Sunteți pe pagina 1din 5

TEST FLIGHT REPORT Bae This form should be performed and completed during test flight.

DATA PILOT TAKE OFF GROSS WEIGHT ZFGW

: : : : :

A/C TYPE : COPIL LANDING C.G. ZFCG : : : :

REG NO CREW TEMP. STATION

: : : :

TOT. TIME :

NO

DESCRIPTION 1. BEFORE ENGINE START

RECOMMENDATION 24 - 28 Volt 390 - 410 Cps 26 - 29 Volt

REMARK REMARK

1.1 1.2

1.3

Battery Voltage before APU start After APU start : APU Generator TRU Voltage No.1 No.2 AC Pump Hydraulic System Yellow PTU 2. AFTER ENGINE START

3000 Psi

2.1

Generator 1 Generator 2

395 185 395 185

405 210 405 210

Cps Volt Cps Volt

3. HYDRAULIC SYSTEM 3.1 Engine Driven Pump : Yellow Green 2850 3300 Psi 2851 3300 Psi

4. BRAKE OPERATION 4.1 Parking Brake Operation Yellow Brake Green Brake Emergency yellow Brake Check Check Check Check

TEST FLIGHT REPORT BAe NO 5.1 DESCRIPTION 5. NOSE WHEEL STEERING Operation Check 6. THRUST MANAGEMENT SYSTEM (TMS) 6.1 TMS - T. Ref./32 Deg. -N1 7. LIFT DUMPER AUTO SYSTEM 7.1 Operation Check 8. LANDING GEAR RETACTION AT 130 KTS 8.1 Operation Check 9. FLIGHT CONTROL 9.1 OPERATION Yellow green Trim Indication 10. BLEED AIR SUPPLY 10.1 Normal Supply - NIP Valve Main Valve Pressure Regulation NIP Valve 11. AIRCONDITIONING 11.1 Cabin System Cockpit System Auto Normal Auto Normal AILERON ELEVATOR RUDDER Max - 6 Sec 90.50% RECOMMENDATION REMARK

12. WINDSHIELD HEATING 12.1 Operation Check 13. AIRFRAME ANTI ICING 13.1 Normal Fungtioning NIP Valve Operation Select Anti Icing ON LH Wing Temperature Stabilization RH Wing Tail 14. FEUL SYSTEM 14.1 Bosster Pump Operation

Warning Lt Ok

14.2 Standby Pump Operation

LH LH RH RH LH RH

Inner Outer Outer Outer

W/L W/L W/L W/L W/L W/L

Ok Ok Ok Ok Ok Ok

TEST FLIGHT REPORT Bae D E S C R I P T I O N NO 15. ENGINE FUNCTIONING DURING CRUISING 15.1 15.2 Engine Control Engine Indication I N1 N2 TGT F/F Oil Temp Oil Press Oil Qty Engine Anti Icing Operation II

RECOMMENDATION

REMARK

III

IV

15.3

16. ENGINE ELECTRICAL SUPPLY DURING CRUISING 16.1 16.2 16.3 A.C Supply TRU's No.1 No.2 DC Supply 17. STABILITY, CONTROL AND RESPONSE 17.1 Longitudinal Lateral and Directional 18. FLIGHT DIRECTOR SYSTEM 18.1 Operational Check 19. AUTOPILOT 19.1 Operational Check 20. FLIGHT INSTRUMENT 20.1 Coordination : Airspeed Indicators Altimeters R/C Indicators Functioning of Flight Instruments 21. COMMUNICATION SYSTEM 21.1 Functioning of : VHF Comm 1 VHF Comm 2 HF 1 HF 2 Selcal Public Address 22. NAVIGATION SYSTEM 22.1 Functioning of : VHF VHF ADF ADF NAV 1 NAV 2 1 2 390 - 310 Cps 26 - 29 Volt 26 - 29 Volt 26 - 18 Volt

20.2

MKR Beacon ATC Transcp WX Radar Compass System TEST FLIGHT REPORT Bae D E S C R I P T I O N NO 23. LANDING GEAR OPERATION 200 KTS 23.1 Landing Gear Extension landing Gear Protection 24. SPEED OPERATION OPERATION 24.1 Normal Operation Configuration Check 25. FLAPS 25.1 Normal Operation Alternate Operation Indications 26. LANDING GEAR EXTENSION, ALTERNATE OPERATION 26.1 Operation Check 27. LIFT DUMPER NORMAL OPERATION DURING LANDING 27.1 ITEM 1 2 3 4 Operation Check D E F E C T RECTIFICATION

RECOMMENDATION

REMARK

TEST FLIGHT CERTIFICATION I hereby certify that the above aircarft and its related system has been satisfactory performed during test flight and that performed during test flight and that the performance and behaviour has been recorded. Date : Place :

Capt. Pilot Signature

: :

Lic. No

TEST FLIGHT REPORT Bae

MAINTENANCE RELEASE I hereby certify that the Test Flight rectification as specified above has been carried out in accordance with Civil Aviation Safety Regulation Date Inspector Signature : : : Place Lic.No : :

S-ar putea să vă placă și