P.COBERTURA DE TEJA SOBRE TIJERAL

Peso Especifico Ancho Tributario 280 4.25

Kg/m 1190

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

PORTICO SECUNDARIO: SEGUNDO NIVEL:

P. P. VIGA

Peso Especifico 2400

b 0.25

h 0.4

Kg/m 240

P. P. ALIGERADO

Peso Especifico 300

Ancho Tributario 1

Kg/m 300

P. P. PISO TERMINADO

Peso Especifico 100

Ancho Tributario 1

Kg/m 100

Peso Especifico P. TABIQUERIA SOBRE EL EJE 19

Ancho 25

Alto 2.15

Kg/m 1021.25

P. TABIQUERIA PARALELA PRIMER Y SEGUNDO TRAMO

Peso Especific Anch Dist. al Dist. al o o Alto Eje Portico 19 15 2.15 1 2.8

Kg/m 393.91

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

TERCER NIVEL:
Peso Especifico 2400

P. P. VIGA

b 0.25

h 0.4

Kg/m 240

P. P. ALIGERADO

Peso Especifico 300

Ancho Tributario 1.4

Kg/m 420

P. P. PISO TERMINADO

Peso Especifico 100

Ancho Tributario 1.4

Kg/m 140

Peso Especifico P. TABIQUERIA SOBRE EL EJE 19

Ancho 25

Alto 2.15

Kg/m 1021.25

P. TABIQUERIA PARALELA PRIMER TRAMO

Peso Anch Especifico o 19 15

Alto 2.15

Dist. al Dist. al Eje Portico 1.5 2.8

Kg/m 284.49

P. TABIQUERIA PARALELA TERCER TRAMO

Peso Anch Especifico o 19 15

Alto 2.15

Dist. al Dist. al Eje Portico 1.6 2.8

Kg/m 262.61

P. COBERTURA DE TEJA SOBRE TIJERAL

Peso Especifico Ancho Tributario 280 1

Kg/m 280

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

METRADO DE CARGAS POR SISMO:

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

W4

W3

W2

W1

DETALLE Aligerado Escalera Viga Principal Viga Secundaria Columnas s/c techo Piso tpico Muros Piso terminado

H 0.2 0.2 0.45 0.4 0.25

PESO (Kg/m2) 300 200

0.25 0.25 0.25

100 300 150 100

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

W3 Peso Techo P.V.prpal 104.875 0.1125 0.1125 0.1125 0.1 0.1 0.0625 300 74.2 25 200 5.8 7 4.2 13.6 15.35 1.075 99.45 1.075 99.45 W3 (Kg) 150 1 2 2 1 1 2 15 20975 3132 3780 1134 3264 7368 2418.75 29835 11964.75 2486.25 86357.75

P.V.sec

Columnas Losa muros s/c

P.V.prpal

W2 0.1125 0.1125 0.1125 0.1 0.1 0.0625 300 74.2 50 100

5.8 7 4.2 13.6 15.35 2.15 99.45 2.15 99.45 99.45

2 2 1 1 2 15

3132 3780 1134 3264 7368 4837.5 29835

P.V.sec

Columnas Losa muros s/c piso terminado escaleras descanso l. inclinada

150 1

23929.5 4972.5 9945

1 1146.277539

780 0.9675 W2 (Kg)

780 1109.02352 94086.5235

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

P.V.prpal

W1 0.1125 0.1125 0.1125 0.1 0.1 0.0625 300 74.2 50 100

5.8 7 4.2 13.6 15.35 2.15 99.45 2.15 99.45 99.45

2 2 1 1 2 15

3132 3780 1134 3264 7368 4837.5 29835

P.V.sec

Columnas Losa muros s/c piso terminado escaleras descanso l. inclinada

150 1

23929.5 4972.5 9945

1 1146.277539

780 2.15 W1 (Kg)

780 2464.49671 95441.9967

CORTANTEPOR PISOS

Piso N
3 2 1

Wi
86.36 94.09 95.44 275.89

hi
6.45 4.30 2.15

Wi x hi
557.01 404.57 205.20 1166.78

Fxi
17.29 12.56 6.37

Fyi
17.29 12.56 6.37

Z 0.3 U 1 S 1.4 C 2.5 R 8 CORTANTE TOTAL Hi 36.210073 Vi 36.210073

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

ANALISIS DE PORTICOS EN SAP 2000:

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

DISEO DE VIGAS:

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

DISEO DE VIGA PRINCIPAL EN EL SEGUNDO PISO: DISEO DE VIGA PRINCIPAL ANLISIS POR FLEXION: DATOS:

b 25 cm h 45 cm Mu 4.43 Tn-m fy 4200 Kg/cm2 fc 210 Kg/cm2 r 5 cm

VERIFICACION DE ACERO DE COMPRESION:

s max = p max bd s max = 0.016( 25)( 40 ) = 16cm 2 a= s1 f y 0.85 f c'b = p max = 0.016

(16)( 4200 ) = 15.06cm 0.85( 210 )( 25)

a 15.06 M ut = s1 f y d = 0.9(16 )( 4200 ) 40 = 19.64ton m 2 2 M ut > M u 19.64 > 4.43

No requiere acero en compresin.

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

VERIFICAMOS SI EL ACERO DE COMPRESION FLUYE:

d 40 = =8 d 5 d 0.85 f c ' 1 = p max f y d 6300 6300 f y 0.85( 210 )( 0.85) 6300 = = 6.77 0.016( 4200 ) 6300 4200

6.77 < 8 entonces el acero en compresin fluye

CALCULO DE LAS AREAS DE ACERO:

AS min i =

0.8 fc fy

*b*d =

0.8 210 * 25 * 40 = 2.76cm 2 4200

AS min i =

14 14 *b*d = * 25 * 40 = 3.33cm 2 fy 4200

rea de acero en traccin rea de acero en traccin

16 cm2 3.3 cm2

3 1 2 5/8

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

DISEO DE VIGA PRINCIPAL ANLISIS POR CORTE:

DATOS:

b 25 cm h 45 cm Vu 9.81 Tn-m fy 4200 Kg/cm2 fc 210 Kg/cm2 r 5 cm

VERIFICAMOS SI LA SECCIN CUMPLE O NO:

Vs MAX = * 2.1 25.87 > 9.81

fc' b d = 0.85 * 2.1 210 * 25 * 40 = 25.87Tn m Vs MAX > Vu

CALCULO DEL ESFUERZO QUE PUEDE ABSORVER EL CONCRETO:

Vc = * 0.53 f' c b d = 0.85 * 0.53 210 * 25 * 40 = 6.53Tn m Vs = Vu Vc = 9.81 6.53 = 3.28

CALCULO DE ESPACIAMIENTO DE ESTRIBOS:

S=

* Av fy d 0.85 * 2 * 0.71 * 4200 * 40 = = 61.8cm Vs 3.28

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

CALCULO DE ESPACIAMIENTOS MAXIMOS:

V = * 1.1 13.5 > 3.28

fc' b d = 0.85 * 1.1 210 * 25 * 40 = 13.5Tn m V > Vs :

d 40 = = 20cm 2 2

CALCULO DE ESPACIAMIENTOS POR ZONA SISMICA:

ZONA DE CONFINAMIENTO 2d = 80 cm

Smax

d/4 = 8db =

10 cm 13 cm 30 cm

ESPACIAMIENTOS:

1 3 / 8" 8 3 / 8"

@ 5 cm @ 10 cm

rst 3 / 8" @ 20 cm

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

DISEO DE VIGA SECUNDARIA ANLISIS POR FLEXION: DATOS:

b 25 cm h 40 cm Mu 4.4 Tn-m fy 4200 Kg/cm2 fc 210 Kg/cm2 r 5 cm

VERIFICACION DE ACERO DE COMPRESION:

s max = p max bd s max = 0.016( 25)( 35) = 14cm 2 a= s1 f y 0.85 f c'b = p max = 0.016

(14)( 4200 ) = 13.2cm 0.85( 210 )( 25)

a 13.2 M ut = s1 f y d = 0.9(14 )( 4200 ) 35 = 15.03ton m 2 2 M ut > M u 15.03 > 4.4

No requiere acero en compresin.

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

VERIFICAMOS SI EL ACERO DE COMPRESION FLUYE:

d 35 = =7 d 5 d 0.85 f c ' 1 6300 = d p max f y 6300 f y 0.85( 210 )( 0.85) 6300 = = 6.77 0.016( 4200 ) 6300 4200

6.77 < 7 entonces el acero en compresin fluye

CALCULO DE LAS AREAS DE ACERO:

AS min i =

0.8 fc 0.8 210 *b * d = * 25 * 35 = 2.41cm 2 fy 4200 14 14 *b * d = * 25 * 35 = 2.92cm 2 fy 4200

AS min i =

rea de acero en traccin rea de acero en traccin

15 cm2 2.9 cm2

3 1 2 5/8

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

DISEO DE VIGA SECUNDARIA ANLISIS POR CORTE:

DATOS:

b 25 cm h 40 cm Vu 7.74 Tn fy 4200 Kg/cm2 fc 210 Kg/cm2 r 5 cm

VERIFICAMOS SI LA SECCIN CUMPLE O NO:

Vs MAX = * 2.1 22.6 > 7.74

fc' b d = 0.85 * 2.1 210 * 25 * 35 = 22.6Tn m

Vs MAX > Vu

CALCULO DEL ESFUERZO QUE PUEDE ABSORVER EL CONCRETO:

Vc = * 0.53 f' c b d = 0.85 * 0.53 210 * 25 * 35 = 5.7Tn m Vs = Vu Vc = 7.74 5.7 = 2.04

CALCULO DE ESPACIAMIENTO DE ESTRIBOS:

S=

* Av fy d 0.85 * 2 * 0.71 * 4200 * 35 = = 86.9cm Vs 2.04

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

CALCULO DE ESPACIAMIENTOS MAXIMOS:

V = * 1.1

fc' b d = 0.85 * 1.1 210 * 25 * 35 = 11.8Tn m

11.8 > 2.04 V > Vs : d 40 = = 20cm 2 2

CALCULO DE ESPACIAMIENTOS POR ZONA SISMICA:

ZONA DE CONFINAMIENTO 2d = 70 cm

Smax

d/4 = 8db =

8.8 cm 13 cm 30 cm

ESPACIAMIENTOS:

1 3 / 8" 7 3 / 8"

@ 5 cm @ 10 cm

rst 3 / 8" @ 20 cm

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

DISEO DE LOSA ALIGERADA:

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

DATOS:

L h S/C

5 m 20 cm 300 Kg/m2

Para h = 20 cm. Peso del aligerado = 300 Kg. /m2 Tabiqueria: 19 x 15 x 2.15 x 0.80 = 490.20 Kg.

WL = 300 Kg. / m.

WD= 300 Kg./m.

WU = 1.5(300) + 1.8(300) = 990

WU = 396 Kg./ m

WU = 1.5(300) = 450

WU= 180 Kg./ m.

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

PRIMERA POSICION DE SOBRECARGAS


DIAGRAMA DE MOMENTOS POR CROSS 490 396 180

1 FD. ME 1 -461.3 461.3 0 869.4 -167.67 701.73

1.8

3.9 1 228.15 -228.15 0 351 -120.38 230.62

MF RI RM RF

0.51 0.49 371.3 -228.15 230.65 -114.075 -132.460 -127.265 469.49 -469.49 729.4 351 167.67 120.38 1368.45

469.49

508.99

159.38

701.73

471.38

230.62 897.07

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

SEGUNDA POSICION DE SOBRECARGAS

DIAGRAMA DE MOMENTOS POR CROSS 490 396 396

1 FD. ME 1 -461.3 461.3 0 869.4 -242.475 626.925

1.8

3.9

MF RI RM RF

0.51 0.49 1 371.3 -501.93 501.93 230.65 -250.965 -501.93 76.982 73.963 678.93 -678.93 0 729.4 772.2 772.2 242.475 174.085 -174.085 1918.16 598.115

678.93

436.62 447.51 626.925 946.285

598.115

971.87 5

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

TERCERA POSICION DE SOBRECARGAS

DIAGRAMA DE MOMENTOS POR CROSS

490

396 396

1 FD. ME 1 -320.1 320.1 0 567 -205.41 361.59

1.8

3.9

MF RI RM RF

0.51 0.49 1 230.1 -501.93 501.93 160.05 -250.965 -501.93 184.990 177.745 575.15 -575.15 0 427 772.2 772.2 205.41 147.47 -147.47 1552.08 624.73

575.15

266.3 482.26 361.59 919.67

624.73

632.41

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

ENVOLVENTES:
678.9 3

482.26 508.99

701.73

946.285

624.73

971.875

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

MOMENTOS NEGATIVOS: Mu = 678.93 Kg-m


PARA a = 6

s =

Mu

a * fy d 2 As f y 1.197 * 4200 a= = = 2.817 0.85 f ' c * B 0.85 * 210 * 10


PARA a = 3

678.93 * 100 = 1.197 cm 2 0.9 * 4200 * (18 3)

Mu 678.93 * 100 = = 1.088cm 2 a 0.9 * 4200 * (18 1.5) * fy d 2 As f y 1.088 * 4200 a= = = 2.56 OK 0.85 f ' c * B 0.85 * 210 * 10 s =
POR LO TANTO As = 1.088 cm2 2 3/8

As MIN =

0.8 210 * 10 * 18 = 0.5 4200

1 3 / 8"

MOMENTOSPOSITIVOS: Mu = 508.99 Kg-m


PARA a = 3

s =

Mu

a * fy d 2 As f y 0.816 * 4200 a= = = 0.48 0.85 f ' c * B 0.85 * 210 * 40

508.99 * 100 = 0.816cm 2 0.9 * 4200 * (18 1.5)

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

PARA a = 1

Mu 508.99 *100 = = 0.77cm 2 a 0.9 * 4200 * (18 0.5) * fy d 2 As f y 0.77 * 4200 a= = = 0.45 OK 0.85 f ' c * B 0.85 * 210 * 40 s =
POR LO TANTO As = 0.77 cm2 Mu = 482.26 Kg-m
PARA a = 1

1 1/2

s =

Mu

a * fy d 2 As f y 0.73 * 4200 a= = = 0.43 OK 0.85 f ' c * B 0.85 * 210 * 40


POR LO TANTO As = 0.73 cm2

482.26 * 100 = 0.73cm 2 0.9 * 4200 * (18 0.5)

1 1/2

0.6

1 3/8

0.7

1.0 m

2 3/8

1 3/8

0.8

1 1/28 1 1/2

2.8

3.9

RUDIARD SOTO ROCA

2007-ii

CONCRETO ARMADO I ING. FRANCISCO SERRANO FLORES

CALCULO DE ACERO DE TEMPERATURA:

Ast = 0.0025 * b * t
Ast = 0.0025 * 100 * 5 40 cm
@=

0.32 100 = 25cm 1.25

1 4 "@ 25cm

Ast = 1.25cm
r = 2

1 4 " @ 25cm
A c e r o

c m

20 cm d e t e m
5 c m

e r a t u

r a

A A 0 . 1 0 s 0

s ( + . 3

( - ) ) 0

VERIFICACION POR ENSANCHE: POR MOMENTOS: MU = 678.93 kg-m MUT = 0.85 fc B.t (d.- t/2) MUT = 0.85*0.9*210*40*5*(18 - 5/2) = 4980 kg-m MU<MUT no requiere ensanches POR MOMENTOS:

VC = 0.53 f ' c b d

VC = 0.85 * 0.53 210 *10 *18 VC = 1175.1kg m


971.875 < 1175 Vu < Vc no requiere ensanches

RUDIARD SOTO ROCA

2007-ii

S-ar putea să vă placă și