Sunteți pe pagina 1din 16

DESIGNED BY

CALCULATION SHEET

119052016

1
2012

PAGE NO

CEG 883

JOB REF :

DATE

REF

CALCULATION

OUTPUT

SLAB DESIGN
DURABILITY AND FIRE RESISTANCE
T.3.3 min cover for mild exposure

20 mm

cover= 20mm

T.3.4 1hour fire resistance = 20mm cover


25 N/mm2

Characteristic strength of concrete =

460 N/mm2

Characteristic strength of steel =


LOADING
Slab Thickness

300 mm

h = 300 mm

d=300-16/2-20 = 272

d=272

Self weight of slab topping =

0.43x0.10x24=1.03

kN/m per 430mm width

1.03kN/m

Self weight of slab Rib =

0.10x0.20x24=0.45

kN/m per 430mm width

0.48kN/m

Total =

1.51 kN/m per 430mm width 1.51kN/m

Total/m2 =

2
3.51 KN/m

1.51/0.43 =

Self weight of Hollow Pot =

0.85 KN/m2

Finishes

1.20 KN/m2

Partition allowance

1.00 KN/m2

Total dead load gk =


Imposed load qk

5.00

T.2.1 Design load n = 1.4(6.56) + 1.6(5) =

2
6.56 KN/m

gk=6.56kN/m2

2
5.00 KN/m

qk=5.0kN/m2

2
17.18 KN/m

Design load/ metre run per rib = 17.18 x 0.43 =7.39

KN/m

Moment Mmax= wl2/8 = 7.39 x 4.7252/8 = 20.62kNm


K = M/(bd fcu) =
AS = M/0.95fyZ =

Z ={0.5 + (0.25-K/0.9)^

0.026,
179mm

n=17.18kN/m2
7.39kN/m2
M=20.62kNm

Design Shear V = wl/2 = 7.39x4.725/2 = 17.45kN


2

3.51kN/m2

V=17.45kN
1/2

} = 0.95d

PROVIDE 2Y12 btm (224mm2) for Ribs

2Y12

PROVIDE BS MESH A142 top throught the Floor Slab Area


SHEAR
V = wl/2 =

17.45kN

Shear Stress v =V/bd = 0.64N/mm2

0.8(fcu)^1/2 = 4N/mm2

2
T.3.7 100%AS/bd = 0.19N/mm
2
T.3.8 vc = 0.39N/mm

0.5c< v < vc+0.4.


c

PROVIDE R6mm @ 200mm \c as nominal links and 2Y8mm for top


hanger Bars

DEFLECTION
T.3.9 Basic Span/ Eff. Depth ratio = 20.8
M/bd2 = 0.65, fs =2fyASrq/3ASprv = 245N/mm2
M.F = 0.55 + {(477-fs)/120(0.9+M/bd2)} = 1.80<2.0
Allowable Span/Eff. Depth ratio = 20.8 x 1.8 = 37.4
Actual Span/Eff. Depth ratio =l/d= 4725/272 = 17.4
17.4 < 37.4 Deflection is Satisfied

R6@200 & 2Y8

BEAM DESIGNS
Beam Height --------- 550mm

Cover to Reinforcement--25mm

Beam Width---------- 225mm

Diameter of Main Bars----20mm

Height of Flange---- 100mm

Diameter of links----------10mm

Fcu-------------------- 25N/mm2, Assummed Height of Walls-----------3000mm


FY-------------------- 460N/mm2
225mm Hollow Blocks Unit Weight ----------- 2.87kN/m2
Wall Finishes- both sides ---------------------- 0.60kN/m2
Effective Depth d = 550 -20/2 - 25 - 10 = 505mm
LOADING
Beam Self Weight ---0.225 x (0.55-0.100) x 24 x 1.4 = 3.402 KN/m
Wall Loads and Finishes ---2.87 x 3 x 1.4 x 0.6 = 7.23kN/m
M ain Loads from Slab---- 17.18 x 4.725/2 = 40.59kN/m
Loads on Beams parallel to Slab span/metre---=17.18kN/m
for Beams A(1-6) and D(1-6)
self weight -----------------------

3.4 kN/m

walls and finishes---------------------

7.23 kN/m
17.18 kN/m

load from slab--------------------------

27.81 kN/m
for Beams B(1-6) and C(1-6)
self weight -----------------------

3.4 kN/m

walls and finishes---------------------

7.23 kN/m
17.18 kN/m
27.81 kN/m

load from slab--------------------------

for Beams 1(A-B) and 1(C-D)


self weight ----------------------walls and finishes--------------------load from slab--------------------------

3.4 kN/m
7.23 kN/m
17.18 kN/m
27.81 kN/m

Please refer to Analysis sheets for the Bending Moments, Shear Forces and
Deflection Diagrams

One way slab

Span =
KN/m
1.8 m

M = 0.1 x x 1.82 KNm

Equa. 8

Equa. 7
Cl. 3.4.6.3

1.8 m

DESIGNED BY

CALCULATION SHEET
JOB REF :

PAGE NO

CEG 883

DATE

REF

CALCULATION
BEAMS DESIGN
Beam A(1-6) and D(1-6)

T.3.5 Using Table 3.5 of BS 8110 to estimate the Moments and Shears since both the
Loads and the Spans are Uniform
For Support Moments,
M1 = M6 = 0.0kNm,
M2 = M5 = -0.11FL(at first interior supports)

F=Design Load n x Span = 17.18 x 4.725 =

81.18 KN

M2= M5 = -0.11FL = -0.11 X81.18 X 4.725 =-42.19

kNm

the Negatve sign indicates that it is a hogging Moment


M3 =M4=-0.08FL( at interior Supports)=-0.08x81.18x4.725=-30.69

kNm

T.3.5 For Span Moments,


M1-2=M5-6 = 0.09FL(Near middle of end spans)=0.09x81.18.4.725=34.52kNm
M2-3=M4-5 = 0.07FL(at middle of interior spans)=0.07x81.18x4.725=26.85kNm
T.3.5 For Support Shears,
V1 = V6 = 0.45F(at outer support) = 0.45 x 81.18 = 36.53kN
V2 = V5 = 0.6F(at first interior support) = 0.6 x 81.18 =48.71kN
V3 = V4 = 0.55F(at interior support) = 0.55 x 81.18 =45.01kN
Beam A(1-6) and D(1-6)
Support Moments:M2 = M5=42.19kNm,M3 =M4=30.69kNm, Mmax=42.19kNm
K = M/(bfd2fcu) =

0.029,

AS = M/0.95fyZ =

201mm2

Z ={0.5 + (0.25-K/0.9)^1/2} = 0.95d

PROVIDE 2Y16 top (402mm2)


Span Moments,M1-2=M5-6=34.52kNm,M2-3=M4-5 = 26.85kNm,Mmax=34.52kNm
K = M/(bd2fcu) =

0.006,

AS = M/0.95fyZ =

165mm2

Z ={0.5 + (0.25-K/0.9)^1/2} = 0.95d

PROVIDE 2Y16 btm (402mm2)


SHEAR
V2 = V 5 =

48.71kN

Shear Stress v =V/bd = 0.35N/mm2

0.8(fcu)^1/2 = 4N/mm2

2
T.3.7 100%AS/bd = 0.19N/mm
2
T.3.8 vc = 0.20N/mm

0.5c< v < vc+0.4.

PROVIDE Minimum shear reinforcement throughout the length of the beam


SV = 0.75d = 304mm
PROVIDE 2 legs of R10mm @ 300mmc\c as links throughtout the span

DEFLECTION
T.3.9 Basic Span/ Eff. Depth ratio = 20.8
M/bd2 = 0.15, fs =2fyASrq/3ASprv = 126N/mm2

M.F = 0.55 + {(477-fs)/120(0.9+M/bd2)} = 3.1>2.0


Allowable Span/Eff. Depth ratio = 20.8 x 2 = 41.6
Actual Span/Eff. Depth ratio =l/d= 4725/505 = 9.4
9.4 < 41.6 Deflection is Satisfied
Beam B(1-6) and C(1-6)
Support Moments: Mmax=65.4kNm
2

K = M/(bd fcu) =

0.046,

AS = M/0.95fyZ =

246mm2

bw=225mm

Z ={0.5 + (0.25-K/0.9)^1/2} = 0.89d

PROVIDE 2Y16 top (402mm2)


Span Moments,Mmax=48.3kNm
2

K = M/(bd fcu) =

0.009,

AS = M/0.95fyZ =

165mm2

bf = 887mm
Z ={0.5 + (0.25-K/0.9)^1/2} = 0.95d

PROVIDE 2Y16btm (402mm2)


SHEAR
V=

146.1kN

Shear Stress v =V/bd = 1.3N/mm2

0.8(fcu)^1/2 = 4N/mm2

2
T.3.7 100%AS/bd = 0.35N/mm

T.3.8 vc = 0.20N/mm2

0.5c< v

PROVIDE Minimum shear reinforcement throughout the length of the beam


SV = 0.75d = 304mm
PROVIDE 2 legs of R10mm @ 300mmc\c as links throughtout the span

DEFLECTION
T.3.9 Basic Span/ Eff. Depth ratio = 20.8
M/bd2 = 0.23, fs =2fyASrq/3ASprv = 188N/mm2
M.F = 0.55 + {(477-fs)/120(0.9+M/bd2)} = 2.7>2.0
Allowable Span/Eff. Depth ratio = 20.8 x 2 = 41.6
Actual Span/Eff. Depth ratio =l/d= 4725/505 = 9.4
9.4 < 41.6 Deflection is Satisfied
Beam 1(A-B) and 1(C-D)
Support Moments: Mmax=22.5kNm
2

K = M/(bd fcu) =

0.017,

AS = M/0.95fyZ =

107mm2

bw=225mm

Z ={0.5 + (0.25-K/0.9)^1/2} = 0.95d

PROVIDE 2Y16 top (402mm2)


Span Moments,Mmax=237kNm
K = M/(bd2fcu) =

0.056,

AS = M/0.95fyZ =

1155mm2

Z ={0.5 + (0.25-K/0.9)^1/2} = 0.93d

PROVIDE 2Y20btm + 3Y16(1231mm2)


SHEAR
V=

163kN

Shear Stress v =V/bd = 1.43N/mm2


2
T.3.7 100%AS/bd =1.08N/mm

0.8(fcu)^1/2 = 4N/mm2

T.3.8 vc = 0.59N/mm2

0.5c< v

PROVIDE Minimum shear reinforcement throughout the length of the beam


SV = 0.95ASVfy/0.4b = 304mm
PROVIDE 2 legs of R10mm @ 250mmc\c as links throughtout the span

DEFLECTION
T.3.9 Basic Span/ Eff. Depth ratio =16
M/bd2 = 1.4, fs =2fyASrq/3ASprv = 288N/mm2
M.F = 0.55 + {(477-fs)/120(0.9+M/bd2)} = 2.0
Allowable Span/Eff. Depth ratio = 16 x 2 = 32
Actual Span/Eff. Depth ratio =l/d= 6225/505 = 12.3
12.3 <32 Deflection is Satisfied

119052016

1
2012
OUTPUT

M=42.19kNm

2Y16TOP

2Y16btm

R10@300

use 2.0

M=65.4kNm

3Y16TOP

2Y16btm

R10@300

use 2.0

M=22.5kNm

3Y16TOP

2Y20+3Y16

R10@250

CALCULATION SHEET

DESIGNED BY

CEG 883

JOB REF :

DATE

REF

CALCULATION
Beam 3(A-D), 4(A-D),5(A-D) ,6(A-D) and 2(A-D)
Support Moments: Mmax=146.9kNm
2

K = M/(bd fcu) =

0.033,

AS = M/0.95fyZ =

760mm2

bw=225mm

Z ={0.5 + (0.25-K/0.9)^1/2} = 0.95d

PROVIDE 4Y16 top (804mm2)


Span Moments,Mmax=159.3kNm
K = M/(bd2fcu) =

0.024,

AS = M/0.95fyZ =

760mm2

Z ={0.5 + (0.25-K/0.9)^1/2} = 0.93d

PROVIDE 4Y16 btm(804mm2)


SHEAR
V=

177.1kN

Shear Stress v =V/bd = 1.56N/mm2


T.3.7

100%AS/bd =0.71N/mm2

T.3.8

vc = 0.57N/mm2

0.8(fcu)^1/2 = 4N/mm2

0.5c< v

PROVIDE Minimum shear reinforcement throughout the length of the beam


SV = 0.95ASVfy/0.4b = 304mm
PROVIDE 2 legs of R10mm @ 250mmc\c as links throughtout the span

DEFLECTION
T.3.9

PAGE NO

Basic Span/ Eff. Depth ratio =20.8


M/bd2 = 1.4, fs =2fyASrq/3ASprv = 290N/mm2
M.F = 0.55 + {(477-fs)/120(0.9+M/bd2)} = 1.45
Allowable Span/Eff. Depth ratio = 20.8 1.45 = 30.2
Actual Span/Eff. Depth ratio =l/d= 6225/505 = 12.3
12.3 <30.22 Deflection is Satisfied

119052016

1
2012
OUTPUT
M=146.9kNm

4Y16TOP

4Y16 btm

R10@250