BARGE / VESSEL : LINAU 91 IN-HOUSE TRAINING MUSTER DRILL Date Time Location Project Client : 18th November, 2011.

: 2025 hrs. : SOGT Kimanis, Sabah Water. : KPOC 14 & 24 Pipeline Post Lay Trenching. : KPOC

A muster drill was carried out onboard, when the barge is on the work location at SOGT Kimanis, Sabah Water 115m from shore. The drill was a regular emergency exercise with the purpose to train and familiarization to the personnel onboard on the response required in the event of emergency. The followings are the events recorded during the exercise. Events recorded during the exercise: No. 1 Alarm signal : Continuous ringing of alarm HSAP Field Engineer notified all the spread :Events Emergency general alarm (bell) was activated from Mustering Point 2025 hours TIME

1. Kaka Express
2

: Crew Boat 2025 hours : Tug Boat : Anchor Handling Tug Boat

2. Danum 99 3. Ocean Fortune


Immediate action was taken :

1. Electrician switch off the main generator. 3 2. Mechanic shut off water pump. 3. Welder switch off acetylene and oxygen supply to welding torch. 4 1. All personnel proceed to and assemble at mustering point. 2028 hours 2027 hours

2. Safety Spv. start headcount and tally with crew movement log. Safety spv. welcoming and inform all personnel of drill objectives: 1. As familiarization training. 2. To capture ability to response to emergency S/S brief to all personnel on safety measure taken in case of real emergency situation:1. All personnel have to immediately to stop work and proceed to assembly at 5 mustering point with I.D. tag and work vest strap on. 2. To wait and listen carefully for further instruction from PIC / SO on duty. 3. All personnel reminded not to panic at real emergency situation. 4. When boarding to life craft / emergency vessel thru boat landing all personnel are reminded to be cautious and queue properly. 5. Personnel to be alert at all time so as to be able to response to emergency alarm. 6 Safety Officer announce the fire drill completed, all team members and crews dismiss. 2040 hours 2030 hours

No

Observation / Finding 1. Remind all personnel that during emergency, those The emergency alarm sound cannot be clearly heard at the stern area near the area to double check and alert personnel at the area. 2. Recommend to replace manual emergency alarm bell, to halo horn. 1. Remind the personnel and brief all personnel necessary action to be Some personnel did not wear work vest during assembly at mustering point. taken. 2. Recommend for the work vest hanging pole to be place near to mustering board Positive observation. All personnel immediately respond after hearing the alarm and proceed to the mustering point.

when the pumps are in operation.

Reported by: _________________ (Azmi Fauzi) SSS, HSAP. cc to: KPOC HSE. GOM HSE. PBJV HSE. HSAP HSE.

Reviewed by: _________________ (Mohd Hasiff Yaacob ) FE, GOM.

Verified by: ________________ (Nasran Omar) General Inspector, KPOC.