Sunteți pe pagina 1din 20

DAY

YEAR

MONTH

18

2012

JUNE

SUMMARY OF FAILURES OF NORTHERN REGION

S.No

Region

Territory

Railways

Date IN

Time IN

Section

AM (HQ)

From-To (STATION/FAILURE SECTION)

Duct

FAILURE CODE

Date RT

Time RT

RM

Customers Affected

E1's

E1's RM

P/ NP

Agency

Remarks

Status

Maint. (RCIL/Rly)

Date

Fault Card No.

OTDR Done At (hh:mm)

NR

LKO

NR

18/6/12

9:45

Utratia-Raibareli-Pratapgarh

Raibareli

PRATAPGARH - RAIBAREILLY(STM16/T)

FCRC

18/6/12

12:00

2:15:00

NIL

NIL

Triveni Metal works

OFC cut at 50Km from Raibareli towards Pratapgarh by Rly Engineering Deptt at Km no-953/1,RLY Quad cable not present ,Duct present & Bricks not present,Cable was at depth of 1m at a distance of 9.5m from the nearest track and Cable as per ABD.

Closed

RCIL

18/6/2012

39000

9:55

NR

CDG

NR

18/6/12

12:00

Saharanpur-LaksarNaziababad& Laksar-Dehradun LMC DDN,HW,RK

Haridwar

DDN/RCIL - HW(STM16/T) IIP/DDN - RCIL/DDN2(STM16/T)

RCIL

18/6/12

12:35

0:35:00

NIL

NIL

Sky Lark

Media disturbed at 4.5km from DDN towards HW by Team during Rectification of break Fiber,RLY Quad cable not present ,Duct present & Bricks not present,Cable was Closed at depth of 1m at a distance of 30m from the nearest track and Cable as per ABD. Media one way b/w NIC/CGO2 - ERNET(STM4/T) due to Patch Chord Disturbed by Unknown at NIC/CGO end Closed and delay due to entry not permitted at NIC/CGO & ERNET End. Media one way b/w HW - IIP/DDN(STM4/T) and restored after JO-JI & Cooling the SFP at HW End,A.C Faulty at HW end due to which high temperature issue at HW. Overhead OFC Cut at 120m & 240m from DGS&D towards DAAK/BHAWAN by Unknown,Cable in LMC Area.Delay due to DGS&D Closed in Sunday and team busy in restoration THRD - VAISH BANK. OFC cut at 10.4Km from NDLS towards GZB by labour of S&T Deptt,RLY Quad cable not present ,Duct not present & Bricks not present,Cable was Temporary Overhead at a distance of 2m from the nearest track and Cable as per ABD.AIRCEL ckt was down due to Airtel/kapashera - GGN and NDLS - GZB and Came up after NDLS - GZB restored. Overhead OFC Cut at 520m from TV9 towards Andra Bank by JC Damaged Unknown,Cable in LMC Area. Overhead OFC Cut at 7km from GGN towards Airtel/Kapashera by Miscreants,Cable in LMC Area,Delay due to Team busy another Fault.Idea Dark Fiber down and Came up after Cut restored. OFC cut at 4.5Km from PALI towards MARWAR by JCB of R.S.E.B Deptt during N.H Work,RLY Quad cable present and Damaged ,Duct not present & Bricks present,Cable was at depth of 1.2m at a distance of 10m from the nearest track and Cable not as per ABD.SBI ckt was down and came up after OFC cut Restored. Media one way at NBPGR/PUSA - NDLS6(STM16/T) and restored after Cleaning patch chord at NDLS end,Rx=-25.6dbm. DS Alarm at UMB(25) from KUN(28) in STM16/A Link due to losses in JC at SZM & MOY & Alarm cleared after Resplicing b/w SZM & MOY, This failure attend by Rohtak Team,Delay due to Rohtak team busy in another Activity. Overhead OFC cut at 600m from BOT towards SBI/Bangla Sahib by Unknown,Cable in LMC Area. Overhead OFC cut at 400m from DSCB towards RBI by Unknown,Cable in LMC Area. Overhead OFC cut at 1500m,2KM from THRD towards VAISH by Unknown,Cable in LMC Area.
Closed

RCIL

18/6/2012

12:05

NR

DLI

NR

17/6/12

18:10

South - East Delhi incl.Ghaziabad & Noida section Saharanpur-LaksarNaziababad& Laksar-Dehradun LMC DDN,HW,RK

Thomson Road

NIC/CGO2 - ERNET(STM4/T)

PTB

18/6/12

12:35

18:25:00

NIL

NIL

M.S.Contractor

RCIL

18/6/2012

38345

NR

CDG

NR

18/6/12

15:45

Haridwar

HW - IIP/DDN(STM4/T)

HWT

18/6/12

18:00

2:15:00

NIL

NIL

Sky Lark

RCIL

18/6/2012

39070

NR

DLI

NR

17/6/12

15:45

North - Central Delhi section

Thomson Road

DAAK/BHAWAN - DGS&D(STM1/T) DGS&D - SBI/BANGLA/SAHIB(STM1/T)

FBO

18/6/12

15:35

23:50

NIL

NIL

Maruti

Closed

RCIL

18/6/2012

38976

12:30

NR

DLI

NR

18/6/12

15:15

South - East Delhi incl.Ghaziabad & Noida section

Thomson Road

GZB - NDLS4(STM16/T) NDLS2 - GZB(STM16/A)both link NDLS1 - GZB(STM4/T) NDLS5 - GZB2(STM16/T)

FCRC

18/6/12

18:30

3:15

AIRCEL(SML - GGN)=2E1 AIRCEL(SML - OKA)=DS3

3:15:00

M.S.Contractor

Closed

RCIL

18/6/2012

39071

15:30

NR

DLI

NR

18/6/12

13:50

North - Central Delhi section

Thomson Road

TV9/DELHI - ANDRA/BANK(STM1/T) TV9 - LADY/HARDING(STM1/T)

FBO

18/6/12

16:30

2:40

NIL

NIL

Maruti

Closed

RCIL

18/6/2012

39015

16:00

NR

DLI

NR

18/6/12

13:35

North - West incl.Gurgaon Section

Thomson Road

GGN - AIRTEL/KAPASHERA(STM16/T)

FBO

18/6/12

21:35

8:00

IDEA(SAHARAUL - BHIM NAGAR)=Dark Fiber

8:00:00

Maruti

Closed

RCIL

18/6/2012

39013

18:30

NR

JP

NWR

18/6/12

16:00

Sendra-Marwar-Jodhpur

Pali

MARWAR - PALI(STM4/T)both link

MIS

18/6/12

21:00

5:00:00

SBI(JUD2 - JPI)=1E1 SBI(JUD1 - JP2)=1E1

5:00:00

NP

ITPL

Closed

RCIL

18/6/2012

39067

16:30

10

NR

DLI

NR

18/6/12

9:00

North - Central Delhi section

Thomson Road

NBPGR/PUSA - NDLS6(STM16/T)

PTB

18/6/12

9:40

0:40

NIL

NIL

Maruti

Closed

RCIL

18/6/2012

38997

11

NR

CDG

NR

17/6/12

21:20

Narela-Ambala including LMC at Sonepat & Karnal

Panipat

DS Alarm at UMB(25) from KUN(28) in STM16/A Link

FBO

18/6/12

10:00

12:40:00

NIL

NIL

Sky Lark

Closed

RCIL

18/6/2012

38980

12

NR

DLI

NR

16/6/12

13:00

North - Central Delhi section

Thomson Road Thomson Road Thomson Road

OFC/DLI/IDRBT/BOT - SBI/BANGLA/SAHIB

FBO

16/6/12

19:35

6:35

NIL

NIL

Maruti

Closed

RCIL

18/6/2012

38884

13

NR

DLI

NR

15/6/12

10:30

North - Central Delhi section

OFC/DLI/IDRBT/DSCB - SPMCIL

FBO

16/6/12

14:37

28:07:00

NIL

NIL

Maruti

Closed

RCIL

18/6/2012

38836

14

NR

DLI

NR

17/6/12

10:30

North - Central Delhi section

OFC/DLI/IDRBT/THRD - VAISH

FBO

17/6/12

13:45

3:15:00

NIL

NIL

Maruti

Closed

RCIL

18/6/2012

38836

Team Reached at site At (hh:mm)

11:30

12:05

12:00

16:00

15:45

18:00

17:00

9:10

5:00

DAY

YEAR

MONTH

18

2012

JUNE

OUTAGES DETAIL OF LEASED FIBERS

S.No

Region

Territory

Railways

Date IN

Time IN

1 2 3 4

NR NR NR NR

CDG DLI DLI CDG

NR NR NR NR

17/6/12 18/6/12 17/6/12 18/6/12

11:30 8:15 14:50 16:00

5 6

NR NR

CDG LKO

NR NCR

18/6/12 18/6/12

19:45 18:25

Section Ludhiana-Sanehwal-Sirhind -Una & LMC at Ropar North - West incl.Gurgaon Section North - West incl.Gurgaon Section Saharanpur-Laksar-Naziababad& Laksar-Dehradun LMC DDN,HW,RK Moradabad-Bareilly-Shajahanpur Bharwari-Allahabad-Meja Rd& Allahabad-Manikpur

AM (HQ)

Ropar Thomson Road Thomson Road Haridwar

Bareilly

Allahabad

From-To (STATION/FAILURE SECTION)

Duct

Failure Code LF LF LF LF

Date RT

RPAR - MOHALI(STM16/A) AIRCEL/GGN - AIRTEL/KAPASHERA(STM16/T) NDLS03(A) - DU_DLI(T)(STM16) SRE1 - DDN/V.FONE(STM16/T)

18/6/12 18/6/12 18/6/12 18/6/12

BC2 - DC/OFFICE/BAREILLY(STM1/T) ALD -MNIT/ALD(STM16/T)

LF LF

18/6/12 19/6/12

Time RT

RM

Customers Affected N N N N

E1's

10:05 12:15 13:30 19:45

22:35:00 4:00 22:40 3:45:00

NIL NIL NIL NIL

23:25 6:35

3:40:00 12:10:00

N N

NIL NIL

E1's RM

P / NP

Agency

NIL NIL NIL NIL

P P P P

HFCL IDEA IPCON TCL

NIL NIL

P P

MULTI CHANNEL Northern Railway.

Remarks

Status

Maint. (RCIL/Rly) RCIL RCIL RCIL RCIL

Date

Partial OFC Cut and Fiber Maintained by HFCL OFC Cut and Fiber Maintained by IDEA. Media disturbed and Fiber Maintained by IPCON Media disturbed and Fiber Maintained by TCL OFC Cut and Fiber Maintained by MULTI CHANNEL Media disturbed and Fiber Maintained by Northern Railway.

Closed Closed Closed Closed

18/6/2012 18/6/2012 18/6/2012 18/6/2012

Closed Closed

RCIL RCIL

18/6/2012 18/6/2012

Team Reached Fault Card OTDR Done at site At No. At (hh:mm) (hh:mm) 38959 38996 38977

39077 39068

DAY

YEAR

MONTH

18

2012

JUNE

DETAIL OF OUTAGES DUE TO ISSUES OTHER THAN RAILTEL

S.No

Region

Territory

Railways

Date IN

Time IN

NR

CDG

NR

16/6/12

6:40

NR

CDG

NR

18/6/12

11:35

Section Saharanpur-Laksar-Naziababad& LaksarDehradun LMC DDN,HW,RK Ludhiana-Sanehwal-Sirhind -Una & LMC at Ropar

AM (HQ)

Haridwar

Ropar

From-To (STATION/FAILURE SECTION)

Duct

Failure Code AC

RCIL/DDN2 - DEAL/DDN(STM4/T)

ROPAR(A) - IIT/ROPAR(T)(STM16)

AC

Date RT

Time RT

RM

Custome rs Affected N

18/6/12

14:40

8:00:00

18/6/12

12:00

0:25:00

E1's

E1's RM

P / NP

NIL

NIL

NIL

NIL

Agency

Remarks Power supply issue at DEAL/DDN and Maintained by same. Power supply issue at IIT/ROPAR and Maintained by same.

Status

DEAL/DDN

Closed

IIT/ROPAR

Closed

Maint. (RCIL/Rly) RCIL

Date

Fault Card OTDR Done No. At (hh:mm) 38858

Team Reached at site At (hh:mm)

18/6/2012

RCIL

18/6/2012

39006

FORMAT FOR SUMMARY OF FAILURES OF NORTHERN REGION (UPDATED : 05/11/2011) S.No Region Territory Railways Date IN Time IN Section AM (HQ) From-To (STATION/FAILURE SECTION) Duct Failure Date RT Code Time RT RM Custome rs Affected N E1's E1's RM P / NP Agency Remarks Status Maint. (RCIL/Rly) Date

NR

CDG

NR

0:00

Pathankot-Jammu Tawi-Udhampur Ludhiana-Sanehwal-Sirhind -Una & LMC at Ropar Rampur-Rudrapur-Kathgodam & Lalkua-Bareli City Jalandhar-Amritsar-Pathankot

Jammu

0:00

0:00:00

NIL

NIL

Sunny Electronics Sunny Electronics

RCIL

NR

CDG

NR

0:00

Ropar

0:00

0:00:00

NIL

NIL

RCIL

NR

CDG

NER

0:00

Rudrapur

0:00

0:00:00

NIL

NIL

Deptt. Team

RCIL

NR

CDG

NR

0:00

Amritsar

0:00

0:00:00

NIL

NIL

Sunny Electronics Deptt. Team

RCIL

NR

CDG

NR

0:00

Shakurbasti-Rohtak-Bhatinda

Rohtak

0:00

0:00:00

NIL

NIL

NP

RCIL

NR

CDG

NR

0:00

Rohtak - Panipat - Jind

Panipat

0:00

0:00:00

NIL

NIL

NP

No Team

RCIL

NR

CDG

NR

0:00

Moradabad-Bareilly-Shajahanpur Saharanpur-Ambala-Sirhind, AmbalaChandigarh ,including Ambala yard & Ambala LMC Chandigarh- Kalka-Shimla including KLK LMC Ludhiana-Jalandhar-Pathankot Saharanpur-Laksar-Naziababad& Laksar-Dehradun LMC DDN,HW,RK Narela-Ambala including LMC at Sonepat & Karnal Nazibabad- Moradabad-AmrohaHapur, North - Central Delhi section North - West incl.Gurgaon Section South - East Delhi incl.Ghaziabad & Noida section Delhi Area arial IDRBT team Hapur-Gaziabad-Aligarh-Pora Gaziabad-Meerut-Saharanpur

Bareilly

0:00

0:00:00

NIL

NIL

Deptt. Team

RCIL

NR

CDG

NR

0:00

Ambala

0:00

0:00:00

NIL

NIL

Sunny Electronics

RCIL

NR

CDG

NR

0:00

CDG

0:00

0:00:00

NIL

NIL

UK Traders Uma Construction Sky Lark

RCIL

10

NR

CDG

NR

0:00

Jalandhar

0:00

0:00:00

NIL

NIL

RCIL

11

NR

CDG

NR

0:00

Haridwar

0:00

0:00:00

NIL

NIL

RCIL

12

NR

CDG

NR

0:00

Panipat

0:00

0:00:00

NIL

NIL

Sky Lark

RCIL

13 14 15 16 17 18 19

NR NR NR NR NR NR NR

CDG DLI DLI DLI DLI DLI DLI

NR NR NR NR NR NCR NR

0:00 0:00 0:00 0:00 0:00 0:00 0:00

Moradabad Thomson Road Thomson Road Thomson Road Thomson Road Aligarh Meerut

0:00 0:00 0:00 0:00 0:00 0:00 0:00

0:00:00 0:00 0:00 0:00 0:00 0:00 0:00

N N N N N N N

NIL NIL NIL NIL NIL NIL NIL

NIL NIL NIL NIL NIL NIL NIL

P P P P P P P

Royal Tech Maruti Maruti M.S.Contractor Maruti ITPL Leo Duct

RCIL RCIL RCIL RCIL RCIL RCIL RCIL

20

NR

DLI

NCR

0:00

Pora-Sikhobad, Tundla-Agra-Dholpur

Agra

0:00

0:00

NIL

NIL

ITPL

RCIL

21 22 23 24 25 26 27 28 29

NR NR NR NR NR NR NR NR NR

DLI DLI DLI LKO LKO LKO LKO LKO LKO

NCR NCR NCR NR NR NER NER NER NR

0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00

Dholpur-Dabra-Jhansi Faridabad-Mathura-Agra Jhansi-Lalitpur-Bina Shajahanpur-Hardoi-Lucknow Meja Rd.-MGS-BSB-Aurihar Luckhnow local Area- LMC Bhatni-Siwan-Chhapra Deoria-Gorakhpur-Kalilabad& GKPValmikiNagar Incl LMC-GKP Nihalgarh-Jaunpur-Varanasi Pratapgarh-Janghai-Zafrabad& Janghai-ALD Aurihar-Bhatni-Deoria

Gwalior Mathura Jhansi Hardoi BSB LKO Siwan Gorakhpur Lucknow

0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00

0:00 0:00 0:00 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00

N N N N N N N N N

NIL NIL NIL NIL NIL NIL NIL NIL NIL

NIL NIL NIL NIL NIL NIL NIL NIL NIL

P P P P P NP P P P

Deptt. Team ITPL Uma Construction RST infocom MS Contractor Deptt. Team Uma Construction UMA Constt. RST infocom

RCIL RCIL RCIL RCIL RCIL RCIL RCIL RCIL RCIL

30

NR

LKO

NR

0:00

Lucknow

0:00

0:00:00

NIL

NIL

Mehta Infocom

RCIL

31

NR

LKO

NER

0:00

Mau

0:00

0:00:00

NIL

NIL

MS Contractor

RCIL

32 33 34 35 36 37

NR NR NR NR NR NR

LKO LKO LKO LKO LKO LKO

NR NER NCR NR NR NCR

0:00 0:00 0:00 0:00 0:00 0:00

Ajgain-Kanpur-Fatehpur-Bharwari Khalilabad-Gonda-Bhurwal Sikhoabad-Etawah-Kanpur Utratia-Raibareli-Pratapgarh Burhwal-Lucknow-Ajgain, &LucknowNihalgarh Bharwari-Allahabad-Meja Rd& Allahabad-Manikpur Jaipur-Ajmer-Sendra

CNB Gonda Kanpur Raibareli Lucknow Allahabad

0:00 0:00 0:00 0:00 0:00 0:00

0:00:00 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00

N N N N N N

NIL NIL NIL NIL NIL NIL

NIL NIL NIL NIL NIL NIL

P P P P P P

ITPL UK Traders M.S Contractor Triveni Metal works RST INFOCOM RST infocom Gujrat Scale Industries Anarc Networking ITPL V.Tech ITPL Deptt. Team

RCIL RCIL RCIL RCIL RCIL RCIL

38

NR

JP

NWR

0:00

Ajmer

0:00

0:00:00

NIL

NIL

NP

RCIL

39 40 41 42 43

NR NR NR NR NR

JP JP JP JP JP

NWR NWR NWR NWR NWR

0:00 0:00 0:00 0:00 0:00

Bandikui-Jaipur, Jaipur-Swaimadhopur Marwar-Abu Road-Palanpur Gurgaon-Rewari-Alwar-Bandikui Sendra-Marwar-Jodhpur Rewari-Lohari-Sadulpur-Hisar

Jaipur Abu Road Rewari Pali Loharu

0:00 0:00 0:00 0:00 0:00

0:00:00 0:00:00 0:00:00 0:00:00 0:00:00

N N N N N

NIL NIL NIL NIL NIL

NIL NIL NIL NIL NIL

P P P NP P

RCIL RCIL RCIL RCIL RCIL

FAILURE CODES (UPDATED : 18/10/2011) No.


1

Brief Description
Fiber improvement Block.

Detailed Description

Code

Miscellaneous Block.

3 4 5

OFC cut by Railway Contractors. OFC cut by Miscreants. OFC damage due to fire, flood or other agencies (other than railway contractors). Damage of system of Agitation, theft of equipments etc. OFC break in Joint Closer, damage by ants in JC. Overhead/Aerial OFC damage/theft/break. Pigtail cut by rat/or dust in pigtail connector/patch chord. Failure due to staff mistake. Charger Problem. Battery discharge. AC power failure/DG failure.

Change of a portion of OFC, block for reducing losses, Change or any FIB work in FMS, repair of broken unused fiber, Replacement of broken JC. Eqpt. shifting, Eqpt/card Change, Work of power supply such as MB change of battery charger/batteries, provision of second source of supply, under gounding the temporary aerial OFC, new connectivity, RUB/ROB works related blocks. Partial or complete cut by Railway contractor or Railway staff. FCRC Partial or complete cut by miscreants. FCM

Only OFC related problems not covered in FCRC, FCM, FBJC,FBO, MIS PTB, RCIL to be included and Damage of system of Agitation, theft of equipments. Any JC related problem, fiber break in FMS, or one fiber break at unknown place, Fiber swapping All Aerial problems to be mentioned here. Pig tail broken, cut by rat or bent, Patch chord problem of any type, 0dB connector/ attenuator problem, OFC/EQPT related failures caused by staff intentionally or unintentionally, Alcatel booster door open. Charger, UPS, AC to DC converter, stabilizer problem. Battery discharged due to any reason, DC MCB tripped, reason unknown for node down/reboot Prolonged AC mains failure, AC MCB tripped, AC wiring burnt. FBJC FBO PTB RCIL CH BD AC HWA SWA HWT SWT HWW SWW HWF SWF HWU

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Hardware problem in Alcatel equipment. H/W problems due to any reason may be high temp, seepage, flood, smoke etc. Software problem with Alcatel Misbehaving eqpt., hanging of Eqpt., equipment. Hardware problem in Tejas equipment. H/W problems due to any reason may be high temp, seepage, flood, smoke etc. Software problem with Tejas equipment. Misbehaving eqpt., hanging of Eqpt., Hardware problem in WRI equipment. Software problem with WRI equipment. H/W problems due to any reason may be high temp, seepage, flood, smoke etc. Misbehaving eqpt., hanging of Eqpt.,

22 23

Hardware problem in Fibcom equipment. H/W problems due to any reason may be high temp, seepage, flood, smoke etc. Software problem with Fibcom Misbehaving eqpt., hanging of Eqpt., equipment Hardware problem in UT Starcom By the time new code is created, all Eqpt problems related to the equipment. eqpts other than mentioned here to be included in this column. Switch problem, media converter, MRO TEK problem, Router Software problem with UT Starcom equipment. Leased fiber.

SWU LF