DETAIL ESTIMATE FOR CONSTRUCTION OF WATER TANK 5000 GALLONS S.# T.1 T.2 Excavation P/L Pcc 1:4:8 in foundation ITEM OF WORKS Cols foundation Total Cols foundation Under floor Steps Total T.3 P/L Rcc 1:2:4 i/c shuttering and finishing Cols footing " Cols up to bottom slab Top slab Tie beams Bracing beams Total T.4 P/L Rcc 1:1:3 i/c shuttering and finishing Bottom slab Core walls " Total T.5 Steel reinforcement bars Rcc 1:2:4 item T.3 Rcc 1:1-1/2:3 item T.4 Total Rcc Steel bars Total T.6 T.7 P/L moasic floor in 1:2 P/L terrazo dado or skirting in 1:2 Inner floor Total Inner walls Total T.8 P/F steel ladder made of 2"x2"x1/4" angle iron @15"c/c and 5/8" Dia bars @12" c/c i/c fixing and painting Total T.9 Earth filling under floor Total T.10 T.11 T.12 T.13 Sand filling under floor Total P/L B.B masonry in F&P in 1:6 Total P/L 2" thick Pcc 1:2:4 floor toping Total P/F 2'x2' man hole cover made of 1-1/2"x1-1/2"x1/8" and 18 gauge m.s sheet and painting Total T.14 P/F 4" Dia C.I bell mouth 2 1 1 1 2 No No Nos 1 16.50 16.50 4 10.00 1.25 1.50 1 10.00 10.00 0.33 1 10.00 10.00 0.67 1 36.00 36.00 36.00 67.00 67.00 33.00 33.00 75.00 75.00 272.25 272.25 Rft Rft Cft Cft Cft Cft Cft Cft Sft Sft 4 10.00 8.00 1 10.00 10.00 383.10 432.85 815.94 815.94 Cft x12/2204 4.44 4.44 100.00 100.00 80.00 80.00 M.tons M.tons Sft Sft Sft Sft 1 2 2 16.50 11.33 10.00 16.50 0.67 0.67 0.75 8.00 8.00 204.19 121.46 107.20 432.85 Cft Cft Cft Cft 4 4 1 4 4 5.00 1.25 11.33 10.00 10.00 5.00 1.25 11.33 1.25 1.25 0.50 21.75 0.41 1.25 1.25 x5.00+1.25/2x5.00+1.25/2x0.5 4 4 1 4 4 5.00 10.00 14.50 16.50 5.00 10.00 1.00 2.00 0.25 0.33 0.50 0.50 NO 4 L 5.00 B 5.00 D 2.00 Qty 200.00 200.00 25.00 33.00 29.00 66.00 153.00 50.00 19.53 135.94 52.63 62.50 62.50 383.10 Cft Cft Cft Cft Cft Cft Unit Cft Cft Cft Cft Cft Cft Cft

Total T.15 P/F 4" Dia G.I pipe 9 gauge Rising,Delivery,Washing,Overflow Total T.16 T.17 T.18 P/F 4' Dia G.I long bend Total P/F 4" Dia duck foot bend Total P/F: Railing Total 4 16.00 4 4 4 40.00

2 160.00 160.00 4.00 4.00 4.00 4.00 64.00 64.00

Nos Rft Rft Nos Nos Nos Nos Rft Rft

http://mosttutorials.blogspot.com/ Free Civil Engineering softwares,tutorials,setups,ebooks and much more


ESTIMATE FOR CONSTRUCTION OF WATER TANK 5000 GALLONS S.# T.1 3.23b+3.16a Excavation ITEM OF WORKS Cols foundation NO 4 L 5.00 B 5.00 D 2.00 Total 0.25 0.33 0.50 0.50 Total CONTENTS UNIT RATE 200.00 Cft 200.00 Cft 25.00 33.00 29.00 66.00 153.00 50.00 19.53 135.94 52.63 62.50 62.50 383.10 Cft Cft Cft Cft Cft AMOUNT

4.52

904.00

T.2

06.03b P/L Pcc 1:4:8 in foundation

Cols foundation Under floor Steps

4 1 4 4

5.00 10.00 14.50 16.50

5.00 10.00 1.00 2.00

75.19

11504.07

T.3

6.06a-03 P/L Rcc 1:2:4 i/c shuttering and finishing Cols footing " Cols up to bottom slab Top slab Tie beams Bracing beams 6-06-b-02 P/L Rcc 1:1:3 i/c shuttering and finishing Bottom slab Core walls " 6.07b Steel reinforcement bars

4 5.00 5.00 0.50 4 x5.00+1.25/2x5.00+1.25/2x0.5 4 1.25 1.25 21.75 1 11.33 11.33 0.41 4 10.00 1.25 1.25 4 10.00 1.25 1.25 Total

Cft Cft Cft Cft Cft Cft

153.44

58782.67

T.4

1 2 2

16.50 11.33 10.00

16.50 0.67 0.67

0.75 8.00 8.00 Total

204.19 121.46 107.20 432.85

Cft Cft Cft Cft

165.36

71575.27

T.5

Rcc 1:2:4 item T.3 Rcc 1:1-1/2:3 item T.4 Total Rcc Steel bars

383.10 432.85 815.94 Cft 815.94 x12/2204 Total

4.44 M.tons 4.44 M.tons 100.00 Sft 100.00 Sft

86060.41

382108.22

T.6

10.22a+(10.43a = 10x10 room = 1/61 P.Sft) P/L moasic floor in 1:2 Inner floor 10.40a-01

10.00

10.00 Total

61.47

6147.00
Page 3

S.# T.7

ITEM OF WORKS P/L terrazo dado or skirting in 1:2 Inner walls

NO 4

L 10.00

B 8.00

D Total

CONTENTS UNIT RATE AMOUNT 80.00 Sft 80.00 Sft 52.56 4204.80

Page 4

S.# T.8

ITEM OF WORKS N.S P/F steel ladder made of 2"x2"x1/4" angle iron @15"c/c and 5/8" Dia bars @12" c/c i/c fixing and painting 3.16-b+3.04-a+3.18-c+3.19-b+3.26-b-02 Earth filling under floor

NO

CONTENTS UNIT RATE

AMOUNT

36.00 Total

36.00 Rft 36.00 Rft 67.00 Cft 67.00 Cft 33.00 Cft 33.00 Cft 75.00 Cft 75.00 Cft 272.25 Sft 272.25 Sft

280

10080.00

T.9

10.00

10.00

0.67 Total 0.33 Total 1.50 Total

6.45

432.15

07.30 T.10 Sand filling under floor 07.04a-05 T.11 P/L B.B masonry in F&P in 1:6 10.15-e+10.43-c T.12 P/L 2" thick Pcc 1:2:4 floor toping

10.00

10.00

12.21

402.93

10.00

1.25

100.81

7560.75

16.50

16.50 Total

35.35

9624.04

Non Schedule T.13 P/F 2'x2' man hole cover made of 1-1/2"x1-1/2"x1/8" and 18 gauge m.s sheet and painting 9.19a+9.20/15+9.21/15 T.14 P/F 4" Dia C.I bell mouth 24-16-c-09 T.15 P/F 4" Dia G.I pipe 9 gauge Rising,Delivery,Washing,Overflow 24-30-d-07 T.16 P/F 4' Dia G.I long bend Non Schedule T.17 P/F 4" Dia duck foot bend 25-37+13-06b01+2x13.06d02 T.18 P/F: Railing

1 Total 2 Total

1 No 1 No 2 Nos 2 Nos

3500

3500.00

363.71

727.42

40.00 Total

160.00 Rft 160.00 Rft 4.00 Nos 4.00 Nos 4.00 Nos 4.00 Nos 64.00 Rft 64.00 Rft

202.21

32353.60

4 Total 4 Total 4 16.00 Total

428.09

1712.36

640

2560.00

322.26

20624.64 624803.92
Page 5

Page 6

Page 7

Page 8

Page 9

Page 10

Page 11

Page 12

Page 13

Page 14

Page 15

Page 16

Page 17

Page 18

Page 19

Page 20

Page 21

Page 22

Page 23

Page 24

Page 25

Page 26

Page 27

Page 28

Page 29

Page 30

Page 31

Page 32

Page 33

Page 34

Page 35

Page 36

Page 37

Page 38

Page 39

Page 40

Page 41

Page 42

Page 43

Page 44

Page 45

Page 46

Page 47

Page 48

Page 49

Page 50

Page 51

Page 52

Page 53

Page 54

Page 55

Page 56

Page 57

Page 58

Page 59

Page 60

Page 61

Page 62

Task No 08
HEALTH FACILTY IMPROVEMENT & RFEHABILITATION OF CIVIL DISPENSARY KOHI BAHARA FR D.I KHAN ESTIMATE FOR CONSTRUCTION OF LABOUR ROOM & MEDICAL LABORATORY AT KOHI BAHARA FR D.I KHAN ABSTRACT OF COST

S No,

Description

Amount(Rs.)

123-

Civil Work Internal Electrification Water Supply G.Total

1,565,436 85,801 144,176 1,795,412

http://mosttutorials.blogspot.com/ Free Civil Engineering softwares,tutorials,setups,ebooks and much more

re

Task No 08 COST ESTIMATE FOR CONSTRUCTION OF WATER TANK 5000 GALLONS

S.# CSR item Coad T.1 T.2 T.3 T.4 T.5 3.23b+3.16a 06.03b 6.06a-03 6-06-b-02 6.07b Excavation

Description Cols foundation Cols

UNIT Cft Cft Cft Cft MT

Qty 200 153 383.1 432.9 4.44

RATE 4.52 75.19 153.44 165.36 86060.4

P/L Pcc 1:4:8 in foundation foundation

P/L Rcc 1:2:4 i/c shuttering and finishing Cols footing P/L Rcc 1:1:3 i/c shuttering and finishing Steel reinforcement bars item T.3 Rcc 1:2:4

10.22a+(10.4 3a = 10x10 T.6 P/L moasic floor in 1:2 room = 1/61 P.Sft) T.7 T.8 10.40a-01 N.S 3.16-b+3.04a+3.18c+3.19b+3.26-b-02 07.30 07.04a-05

Inner floor Inner

Sft

100

61.47

P/L terrazo dado or skirting in 1:2 walls

Sft Rft

80 36

52.56 280

P/F steel ladder made of 2"x2"x1/4" angle iron @15"c/c and 5/8" Dia bars @12" c/c i/c fixing and painting Earth filling under floor

T.9

Cft

67

6.45

T.10 T.11

Sand filling under floor P/L B.B masonry in F&P in 1:6 P/L 2" thick Pcc 1:2:4 floor toping P/F 2'x2' man hole cover made of 1-1/2"x11/2"x1/8" and 18 gauge m.s sheet and painting P/F 4" Dia C.I bell mouth P/F 4" Dia G.I pipe 9 gauge Rising,Delivery,Washing,Overflow P/F 4' Dia G.I long bend P/F 4" Dia duck foot bend P/F: Railing

Cft Cft Sft N N Rft No N Rft

33 75 272.3 1 2 160 4 4 64

12.21 100.81 35.35 3500 363.71 202.21 428.09 640 322.26

T.1210.15-e+10.43-c T.13 Non Schedule T.14 T.15 T.16 9.19a+9.20/1 5+9.21/15 24-16-c-09 24-30-d-07

T.17 Non Schedule 25-37+13T.18 06b01+2x13.0 6d02

Total:

000 GALLONS

http://mosttutorials.blogspot.com/
AMOUNT 904 11504.07 58782.864 71576.076 382108.2204 Free Civil Engineering Softwares,tutorials.setups,ebooks and much more

6147

4204.8 10080

432.15

402.93 7560.75 9624.0375 3500 727.42 32353.6 1712.36 2560 20624.64

624804.9

Task No 08

HEALTH FACILTY IMPROVEMENT & RFEHABILITATION OF CIVIL DISPENSARY KOHI BAHARA FR D.I KHAN GENERAL ABSTRACT OF COST S No, 12345678910Description Doors & Windows of Doctor House Dining Hall Wash Basin Quarter Class-IV + Chowkidar House (Doors & Windows BHU Distempering Overhead Water Tank Transformer 25 KV etc. Boring of Tube Well & Machinary Stabilizer 10000 watt 1" G.I Pipe Labour Room + Medical Lab G.Total Amount(Rs.) 445,520 4,544 562,249 46,879 624,805 304,206 2,171,617 16,500 24,350 1,795,412 5,996,082

http://mosttutorials.blogspot.com/
Free Civil Engineering Softwares,tutorials.setups,ebooks and much more

HEALTH FACILTY IMPROVEMENT & RFEHABILITATION OF CIVIL DISPENSARY KOHI BAHARA FR D.I KHAN TASK-8 Doors & Windows of Doctor House S No. CSR item Coad 1204-34 04-35 Description Removing door with chowkat (Existing) Removing windows CSW P/F: of 1st class 1" thick paneled door with 2"x5" 16 gauge M.S Sheet chowkat i/c all hardware and iron mongry such as earl drawer, handle, tower bolt, holdfast, cleat and stopper with 1" thick panel door of 18 gauge M.s Sheet, 2 coats of read oxide and 3 coats of synthetic enamel paint, filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of E/Incharge. P/F: 1" thick glazed windows/csw with 4"x1" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1" M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware such as hinges, holdfast, cleat & stopper, handles, tower bolts, 12x24 wire mesh Islamabad made, 5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per specification and instruction of Engineer incharge. Sub Total : Dining Hall Wash Basin S No. CSR item Coad Description Unit Qty Rate Amount (Rs.) Unit No No Qty 16.00 9.00 Rate 164.43 119.73 Amount (Rs.) 2630.88 1077.57

3-

12.07c+12.24c+ 12.27a/28+13.0 6c01+(2x13.06c02 )

Sft

370.00

805.19

297920.3

4-

25.039-b05+12.50

Sft

241.00

597.06

143891.46

445520.21

1-

P/F: ICL Boch wash hand basin large size i/c water mixer, 14.05astop cocks (Fisal or equivalent), C.P inlet pipe and 03+(14.25x2)+1 pedestal. Complete in all respect as per specification and 4.27 instruction of Engineer incharge. Sub Total : Quarter Class-IV & Chowkidar House

No

2272.18

4544.36

4544.36

S No. CSR item Coad 1204-34 04-35

Description Removing door with chowkat (Existing) Removing windows CSW

Unit No No

Qty 21 12

Rate 164.43 119.73

Amount (Rs.) 3453.03 1436.76

3-

S/F: of Steel doors 18 SWG MS sheet with angle iron frame 1"x1"x1/8", bolt, hinges & paint etc. P/F: of 1st class 1" thick paneled door with 2"x5" 16 12.07c+12.24c+ gauge M.S Sheet chowkat i/c all hardware and iron 12.27a/28+13.0 mongry such as earl drawer, handle, tower bolt, holdfast, 6ccleat and stopper with 1" thick panel door of 18 gauge 01+(2x13.06c02 M.s Sheet, 2 coats of read oxide and 3 coats of synthetic ) enamel paint, filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of E/Incharge.

Sft

84

251.56

21131.04

4-

Sft

433.5

805.19

349049.865

P/F: 1" thick glazed windows/csw with 4"x1" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1" M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware such as hinges, holdfast, cleat & 5- 25.039-b-05+12.50 stopper, handles, tower bolts, 12x24 wire mesh Islamabad made, 5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per specification and instruction of Engineer incharge. Sub Total : BHU Distempering S No. CSR item Coad Description P/A: 2 coats of distemper SPD of (Berger Robbialac) or equivalent) on walls or ceiling as per approved shade & quality i/c scraping of old surface, putty filling, cement repair where required & brining the surface to sparkling finish, complete as per instruction of Engineer incharge. Sub Total : Transformer 25 KV S No. CSR item Coad Description S/F: of 4 legged angle iron HT pole in PCC 1:3:6 at depth of 6' complete in all respect as per WAPDA specification I/c HT shackles disc, insulators wooden bars etc. earthing of each pole as per instruction of Engineer incharge.

Sft

313.5

597.06

187178.31

562249.005

Unit

Qty

Rate

Amount (Rs.)

1-

(11.23-a-03)

Sft

4034.3

11.62

46879.0308

46879.03

Unit

Qty

Rate

Amount (Rs.)

1-

15.39

No

16103

32206

2-

3-

S/F of HT line of aluminum conductor 7/.132 aluminum as per WAPDA specification I/c 3% saage, cutting, jointing. Complete in all respect as per specification and instruction of Engineer incharge. P/F of 4 core cable as per design 19/.083 for connection of electric board for motor to transformer. Complete in all Non Schedule respect as per specification and instruction of Engineer incharge. Non Schedule Non Schedule P/F: of transformer 25 KVA "Climax" I/c H.poles with transformer for meter etc. as per WAPDA specification. Sub Total :

Rft

800

60

48000

Rft

60

400

24000

4-

No

200000

200000 304206

New Tube Well S No. CSR item Coad 1234567891011Description Unit Job Job Rft Rft Rft Rft Job Rft Sets No Job Qty 1 1 100 100 100 40 1 340 4 1 1 Rate 30000 20000 1124.76 1424.37 1424.37 1707.59 20000 1709.8 1323.55 2181.54 1089 Amount (Rs.) 30000 20000 112476 142437 142437 68303.6 20000 581332 5294.2 2181.54 1089

Non Schedule Resistivity of survey for selection of site. 24.01 24.02a-09 24.02b07 24.02c07 24.02-d25 Mobilization of boring plant and equipment to site Tube Well boring in all kind of soil except shangle/rock 18" I/d from ground upto 100' below G.L From 101' to 200' below G.L 18" I/d. From 201' to 300' below G.L 18" I/d. From 301' to 340' below G.L 18" I/d.

Non Schedule Subsequent shifting to next site (if required) 24.12c04 24.06 24.08d 24.39c Providing and installation PVC blind pipe in tube well with stranger BSS class "D" working pressure and jointing. 12" I/d Furnishing sample of water from bore hole and testing. S/Installation of 12" dia 2' long M.S bail plug in tube well bore hole. Complete in all respect as per specification and instruction of Engineer incharge. S/Installation on MS suspension clamp of heavy duty 3/8" thick 12" I/d with PCC 1:2:4 block round it Complete. Furnishing/installation of MS cap over housing pipe with locking arrangement. Complete in all respect as per specification and instruction of Engineer incharge. Shrouding with graded gravel pack 3/8" to 1/8" around tube well in bore hole. Complete in all respect as per specification and instruction of Engineer incharge. Development and testing of tube well with air compressor over 1.5 cusecs discharge. Complete in all respect as per specification and instruction of Engineer incharge.

12-

24.36a

Job

884

884

13-

24.14

Rft

340

133.66

45444.4 0

14-

24.13b

Hrs

72

511

36792

15-

Development and testing of tube well with "D" and "T" unit. Non Schedule Complete in all respect as per specification and instruction of Engineer incharge.

Job

20000

20000

16-

Supply/Installation of "KSB" submersible pumping set with seimens A.C electric motor upto 40 H.P, 6" dia 12 stages KSB pump, 6" dia KSB column pipes of required length, 4 core submersible electric cable for 40 HP motor to electric starter, 14 gauge main switch board, star/delta "Seimens" starter, Japan made, bolt meter, Ampere meter and Non Schedule selector switches, phase indicator lamps, earthing of main switch board and starter, 6" dia sluice valve and non return valve of "AERO Brand" 6" dia M.S long bend and 18 gauge M.S sheet cover for bore hole. Complete in all respect as per specification and instruction of Engineer incharge.

Set

750000

750000

17-

24.22c

P/F of 6" dia C.I sluice valve. BSS standard for G.I and PVC pipe I/c jointing material. Complete in all respect as per specification and instruction of Engineer incharge.

Nos

5568

11136

18-

P/F: of 6" dia G.I pipe or CI Tee with jointing material. Non Schedule Complete in all respect as per specification and instruction of Engineer incharge. P/F: of 6" dia GI pipe heavy quality I/c excavation of trench and refilling. Complete in all respect as per specification and instruction of Engineer incharge.

Nos

3500

7000

19-

24.16a02

Rft

250

647.84

161960

20-

P/F: of 6" dia G.I socket heavy quality. Complete in all Non Schedule respect as per specification and instruction of Engineer incharge. P/F: of 6" dia G.I Long bend heavy quality with jointing Non Schedule material. Complete in all respect as per specification and instruction of Engineer incharge. Sub Total : Stabilizer (10000 Watt)

Nos

650

5850

21-

Nos

3500

7000

2171616.74

S No. CSR item Coad 1-

Description S/F: 10000 watt Stablizier (Universal or Allied)

Unit No

Qty 1

Rate 16500

Amount (Rs.) 16500

Sub Total : Water Supply S No. CSR item Coad Description P/Fixing 1" dia G.I pipe (IIL-L) or equivalent in trench I/c excavation and its refilling, all necessary fitting for pipe. Complete in all respect as per specification and instruction of Engineer incharge. Unit Qty Rate

16500

Amount (Rs.)

24-16-c-05

Rft

200

121.75

24350

ESTIMATE FOR CONSTRUCTION OF LABOUR ROOM & MEDICAL LABORATORY AT KOHI BAHARA FR D.I KHAN Civil Work S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)

C-1

3.23b+3.16a

C-2

26.15

C-3

06.03b

C-4

07.04a-05

C-5

6.22a-02

C-6

6.06a-03

C-7

06.07c

C-8

07.05a-05

Excavation as in foundation of building upto required depth in all kind of soil i/c subsequent re-filling in trenches and plinth area or where required, disposal of surplus earth as Cft directed, watering, ramming and consolidating the earth as as specified complete in all respect as per specification and instruction of E/Incharge. P/A: termite proofing chemicals in 3 stages as per Sft specification and instruction of Engineer Incharge. P/L: P.C.C 1:4:8 in any part of building such as foundation, sub flooring etc. using 1" down graded stone aggregate i/c framework, placing, compacting, leveling and curing etc. Cft Complete as per specification and instruction of Engineer incharge. P/L: 1st class BB masonry in foundation and plinth in 1:6 cement sand mortar i/c racking out the joints where Cft necessary scaffolding & curing etc. Complete in all respect as per specification and instruction if Engineer incharge. P/L: 2" thick DPC with cement concrete, 1:2:4 using approved quality fine/course aggregate i/c farmwork, compacting, leveling, finishing and curing etc. 2 coats of Sft hot bitumen (PB/3 or PB/4) and 2 layers of approved polythene sheet. Complete in all respect as per specification and instruction of Engineer incharge. P/L: RCC 1:2:4 i/c finishing as in footing, columns, beam, lintels, slabs, sun shade & projection etc. of specified strength using approved quality crushed stone & fine aggregate i/c formwork & its removal, compacting, vibrating, leveling, finishing and curing etc. but excluding Cft the cost of MS re-inforcement bars i/c cost of RCC design & lab tests. RCC works be designed & submitted well in time by the contractor from approved designer or reputed structure designer. Complete in all respect as per specification and instruction of Engineer icharge. P/F: in position mild steel, reinforcement bars of minimum 40000 PSI yield strength, of any size and diameter i/c straightening, bending, placing, binding in position and binding wire, spacer, wastage etc. Steel required for RCC M.T works be designed & submitted well before by the contractor from approved designer or reputed structure designer. Complete in all respect as per specification and instruction of Engineer incharge. P/L: 1st class BB masonry in superstructure in any thickness of wall. Set in 1:6 cement sand mortar i/c racking out the joints where necessary, Scaffolding, making Cft grooves and corners where required & curing etc. Complete as per specification and instruction of Engineer Incharge.

1809

4.52

8176.68

880

1.26

1108.8

3695.6

75.19

277872.164

1009

100.81

101712.2495

141

32.34

4559.94

1104.9

153.44

169534.3216

3.68

86060.4

316702.3088

1303.9

108.55

141536.174

Earth filing: under floors with earth brought from out side 3.16-b+3.04approved source i/c all leads & lifts, filling in layers not C-9 a+3.18-c+3.19more than 6" thick, consolidating upto specified density b+3.26-b-02 and to the satisfaction of Engineer incharge. C-10 07.30 P/F: clean course sand under floors from an approved source i/c leveling, watering, compacting etc. Complete in all respect as per specification and instruction of Engineer incharge

Cft

1218

6.45

7856.1

Cft

404

12.21

4932.84

P/L: mosaic floors consisting of 1" thick PCC 1:2:4 divided into panels not morethan 3'x3' with 3/8" thick 10.22a+(10.43a marble strip and 1/2" thick mosaic topping (1 part of grey C-11 = 10x10 room = cement & 3 parts of approved colour and size marble chips 1/61 P.Sft) i/c curing, grinding, rubbing and polishing etc. Complete as per specification and instruction of Engineer incharge. P/L: 3/8" thick terrazzo dado or skirting over 1/2" thick cement plaster in 1:3 ratio, (1 part of gray cement and three parts of approved colour and size marble chips i/c grinding, rubbing, curing and wax polishing etc. Complete as per specification and instruction of Engineer incharge. P/A: 1/2" thick cement plaster on walls in 1:4 c/sand mortar i/c scaffolding, chamfering of edges, rounding the corners, making grooves and edges where required, P/F: of expended metal jali, 1/2"x1/2" size, 1' wide at all joints of RCC & bricks & curing etc. Complete as per specification and instruction of Engineer Incharge. P/A: deep struck pointing in cement/surkhi mortar in 1:1 with approved colour i/c racking out the joints not less than 1/2" deep, saturating the surface, scaffolding & curing etc. Complete in all respect as per specification and instruction of Engineer incharge.

Sft

826.63

61.47

50812.95

C-12

10.40a-01

Sft

80

52.56

4204.8

C-13

11.09b

Sft

4812.6

11.82

56884.46

C-14

11.18a

Sft

1567.5

13.11

20549.93

P/F: of 1st class 1" thick paneled door with 2"x5" 16 gauge M.S Sheet chowkat i/c all hardware and iron mongry such as earl drawer, handle, tower bolt, holdfast, 12.07c+12.24c+12.27a/28+13.06c-01+(2x13.06c02) with 1" thick panel door of 18 gauge C-15 cleat and stopper M.s Sheet, 2 coats of read oxide and 3 coats of synthetic enamel paint, filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of E/Incharge. P/F: 1" thick glazed windows/csw with 4"x1" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1" M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware such as hinges, holdfast, cleat & C-1625.039-b-05+12.50 stopper, handles, tower bolts, 12x24 wire mesh Islamabad made, 5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per specification and instruction of Engineer incharge. P/A: 3 coats of distemper SPD of (Berger Robbialac) or equivalent) on walls or ceiling as per approved shade & C-17 (11.23-a-03) quality i/c scraping of old surface, putty filling, cement repair where required & brining the surface to sparkling finish, P/F: 4" dia CI rain water pipe i/c jointing, bends and clamps 9.19a+9.20/15+ and 3 coats of synthetic enamel paint. complete in all C-18 9.21/15 respect as per specification and instruction of Engineer incharge. S/F: of 1" thick D/Wood joinery as in wire gauze door 12.13d+13.06bwithout chowkat i/c all iron mongery and hardware such as C-19 01+(13.06bhinges, handle, holdfast, door spring and tower bolts etc. 02x2) as approved, 12x24 wire mesh and 3 coats of S/E paint. P/L: PCC 1:3:6 as in plinth protection, around the building over compacted earth or where required i/c framework, placing, curing, leveling, compacting and finishing etc. Complete in all respect P/L: roof treatment consisting of:a) 2 coats of hot bitumen with sand blinding. 09.05+09.12+1 b) 2 layers of approved polythene sheet. C-21 1.17+polythene c) 4" thick compacted earth with proper slope. sheet d) 1" thick brick tiles in 1:6, grouting in 1:3 and flush pointing in 1:1 Complete Sub Total : C-20 6.05h

Sft

158.25

805.19

127421.3175

Sft

155

597.06

92544.3

Sft

4812.6

15.09

72621.53

Rft

75

363.71

27278.25

Sft

63.75

90.15

5747.06

Cft

152.96

101.41

15511.67

Sft

836

69.22

57867.92

1565435.76

INTERNAL ELECTRIFICATION S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)

E-1

Wiring of light or fan point from point to switch with 2x3/.029 Pakistan cable i/c sub circuit wiring with 7/.029 Pakistan cable, with all accessories such as PVC Non Schedule concealed conduit PPI switches (premier) fixed on plastic sheets & wooden box, ceiling rose and holder etc. Complete as per instruction of Engineer Incharge. Same as item # 01, but wiring with 2x7/.044+1x3/.029 for 3 pin 15 Amp. power plug i/c P/F: of 15 Amp. switch socket Non Schedule unit PPI (China clay base) fixed on wooden box on separate circuit. Complete as per instruction of Engineer Incharge. P/F: 4' long tube light (Asia/M. Inayatullah made) with starter, tube rod (Phillips) and choke. Complete as per specification and instruction of Engineer Incharge. P/F: of 56" sweep capacitor type ceiling fan with dimmer, (Pak Fan Delux) i/c suspension rod and canopy etc. Complete as per instruction of Engineer Incharge.

No

20

783.5

15670

E-2

No

950

4750

E-3

15.24b

No

12

528.17

6338.04

E-4

15.68c

No

2433.13

14598.78

E-5

Same as item # E-1, but wiring of 5 pin 5 Amp. light plug away from switch board i/c P/F: of PPI (premier) light plug Non Schedule i/c wiring with 7/.029 etc. Complete as per instruction of Engineer Incharge. Providing and Fixing of main board having:a. 20 AMP TPNACB 01 No. (Hager) or Tarrasaki Non Schedule b. 10 AMP single phase ACB 08 Nos. i/c connection of earth with main switch, Complete in all respect. P/Fixing: of 2 core 7/0.052 aluminum cable in PVC pipe of Non Schedule approved quality i/c connection from nearest source to main board. P/Fixing: 12" Sweep (Pak) Exhaust fan with louver. Complete in all respect as per specification and instruction of Engineer incharge. Earthing of main switch with 8 SWG copper wire, laid in 1/2" dia GI pipe from main switch to 2'x2' copper plate burried in 14 feet deep pit alongwith salt & charcoal mixture. Complete in all respect as per specification and instruction of Engineer incharge. Sub Total :

No

400

2400

E-6

No

18000

18000

E-7

Rft

180

80

14400

E-8

15.69a

No

1618.54

3237.08

E-9

15.53

No

6406.6

6406.6

85800.5

WATER SUPPLY & SANITARY INSTALLATION S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)

P/F: Asiatic type WC (ICI Boch) or equivalent) i/c "Master" 14.03a+14.10a Tanki, P/Trap, Stop Cock, Plastic Connection & Hockey +14.25+14.47a Pipe etc. Complete as per specification and instruction of Engineer Incharge. P/F: ICL Boch wash hand basin large size i/c water mixer, 14.05astop cocks (Fisal or equivalent), C.P inlet pipe and W-2 03+(14.25x2)+1 pedestal. Complete in all respect as per specification and 4.27 instruction of Engineer incharge. W-1 W-3 14.26a+14.23 P/F: CP adjustable shower rose i/c stop cock and CP inlet pipe etc. Complete as per instruction of Engineer Incharge. P/F: Brass bib cock " dia screw down type Faisal or equivalent make. Complete as per instruction of Engineer Incharge. P/F: of soil, water, vent pipe of CI with plain socket i/c tee, bend, caulking the joints with cement, painting to pipe, making holes and repair to original shape. Complete in all respect. 4" dia CI pipe. P/F: of soil, water, vent pipe of CI with plain socket i/c tee, bend, caulking the joints with cement, painting to pipe, making holes and repair to original shape. Complete in all respect. 2" dia CI pipe. S/L: jointing and testing of " dia GI pipe (IIL-L) i/c tees, bends, union, elbows, socket etc. Making hole and repair complete. P/F: 3" floor trap of CI i/c CP grating, caulking the joints with cement and hole repair complete. Providing and Fixing of best quality 24" long towel rail. (Fiasal or equivalent of approved quality). Complete in all respect as per specification and instruction of Engineer incharge. Providing and Fixing of best quality Plastic soap dish. (Fiasal or equivalent of approved quality). Complete in all respect as per specification and instruction of Engineer incharge. Providing and Fixing of best quality Plastic paper holder. (Fiasal or equivalent of approved quality). Complete in all respect as per specification and instruction of Engineer incharge. P/F: CP bib cock heavy 1/2" dia Faisal or equivalent made. Complete as per specification and instruction of E/Incharge.

No

3280.13

3280.13

No

2272.18

2272.18

No

684.82

684.82

W-4

14.39-a

No

185.31

370.62

W-5

14.34b-01

Rft

30

377.4

11322

14.34b-02

Rft

18

257.42

4633.56

W-6 W-7

24.16c-01 14.31a

Rft No

80 2

42.74 597.03

3419.2 1194.06

W-8

14.16a

No

415.88

415.88

W-9

14.20a

No

110.53

110.53

W-10

14.20b

No

129.23

129.23

W-11

14.24b

No

353.56

707.12

Construction of septic tank of BB size, 8'x4'x6' with 9" thick BB wall, 4" thick BB partition, 1/2" thick cement plaster in W-12 Non Schedule 1:4 and 6" thick PCC 1:3:6 in foundation and bed, 4" thick RCC 1:2:4 precast covers with 1/2" dia bars, 4" C/C both way. Complete as per instruction of Engineer Incharge. Construction of 6' internal dia 30' deep soakage pit i/c 9" thick BB in 1:4 from top to 6' depth, filling of pit with stone W-13 Non-Schedule boulder, making chemny and RCC 1:2:4 cover 4" thick with 1/2" dia bars 4" C/C both way. Complete in all respect as per specification and instruction of Engineer incharge. P/L: in trench, jointing and testing 6" dia RCC pipe i/c collar, excavation of trench & re-filling after laying of pipe. W-14 23.01b Complete as per specification and instruction of Engineer Incharge. Construction of 2'x2' or 2' dia BB manhole, upto required depth i/c 4" PCC 1:4:8 in bed, BB wall laid & plastered in W-15 Non-Schedule 1:4 making channel inside and RCC 1:2:4 cover, 4" thick with 3/8" dia bars 4" C/C both side. W-16 14-69-b-03 S/F: of polythene water tank 500 gallons Sub Total :

No

30000

30000

No

45000

45000

Rft

40

101.26

4050.4

No No

4 1

3500 22586

14000 22586 144175.73

HEALTH FACILTY IMPROVEMENT & RFEHABILITATION OF CIVIL DISPENSARY KOHI BAHARA FR D.I KHAN TASK-8
Doors & Windows of Doctor House

1- Removing door with chowkat (Existing) 16 Nos. 2- Removing windows CSW 9 Nos.

3- P/F: of 1st class 1" thick paneled door with 2"x5" 16 gauge M.S Sheet chowkat i/c all hardware and iron mongry such as earl drawer, handle, tower bolt, holdfast, cleat and stopper with 1" thick panel door of 18 gauge M.s Sheet, 2 coats of read oxide and 3 coats of synthetic enamel paint, filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of E/Incharge. 1 4.00 8.50 = 34.00 10 3.50 7.00 = 245.00 1 3.00 7.00 = 21.00 4 2.50 7.00 = 70.00 370.00 Total =

Sft Sft Sft Sft Sft

4- P/F: 1" thick glazed windows/csw with 4"x1" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1" M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware such as hinges, holdfast, cleat & stopper, handles, tower bolts, 12x24 wire mesh Islamabad made, 5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per specification and instruction of Engineer incharge. 2 3 2 1 1 8.00 6.00 4.00 3.00 2.00 5.50 5.50 5.50 2.00 2.00 Total = = = = = = 88.00 99.00 44.00 6.00 4.00 241.00 Sft Sft Sft Sft Sft Sft

Dining Hall Wash Basin

1- P/F: ICL Boch wash hand basin large size i/c water mixer, stop cocks (Fisal or equivalent), C.P inlet pipe and pedestal. Complete in all respect as per specification and instruction of Engineer incharge. 2 Nos.

Quarter Class-IV & Chowkidar House

1- Removing door with chowkat (Existing) 21 Nos. 2- Removing windows CSW 12 Nos. 3- S/F: of Steel doors 18 SWG MS sheet with angle iron frame 1"x1"x1/8", bolt, hinges & paint etc. 3 4.00 Total 7.00 = = 84.00 Sft 84.00 Sft

4- P/F: of 1st class 1" thick paneled door with 2"x5" 16 gauge M.S Sheet chowkat i/c all hardware and iron mongry such as earl drawer, handle, tower bolt, holdfast, cleat and stopper with 1" thick panel door of 18 gauge M.s Sheet, 2 coats of read oxide and 3 coats of synthetic enamel paint, filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of E/Incharge. 6 3.50 8.50 = 178.50 3 3.50 7.00 = 73.50 3 3.00 8.50 = 76.50 6 2.50 7.00 = 105.00 433.50 Total =

Sft Sft Sft Sft Sft

5- P/F: 1" thick glazed windows/csw with 4"x1" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1" M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware such as hinges, holdfast, cleat & stopper, handles, tower bolts, 12x24 wire mesh Islamabad made, 5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per specification and instruction of Engineer incharge. 3 6 3 6.00 5.00 3.00 5.50 5.50 5.50 Total = = = = 99.00 165.00 49.50 313.50 Sft Sft Sft Sft

BHU Distempering

1- P/A: 2 coats of distemper SPD of (Berger Robbialac) or equivalent) on walls or ceiling as per approved shade & quality i/c scraping of old surface, putty filling, cement repair where required & brining the surface to sparkling finish, complete as per instruction of Engineer incharge. 987.65 Sft 3046.69 Sft 4034.34 Sft

Transformer 25 KV

1- S/F: of 4 legged angle iron HT pole in PCC 1:3:6 at depth of 6' complete in all respect as per WAPDA specification I/c HT shackles disc, insulators wooden bars etc. earthing of each pole as per instruction of Engineer incharge. 2 Nos. 2- S/F of HT line of aluminum conductor 7/.132 aluminum as per WAPDA specification I/c 3% saage, cutting, jointing. Complete in all respect as per specification and instruction of Engineer incharge. 800 Rft 3- P/F of 4 core cable as per design 19/.083 for connection of electric board for motor to transformer. Complete in all respect as per specification and instruction of Engineer incharge. 60.00 Rft 4- P/F: of transformer 25 KVA "Climax" I/c H.poles with transformer for meter etc. as per WAPDA specification. 1 Nos.

ESTIMATE FOR CONSTRUCTION OF NEW TUBE WELL BORING & MACHINARY

New Tube Well 1- Resistivity of survey for selection of site. 1 Job 2- Mobilization of boring plant and equipment to site 1 Job 3- Tube Well boring in all kind of soil except shangle/rock 18" I/d from ground upto 100' below G.L 100.00 Rft 4- From 101' to 200' below G.L 18" I/d. 100.00 Rft 5- From 201' to 300' below G.L 18" I/d. 100.00 Rft 6- From 301' to 340' below G.L 18" I/d. 40.00 Rft

7- Subsequent shifting to next site (if required) 1 Job 8- Providing and installation PVC blind pipe in tube well with stranger BSS class "D" working pressure and jointing. 12" I/d 340.00 Rft 9- Furnishing sample of water from bore hole and testing. 4 Sets 10- S/Installation of 12" dia 2' long M.S bail plug in tube well bore hole. Complete in all respect as per specification and instruction of Engineer incharge. 1 No. 11- S/Installation on MS suspension clamp of heavy duty 3/8" thick 12" I/d with PCC 1:2:4 block round it Complete. 1 Job 12- Furnishing/installation of MS cap over housing pipe with locking arrangement. Complete in all respect as per specification and instruction of Engineer incharge. 1 Job 13- Shrouding with graded gravel pack 3/8" to 1/8" around tube well in bore hole. Complete in all respect as per specification and instruction of Engineer incharge.

340.00 Rft 14- Development and testing of tube well with air compressor over 1.5 cusecs discharge. Complete in all respect as per specification and instruction of Engineer incharge.

72.00 Hrs 15- Development and testing of tube well with "D" and "T" unit. Complete in all respect as per specification and instruction of Engineer incharge. 1 Job 16- Supply/Installation of "KSB" submersible pumping set with seimens A.C electric motor upto 40 H.P, 6" dia 12 stages KSB pump, 6" dia KSB column pipes of required length, 4 core submersible electric cable for 40 HP motor to electric starter, 14 gauge main switch board, star/delta "Seimens" starter, Japan made, bolt meter, Ampere meter and selector switches, phase indicator lamps, earthing of main switch board and starter, 6" dia sluice valve and non return valve of "AERO Brand" 6" dia M.S long bend and 18 gauge M.S sheet cover for bore hole. Complete in all respect as per specification and instruction of Engineer incharge. 1 Set

17- P/F of 6" dia C.I sluice valve. BSS standard for G.I and PVC pipe I/c jointing material. Complete in all respect as per specification and instruction of Engineer incharge.

2 Nos. 18- P/F: of 6" dia G.I pipe or CI Tee with jointing material. Complete in all respect as per specification and instruction of Engineer incharge. 2 Nos. 19- P/F: of 6" dia GI pipe heavy quality I/c excavation of trench and refilling. Complete in all respect as per specification and instruction of Engineer incharge. 250.00 Rft 20- P/F: of 6" dia G.I socket heavy quality. Complete in all respect as per specification and instruction of Engineer incharge. 9 Nos. 21- P/F: of 6" dia G.I Long bend heavy quality with jointing material. Complete in all respect as per specification and instruction of Engineer incharge. 2 Nos. Stabilizer (10000 Watt)

1- S/F: 10000 watt Stablizier (Universal or Allied) 1 No. Water Supply P/Fixing 1" dia G.I pipe (IIL-L) or equivalent in trench I/c excavation and its refilling, all necessary fitting for pipe. Complete in all respect as per specification and instruction of Engineer incharge.

200.00 Rft ESTIMATE FOR CONSTRUCTION OF LABOUR ROOM & MEDICAL LABORATORY AT KOHI BAHARA FR D.I KHAN

Civil Work C-1 Excavation as in foundation of building upto required depth in all kind of soil i/c subsequent re-filling in trenches and plinth area or where required, disposal of surplus earth as directed, watering, ramming and consolidating the earth as as specified complete in all respect as per specification and instruction of E/Incharge. 2 5 1 1 9 56.75 13.50 3.00 3.00 4.00 3.00 3.00 3.00 1.50 4.00 3.00 3.00 3.00 2.00 1.00 Total = = = = = = 1021.50 607.50 27.00 9.00 144.00 1809.00 Cft Cft Cft Cft Cft Cft

C-2

P/A: termite proofing chemicals in 3 stages as per specification and instruction of Engineer Incharge. As per Covered Area 880.00 Sft

C-3

P/L: P.C.C 1:4:8 in any part of building such as foundation, sub flooring etc. using 1" down graded stone aggregate i/c framework, placing, compacting, leveling and curing etc. Complete as per specification and instruction of Engineer incharge. 2 5 1 1 9 1 1 1 1 1 1 56.75 13.50 3.00 3.00 4.00 20.00 15.00 10.00 5.00 10.00 11.25 3.00 3.00 3.00 1.50 4.00 16.00 16.00 10.00 5.00 5.50 5.75 0.75 0.75 0.75 0.50 0.50 0.50 0.50 0.50 0.50 51.50 0.50 Total = = = = = = = = = = = = 255.38 151.88 6.75 2.25 72.00 160.00 120.00 50.00 12.50 2832.50 32.34 3695.60 Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft

C-4

P/L: 1st class BB masonry in foundation and plinth in 1:6 cement sand mortar i/c racking out the joints where necessary scaffolding & curing etc. Complete in all respect as per specification and instruction if Engineer incharge. 2 2 2 2 5 5 5 5 1 1 1 1 1 1 54.87 54.50 54.12 53.75 14.87 15.25 15.62 16.00 4.25 4.62 5.00 4.25 4.62 5.00 1.87 1.50 1.13 0.75 1.87 1.50 1.13 0.75 1.50 1.13 0.75 1.50 1.13 0.38 Total 0.75 0.75 0.75 2.50 0.75 0.75 0.75 2.50 0.75 0.75 2.50 0.75 0.75 3.25 = = = = = = = = = = = = = = = 153.91 122.63 91.73 201.56 104.28 85.78 66.19 150.00 4.78 3.92 9.38 4.78 3.92 6.09 1008.95 Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft

C-5

P/L: 2" thick DPC with cement concrete, 1:2:4 using approved quality fine/course aggregate i/c farmwork, compacting, leveling, finishing and curing etc. 2 coats of hot bitumen (PB/3 or PB/4) and 2 layers of approved polythene sheet. Complete in all respect as per specification and instruction of Engineer incharge. 1 188.00 0.75 = Total = 141.00 Sft 141.00 Sft

C-6

P/L: RCC 1:2:4 i/c finishing as in footing, columns, beam, lintels, slabs, sun shade & projection etc. of specified strength using approved quality crushed stone & fine aggregate i/c formwork & its removal, compacting, vibrating, leveling, finishing and curing etc. but excluding the cost of MS reinforcement bars i/c cost of RCC design & lab tests. RCC works be designed & submitted well in time by the contractor from approved designer or reputed structure designer. Complete in all respect as per specification and instruction of Engineer icharge. 2 5 2 1 8 8 8 1 3 2 1 4 2 1 2 2 1 8 8 53.75 16.00 5.00 5.00 4.00 4.00 0.75 5.50 5.00 4.00 7.50 6.50 4.50 18.50 54.75 18.50 24.00 0.75 2.50 0.75 0.75 0.75 0.38 4.00 4.00 0.75 0.75 0.75 0.75 0.75 0.75 0.75 54.75 0.33 0.33 2.00 0.75 1.00 0.75 0.75 0.75 0.75 1.00 0.33 15.00 0.75 0.75 0.75 0.75 0.75 0.75 0.50 2.25 2.25 0.25 15.00 1.00 Total = = = = = = = = = = = = = = = = = = = = 60.47 45.00 5.63 1.41 128.00 42.24 67.50 3.09 8.44 4.50 4.22 14.63 5.06 506.44 81.30 27.47 12.00 67.50 20.00 1104.89 Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft

C-7

P/F: in position mild steel, reinforcement bars of minimum 40000 PSI yield strength, of any size and diameter i/c straightening, bending, placing, binding in position and binding wire, spacer, wastage etc. Steel required for RCC works be designed & submitted well before by the contractor from approved designer or reputed structure designer. Complete in all respect as per specification and instruction of Engineer incharge. R.C.C 1:2:4 (item No.C-5) 1104.89 x 7.35/2204 = Total = 3.68 M.T 3.68 M.T

C-8

P/L: 1st class BB masonry in superstructure in any thickness of wall. Set in 1:6 cement sand mortar i/c racking out the joints where necessary, Scaffolding, making grooves and corners where required & curing etc. Complete as per specification and instruction of Engineer Incharge.

2 4 2 1 Deduction 1 4 1 3 2

53.75 16.00 5.00 5.00

0.75 0.75 0.75 0.38

11.00 11.00 11.00 11.00 Total-A 5.50 5.50 8.50 7.00 7.00 Total D/d

= = = =

886.88 528.00 82.50 20.63 1518.01 24.75 82.50 25.50 55.13 26.25 214.13

Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft Cft

6.00 5.00 4.00 3.50 2.50

0.75 0.75 0.75 0.75 0.75

= = = = = =

Net B.B

1518.01

( - )

214.13 =

1303.88 Cft

C-9

Earth filing: under floors with earth brought from out side approved source i/c all leads & lifts, filling in layers not more than 6" thick, consolidating upto specified density and to the satisfaction of Engineer incharge. 1 1 1 20.00 15.00 15.75 16.00 16.00 16.00 1.50 1.50 1.50 Total = = = = 480.00 360.00 378.00 1218.00 Cft Cft Cft Cft

C-10

P/F: clean course sand under floors from an approved source i/c leveling, watering, compacting etc. Complete in all respect as per specification and instruction of Engineer incharge

1 1 1

20.00 15.00 15.50

16.00 16.00 16.00

0.50 0.50 0.50 Total

= = = =

160.00 120.00 124.00 404.00

Cft Cft Cft Cft

C-11

P/L: mosaic floors consisting of 1" thick PCC 1:2:4 divided into panels not morethan 3'x3' with 3/8" thick marble strip and 1/2" thick mosaic topping (1 part of grey cement & 3 parts of approved colour and size marble chips i/c curing, grinding, rubbing and polishing etc. Complete as per specification and instruction of Engineer incharge. 1 1 1 3 2 1 20.00 15.00 15.75 3.50 2.50 4.00 16.00 16.00 16.00 0.75 0.75 0.75 Total = = = = = = = 320.00 240.00 252.00 7.88 3.75 3.00 826.63 Sft Sft Sft Sft Sft Sft Sft

C-12

P/L: 3/8" thick terrazzo dado or skirting over 1/2" thick cement plaster in 1:3 ratio, (1 part of gray cement and three parts of approved colour and size marble chips i/c grinding, rubbing, curing and wax polishing etc. Complete as per specification and instruction of Engineer incharge. 1 20.00 Total 4.00 = = 80.00 Sft 80.00 Sft

C-13

P/A: 1/2" thick cement plaster on walls in 1:4 c/sand mortar i/c scaffolding, chamfering of edges, rounding the corners, making grooves and edges where required, P/F: of expended metal jali, 1/2"x1/2" size, 1' wide at all joints of RCC & bricks & curing etc. Complete as per specification and instruction of Engineer Incharge. 2 20.00 11.00 = 440.00 2 16.00 11.00 = 352.00 1 20.00 16.00 = 320.00 2 15.00 11.00 = 330.00 2 16.00 11.00 = 352.00 1 16.00 15.00 = 240.00 2 10.00 11.00 = 220.00 4 10.00 11.00 = 440.00 1 10.00 10.00 = 100.00 2 10.00 11.00 = 220.00 1 10.00 5.50 = 55.00 1 20.00 7.00 = 140.00 1 16.75 11.00 = 184.25 1 16.75 5.75 = 96.31 2 53.75 11.00 = 1182.50 2 17.50 11.00 = 385.00 Total-A 5057.06 Deduction 3.50 7.00 = 73.50 3 4.00 7.00 = 28.00 1 5.00 5.50 = 110.00 4 6.00 5.50 = 33.00 1 Total-B = 244.50 Net Plaster (A - B) 5057.06 ( - ) 244.50 =

Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft

4812.56 Sft

C-14

P/A: deep struck pointing in cement/surkhi mortar in 1:1 with approved colour i/c racking out the joints not less than 1/2" deep, saturating the surface, scaffolding & curing etc. Complete in all respect as per specification and instruction of Engineer incharge. 2 2 53.75 17.50 11.00 = 11.00 = Total = 1182.50 Sft 385.00 Sft 1567.50 Sft

C-15

P/F: of 1st class 1" thick paneled door with 2"x5" 16 gauge M.S Sheet chowkat i/c all hardware and iron mongry such as earl drawer, handle, tower bolt, holdfast, cleat and stopper with 1" thick panel door of 18 gauge M.s Sheet, 2 coats of read oxide and 3 coats of synthetic enamel paint, filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of E/Incharge. 1 4.00 8.50 = 34.00 3 3.50 8.50 = 89.25 2 2.50 7.00 = 35.00 158.25 Total =

Sft Sft Sft Sft

C-16

P/F: 1" thick glazed windows/csw with 4"x1" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1" M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware such as hinges, holdfast, cleat & stopper, handles, tower bolts, 12x24 wire mesh Islamabad made, 5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per specification and instruction of Engineer incharge. 1 4 2 6.00 5.00 3.00 5.50 5.50 2.00 Total = = = = 33.00 110.00 12.00 155.00 Sft Sft Sft Sft

C-17

P/A: 3 coats of distemper SPD of (Berger Robbialac) or equivalent) on walls or ceiling as per approved shade & quality i/c scraping of old surface, putty filling, cement repair where required & brining the surface to sparkling finish, complete as per instruction of Engineer incharge. As per item No.C-12 Total = = 4812.56 Sft 4812.56 Sft

C-18 P/F: 4" dia CI rain water pipe i/c jointing, bends and clamps and 3 coats of synthetic enamel paint. complete in all respect as per specification and instruction of Engineer incharge. 5 x 15.00 = 75.00 Rft

C-19

S/F: of 1" thick D/Wood joinery as in wire gauze door without chowkat i/c all iron mongery and hardware such as hinges, handle, holdfast, door spring and tower bolts etc. as approved, 12x24 wire mesh and 3 coats of S/E paint. Complete in all respect as per specification and instruction of E/Incharge. 1 4.00 8.50 = 34.00 Sft 1 3.50 8.50 = 29.75 Sft Total = 63.75 Sft

C-20

P/L: PCC 1:3:6 as in plinth protection, around the building over compacted earth or where required i/c framework, placing, curing, leveling, compacting and finishing etc. Complete in all respect as per specification and instruction of Engineer Incharge. 2 2 59.75 17.50 3.00 3.00 0.33 = 0.33 = Total = 118.31 Cft 34.65 Cft 152.96 Cft

C-21

P/L: roof treatment consisting of:a) 2 coats of hot bitumen with sand blinding. b) 2 layers of approved polythene sheet. c) 4" thick compacted earth with proper slope. d) 1" thick brick tiles in 1:6, grouting in 1:3 and flush pointing in 1:1 Complete as per specification and instruction of Engineer Incharge.

52.25 Total

16.00 = =

836.00 Sft 836.00 Sft

INTERNAL ELECTRIFICATION

E-1 Wiring of light or fan point from point to switch with 2x3/.029 Pakistan cable i/c sub circuit wiring with 7/.029 Pakistan cable, with all accessories such as PVC concealed conduit PPI switches (premier) fixed on plastic sheets & wooden box, ceiling rose and holder etc. Complete as per instruction of Engineer Incharge. 20 Nos E-2 Same as item # 01, but wiring with 2x7/.044+1x3/.029 for 3 pin 15 Amp. power plug i/c P/F: of 15 Amp. switch socket unit PPI (China clay base) fixed on wooden box on separate circuit. Complete as per instruction of Engineer Incharge. 5 Nos E-3 P/F: 4' long tube light (Asia/M. Inayatullah made) with starter, tube rod (Phillips) and choke. Complete as per specification and instruction of Engineer Incharge. 12 Nos E-4 P/F: of 56" sweep capacitor type ceiling fan with dimmer, (Pak Fan Delux) i/c suspension rod and canopy etc. Complete as per instruction of Engineer Incharge. 6 Nos E-5 Same as item # E-1, but wiring of 5 pin 5 Amp. light plug away from switch board i/c P/F: of PPI (premier) light plug i/c wiring with 7/.029 etc. Complete as per instruction of Engineer Incharge. 6 Nos E-6 Providing and Fixing of main board having:1 No E-7 P/Fixing: of 2 core 7/0.052 aluminum cable in PVC pipe of approved quality i/c connection from nearest source to main board.

E-8 P/Fixing: 12" Sweep (Pak) Exhaust fan with louver. Complete in all respect as per specification and instruction of Engineer incharge. 2 Nos. E-9 Earthing of main switch with 8 SWG copper wire, laid in 1/2" dia GI pipe from main switch to 2'x2' copper plate burried in 14 feet deep pit alongwith salt & charcoal mixture. Complete in all respect as per specification and instruction of Engineer incharge. 1 No.

WATER SUPPLY & SANITARY INSTALLATION

W-1

P/F: Asiatic type WC (ICI Boch) or equivalent) i/c "Master" Tanki, P/Trap, Stop Cock, Plastic Connection & Hockey Pipe etc. Complete as per specification and instruction of Engineer Incharge. 1 No.

W-2

P/F: ICL Boch wash hand basin large size i/c water mixer, stop cocks (Fisal or equivalent), C.P inlet pipe and pedestal. Complete in all respect as per specification and instruction of Engineer incharge. 1 No.

W-3

P/F: CP adjustable shower rose i/c stop cock and CP inlet pipe etc. Complete as per instruction of Engineer Incharge. 1 No.

W-4

P/F: Brass bib cock " dia screw down type Faisal or equivalent make. Complete as per instruction of Engineer Incharge. 2 Nos.

W-5

P/F: of soil, water, vent pipe of CI with plain socket i/c tee, bend, caulking the joints with cement, painting to pipe, making holes and repair to original shape. Complete in all respect. 4" dia CI pipe. 1 30.00 = 30.00 Rft

2" dia CI pipe.

18.00 =

18.00 Rft

W-6

S/L: jointing and testing of " dia GI pipe (IIL-L) i/c tees, bends, union, elbows, socket etc. Making hole and repair complete. 80.00 Rft

W-7

P/F: 3" floor trap of CI i/c CP grating, caulking the joints with cement and hole repair complete. 2 Nos.

W-8

Providing and Fixing of best quality 24" long towel rail. (Fiasal or equivalent of approved quality). Complete in all respect as per specification and instruction of Engineer incharge. 1 No. Providing and Fixing of best quality Plastic soap dish. (Fiasal or equivalent of approved quality). Complete in all respect as per specification and instruction of Engineer incharge. 1 No. Providing and Fixing of best quality Plastic paper holder. (Fiasal or equivalent of approved quality). Complete in all respect as per specification and instruction of Engineer incharge. 1 No.

W-9

W-10

W-11

P/F: CP bib cock heavy 1/2" dia Faisal or equivalent made. Complete as per specification and instruction of E/Incharge. 2 Nos.

W-12

Construction of septic tank of BB size, 8'x4'x6' with 9" thick BB wall, 4" thick BB partition, 1/2" thick cement plaster in 1:4 and 6" thick PCC 1:3:6 in foundation and bed, 4" thick RCC 1:2:4 precast covers with 1/2" dia bars, 4" C/C both way. Complete as per instruction of Engineer Incharge. 1 No.

W-13

Construction of 6' internal dia 30' deep soakage pit i/c 9" thick BB in 1:4 from top to 6' depth, filling of pit with stone boulder, making chemny and RCC 1:2:4 cover 4" thick with 1/2" dia bars 4" C/C both way. Complete in all respect as per specification and instruction of Engineer incharge. 1 No.

W-14

P/L: in trench, jointing and testing 6" dia RCC pipe i/c collar, excavation of trench & re-filling after laying of pipe. Complete as per specification and instruction of Engineer Incharge. 40.00 Rft

W-15

Construction of 2'x2' or 2' dia BB manhole, upto required depth i/c 4" PCC 1:4:8 in bed, BB wall laid & plastered in 1:4 making channel inside and RCC 1:2:4 cover, 4" thick with 3/8" dia bars 4" C/C both side. Complete as per instruction of Engineer Incharge. 4 Nos.

W-16

S/F: of polythene water tank 500 gallons 1 No.