DRAINAGE BASIC DATA 50 mm/hr Maximum hourly rainfall intensity = Rainfall intensity of duration of 20 min 85 mm/hr = 50*1.7= Rainfall intensity of duration of 5 min 185 mm/hr = 50*3.7= Assuming a logarithimic progression

I(T) = 10^(a*Log(T)+Log(b))
Putting the intensities of 1.778151 a 1.30103 a + + 60 min Log(b) = Log(b) = & 20 min 1.69897 1.929419

Log 50 = Log 85 =

Therefore, a = -0.482999 Putting the intensities of 1.30103 a 0.69897 a + + 20 min

b= 361.2557 & 5 min

Log(b) = Log(b) =

1.929419 Log 85= Log 185 = 2.267172

Therefore, a = -0.560995 I(10)= 125.4 mm/hr

b= 456.3422 I(30)= 69.882 mm/hr

All intermediate intensities may be calculated based on time of concentration

Consider 5 min intensity for builtup & paved area & 10 min intensity for open area Runoff Coefficients Rb = 0.95 Rp = 0.8 Ro = 0.65

Therefore as per Rational method Qc1 = Ab*Ib*Rb +Ap*IpRp+Ao*Io*Ro = 13.54 Lit/s

2 of 6

Consider 5 min intensity for builtup & paved area & 10 min intensity for open area Runoff Coefficients Rb = 0.95 Rp = 0.8 Ro = 0.65

Therefore as per Rational method Qc2 = Ab*Ib*Rb +Ap*IpRp+Ao*Io*Ro = 12.24 Lit/s

Consider 5 min intensity for builtup & paved area & 10 min intensity for open area Runoff Coefficients Rb = 0.95 Rp = 0.8 Ro = 0.65

Therefore as per Rational method Qc3= Ab*Ib*Rb +Ap*IpRp+Ao*Io*Ro = 10.11 Lit/s

Consider 5 min intensity for builtup & paved area & 10 min intensity for open area Runoff Coefficients Rb = 0.95 Rp = 0.8 Ro = 0.65

Therefore as per Rational method Qc4 = Ab*Ib*Rb +Ap*IpRp+Ao*Io*Ro = 11.77 Lit/s

3 of 6

Consider 5 min intensity for builtup & paved area & 10 min intensity for open area Runoff Coefficients Rb = 0.95 Rp = 0.8 Ro = 0.65

Therefore as per Rational method Qc5 = Ab*Ib*Rb +Ap*IpRp+Ao*Io*Ro = 19.72 Lit/s

Consider 5 min intensity for builtup & paved area & 10 min intensity for open area Runoff Coefficients Rb = 0.95 Rp = 0.8 Ro = 0.65

Therefore as per Rational method Qc6 = Ab*Ib*Rb +Ap*IpRp+Ao*Io*Ro = 18.64 Lit/s

Consider 5 min intensity for builtup & paved area & 10 min intensity for open area Runoff Coefficients Rb = 0.95 Rp = 0.8 Ro = 0.65

Therefore as per Rational method Qc7 = Ab*Ib*Rb +Ap*IpRp+Ao*Io*Ro = 16.05 Lit/s

4 of 6

Consider 5 min intensity for builtup & paved area & 10 min intensity for open area Runoff Coefficients Rb = 0.95 Rp = 0.8 Ro = 0.65

Therefore as per Rational method Qc8 = Ab*Ib*Rb +Ap*IpRp+Ao*Io*Ro = 21.81 Lit/s

Consider 5 min intensity for builtup & paved area & 10 min intensity for open area Runoff Coefficients Rb = 0.95 Rp = 0.8 Ro = 0.65

Therefore as per Rational method Qc9 = Ab*Ib*Rb +Ap*IpRp+Ao*Io*Ro = 20.43 Lit/s

Consider 5 min intensity for builtup & paved area & 10 min intensity for open area Runoff Coefficients Rb = 0.95 Rp = 0.8 Ro = 0.65

Therefore as per Rational method Qc10 = Ab*Ib*Rb +Ap*IpRp+Ao*Io*Ro = 25.05 Lit/s

Design of Pipe Drain C D ######## D ######## DRAIN - 1-1 Design discharge , Qd = 13.54 Lit/s Select diameter of Pipe, D = Percentage full, p = pD= 135 mm F= 4.996 rad F pD pD 90%

C= 90 mm

16752 mm2 Wetted Area, Aw = Wetted Perimeter, Pw = 374.7 mm

Hydraulic mean radius, Rm = 44.71 mm

From Manning's formula, flow velocity, Vf = 1/N * Rm^2/3 * S^1/2 Manning's Coefficient for concrete pipe, N = Select bed slope , S = 1: Vf = 0.012 0.742 m/s OK 12.43 Lit/s C DRAIN - 1-2 Design discharge , Qd = 25.78 Lit/s Select diameter of Pipe, D = Percentage full, p = pD= 180 mm F= 4.996 rad 90% F

Therefore Discharge carrying capacity, Qp = Aw * Vf=

C= 120 mm

29781 mm2 Wetted Area, Aw = Wetted Perimeter, Pw = 499.6 mm

Hydraulic mean radius, Rm = 59.61 mm

From Manning's formula, flow velocity, Vf = 1/N * Rm^2/3 * S^1/2 Manning's Coefficient for concrete pipe, N = Select bed slope , S = 1: Vf = 0.012 0.899 m/s OK 26.78 Lit/s

Therefore Discharge carrying capacity, Qp = Aw * Vf=

3 1 2 3 4 5 6 7 8 9 10 11

11 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90%

3 100 150 200 250 300 350 400 450 500 550 600

50 Dia. 100 Dia. 150 Dia. 200 Dia. 250 Dia. 300 Dia. 350 Dia. 400 Dia. 450 Dia. 500 Dia. 600 Dia.

50 Dia. 100 Dia. 150 Dia. 200 Dia. 250 Dia. 300 Dia. 350 Dia. 400 Dia. 450 Dia. 500 Dia. 600 Dia.
150 mm

90%

200

4 1 2 3 4 5 6 7 8 9 10 11

11 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90%

3 100 150 200 250 300 350 400 450 500 550 600

50 Dia. 100 Dia. 150 Dia. 200 Dia. 250 Dia. 300 Dia. 350 Dia. 400 Dia. 450 Dia. 500 Dia. 600 Dia.