Sunteți pe pagina 1din 79

I.T.T.

SpA
INTRODUCTION

Sheet 1

VERTICAL CYLINDRICAL HEATERS

BOX HEATERS

REFORMERS

I.T.T. SpA
ORGANIZATION CHART
(PRE) PRESIDENT

Sheet 2

(GM) DIRECTOR & GENERAL MANAGER

(ADM) FINANCING ADMINISTRATION & HUMAN RESOURCES DIRECTOR

(QAM) QUALITY MANAGER Rappresentante della Direzione

(CM) Secretary & Accounting SECRETARY & GENERAL SERVICES DIRECTOR SECRETARY

(SDM) SALES

(TDM) DESIGN &


ENGINEERI NG

(PEM) PROCESS ENGINEERING

(PDM) PROCUEREME NT & SHIPPING

SHOP MANUFACTURING

(QCM) QUALITY CONTROL &


EXPEDITING

(CSM) ERECTION
COMMISSIO NING &

(PM) PROJECT MANAGEMENET

START UP

U.T. Secretary) Calculation/ Specification

Approved Manuafcturers

Drawings & Material Requisition Engineering Office External Engineering Offices

I.T.T. SpA
EXECUTION PLAN
F.I.M. & EQUIPMENT SHOP CRITICAL ACTIVITIES

Sheet 3

CATALYST TUBES & SPRING

TUBE & FITTING FOR PRESSURE PARTS

LOOSE MATERIAL FOR INLET DISTRIBUTORS

TUBES FOR HAIRPINS & FINNED TUBES

- STEELWORK FABRICATION & SUPPLY - LADDERS, PLATFORMS & GRATINGS & SUPPLY - STACK, DUCTS FABRICATION - WHS COIL FABRICATION - WHS LINING INSTALLATION - WHS MODULARIZATION - STACK / DUCTS LINING INSTALLATION - INLET DISTRIBUTOR FABRICATION - COLD COLLECTOR FABRICATION - HAIRPINS BENDING - STACK LINING APPLICATION - FG DUCTS LINING APPLICATION - DAMPERS FABRICATION & SUPPLY - DOORS FABRICATION & SUPPLY - MISCELLANEA SUPPLY AND FABRICATION

I.T.T. SpA MANAGEMENT & SUPERVISION

BURNERS

SITE ACTIVITIES
FANS & MOTORS - SITE SURVEY OF FOUNDATION - ERECTION OF RADIANT SECTION - RADIANT SECTION LINING APPLICATION - ERECTION OF WHS MODULES - ERECTION OF DUCT SECTIONS - ERECTION OF STACK SECTIONS - ERECTION OF PLATFORMS & LADDERS - PRESSURE PARTS FIELD WELDING - WELDING OF CATALYST TUBES - FIELD WELDING OF INTERC. PIPING - WELDING OF INLET HAIRPINS - INSTALLATION OF BURNERS - WELDING OF EXTERNAL PIPING - INSTALLATION OF MOTORS / FANS - MISCELLANEA INSTALLATION - INSTRUMENTATION INSTALLATION

CASTINGS

INSTRUMENTS & OTHER EQUIPMENTS

LINING MATERIAL

- DETAILED ENGINEERING - MECHANICAL DESIGN - Structural calculations - Pressure part calculations - CONSTRUCTION DRAWINGS - W.P.S. (Welding procedure Specification) - Q.A.P. (Quality Assurance Plan) - I.T.P. (Inspection Test plan) - P.P.P. (Project Procurement Plan) - ERECTION PROCEDURES - SCHEDULING - CHECK OF WELDING QUALIFICATION - PROCEDURE FOR ERECTION & INSTALLATION - 100 % SUPERVISION ON CRITICAL ACTIVITIES - Fit Up - Intermediate check of Steel Structure - All lining work - Welder qualification for site completion and installation - Coils welding

I.T.T. SpA
COMPANY PROFILE

Sheet 4

I.T.T. SpA is a leading Italian Company who specialise in the design, manufacture and installation of reformers and fired heaters for global oil, gas and petrochemical industries. Understanding of process technology is a key factor in our ability to provide the best fired heaters for the job and to provide units designed to maximise efficiency and to minimise emissions. There is no fired heater challenge we cannot meet, whether for new installations, replacements, revamps or retrofit. We have the experience since 1954 and present day structure to handle both single heater projects as well as larger and more complex multiple heater projects and reformers. I.T.T. was formed as an independent Company to develop new business in international markets, following reorganisation and splitting of Kirchner Italia business in 1997. We operate from our offices in Milan, Delhi and Seoul as well as through our workshop and worldwide network of Agents and Representatives. I.T.T. has its own thermal and mechanical design capability for Fired Heaters and our own in-house software resulting from fifty years of experience and reliable know-how. We are as well approved constructor of Reformers and Heaters designed by other parties (HALDOR TOPSE, UOP, etc.).

I.T.T. SpA
QUALITY POLICY and QUALITY ASSURANCE
QUALITY POLICY (ISO 9001:2008 International Standard)

Sheet 5

I.T.T. SpA has established his quality policy based on understanding of process technology, providing best and reliable design, best quality, on time delivery and competitive price. The company is totally committed to this policy and follow this strategy: Keep and improve the design reliability based on proven know-how since 1954 and feed back data; Implement quality products with competitive prices and on-time deliveries in accordance with Codes and Standards; Follow Client specifications and requirements; Establish a training program to improve potential capability and performance of personnel; Establish the Company strategic annual objectives, targets and review of management activities. All personnel share understanding and responsibilities aimed at the enhancement of their performance and achievement of Companys policy.

QUALITY ASSURANCE

The Quality Control for design, fabrication and erection assure that every project is performed in strict accordance with all Codes and Standards as well as Customers specifications and ISO 9001:2008
A. Piccioni I.T.T. SpA Managing Director

I.T.T. SpA
PRODUCTS & SERVICES
DETAILED ENGINEERING, PROCUREMENT, SHOP FABRICATION AND ERECTION OF REFORMER PACKAGE FOR HYDROGEN UNITS, METHANOL AND AMMONIA PLANTS (based on Licensors Basic design HALDOR TOPSE A/S, KBR, ETC..). BASIC AND DETAILED ENGINEERING OF FIRED HEATERS WITH I.T.T. OWN DESIGN: Crude Oil Heaters / Charge Heaters / Vacuum Heaters / Coker Heaters / Hydrocracker Heaters / Hydrotreater Heaters / Platforming Heaters / Preheaters / Hot Oil Heaters / Dowtherm Heaters / Reboilers / Start-up Heaters / Regeneration Furnaces / Visbreaking Heaters / Ethylene Cracking Heaters / Ethane Cracking Heaters / Naphtha Cracking Heaters AIR PREHEATING SYSTEMS STEAM GENERATION SYSTEMS WASTE HEAT BOILERS (WHB) AND WASTE HEAT RECOVERY SECTIONS (WHS) DESIGN AND ENGINEERING SERVICES, PROCUREMENT, EXPEDITING, SUPERVISION FOR FIELD ERECTION, DRY OUT. COMMISSIONING AND START UP. ENERGY CONSERVATION FEASIBILITY STUDIES. PROCESS DESIGN PACKAGE AND REVAMPING OF EXISTING HEATERS. CONSULTING AND TRAINING COURSES. SITE ERECTION. POST SALE ASSISTANCE.

Sheet 6

I.T.T. SpA
REFORMERS

Sheet 7

I.T.T. SpA
REFORMERS

Sheet 8

I.T.T. SpA
The INDIPENDENT Syngas Engineers
TABLE OF CONTENTS
1 2 a. b. c. d. e. f. 3 Company Experience Design and Engineering Process Design & Thermal Design Fluid Dynamics Design Mechanical Design Structural Engineering Piping Engineering Flexibility Piping Engineering Prefabrication Grade 3 5 5 6 8 9 10 12 13

Sheet 9

I.T.T. SpA
The INDIPENDENT Syngas Engineers
1. Company Experience
ITT is the leading Independent Syngas Reforming Engineer in the worldwide market. Based on their over 50 years and over 50 furnaces experience, ITT have been able to design, engineer, supply and start-up Steam Reforming packages for all Syngas application including: Hydrogen Ammonia Methanol Hy-Co Syngas Besides all the technical consideration above explained it is worthy to note that ITT performance limited to the very last 5 years is as follows: -26 Steam Reforming Units designed and supplied / being supplied to 5 different Process Licenses -5776 Catalyst Tubes purchased -Large single train Steam Reforming unit up to 384 tubes.

Sheet 10

Keeping an ideal condition of independence from any specific Basic Process Licensor, ITT has developed a wide knowledge of the specifications and details of construction as typical of all such Licensors and has at present an unequalled record of designed Steam Reforming Furnaces within units licensed by: Haldor Topsoe Technip Kellogg Brown & Root Ammonia and Methanol Casale Davy Process

-Largest single train firing in Steam Reforming package in excess of 500 MW, inclusive of auxiliary tunnel firing, convection crossover firing and external steam superheating. The simplified 3-D model of this package is shown here below:

Also, the composite origin of our key personell, coming from very senior positions and several differentiated experiences in other companies for the last 35 years, makes ITT very comfortable in dealing with such design issues as implemented in Syngaz Reforming technology by: KTI Uhde Lurgi Linde (Selas) Petrobras CENPES Foster Wheeler

Experience as gained from these wide references allows ITT to design their Steam Reformers in any current state of the art technique including: Top firing Side firing Short hot stiff pigtail outlets Short cold stiff pigtail outlets Long hot flexible pigtail outlets Premix PSA/Make Up Gas firing Separate gun PSA/Make Up Gas firing Hot headers Cold headers Ground mounted lined transferlines Penthouse mounted lined and jacketed transferlines

A comprehensive list of all 50 years of references of ITT is attached hereto together with a more detailed list including the major technical data of all Steam Reformers design and supplied by ITT in the last 15 years. Also, a set of pictures of Steam Reformers package form around the world is attached.

I.T.T. SpA
The INDIPENDENT Syngas Engineers
2. Design and Engineering a. Process Design & Thermal Design b. Fluid Dynamics Design

Sheet 11

Process reaction design and thermal design are done by using ITT proprietary softwares, fully validated in all the many years of experience of ITT in the field of Syngas Steam Reforming. Catalyst data as given by the Licensor are checked with specialized Catalyst companies such as Johnson Mattey, Suedchemie, Topsoe or others before being imputed into ITT proprietary process and thermal design softwares.

A great deal of attention is given in ITT Reformer Design is paid to the Fluid Dynamics issues. This usually involves CFD analysis by using FLUENT software. Namely, the flue gas flow in the radiant tunnels of Top Fired Reformers is always simulated and optimized. A few examples of tunnel design procedure are given below: - 3-D modeling for mesh preparation

I.T.T. SpA
The INDIPENDENT Syngas Engineers
- Tunnel openings modeling c. Mechanical Design

Sheet 12

Critical parts of the Reformer Package are designed to the most updated and sophisticated design tools. Namely, critical intermediate tube sheets in the case of high biridgewall temperature design of horizontal tubes convection sections, are always designed by using FEM (Finite Elements Method). A sample of FEM output is given below.

I.T.T. SpA
The INDIPENDENT Syngas Engineers
d. Structural Engineering
Structural engineering is executed within a 3-D environment, namely TEKLA. The use of TEKLA software will result in a nearly non existent risk of design mismatching as well in the automatic production of shop fabrication cutting spools sketches and panel assembly sketches which in turn will allow an extremely low rate of possible site reworks. ITT will be pleased to give more detailed in formation on this issue at request.

Sheet 13

e.

Piping Engineering

Piping engineering will be executed within a 3-D environment, namely PDS. ITT is available to produce an interface to Client at the agreed battery limits based on a PDS model. If so desired, also PDMS model may be considered. Some examples of PDS 3-D modeling of a Top Fired Steam Reformer by ITT for a Hydrogen Unit are given below:

TEKLA Model: Cross Sectional View, Side Fired Reformer

Fuel Gas Distribution TEKLA Model: Cross Sectional View, Top Fired Reformer

I.T.T. SpA
The INDIPENDENT Syngas Engineers

Sheet 14

f.

Flexibility Piping Engineering

3-D model as generated in PDS or PDMS environment are also the basis for the flexibility analysis typically incorporating the whole process piping for the Mixed Feed crossover outlet at convection section up to Process Gas Boiler in Hydrogen service of Secondary Reformer or Post Reformer in Ammonia and Methanol service

Risers/Downcomers Arrangement

Penthouse Piping Lay Out

I.T.T. SpA
The INDIPENDENT Syngas Engineers
3. Prefabrication Grade

Sheet 15

ITT is in the position of providing any level of prefabrication up to full size, fully dressed RoRo modules as shown below.

4.

Attachments

Attachment 1: Company Presentation Attachment 2: Reference Lists Reformers Reference List Reformers Photos Technical Data List Attachment 3: Project Management Documents Typical Project Quality Plan Organization Chart

I.T.T. SpA
REFORMER DOUBLE CELL
REFORMER Photos Location: Tjeldbergodden Norway Licensor: Haldor Topse Client: Statoil A/S Fluor Daniel I.T.T. ref.: B-2971 Hydrogen production: 2400 MTPD

Sheet 16

I.T.T. SpA
REFORMER DOUBLE CELL
REFORMER Photos Location: Tjeldbergodden Norway Licensor: Haldor Topse Client: Statoil A/S Fluor Daniel I.T.T. ref.: B-2971 Hydrogen production: 2400 MTPD

Sheet 17

I.T.T. SpA
REFORMER DOUBLE CELL
REFORMER Photos Location: Tjeldbergodden Norway Licensor: Haldor Topse Client: Statoil A/S Fluor Daniel I.T.T. ref.: B-2971 Hydrogen production: 2400 MTPD

Sheet 18

I.T.T. SpA
REFORMER SINGLE CELL
REFORMER Photos Location: Air Liquide Yochon-Korea Licensor: Haldor Topse Client: Samsung Engineering Co, Ltd I.T.T. ref.: B-3441 Hydrogen production: 11200 Nm3/h

Sheet 19

I.T.T. SpA
REFORMER SINGLE CELL
REFORMER Photos Location: Air Liquide Yochon-Korea Licensor: Haldor Topse Client: Samsung Engineering Co, Ltd I.T.T. ref.: B-3441 Hydrogen production: 11200 Nm3/h

Sheet 20

I.T.T. SpA
REFORMER SINGLE CELL
REFORMER Photos Location: Hpcl Mumbai ref. India Licensor: Haldor Topse A/S Client: Hyundai-Korea I.T.T. ref.: B-3480 Hydrogen production: 21000 Nm3/h

Sheet 21

I.T.T. SpA
REFORMER SINGLE CELL
REFORMER Photos Location: Hpcl Mumbai ref. India Licensor: Haldor Topse A/S Client: Hyundai-Korea I.T.T. ref.: B-3480 Hydrogen production: 21000 Nm3/h

Sheet 22

I.T.T. SpA
REFORMER SINGLE CELL
REFORMER Photos Location: Hpcl Mumbai ref. India Licensor: Haldor Topse A/S Client: Hyundai-Korea I.T.T. ref.: B-3480 Hydrogen production: 21000 Nm3/h

Sheet 23

I.T.T. SpA
REFORMER SINGLE CELL
REFORMER Photos Location: Iocl Barauni India Licensor: Haldor Topse Client: Haldor Topse I.T.T. ref.: B-98037 Hydrogen production: 38500 Nm3/h

Sheet 24

I.T.T. SpA
REFORMER SINGLE CELL
REFORMER Photos Location: Iocl Barauni India Licensor: Haldor Topse Client: Haldor Topse I.T.T. ref.: B-98037 Hydrogen production: 38500 Nm3/h

Sheet 25

I.T.T. SpA
REFORMER SINGLE CELL
REFORMER Photos Location: Iocl Barauni India Licensor: Haldor Topse Client: Haldor Topse I.T.T. ref.: B-98037 Hydrogen production: 38500 Nm3/h

Sheet 26

I.T.T. SpA
REFORMER DOUBLE CELL
REFORMER Photos Location: Air Liquide Yochon Korea Licensor: Haldor Topse Client: Samsung Engineering Co, Ltd I.T.T. ref.: B-00027 Hydrogen production: 48300 Nm3/h

Sheet 27

I.T.T. SpA
REFORMER DOUBLE CELL
REFORMER Photos Location: Air Liquide Yochon Korea Licensor: Haldor Topse Client: Samsung Engineering Co, Ltd I.T.T. ref.: B-00027 Hydrogen production: 48300 Nm3/h

Sheet 28

I.T.T. SpA
REFORMER DOUBLE CELL
REFORMER Photos Location: Capro Corporation Ulsan Korea Licensor: Haldor Topse Client: Hyundai Engineering Co, Ltd I.T.T. ref.: B-02015 Hydrogen production: 42000 Nm3/h

Sheet 29

I.T.T. SpA
REFORMER DOUBLE CELL
REFORMER Photos Location: Esso Normandia P. Jerome France Licensor: Haldor Topse Client: Air Liquide France I.T.T. ref.: B-02096 Hydrogen production: 47000 Nm3/h

Sheet 30

I.T.T. SpA
REFORMER DOUBLE CELL
REFORMER Photos Location: Esso Normandia P. Jerome France Licensor: Haldor Topse Client: Air Liquide France I.T.T. ref.: B-02096 Hydrogen production: 47000 Nm3/h

Sheet 31

I.T.T. SpA
REFORMER DOUBLE CELL
REFORMER Photos Location: Esso Normandia P. Jerome France Licensor: Haldor Topse Client: Air Liquide France I.T.T. ref.: B-02096 Hydrogen production: 47000 Nm3/h

Sheet 32

I.T.T. SpA
REFORMER DOUBLE CELL
REFORMER Photos Location: Air Liquide Caojing Hyco1 China Licensor: Haldor Topse Client: Samsung Engineering Co, Ltd I.T.T. ref.: B-02106 Hydrogen production: 55800 Nm3/h

Sheet 33

I.T.T. SpA
REFORMER DOUBLE CELL
REFORMER Photos Location: Air Liquide Caojing Hyco1 China Licensor: Haldor Topse Client: Samsung Engineering Co, Ltd I.T.T. ref.: B-02106 Hydrogen production: 55800 Nm3/h

Sheet 34

I.T.T. SpA
REFORMER SINGLE CELL
REFORMER Photos Location: Air Liquide Priolo - Italy Licensor: Haldor Topse Client: Air Liquide France I.T.T. ref.: B-03147 Hydrogen production: 27000 Nm3/h

Sheet 35

I.T.T. SpA
REFORMER SINGLE CELL
REFORMER Photos Location: Air Liquide Lavera - France Licensor: Haldor Topse Client: Air Liquide France I.T.T. ref.: B-04153 Hydrogen production: 25000 Nm3/h

Sheet 36

I.T.T. SpA
REFORMER DOUBLE CELL
REFORMER Photos Location: Air Liquide Jupiter - Belgium Licensor: Haldor Topse Client: Air Liquide France I.T.T. ref.: B-05270 Hydrogen production: 100000 Nm3/h

Sheet 37

I.T.T. SpA
REFORMER DOUBLE CELL
REFORMER Photos Location: Air Liquide Jupiter - Belgium Licensor: Haldor Topse Client: Air Liquide France I.T.T. ref.: B-05270 Hydrogen production: 100000 Nm3/h

Sheet 38

I.T.T. SpA
REFORMER DOUBLE CELL
REFORMER Photos Location: Korea Licensor: Haldor Topse Client: SK / Daelim Korea I.T.T. ref.: B-06023 Hydrogen production: 110 MMSCFD

Sheet 39

I.T.T. SpA
REFERENCES LIST OF REFORMER from 1998 up to 2010
Customer / Contractor Heater Service Year of Order
1998 1998 1999 1999 2000 2001 2002 2002 2003 2004 2005 2005 2006 2006 2006 2007 2007 2007 2007

Sheet 40

Type

Basic Design
H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE H. TOPSE

Place

SAMSUNG ENGINEERING CO., LTD. KOREA HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA FOSTER WHEELER FRANCE HALDOR TOPSOE A/S DENMARK TESSAG EDELEANU GmbH GERMANY SAMSUNG ENGINEERING CO., LTD. KOREA HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA AIR LIQUIDE, FRANCE SAMSUNG ENGINEERING CO., LTD. KOREA AIR LIQUIDE, FRANCE AIR LIQUIDE, FRANCE MITSUBISHI HEAVY INDUSTRIES JAPAN AIR LIQUIDE, FRANCE SK CORPORATION - KOREA ENI S.p.A. - RAFFINERIA DI TARANTO HALDOR TOPSOE A/S DENMARK AIR LIQUIDE, FRANCE FAUJI FERTILIZER Co., Ltd. PAKISTAN CHINA PETROLEUM MATERIAL & EQUIPMENT (Group) CORPORATION SAIPEM - PORTUGAL

Reformer Package H-111 Reformer Package Reformer Heater BA-551 Reformer Package Tubular Reformer & W.H.B. Package Reformer Package H-101 Reformer Package N. 1 Steam Reformer Package & WHB Tubular Reformer Package No. 1 Steam Reformer Package & Waste Heat Boiler Steam Reformer Package & Waste Heat Boiler Steam Reformer Package & Waste Heat Boiler Steam Reformer Package & Waste Heat Boiler Hydrogen Refomer Steam Reformer Package & Waste Heat Boiler HTCR Skids and Equipment Steam Reformer Package & Waste Heat Boiler WHS Revamping Primary Reformer H-201

R R R R R R R R R R R R R R R R R R R

Air Liquide - Yochon, Korea HPCL Mumbai Refinery, India Lube Oil Plant, Alexandria Egypt IOCL, Barauni-India Bayer PC, Thailand Proj. Air Liquide, Yochon Korea Capro Corporation Ulsan, Korea Esso Normandie, Port Jerome, France Air Liquide - Caojing Hyco 1 Project Air Liquide Hydrogen Plant Priolo (Italy) Air Liquide Hydrogen Plant Lavera (France) Sohar Fertilizer Project - Oman Ally Jupiter 2 Plant - BASF Site, Antwerpen Belgium SK Corporation No. 2 FCC Project - Korea ENI Taranto Refinery - Italy Cepsa / Spain 10000 Nm3/h HTCR H2 Plant HYCO 3 Plant - SPAL Site of Estarreja, Portugal FFC Plant-III BMR Project Mirpur Mathelo, Pakistan Petrochina Tarim Oilfield Co. Korla, Xinjiang - China

Primary Reformer F-201

2007

H. TOPSE

ENGRO Plant - Daharki Pakistan

I.T.T. SpA
REFERENCES LIST OF REFORMER from 1998 up to 2010
Customer / Contractor Heater Service Year of Order
2007 2008 2008 2008

Sheet 41

Type

Basic Design
TECHNIP H. TOPSE H. TOPSE H. TOPSE

Place

CONSORTIUM of SAZEH-ODCC-SEI, CHINA AIR LIQUIDE, FRANCE SNAMPROGETTI - ITALY ACE - UNGHERIA

No. 2 Reformers Package (Train A & Train B) Steam Reformer Package & Waste Heat Boiler No. 2 Reformers Packages Primary Reformer

R R R R

Shazand Arak Refinery - Iran SOXAL Plant, Jurong Island Singapore QATAR FERTILISER Co. (SAQ) Mesaieed Industrial City MOL Hungarian Oil & Gas Co Danube Refinery -Hungary

TECNICAS REUNIDAS - SPAIN

Engineering Services and Supplies for Steam Reformers U-604 & U-605 No. 2 Primary Reformers

2008

H. TOPSE

REPSOL Cartagena - Spain

MITSUBISHI HEAVY INDUSTRIES JAPAN

2008

H. TOPSE

AOFP Project - El-Djazairia El-Omania Lil Asmida SpA Algeria Tehran Refinery Products, Upgrading Project - Iran

EHSAN JOINT VENTURE - IRAN

Primary Reformer

2008

TECHNIP

CHINA BLUE CHEMICAL Ltd. - CHINA

Convection Section Modules

2009

DAVY PROCESS TECHN. H. TOPSE

CBC - 2500 MTPD Methanol Plant in Dongfang City, Hainan

TECNICAS REUNIDAS - SPAIN

Lining Material Supply and Design

2009

REPSOL Cartagena - Spain

WUHUAN ENGINEERING Co., Ltd. - China ENI S.p.A. - Italy

Primary Reformer Primary Reformer

2009 2010

R R

H. TOPSE H. TOPSE

PETROVIETNAM - CaMau Raffineria SANNAZZARO, Italy

KAVEH METHANOL / PIDEC SK ENGINEERING & CONSTRUCTION-Korea

Primary Reformer Primary Reformer

2010 2010

R R

CASALE H. TOPSE

Kaveh Methanol, Dayer, Iran Abu Dhabi Oil Refining Co. (TAKREER)

UTC - Brazil TECNIMONT S.p.A. - ITALY

Primary Reformer Primary Reformer

2010 2010

R R

H. TOPSE KBR

Alberto Pasqualinin REFAP / Brasil NFL, Nangal Fertilizer Co.

I.T.T. SpA
BOX & VERTICAL CYLINDRICAL HEATERS

Sheet 42

I.T.T. SpA
BOX HEATERS
BOX Photos Location: Al Jubail Saudi Arabia Client: Samsung Engineering CO., LTD. Korea I.T.T. ref.: B-00047 Reactor Charge Heater double cell / double fired with Vert. Tubes.

Sheet 43

I.T.T. SpA
BOX HEATERS
BOX Photos Location: Saras refinery Sarroch (Cagliari) - Italy Client: Parsons U.K. I.T.T. ref.: B-98059 Reactor Charge Heater single cell With Aph and Hor. Tubes.

Sheet 44

I.T.T. SpA
BOX HEATERS
BOX Photos Location: Assiut Egipt Client: Assiut Oil Refining Co. through Petromaint I.T.T. ref.: B-98047 Crude Oil Fired Heater Double cell with Pumps / Steam Drum and Hor. tubes

Sheet 45

I.T.T. SpA
BOX HEATERS
BOX Photos Location: Izmir Turkey Client: LG Engineering CO., LTD. Korea I.T.T. ref.: B-02054 Combined Feed Heater single cell double fired and Vert. tubes

Sheet 46

I.T.T. SpA
BOX HEATERS
BOX Photos Location: Atofina plant Daesan Client: Samsung Engineering CO., LTD. Korea I.T.T. ref.: B-04061 Reactor Charge Heater with harbor tubes

Sheet 47

I.T.T. SpA
REFERENCES LIST OF BOX HEATERS from 1998 up to 2010
Customer / Contractor
MOTOR OIL HELLAS GREECE HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA

Sheet 48

Heater Service
Convection Package Design for modification & revamping of 2 crude heaters HDO Refinery - Steam/air Preheater Reactor Charge Heater H-S-201 Complete Package of Crude Oil Fired Heater Reactor Charge Heater 1-BA-1001 No. 1 Combined Feed Heater Feasibility Study (Design & Engineering) for Reforming Plant Rehabilitation of Coker Heater 12 H-3

Year of Order
1998 1998

Type
B B

Basic Design
I.T.T. HYUNDAI Corinth Greece

Place

HDO Daesan Refinery, South Korea

PARSONS - U.K. ASSIUT OIL REFINING Co. through PETROMAINT - EGYPT SAMSUNG ENGINEERING CO., LTD. KOREA LG ENGINEERING & CONSTRUCTION CORPORATION KOREA POLIMERI EUROPA

1998 1999 2001 2002 2003

B B B B B

I.T.T. I.T.T. I.T.T. UOP

Saras S.p.A., Italy Assiut Refinery - Egypt National Industrialization Co.Al Jubail, S.Arabia Turkey Petrol Rafinerileri A.S. Izmir, Turkey Polimeri Europa Sarroch Cagliari (Italy)

EGYPTIAN MAINTENANCE COMPANY - EGYPT

2003

ALCOR C I.T.T.

Suez Oil Processing Co. Suez, Egypt

POLIMERI EUROPA SpA San Donato Milanese (MI)

Feasibility Study - Basic Design Revamping of Reforming Heaters F4-F5-F6-F7. A-BA 1501 Charge Heater Reactor Charge Heater Revamping of Heaters CCR Pplatforming - Charge Heater

2004

I.T.T.

Polimeri Europa Sarroch Cagliari (Italy)

SAMSUNG ENGINEERING CO., LTD. KOREA SAMSUNG ENGINEERING CO., LTD. KOREA ENI - LIVORNO SK ENGINEERING & CONSTRUCTION Co., Ltd. - Korea

2004 2005 2005 2005

B B B B

I.T.T. I.T.T. ENI / I.T.T. UOP

Aromatic Expansion Project Atofina Plant Daesan, Korea

NPPC Al Jubail, Saudi Arabia ENI - Livorno Refinery (Italy) The Aromatics (Thailand) Public Co. Ltd. Map Ta Phut, Thailand SK Corporation No. 2 FCC Project - Korea HDS VII Plant - PKN Orlen S.A. Plock / Poland Shazand Arak Refinery - Iran N.P.C. - Egypt NIOEC Bandar Abbas Refinery - Iran INA Rijeka - Croatia NAFTEC SpA Arzew Refinery Rehabilitation & Adaptation Project - Alger Lab Complex, Al Jubail, Saudi Arabia Kaveh Methanol, Dayer, Iran

DAELIM INDUSTRIAL Co. Ltd. KOREA TECHNIP ITALY S.p.A. CONSORTIUM of SAZEH-ODCC-SEI, CHINA PETROJET - EGYPT FIMCO FZE U.A.E. KG PROCESS INNOVATIONS s.r.o. CZECH REPUBLIC HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA

No. 3 Residue Hydrodesulphurisation Heaters Charge Heater No. 1 Preheater & (1st, 2nd, 3rd Interheaters

2006 2007 2007 2008 2009 2009 2009

B B B B B B B

I.T.T. I.T.T. I.T.T. I.T.T. I.T.T. I.T.T.


TECHNIP/I.T. T.

Fired Heater with Auxiliaries & APH System CCR Platformin


ReEngineering Study Vacuum Heater 323-H-001

Hot Oil Heater Crude Feed Heater (Revamping)

GULF ARABI /UHDE India KAVEH METHANOL/PIDEC

Hot Oil Heater / Pacoi Charge Heater Steam Superheater

2010 2010

B B

UOP
CASALE/I.T. T.

I.T.T. SpA
VERTICAL CYLINDRICAL HEATERS
VERTICAL CYLINDRICAL HEATER Photos Location: Kalundborg, Denmark Client: Statoil Denmark I.T.T. ref.: B-3352 Charge Heater

Sheet 49

I.T.T. SpA
VERTICAL CYLINDRICAL HEATERS
VERTICAL CYLINDRICAL HEATER Photos Location: Holborn Europa Raffinerie GmbH Client: Tessag Edeleanu GmbH - Germany I.T.T. ref.: B-02031 Finishing Reactor Feed Heater

Sheet 50

I.T.T. SpA
VERTICAL CYLINDRICAL HEATERS
VERTICAL CYLINDRICAL HEATER Photos Location: Segas, Egypt LNG Project Damietta Port Egypt Client: Kellogg / Jcg / Tecnicas Reunidas (KJT) I.T.T. ref.: B-02078 Hot Oil Furnace

Sheet 51

I.T.T. SpA
VERTICAL CYLINDRICAL HEATERS
VERTICAL CYLINDRICAL HEATER Photos Location: GOK-3 Unit, MolHungary Client: Uhde Edeleanu GmbH Germany I.T.T. ref.: B-03035_40 Fired Heater with Steam Drum

Sheet 52

I.T.T. SpA
VERTICAL CYLINDRICAL HEATERS
VERTICAL CYLINDRICAL HEATER Photos Location: Atofina plant Daesan Client: Samsung Engineering CO., LTD. Korea I.T.T. ref.: B-04062 Naphtha Splitter Reboiler

Sheet 53

I.T.T. SpA
REFERENCE LIST FOR VERTICAL CYLINDRICAL HEATERS Customer / Contractor Heater Service Year of Order
1998

Sheet 54

REFERENCES LIST OF VERT. CYLINDRICAL HEATERS from 1998 up to 2010


Type Basic Design
I.T.T.

Place

K N P C Sunkyong Eng. & Construction Co. KOREA

H-33-351 Polishing Regen. Gas Heater for Acid Gas Removal Project Engineering Design-New Convection Bank in Heater H-4201 TCCU Feed Heater - Item No.600 Convection Section & Associated Parts Vertical Cylindrical Heater BA-552 No. 3 Heating Medium Heaters Replacement of Coil in Heater H-4801 Fired Heater RD-1501 Natural Gas Fired Heater F-1003 Heating Medium Fired Heater 300-F-56001 Finishing Reactor Feed Heater CHD-F-1001 Rehabilitation of Coker Heater 12 H-2 n. 4 Drivers Regeneration Furnaces, N. 2 Propane Regeneration Heaters n. 2 Butane Regeneration Heaters, n. 2 Ethane Regeneration Heaters Hot Oil Furnace 58-MB01 No. 1 Fired Heater 221HT-N01 No. 2 Fired Heaters (items H-401 & H-402) with related equipment Charge Heater H-802 Hot Oil Heater 460-H-50 No. 1 Stabilizer Reboiler Heater (F-501) Rehabilitation of Coker Heater 12H-1
A-BA 101 Revamping of Column Reboiler Heater A-BA 102 Revamping of Charge Heater BA-106 Naphtha Splitter Reboiler Engineering and Supply of Combustion Air Ducts

Mina Al-Ahmadi Kuwait

STATOIL DENMARK

1998

I.T.T.

Kalundborg, Denmark

HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA STATOIL DENMARK FOSETER WHEELER FRANCE HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA STATOIL DENMARK TESSAG EDELEANU GmbH GERMANY FFC - JORDAN FERTILIZER COMPANY LIMITED SAMSUNG ENGINEERING CO., LTD. KOREA TESSAG EDELEANU GmbH GERMANY EGYPTIAN MAINTENANCE COMPANY - EGYPT HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA

1998 1999 1999 2000 2000 2001 2001 2001 2002 2002 2002

C C C C C C C C C C C

I.T.T. I.T.T. I.T.T. I.T.T. I.T.T. I.T.T. I.T.T. I.T.T. I.T.T. ALCOR C I.T.T.

Bataan, Philippines Kalundborg, Denmark Lube Oil Plant Alexandria - Egypt Sirte Oil Co. - Libya Statoil Refinery, Tjeldbergodden MDH-Plant, DEA UK Wesseling FJFC Bin Qasim - Karachi Korea National Oil Corporation (KNOC) Holborn Europa Raffinerie GmbH E.M.C. - Egypt AGIP Iran BV Assaluyah Gas Plant . South Pars Dev. Ph. 4 & 5 Onshore Facilities

KELLOGG / JCG / TECNICAS REUNIDAS (KJT) GRINAKER - LTA / SASOL SOUTH AFRICA UHDE EDELEANU GmbH GERMANY

2002 2002 2003

C C C

I.T.T. I.T.T. I.T.T.

Segas, Egypt LNG Project Damietta Port - Egypt DSU Plant in Secunda GOK-3 Unit, Mol-Hungary

STATOIL DENMARK OTF - IGN Petrotech Kft., Hungary FLUOR DANIEL B.V.The Netherlands PETROJET - EGYPT SAMSUNG ENGINEERING CO., LTD. KOREA

2003 2004 2004 2004 2004

C C C C C

I.T.T. I.T.T. SHELL I.T.T. I.T.T.

STATOIL A/S - Site RefineryKalundborg Denmark MOL Danube Refinery, BEK-5 Unit Hungary Shell and BP South African Petroleum Refineries Suez Oil Processing Co. Suez, Egypt
Aromatic Expansion ProjectAtofina Plant Daesan, Korea

ENI - LIVORNO

2005

I.T.T.

ENI - Livorno Refinery (Italy)

I.T.T. SpA
REFERENCE LIST FOR VERTICAL CYLINDRICAL HEATERS Customer / Contractor Heater Service Year of Order
2005

Sheet 55

REFERENCES LIST OF VERT. CYLINDRICAL HEATERS from 1998 up to 2010


Type Basic Design
I.T.T.

Place

OIEC Group /LG E&C Construction

n. 4 Drivers Regeneration Furnaces, N. 2 Propane Regeneration Heaters n. 2 Butane Regeneration Heaters, n. 2 Ethane Regeneration Heaters
Start-up Heater Reboiler Fired Heater

AGIP Iran BV Assaluyah Gas Plant . South Pars Dev. Ph. 9 & 10 Onshore Facilities

MITSUBISHI HEAVY INDUSTRIES JAPAN UHDE EDELEANU GmbH GERMANY ENI - LIVORNO SK ENGINEERING & CONSTRUCTION-Korea

2005 2005 2005 2005

C C C C

I.T.T. I.T.T. I.T.T. I.T.T.

Sohar Fertilizer Project - Oman BP Gelsenkirchen - Germany ENI - Livorno Refinery (Italy) The Aromatics (Thailand) Public Co Ltd Map Ta Phut Thailand Vietnam Oil & Gas Corporation (Petrovietnam) Dung Quat Refinery Project, Vietnam New Ethane Recovery Plant Project, Kuwait Ruwais - Emirates of Abu Dhabi GASCO Project 5229 - Ruwais 3rd NGL Turkish Petroleum Refineries Corp. Izmir Refinery Gasco Miximization of C2 & C3 Project

Revamping of Reboiler Fired Heater n. 2 Feed Fractionation Unit n. 2 Heavy Naphta Hydrotreating Unit n. 2 Heavy Naphta Hydrotreating Unit Reactor Fired Heater Fired Heaters No. 2 Regeneration Gas Heaters

CONSORTIUM OF TECHNIP (FRANCE) JGC CORPORATION (JAPAN) & TECNICAS REUNIDAS (SPAIN) HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA SNAMPROGETTI - ITALY

2006 2006 2006

C C C

I.T.T. I.T.T. I.T.T.

TUPRAS - TURKEY ENPPI - EGYPT

Fired Heaters Deethanizer Fired Heater Reboiler Depropanizer Fired Heater Reboiler Debutanizer Fired Heater Reboiler Fired Heaters Engineering Services (Fired Heater F-8001) Hot Oil Heater Reactor Feed Heater Product Stripper Reboiler n,. 1 DP Reactor Feed Heater n. 1 Regeneration Heater Revamping of Hot Oil Heater n. 1 Reactor Heater n. 1 Splitter Reboiler n. 1 HDS Reactor Effluent Heater n. 1Stabilizer Reboiler n. 1 Fired Heater F101UNI1 n. 1 Fired Heater F1 HSW

2006 2006

C C

I.T.T. I.T.T.

TECNIMONT S.p.A. - ITALY KCE - TAIWAN ACE Kft. - HUNGARY ABB Lummus Global GmbH GERMANY

2006 2007 2007 2007

C C C C

I.T.T. ALCOR C I.T.T. I.T.T.

Q-Chem II - Mesaieed, Qatar Chinese Petroleum Corporation - Taiwan


INA FCC Gasoline HDS Unit, Sisak Refinery - Croatia

Gasoil HDS Unit, Gdansk Poland

SAMSUNG ENGINEERING Co., Ltd.KOREA

2007

I.T.T.

MOC Cracker Project Map Ta Phut Olefins Co.,Ltd. Thailand Petron Bataan Refinery Philippines Ecopetrol S.A. Barrancabermeja Complex

DAELIM INDUSTRIAL Co., Ltd. KOREA ECOPETROL S.A. - COLUMBIA

2007 2007

C C

I.T.T. I.T.T.

ENI - LIVORNO

2007

ENI

ENI - Livorno Refinery (Italy)

I.T.T. SpA
REFERENCE LIST FOR VERTICAL CYLINDRICAL HEATERS Customer / Contractor Heater Service Year of Order
2007 2007

Sheet 56

Type

Basic Design
I.T.T. I.T.T.

Place

UHDE EDELEANU GmbH GERMANY CONSORTIUM of SAZEH-ODCC-SEI, CHINA

HDS Charge Heater No. 2 Reactor Heaters - No. 1 LP Stripper Reboiler Heater - No. 1 HDS Heater No. 1 Charge Heater Start-Up F-501 No. 1 Reactor Feed Heaters - No. 2 Stripper Reboilers - No. 1 Stabilizer Reboiler Revamping of Economizers E135 - E136 Start-up Heater No. 2 Start-Up Heaters H-1302CONVECTION Bank with Spare Parts No. 1 Reactor Heater -No. 1 LP Stripper Reboilers - No. 1 Stabilizer Reboiler n. 2 Start-up Heaters No. 1 Reactor Feed Heater -No. 1 Stripper Reboilers - No. 1 Reactor Feed Heater -No. 1 Stripper Reboilers First Stage HDS Heater Second Stage HDS Heater Dryer Regenaration Gas Fired Heater (4 sets) Ethane Regeneration Heater (2 sets) 2 Splitter Reboiler Heater Charge Heater Revamping of Heaters Combustor Boiler n. 1 Hot Oil Heater n. 1 Pacol Charge Heater Regeneration Gas Heater (2 Heaters) HDS Charge Heater Start-up Heater Regeneration Gas Heater (2 Heaters)

C C

HDS/HDA Lukoil Neftochim Bourgas Shazand Arak Refinery - Iran

SAIPEM - PORTUGAL CONSORTIUM of SAZEH-ODCC-SEI, CHINA POLIMERI EUROPA - ITALY UHDE EDELEANU GmbH GERMANY SNAMPROGETTI - ITALY TUPRAS - TURKEY FIMCO FZE U.A.E.

2007 2007 2008 2008 2008 2009 2009

C C C C C C C

I.T.T. I.T.T. I.T.T. I.T.T. I.T.T. I.T.T. I.T.T.

ENGRO Plant - Daharki Pakistan Shazand Arak Refinery - Iran POLIMERI EUROPA - PORTO MARGHERA (Italy) Ma'aden Ammonia Project - Saudi Arabia QATAR FERTILISER Co. Mesaieed Industrial City Tupras Izmir Refinery Turkey NIOEC Bandar Abbas Refinery - Iran

MITSUBISHI HEAVY INDUSTRIES JAPAN FIMCO FZE U.A.E.

2009 2009

C C

I.T.T. I.T.T.

ADFP Project El-Djazairia El-Omania Lil Asmida SpA - Algeria NIOEC Bandar Abbas Refinery - Iran

PETROCHEMICAL INDUSTRIES DESIGN & ENG. Co. (PIDEC) Iran

2009

I.T.T.

ABADAN Preliminary Renovation Project Phase III Iran NIOEC / POGC Iran South Pars Gas Field Devel. Phases 17 & 18 NAFTEC SpA -Arzev Refinery Rehabilitation & Adaptation Project - Algeria Lube Oil Refinery - Tehran CHO Power Plant Morceux - France LAB Complex, Al Jubail, Saudi Arabia 4 NGL Train Project Ruwais Abu Dhabi Alberto Pasqualinin REFAP / Brazil Ruwais Industrial Complex, Abu Dhabi, UAE KNPC / LPG Train 4 at MAA Refinery Project Kuwait

FIMCO FZE U.A.E.

2009

I.T.T.

HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. KOREA

2009

TECHNIP I.T.T. I.T.T. I.T.T. UOP UOP UOP UOP UOP

BEHRAN OIL Co. - Iran CHO POWER / EUROPLASMA GULF ARABI / UHDE India PETROFAC GS E&C JOINT VENTURE UTC - Brazil SAMSUNG ENGINEERING CO., LTD. KOREA DAELIM INDUSTRIAL Co. Ltd. KOREA

2009 2009 2010 2010 2010 2010 2010

C C C C C C C

I.T.T. SpA
SNAPSHOTS OBTAINED FROM SOLIDWORKS SOFTWARE

Sheet 57

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 58

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 59

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 60

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 61

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 62

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 63

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 64

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 65

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 66

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 67

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 68

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 69

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 70

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 71

I.T.T. SpA
SNAPSHOTS OBTAINED FROM TEKLA SOFTWARE

Sheet 72

I.T.T. SpA
Photo

Sheet 73

I.T.T. SpA
Photos

Sheet 74

I.T.T. SpA
I.T.T. Sponsor of competition Carrera Cup 2010

Sheet 75

I.T.T. SpA
I.T.T. Sponsor of competition Carrera Cup 2010

Sheet 76

I.T.T. SpA
I.T.T. Sponsor of competition Carrera Cup 2010

Sheet 77

I.T.T. SpA
I.T.T. Sponsor of competition Carrera Cup 2010

Sheet 78

I.T.T. SpA
THANK YOU FOR YOUR TIME

Sheet 79

I.T.T. SpA - Head Office - Italy Via Privata Vasto, 1/3 20129 Milano.
(Tel. No. +39 02 29536032 / Fax. +39 0229536031) E-mail: itt@ittki.it / Web link: www.ittki.it

I.T.T. Branch Office - Italy Viale Bramante, 36 00054 Fiumicino Roma.


(Tel. No. +39 06 657666224 / Fax. +39 06 657666235) Office in the World: I.T.T. Korean Office - Korea Address : Room 1207-2, ILSHIN B/D, 541, Dohwa-dong, Mapo-gu, Seoul, 121-701, Korea (Tel. No. +82 2 707 0006 / Fax. + 82 2 707 0069 )

S.T.T. Singapore Thermal Technology PTE LTD (STT) - 143 Cecil Street, #18-00 GB Building, Singapore 069542 I.T.T. Indian Office - India Address : Indian Rep. Office of ITT SpA 707 , Madhuban 55,Nehru Place
New Delhi - 110 019 (Tel. No.91 11 30882707 + / Fax. + 91 11 30882708 )

S-ar putea să vă placă și