Sunteți pe pagina 1din 175

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation of Railway Power Supply Systems

AC Railway

DC Railway / Trolleybus

Stephan_080915_OpenPowerNet_engl.ppt (Figure 1)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation of Railway Power Supply Systems

AC Railway

DC Railway / Trolleybus

Prof. Dr.-Ing. Arnd Stephan

Stephan_080915_OpenPowerNet_engl.ppt (Figure 1)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation of Railway Power Supply Systems why?

Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation of Railway Power Supply Systems why?


The electrical load flows and the energy consumption within railway power supply networks depend on the running trains and the power supply system characteristics.

Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation of Railway Power Supply Systems why?


The electrical load flows and the energy consumption within railway power supply networks depend on the running trains and the power supply system characteristics. The voltage situation as well as the network structure influence the electrical load flows ( current levels and directions).

Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation of Railway Power Supply Systems why?


The electrical load flows and the energy consumption within railway power supply networks depend on the running trains and the power supply system characteristics. The voltage situation as well as the network structure influence the electrical load flows ( current levels and directions). There are energy consumers with time- and location-dependent power demands ( picking up and recovering energy).

Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation of Railway Power Supply Systems why?


The electrical load flows and the energy consumption within railway power supply networks depend on the running trains and the power supply system characteristics. The voltage situation as well as the network structure influence the electrical load flows ( current levels and directions). There are energy consumers with time- and location-dependent power demands ( picking up and recovering energy). Thus the power supply system influences the energy consumption.

Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation of Railway Power Supply Systems why?


The electrical load flows and the energy consumption within railway power supply networks depend on the running trains and the power supply system characteristics. The voltage situation as well as the network structure influence the electrical load flows ( current levels and directions). There are energy consumers with time- and location-dependent power demands ( picking up and recovering energy). Thus the power supply system influences the energy consumption. Simulation of these dynamic processes enables:

Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation of Railway Power Supply Systems why?


The electrical load flows and the energy consumption within railway power supply networks depend on the running trains and the power supply system characteristics. The voltage situation as well as the network structure influence the electrical load flows ( current levels and directions). There are energy consumers with time- and location-dependent power demands ( picking up and recovering energy). Thus the power supply system influences the energy consumption. Simulation of these dynamic processes enables: Energy consumption analysis and prognosis

Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation of Railway Power Supply Systems why?


The electrical load flows and the energy consumption within railway power supply networks depend on the running trains and the power supply system characteristics. The voltage situation as well as the network structure influence the electrical load flows ( current levels and directions). There are energy consumers with time- and location-dependent power demands ( picking up and recovering energy). Thus the power supply system influences the energy consumption. Simulation of these dynamic processes enables: Energy consumption analysis and prognosis Design and rating verification of the electrical installations

Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)

Simulation of Railway Power Supply

COMPRAIL 2008

Special Requirements
The network voltage situation affects the electrical load flows and may have retroaction to the propulsion characteristics of the trains:

Stephan_080915_OpenPowerNet_engl.ppt (Figure 3)

Simulation of Railway Power Supply

COMPRAIL 2008

Special Requirements
The network voltage situation affects the electrical load flows and may have retroaction to the propulsion characteristics of the trains: currents and power losses increase with decreasing voltage,

Stephan_080915_OpenPowerNet_engl.ppt (Figure 3)

Simulation of Railway Power Supply

COMPRAIL 2008

Special Requirements
The network voltage situation affects the electrical load flows and may have retroaction to the propulsion characteristics of the trains: currents and power losses increase with decreasing voltage, under low voltage conditions current or power limitations of the train propulsion control are activated impact on driving dynamics,

Stephan_080915_OpenPowerNet_engl.ppt (Figure 3)

Simulation of Railway Power Supply

COMPRAIL 2008

Special Requirements
The network voltage situation affects the electrical load flows and may have retroaction to the propulsion characteristics of the trains: currents and power losses increase with decreasing voltage, under low voltage conditions current or power limitations of the train propulsion control are activated impact on driving dynamics, the network voltage influences the braking energy recovering decisively (energy absorption capability).

Stephan_080915_OpenPowerNet_engl.ppt (Figure 3)

Simulation of Railway Power Supply

COMPRAIL 2008

Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning

Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)

Simulation of Railway Power Supply

COMPRAIL 2008

Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning each trains driving state and its required traction power,

Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)

Simulation of Railway Power Supply

COMPRAIL 2008

Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning each trains driving state and its required traction power, the trains positions within the network,

Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)

Simulation of Railway Power Supply

COMPRAIL 2008

Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning each trains driving state and its required traction power, the trains positions within the network, the layout and the capability of the power supply system.

Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)

Simulation of Railway Power Supply

COMPRAIL 2008

Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning each trains driving state and its required traction power, the trains positions within the network, the layout and the capability of the power supply system. All these information are needed exactly at the same time.

Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)

Simulation of Railway Power Supply

COMPRAIL 2008

Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning each trains driving state and its required traction power, the trains positions within the network, the layout and the capability of the power supply system. All these information are needed exactly at the same time. In the past a number of compromises were made

Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)

Simulation of Railway Power Supply

COMPRAIL 2008

Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning each trains driving state and its required traction power, the trains positions within the network, the layout and the capability of the power supply system. All these information are needed exactly at the same time. In the past a number of compromises were made either concerning the complexity of the railway operation simulation,

Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)

Simulation of Railway Power Supply

COMPRAIL 2008

Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning each trains driving state and its required traction power, the trains positions within the network, the layout and the capability of the power supply system. All these information are needed exactly at the same time. In the past a number of compromises were made either concerning the complexity of the railway operation simulation, or regarding the modelling depth of the propulsion technology and the electrical network.

Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)

Simulation of Railway Power Supply

COMPRAIL 2008

Separation of Simulation Tasks Railway Operation


Line routing and alignment Track layout Signalling system Train data Timetable Connecting conditions Operating rules

Load Flow and Energy


Train propulsion data Power grid parameter Substations arrangement Switch states Feeder lines and cables Catenary system Earthing system

Stephan_080915_OpenPowerNet_engl.ppt (Figure 5)

Simulation of Railway Power Supply

COMPRAIL 2008

Separation of Simulation Tasks Railway Operation


Line routing and alignment Track layout Signalling system Train data Timetable Connecting conditions Operating rules

Load Flow and Energy


Train propulsion data Power grid parameter Substations arrangement Switch states Feeder lines and cables Catenary system Earthing system

Stephan_080915_OpenPowerNet_engl.ppt (Figure 5)

Simulation of Railway Power Supply

COMPRAIL 2008

Separation of Simulation Tasks Railway Operation


Line routing and alignment Track layout Signalling system Train data Timetable Connecting conditions Operating rules

Load Flow and Energy


Train propulsion data Power grid parameter Substations arrangement Switch states Feeder lines and cables Catenary system Earthing system

Stephan_080915_OpenPowerNet_engl.ppt (Figure 5)

Simulation of Railway Power Supply

COMPRAIL 2008

Separation of Simulation Tasks Railway Operation


Load Flow and Energy

Line routing and alignment Train propulsion data Track layout Power grid parameter Signalling system Substations arrangement Train data Switch states Plug-in Timetable Feeder lines and cables Connecting conditions Catenary system Operating rules Earthing system

Stephan_080915_OpenPowerNet_engl.ppt (Figure 5)

Simulation of Railway Power Supply

COMPRAIL 2008

Separation of Simulation Tasks Railway Operation


Load Flow and Energy

Line routing and alignment Train propulsion data Track layout Power grid parameter Signalling system Substations arrangement Train data Switch states Plug-in Timetable Feeder lines and cables Connecting conditions Catenary system Operating rules Earthing system

Stephan_080915_OpenPowerNet_engl.ppt (Figure 5)

Simulation of Railway Power Supply

COMPRAIL 2008

Separation of Simulation Tasks Railway Operation


Load Flow and Energy

Line routing and alignment Train propulsion data Track layout Power grid parameter Signalling system Substations arrangement Train data Switch states Plug-in Timetable Feeder lines and cables Connecting conditions Catenary system Operating rules Earthing system

Stephan_080915_OpenPowerNet_engl.ppt (Figure 5)

Simulation of Railway Power Supply

COMPRAIL 2008

Source: ETHZ

Stephan_080915_OpenPowerNet_engl.ppt (Figure 6)

Simulation of Railway Power Supply

COMPRAIL 2008

Source: IFB

Stephan_080915_OpenPowerNet_engl.ppt (Figure 7)

Simulation of Railway Power Supply

COMPRAIL 2008

Railway Operation Simulation

Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)

Simulation of Railway Power Supply

COMPRAIL 2008

Railway Operation Simulation

Propulsion Technology

Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)

Simulation of Railway Power Supply

COMPRAIL 2008

Railway Operation Simulation

Propulsion Technology

Power Supply System

Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)

Simulation of Railway Power Supply

COMPRAIL 2008

Railway Operation Simulation

Propulsion Technology

Power Supply System

Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)

Simulation of Railway Power Supply

COMPRAIL 2008

Railway Operation Simulation

ATM
Advanced Train Module

Propulsion Technology

Power Supply System

Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)

Simulation of Railway Power Supply

COMPRAIL 2008

Railway Operation Simulation

ATM
Advanced Train Module

PSC
Power Supply Calculation

Propulsion Technology

Power Supply System

Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)

Simulation of Railway Power Supply

COMPRAIL 2008

Railway Operation Simulation

ATM
Advanced Train Module
Interaction

PSC
Power Supply Calculation

Propulsion Technology

Power Supply System

Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)

Simulation of Railway Power Supply

COMPRAIL 2008

Railway Operation Simulation

ATM
Advanced Train Module
Interaction

PSC
Power Supply Calculation

Propulsion Technology

Power Supply System

Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)

Simulation of Railway Power Supply

COMPRAIL 2008

Railway Operation Simulation

Co-Simulation

ATM
Advanced Train Module
Interaction

PSC
Power Supply Calculation

Propulsion Technology

Power Supply System

Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation Sequence per Time Step

OpenTrack

PSC

ATM

Stephan_080915_OpenPowerNet_engl.ppt (Figure 9)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation Sequence per Time Step

OpenTrack
Train Position, Requested Effort

PSC

ATM

Stephan_080915_OpenPowerNet_engl.ppt (Figure 9)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation Sequence per Time Step

OpenTrack
Train Position, Requested Effort

PSC
Train Current

ATM

Line Voltage, Requested Effort

Stephan_080915_OpenPowerNet_engl.ppt (Figure 9)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation Sequence per Time Step

OpenTrack
Train Position, Requested Effort Achieved Effort

PSC
Train Current

ATM

Line Voltage, Requested Effort

Stephan_080915_OpenPowerNet_engl.ppt (Figure 9)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation Sequence per Time Step

OpenTrack
Train Position, Requested Effort Achieved Effort

PSC
Train Current

ATM

Line Voltage, Requested Effort

Stephan_080915_OpenPowerNet_engl.ppt (Figure 9)

Simulation of Railway Power Supply

COMPRAIL 2008

PSC

ATM

Stephan_080915_OpenPowerNet_engl.ppt (Figure 10)

Simulation of Railway Power Supply

COMPRAIL 2008

AP Server

PSC

ATM

Stephan_080915_OpenPowerNet_engl.ppt (Figure 10)

Simulation of Railway Power Supply

COMPRAIL 2008

network data base

AP Server

propulsion data base

PSC

ATM

Stephan_080915_OpenPowerNet_engl.ppt (Figure 10)

Simulation of Railway Power Supply

COMPRAIL 2008

train_ID, engine_ID, line_ID, track_ID, train location, time, requested force, speed

1
network data base

AP Server

propulsion data base

PSC

ATM

Stephan_080915_OpenPowerNet_engl.ppt (Figure 10)

Simulation of Railway Power Supply

COMPRAIL 2008

train_ID, engine_ID, line_ID, track_ID, train location, time, requested force, speed

1
network data base
line_ID, track_ID, train location, time, train current

AP Server

propulsion data base

PSC

ATM

Stephan_080915_OpenPowerNet_engl.ppt (Figure 10)

Simulation of Railway Power Supply

COMPRAIL 2008

train_ID, engine_ID, line_ID, track_ID, train location, time, requested force, speed

1
network data base
line_ID, track_ID, train location, time, train current

AP Server
3
train voltage, nominal voltage, nominal frequency

propulsion data base

PSC

ATM

Stephan_080915_OpenPowerNet_engl.ppt (Figure 10)

Simulation of Railway Power Supply

COMPRAIL 2008

train_ID, engine_ID, line_ID, track_ID, train location, time, requested force, speed

1
network data base
line_ID, track_ID, train location, time, train current

AP Server
3
train voltage, nominal voltage, nominal frequency train_ID, engine_ID, requested force, speed, train voltage, nominal voltage, nominal frequency

propulsion data base

PSC

ATM

Stephan_080915_OpenPowerNet_engl.ppt (Figure 10)

Simulation of Railway Power Supply

COMPRAIL 2008

train_ID, engine_ID, line_ID, track_ID, train location, time, requested force, speed

1
network data base
line_ID, track_ID, train location, time, train current

AP Server
3
train voltage, nominal voltage, nominal frequency train_ID, engine_ID, requested force, speed, train voltage, nominal voltage, nominal frequency

propulsion data base

5
achieved force, train current

PSC

ATM

Stephan_080915_OpenPowerNet_engl.ppt (Figure 10)

Simulation of Railway Power Supply

COMPRAIL 2008

6
train_ID, engine_ID, line_ID, track_ID, train location, time, requested force, speed achieved force

1
network data base
line_ID, track_ID, train location, time, train current

AP Server
3
train voltage, nominal voltage, nominal frequency train_ID, engine_ID, requested force, speed, train voltage, nominal voltage, nominal frequency

propulsion data base

5
achieved force, train current

PSC

ATM

Stephan_080915_OpenPowerNet_engl.ppt (Figure 10)

Simulation of Railway Power Supply

COMPRAIL 2008

SOAP interface

6
train_ID, engine_ID, line_ID, track_ID, train location, time, requested force, speed achieved force

1
network data base
line_ID, track_ID, train location, time, train current

AP Server
3
train voltage, nominal voltage, nominal frequency train_ID, engine_ID, requested force, speed, train voltage, nominal voltage, nominal frequency

propulsion data base

5
achieved force, train current

PSC

ATM

Stephan_080915_OpenPowerNet_engl.ppt (Figure 10)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling levels available for propulsion simulation

Stephan_080915_OpenPowerNet_engl.ppt (Figure 11)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling levels available for propulsion simulation


a) constant efficiency factors for propulsion equipment

Stephan_080915_OpenPowerNet_engl.ppt (Figure 11)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling levels available for propulsion simulation


a) constant efficiency factors for propulsion equipment b) driving state related efficiency factors

Stephan_080915_OpenPowerNet_engl.ppt (Figure 11)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling levels available for propulsion simulation


a) constant efficiency factors for propulsion equipment b) driving state related efficiency factors c) load depending efficiency factors of components

Stephan_080915_OpenPowerNet_engl.ppt (Figure 11)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling levels available for propulsion simulation


a) constant efficiency factors for propulsion equipment b) driving state related efficiency factors c) load depending efficiency factors of components d) detailed engine models of components

Stephan_080915_OpenPowerNet_engl.ppt (Figure 11)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling levels available for propulsion simulation


a) constant efficiency factors for propulsion equipment b) driving state related efficiency factors c) load depending efficiency factors of components d) detailed engine models of components + auxiliary power and eddy current break

Stephan_080915_OpenPowerNet_engl.ppt (Figure 11)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling levels available for propulsion simulation


a) constant efficiency factors for propulsion equipment b) driving state related efficiency factors c) load depending efficiency factors of components d) detailed engine models of components + + auxiliary power and eddy current break additionally: limiting values of propulsion control (e.g. voltage related current limitation)

Stephan_080915_OpenPowerNet_engl.ppt (Figure 11)

Simulation of Railway Power Supply Propulsion Structure

COMPRAIL 2008

Pel

Pmech

Stephan_080915_OpenPowerNet_engl.ppt (Figure 12)

Simulation of Railway Power Supply

COMPRAIL 2008

Efficiency Characteristics of ICE3 train


Wirkungsgradverlufe ICE 3 fr maximale Zugkraft 1 AC fr kV 16,7 Hz Herstellerangabe 15Betrieb bei 15 kV 16,7 Hz
1

0,9

Wirkungsgrad

0,8
Transformator 4-QS

0,7

Pulswechselrichter Asynchron-Fahrmotor Radsatzgetriebe Gesamt

0,6

0,5 0 20 40 60 80 100 Motorfrequenz 120 140 160 180 Hz 200

Stephan_080915_OpenPowerNet_engl.ppt (Figure 13)

Simulation of Railway Power Supply Propulsion Component Modelling (example for traction motor)

COMPRAIL 2008

i1

R1

L 1

L' 2
i1 + i '2

R '2 s

i '2

1 u1
H

'2

LH

M
M

e le k t

= M

m ech

+ M

L u fe r v e r lu s te
3 2

L u fe r v e r lu s te

P = R o to r v e r lu s te = 2n

i '2 2 R '2 2n

Stephan_080915_OpenPowerNet_engl.ppt (Figure 14)

Simulation of Railway Power Supply

COMPRAIL 2008

Propulsion Model Verification


Spannung in Pantograph Voltage Strom in Ampere Train Current and Volt 27000 500,00

V
26500

A
400,00

300,00 26000 200,00 25500

voltage Spannung in Volt

25000

0,00

-100,00 24500 -200,00 24000 -300,00 23500 -400,00

23000 00:00 00:30 01:00 01:30 02:00 02:30 03:00 03:30 04:00 04:30 05:00 05:30 06:00 06:30 07:00 07:30 08:00 08:30 09:00

-500,00

Zeit in Minuten

time

h:min

Stephan_080915_OpenPowerNet_engl.ppt (Figure 15)

Strom in Ampere

100,00

current

Simulation of Railway Power Supply

COMPRAIL 2008

Train Speed and Power Characteristics


Measurement and Mewerte am Results Betriebsfahrt Hannover - Gttingen, Simulationfhrenden Triebkopf, Simulation IFB: Standardparameter und Wirkungsgradmodell ICE1/2 ICE1 Hannover Gttingen
260
km/h

Fahrschaubild und Leistungsverlauf ICE1

240 220 200 180 160 140

8
MW

120 100 80 60 40
Fehlertoleranzen: Fahrschaubild < 1 % Energie ab Stromabnehmer < 2 %

2
v Mefahrt v Simulation P Mefahrt P Simulation

-2

20 0 0 10 20 30 40 50 Weg 60

km

70

80

90

-4 100

Quelle: IFB

Stephan_080915_OpenPowerNet_engl.ppt (Figure 16)

PStr

Simulation of Railway Power Supply

COMPRAIL 2008

Requirements to the electrical network model

Stephan_080915_OpenPowerNet_engl.ppt (Figure 17)

Simulation of Railway Power Supply

COMPRAIL 2008

Requirements to the electrical network model


Simulation of all common AC- and DC-railway power supply systems

Stephan_080915_OpenPowerNet_engl.ppt (Figure 17)

Simulation of Railway Power Supply

COMPRAIL 2008

Requirements to the electrical network model


Simulation of all common AC- and DC-railway power supply systems Representation of the entire electrical network structure

Stephan_080915_OpenPowerNet_engl.ppt (Figure 17)

Simulation of Railway Power Supply

COMPRAIL 2008

Requirements to the electrical network model


Simulation of all common AC- and DC-railway power supply systems Representation of the entire electrical network structure Unrestricted choice of conductor configuration along the line

Stephan_080915_OpenPowerNet_engl.ppt (Figure 17)

Simulation of Railway Power Supply

COMPRAIL 2008

Requirements to the electrical network model


Simulation of all common AC- and DC-railway power supply systems Representation of the entire electrical network structure Unrestricted choice of conductor configuration along the line Precise consideration of electromagnetic coupling effects of overhead line conductors for a.c.-systems

Stephan_080915_OpenPowerNet_engl.ppt (Figure 17)

Simulation of Railway Power Supply

COMPRAIL 2008

Requirements to the electrical network model


Simulation of all common AC- and DC-railway power supply systems Representation of the entire electrical network structure Unrestricted choice of conductor configuration along the line Precise consideration of electromagnetic coupling effects of overhead line conductors for a.c.-systems Change of switching status within the power supply network

Stephan_080915_OpenPowerNet_engl.ppt (Figure 17)

Simulation of Railway Power Supply

COMPRAIL 2008

Requirements to the electrical network model


Simulation of all common AC- and DC-railway power supply systems Representation of the entire electrical network structure Unrestricted choice of conductor configuration along the line Precise consideration of electromagnetic coupling effects of overhead line conductors for a.c.-systems Change of switching status within the power supply network Retroaction to the railway operation simulation (OpenTrack)

Stephan_080915_OpenPowerNet_engl.ppt (Figure 17)

Simulation of Railway Power Supply

COMPRAIL 2008

Requirements to the electrical network model


Simulation of all common AC- and DC-railway power supply systems Representation of the entire electrical network structure Unrestricted choice of conductor configuration along the line Precise consideration of electromagnetic coupling effects of overhead line conductors for a.c.-systems Change of switching status within the power supply network Retroaction to the railway operation simulation (OpenTrack) Iterative communication with the propulsion simulation (ATM)

Stephan_080915_OpenPowerNet_engl.ppt (Figure 17)

Simulation of Railway Power Supply

COMPRAIL 2008

Requirements to the electrical network model


Simulation of all common AC- and DC-railway power supply systems Representation of the entire electrical network structure Unrestricted choice of conductor configuration along the line Precise consideration of electromagnetic coupling effects of overhead line conductors for a.c.-systems Change of switching status within the power supply network Retroaction to the railway operation simulation (OpenTrack) Iterative communication with the propulsion simulation (ATM) Configurable data output

Stephan_080915_OpenPowerNet_engl.ppt (Figure 17)

Simulation of Railway Power Supply

COMPRAIL 2008

Requirements to the electrical network model


Simulation of all common AC- and DC-railway power supply systems Representation of the entire electrical network structure Unrestricted choice of conductor configuration along the line Precise consideration of electromagnetic coupling effects of overhead line conductors for a.c.-systems Change of switching status within the power supply network Retroaction to the railway operation simulation (OpenTrack) Iterative communication with the propulsion simulation (ATM) Configurable data output Interfaces for post-processing

Stephan_080915_OpenPowerNet_engl.ppt (Figure 17)

Simulation of Railway Power Supply Power Supply Network Structure (DC 0.6 3.0 kV)
Power Grid Connection 3 AC 10 / 20 / 30 kV

COMPRAIL 2008

SS1
sw sw sw

Substation

SS2
sw sw sw

SS3
sw sw sw

SS4
sw sw sw

single-end
GO1 GO2

double-end
GO3 GO4

double-end
GO5

0.6 kV
GR1 GR2 GR3 GR4

OCS Rails

GRE

GRE

GRE

GRE

GRE

GRE

GRE

Earth

train NOT in section

train in section

Stephan_080915_OpenPowerNet_engl.ppt (Figure 18)

Simulation of Railway Power Supply Power Supply Network Structure (1 AC 15 kV 16,7 Hz)
Power Grid Connection 1 AC 110 kV 16,7 Hz

COMPRAIL 2008

SS1
sw sw sw

Substation

CS
sw sw

SS2
sw sw sw

YO1

YO2

YO3

15 kV
YR1 YR2 YR3

OCS Rails

YRE

YRE

YRE

YRE

YRE

YRE

YRE

Earth

Stephan_080915_OpenPowerNet_engl.ppt (Figure 19)

Simulation of Railway Power Supply Power Supply Network Structure (2 AC 25 kV ~ 50 / 60 Hz)


Power Grid Connection 3 AC 110 / 220 kV

COMPRAIL 2008

Substation SS
sw sw sw

Autotransformer

Autotransformer

Autotransformer

AT1
sw sw sw

AT2
sw sw sw

AT3
sw sw sw

YO1

YO2

YO3

YO4

25 kV
YR1 YN1 YR2 YN2 YR3 YN3 YR4

OCS Rails

-25 kV
YRE YRE YRE YRE YRE YRE YRE

Negative Feeder Earth

train NOT in section

train in section

Stephan_080915_OpenPowerNet_engl.ppt (Figure 20)

Simulation of Railway Power Supply Modelling of infrastructure Catenary arrangement and switch status

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 21)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling of the Railway Power Supply System

Stephan_080915_OpenPowerNet_engl.ppt (Figure 22)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling of the Railway Power Supply System


Electrical network structure (feeding sections, feeding points, switching status) in congruence to the track topology

Stephan_080915_OpenPowerNet_engl.ppt (Figure 22)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling of the Railway Power Supply System


Electrical network structure (feeding sections, feeding points, switching status) in congruence to the track topology Electrical characteristics of the feeding power grid

Stephan_080915_OpenPowerNet_engl.ppt (Figure 22)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling of the Railway Power Supply System


Electrical network structure (feeding sections, feeding points, switching status) in congruence to the track topology Electrical characteristics of the feeding power grid Electrical characteristics of the substations

Stephan_080915_OpenPowerNet_engl.ppt (Figure 22)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling of the Railway Power Supply System


Electrical network structure (feeding sections, feeding points, switching status) in congruence to the track topology Electrical characteristics of the feeding power grid Electrical characteristics of the substations Electrical characteristics of the conductors (cables, Catenary wires, tracks, rails)

Stephan_080915_OpenPowerNet_engl.ppt (Figure 22)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling of the Railway Power Supply System


Electrical network structure (feeding sections, feeding points, switching status) in congruence to the track topology Electrical characteristics of the feeding power grid Electrical characteristics of the substations Electrical characteristics of the conductors (cables, Catenary wires, tracks, rails) Electrical characteristics rail-to-earth

Stephan_080915_OpenPowerNet_engl.ppt (Figure 22)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling of the Railway Power Supply System


Electrical network structure (feeding sections, feeding points, switching status) in congruence to the track topology Electrical characteristics of the feeding power grid Electrical characteristics of the substations Electrical characteristics of the conductors (cables, Catenary wires, tracks, rails) Electrical characteristics rail-to-earth Modelling of additional power consumers (e.g. point heatings)

Stephan_080915_OpenPowerNet_engl.ppt (Figure 22)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling of the Railway Power Supply System


Electrical network structure (feeding sections, feeding points, switching status) in congruence to the track topology Electrical characteristics of the feeding power grid Electrical characteristics of the substations Electrical characteristics of the conductors (cables, Catenary wires, tracks, rails) Electrical characteristics rail-to-earth Modelling of additional power consumers (e.g. point heatings) Loading capacity (conductors, converters, transformers)

Stephan_080915_OpenPowerNet_engl.ppt (Figure 22)

Simulation of Railway Power Supply

COMPRAIL 2008

Modelling of the Railway Power Supply System


Electrical network structure (feeding sections, feeding points, switching status) in congruence to the track topology Electrical characteristics of the feeding power grid Electrical characteristics of the substations Electrical characteristics of the conductors (cables, Catenary wires, tracks, rails) Electrical characteristics rail-to-earth Modelling of additional power consumers (e.g. point heatings) Loading capacity (conductors, converters, transformers) Protection settings

Stephan_080915_OpenPowerNet_engl.ppt (Figure 22)

Simulation of Railway Power Supply Substation / AT Structure (2 AC 25 kV ~ 50/60 Hz)

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 23)

Simulation of Railway Power Supply Trackside Arrangement of Conductors

COMPRAIL 2008

Source: DB KoRiL 997

Stephan_080915_OpenPowerNet_engl.ppt (Figure 24)

Simulation of Railway Power Supply Trackside Arrangement of Conductors

COMPRAIL 2008

hollow coils

RL

RR

Stephan_080915_OpenPowerNet_engl.ppt (Figure 25)

Simulation of Railway Power Supply Trackside Arrangement of Conductors

COMPRAIL 2008

RF hollow coils

RL

RR

Stephan_080915_OpenPowerNet_engl.ppt (Figure 25)

Simulation of Railway Power Supply Trackside Arrangement of Conductors

COMPRAIL 2008

RF hollow coils

RL

RR

Stephan_080915_OpenPowerNet_engl.ppt (Figure 25)

Simulation of Railway Power Supply Trackside Arrangement of Conductors

COMPRAIL 2008

RF hollow coils

RL

RR

Stephan_080915_OpenPowerNet_engl.ppt (Figure 25)

m ax .

15 00

Simulation of Railway Power Supply Trackside Arrangement of Conductors

COMPRAIL 2008

RF hollow coils

RL

RR

Stephan_080915_OpenPowerNet_engl.ppt (Figure 25)

m ax .

15 00

Simulation of Railway Power Supply Trackside Arrangement of Conductors

COMPRAIL 2008

RF E hollow coils

RL

RR

Stephan_080915_OpenPowerNet_engl.ppt (Figure 25)

m ax .

15 00

Simulation of Railway Power Supply Trackside Arrangement of Conductors

COMPRAIL 2008

MW RF CW E hollow coils

RL

RR

Stephan_080915_OpenPowerNet_engl.ppt (Figure 25)

m ax .

15 00

Simulation of Railway Power Supply Trackside Arrangement of Conductors


NF MW RF CW E hollow coils

COMPRAIL 2008

RL

RR

Stephan_080915_OpenPowerNet_engl.ppt (Figure 25)

m ax .

15 00

Simulation of Railway Power Supply Catenary Arrangement and Conductor Model

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 26)

Simulation of Railway Power Supply Catenary Arrangement and Conductor Model

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 26)

Simulation of Railway Power Supply Catenary Arrangement and Conductor Model

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 26)

Simulation of Railway Power Supply Catenary Arrangement and Conductor Model

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 26)

Simulation of Railway Power Supply Catenary Arrangement and Conductor Model

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 26)

Simulation of Railway Power Supply Catenary Arrangement and Conductor Model

COMPRAIL 2008

Slice

Stephan_080915_OpenPowerNet_engl.ppt (Figure 26)

Simulation of Railway Power Supply Catenary Arrangement and Conductor Model

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 27)

Simulation of Railway Power Supply Catenary Arrangement and Conductor Model


y

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 27)

Simulation of Railway Power Supply Catenary Arrangement and Conductor Model


y

COMPRAIL 2008

(0; 0)

Stephan_080915_OpenPowerNet_engl.ppt (Figure 27)

Simulation of Railway Power Supply Catenary Arrangement and Conductor Model


y

COMPRAIL 2008

(x1; y1)

(0; 0)

Stephan_080915_OpenPowerNet_engl.ppt (Figure 27)

Simulation of Railway Power Supply Catenary Arrangement and Conductor Model


y

COMPRAIL 2008

material, diameter (x1; y1)

(0; 0)

Stephan_080915_OpenPowerNet_engl.ppt (Figure 27)

Simulation of Railway Power Supply Catenary Arrangement and Conductor Model


y

COMPRAIL 2008

material, diameter (x1; y1)

electro-magnetic coupling effects

(0; 0)

Stephan_080915_OpenPowerNet_engl.ppt (Figure 27)

Simulation of Railway Power Supply Catenary Arrangement and Conductor Model


y

COMPRAIL 2008

Slice n

material, diameter (x1; y1)

electro-magnetic coupling effects

(0; 0)

Stephan_080915_OpenPowerNet_engl.ppt (Figure 27)

Simulation of Railway Power Supply Sequence of Slices

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 28)

Simulation of Railway Power Supply Mathematical Network Model

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 29)

Simulation of Railway Power Supply

COMPRAIL 2008

Electrical network calculation using the advanced method of nodes

node voltages nodes

inductive voltages

currents

Stephan_080915_OpenPowerNet_engl.ppt (Figure 30)

Simulation of Railway Power Supply

COMPRAIL 2008

Electrical network calculation using the advanced method of nodes

Voltage drops caused by self- and mutual induction


node voltages nodes inductive voltages currents

Stephan_080915_OpenPowerNet_engl.ppt (Figure 30)

Simulation of Railway Power Supply

COMPRAIL 2008

Verification of the simulation

Stephan_080915_OpenPowerNet_engl.ppt (Figure 31)

Simulation of Railway Power Supply

COMPRAIL 2008

Verification of the simulation


Punctual theoretical evaluation

Stephan_080915_OpenPowerNet_engl.ppt (Figure 31)

Simulation of Railway Power Supply

COMPRAIL 2008

Verification of the simulation


Punctual theoretical evaluation current sum cero for network slices

Stephan_080915_OpenPowerNet_engl.ppt (Figure 31)

Simulation of Railway Power Supply

COMPRAIL 2008

Verification of the simulation


Punctual theoretical evaluation current sum cero for network slices energy picking up and recovering

Stephan_080915_OpenPowerNet_engl.ppt (Figure 31)

Simulation of Railway Power Supply

COMPRAIL 2008

Verification of the simulation


Punctual theoretical evaluation current sum cero for network slices energy picking up and recovering correspondence of voltage minimum and maximum / jumps with the network structure during constant load test

Stephan_080915_OpenPowerNet_engl.ppt (Figure 31)

Simulation of Railway Power Supply

COMPRAIL 2008

Verification of the simulation


Punctual theoretical evaluation current sum cero for network slices energy picking up and recovering correspondence of voltage minimum and maximum / jumps with the network structure during constant load test

Comparison of measurement data with the simulation results for predefined load cases

Stephan_080915_OpenPowerNet_engl.ppt (Figure 31)

Simulation of Railway Power Supply

COMPRAIL 2008

Verification of the simulation


Punctual theoretical evaluation current sum cero for network slices energy picking up and recovering correspondence of voltage minimum and maximum / jumps with the network structure during constant load test

Comparison of measurement data with the simulation results for predefined load cases driving dynamics of the trains

Stephan_080915_OpenPowerNet_engl.ppt (Figure 31)

Simulation of Railway Power Supply

COMPRAIL 2008

Verification of the simulation


Punctual theoretical evaluation current sum cero for network slices energy picking up and recovering correspondence of voltage minimum and maximum / jumps with the network structure during constant load test

Comparison of measurement data with the simulation results for predefined load cases driving dynamics of the trains current-, voltage- and power characteristics

Stephan_080915_OpenPowerNet_engl.ppt (Figure 31)

Simulation of Railway Power Supply Verification: Measurement and Simulation


AB07, Messfahrt F8, mit Halt
60

COMPRAIL 2008

50

Geschwidnigkeit [km/h]

40

30

20

10

0 0 20 40 60 Zeit [s] v_TFZ_2099 v_Tfz_Simu 80 100 120

Stephan_080915_OpenPowerNet_engl.ppt (Figure 32)

Simulation of Railway Power Supply Verification: Measurement and Simulation


AB07, Messfahrt F8, mit Halt
900

COMPRAIL 2008

4000

800

3500

700

3000

600 Spannung [V]

2500

500

2000

400

1500

300 675 A 200 673 A 100

1000

500

0 0 20 40 60 Zeit [s] Toleranz U (EN 50163) U_nenn U_TFZ_2099 U_Tfz_Simu I_TFZ_2099 I_Tfz_Simu 80 100 120

-500

Stephan_080915_OpenPowerNet_engl.ppt (Figure 33)

Strom [A]

Simulation of Railway Power Supply

COMPRAIL 2008

High Speed Railway


350 km/h 966 km Double Track 2AC 25 kV 50 Hz

Stephan_080915_OpenPowerNet_engl.ppt (Figure 34)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation Example: High Speed Railway 966 km, Track Alignment (Detail)

Stephan_080915_OpenPowerNet_engl.ppt (Figure 35)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation Example: High Speed Railway 966 km, OCS Infeed (Detail)

Stephan_080915_OpenPowerNet_engl.ppt (Figure 36)

Simulation of Railway Power Supply

COMPRAIL 2008

Simulation Example: High Speed Railway 966 km, Timetable Draft (Detail)

Stephan_080915_OpenPowerNet_engl.ppt (Figure 37)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 38)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 39)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV

COMPRAIL 2008

Detail

Stephan_080915_OpenPowerNet_engl.ppt (Figure 39)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 40)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 41)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV

COMPRAIL 2008

Detail

Stephan_080915_OpenPowerNet_engl.ppt (Figure 41)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 42)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
TSS Energy Delivery (1 h)
WGPDL - Operation Program 2028
120,0
107,8 107,8

COMPRAIL 2008

Energy total Energy by TSS


96,56,5 9

100,0
91,5 90,9 85,2 81,0 92,92,9 9 92,52,1 9 91,3 90,5

91,01,0 9 87,57,5 8

Electric Energy [MWh]

80,0

78,5 74,0

79,6

81,81,8 8 78,08,0 7

77,16,8 7 73,9 73,2 72,21,8 7 71,61,4 7 71,2

62,42,1 6

60,0

57,0 49,5 44,0

40,0

37,7

20,0

0,0 1 2 3 4 5 6 7 8 9 10 11 12 Substation No. 13 14 15 16 17 18 19 20

Stephan_080915_OpenPowerNet_engl.ppt (Figure 43)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
Recovery Rates (peak operation)
WGPDL - Operation Program 2028
18,0%

COMPRAIL 2008

16,6%

16,0%
15,1%

14,0%

13,7%

12,0% Energy Recovering

10,0%

8,0%
7,0% 6,0%

6,0%

4,0%

2,0%
0,9% 0,5% 0,3% 0,5% 0,3% 0,0% 0,6% 0,0% 0,9% 0,5% 0,0% 0,0% 0,0% 0,0% 0,0%

0,0% 1 2 3 4 5 6 7 8 9 10 11 12 Substation No. 13 14 15 16 17 18 19 20

Stephan_080915_OpenPowerNet_engl.ppt (Figure 44)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV

COMPRAIL 2008

Vehicle Energy Consumption And Recovery Overview, Wuhan - Guangzhou


Ygm 1862-1918

Vehicle Type

EngineID Transport Work [tkm] G469-0 G469-1 G371-0 G371-1 G299-0 G299-1 G355-0 G355-1 G509-0 G509-1 G600-0 G600-1 G520-0 G520-1 26001,806 26001,806 25973,739 25973,739 26002,845 26002,845 25996,262 25996,262 8741,502 8741,502 7635,276 7635,276 15460,187 15460,187

Total Energy [kWh] 1754,227 1754,227 1759,052 1759,052 1754,247 1754,247 1756,881 1756,881 588,711 588,711 533,004 533,004 1068,943 1068,943

Specific Consumed Recovered Energy Energy Energy [Wh/ tkm] [kWh] [kWh] 67,466 67,466 67,724 67,724 67,464 67,464 67,582 67,582 67,347 67,347 69,808 69,808 69,142 69,142 1755,741 1755,741 1759,052 1759,052 1755,755 1755,755 1758,806 1758,806 588,711 588,711 533,004 533,004 1068,943 1068,943 1,513 1,513 0,000 0,000 1,508 1,508 1,926 1,926 0,000 0,000 0,000 0,000 0,000 0,000

Degree Of Regeneration [% ] 0,1 0,1 0,0 0,0 0,1 0,1 0,1 0,1 0,0 0,0 0,0 0,0 0,0 0,0

Available Braking Energy [kWh] 1,942 1,942 0,000 0,000 1,936 1,936 3,791 3,791 0,000 0,000 0,000 0,000 0,000 0,000

Used Braking Energy [kWh] 1,596 1,596 0,000 0,000 1,591 1,591 2,009 2,009 0,000 0,000 0,000 0,000 0,000 0,000

CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3

Stephan_080915_OpenPowerNet_engl.ppt (Figure 45)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV

COMPRAIL 2008

Energy Consumption And Losses Overview, Wuhan - Guangzhou


Cha 1532-1600

Energy output to catenary at substation [kWh] Energy input from catenary at substation [kWh] Total energy at substation [kWh] Vehicles energy consumption [kWh] Vehicles braking energy used for auxiliaries [kWh] Vehicles braking energy recovered by catenary [kWh] Total used vehicles braking energy [kWh] Total vehicles energy [kWh] Total energy consumption [kWh] Energy consumption from national power grid [kWh] Average efficiency of traction power supply

72300,187 1154,082 71146,105 78540,848 639,139 9230,867 9870,007 69309,980 81016,112 71233,480 97,6%

Losses in contact wire [kWh] Losses in messenger wire [kWh] Losses in negative feeder [kWh] Losses in return conductor [kWh] Losses in left rail [kWh] Losses in right rail [kWh] Losses in LEBC [kWh] Total losses in conductors [kWh] Losses in connectors [kWh] Losses in autotransformers [kWh] Total losses in catenary system [kWh] Losses in feeders [kWh] Losses in traction transformers [kWh]

525,588 565,248 481,426 138,879 13,174 13,196 31,117 1768,629 1,495 21,896 1792,020 44,072 87,375

Stephan_080915_OpenPowerNet_engl.ppt (Figure 46)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
Busbar Power, Wuhan-Guangzhou Substation TSS_1444_Hua, Transformer 1444_Hua_TT-02
80000 70000 60000 50000

COMPRAIL 2008

9000

8000

7000

Apparent Power [kVA] Active Power [kW]

6000 40000 5000 30000 4000 20000 3000 10000 0 -10000 -20000 2000

1000

12:00:01

12:05:01

12:10:01

12:15:01

12:20:01

12:25:01

12:30:01

12:35:01

12:40:01

12:45:01

12:50:01

Time | S| -1444_Hua_TT-02 P-1444_Hua_TT-02 Q-1444_Hua_TT-02

Stephan_080915_OpenPowerNet_engl.ppt (Figure 47)

12:55:01

Reactive Power [kvar]

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
Maximum Substation Power
WGPDL - Operation Program 2028
120
115

COMPRAIL 2008

WU dir. GUA dir.


103

100
94 88

95

93

93

94

93

93 94 89 82 83

93 93

93 94

92 92

95 94 90

92

92

91

91

92

Apparent Power [MVA]

80
73 70 67 69 66 69 70 70 69 69

60

44

40

20

0 1 2 3 4 5 6 7 8 9 10 11 12 Substation No. 13 14 15 16 17 18 19 20

Stephan_080915_OpenPowerNet_engl.ppt (Figure 48)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
Maximum Return Cable Current
WGPDL - Operation Program 2028
1200

COMPRAIL 2008

SP WU dir. ATS WU dir. ATS GUA dir. 1000 SP GUA dir.

800 Max. Current [A]

600

400

200

0 1 2 3 4 5 6 7 8 9 10 11 Section No. 12 13 14 15 16 17 18 19 20

Stephan_080915_OpenPowerNet_engl.ppt (Figure 49)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
Short Circuit Current, Wuhan-Guangzhou Line Wuh-Gua_2, Track Up, km 1961.2-2015.12
ATS_1974_Sha [1974.539] TSS_1986_Sha [1986.37] TSS_1986_Sha [1986.79]

COMPRAIL 2008

20000
SP_1961_Sha [1961.41]

ATS_1997_Sha [1997.4]

18000

16000

14000

12000

Current [A]

10000

8000

4000

2000

0 1961

1971

1981

New Shaoguan [1987.638]

6000

1991

2001

2011

Short Circuit Position [km]


Isolator AT Infeed short_circuit_current

Stephan_080915_OpenPowerNet_engl.ppt (Figure 50)

SP_2015_Sha [2014.91]

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
Maximum Rail-Earth Potential, Wuhan-Guangzhou Line Wuh-Gua_2, Track Up, km 1961.2-2015.12
ATS_1974_Sha [1974.539]

COMPRAIL 2008

180
SP_1961_Sha [1961.41]

TSS_1986_Sha [1986.37] TSS_1986_Sha [1986.79]

ATS_1997_Sha [1997.4]

160

140

120

Voltage [V]

100

80

78 V

40

20

0 1961

1971

1981

New Shaoguan [1987.638]

60

1991

2001

2011

Position [km] Isolator LR_U_LEBC_Up RR_U_LEBC_Up-2 AT LR_U_LEBC_Up-2 RR_U_LEBC_Up-3 Infeed LR_U_LEBC_Up-3 URE_max RR_U_LEBC_Up

Stephan_080915_OpenPowerNet_engl.ppt (Figure 51)

SP_2015_Sha [2014.91]

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
TSS SHA
ATS

COMPRAIL 2008

SP km 2015,1

km 1986,8

km 1997,4

OCS
10,9 MW

10,9 MW

Rails

NF

Stephan_080915_OpenPowerNet_engl.ppt (Figure 52)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
TSS SHA
ATS

COMPRAIL 2008

SP km 2015,1

km 1986,8

km 1997,4

OCS
10,9 MW

10,9 MW

Rails RC LEBC NF

Stephan_080915_OpenPowerNet_engl.ppt (Figure 52)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
TSS SHA
ATS

COMPRAIL 2008

SP km 2015,1

km 1986,8
1988,000

km 1997,4

2014,300 10,9 MW

OCS
2x CRH 3 10,9 MW 2x CRH 3

Rails RC LEBC NF

Stephan_080915_OpenPowerNet_engl.ppt (Figure 52)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
TSS SHA
ATS

COMPRAIL 2008

SP km 2015,1

km 1986,8
1988,000

km 1997,4

2014,300 10,9 MW

OCS
2x CRH 3 880 A 880 A 10,9 MW 2x CRH 3

Rails RC LEBC NF

Stephan_080915_OpenPowerNet_engl.ppt (Figure 52)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
TSS SHA
ATS

COMPRAIL 2008

SP km 2015,1

km 1986,8
1988,000

km 1997,4

2014,300 280 A 880 A 493 A 10,9 MW 880 A 10,9 MW 387 A 2x CRH 3

OCS

1150 A 2x CRH 3

Rails RC LEBC NF

363 A 136 A 74 A 603 A

148 A 163 A 60 A 603 A

103A 7A 13 A 387 A

512 A 303 A 24 A 387 A

Stephan_080915_OpenPowerNet_engl.ppt (Figure 52)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
TSS SHA
ATS

COMPRAIL 2008

SP km 2015,1

km 1986,8
1988,000

km 1997,4

2014,300 280 A 880 A 493 A 10,9 MW 880 A 10,9 MW 387 A 2x CRH 3

OCS

1150 A 2x CRH 3

Rails RC LEBC NF

363 A 136 A 74 A 603 A

148 A 163 A 60 A 603 A

103A 7A 13 A 387 A

512 A 303 A 24 A 387 A

1987,000 EMC 1 / EMC 2

1997,000 EMC 3

1998,000 EMC 4

Stephan_080915_OpenPowerNet_engl.ppt (Figure 52)

Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV

COMPRAIL 2008

tunnel

subgrade

Stephan_080915_OpenPowerNet_engl.ppt (Figure 53)

Simulation of Railway Power Supply

COMPRAIL 2008

City Light Rail Network


300 km TRAM 220 km Trolleybus DC 600 V

Stephan_080915_OpenPowerNet_engl.ppt (Figure 54)

Simulation of Railway Power Supply Network modelling: Catenary and cable plan detail

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 55)

Simulation of Railway Power Supply Vehicle modelling TRAM und Trolleybus

COMPRAIL 2008

2 x Mirage

Cobra

Tram2000

Tram2000+Pony

Tram2000 Snfte

Mercedes

GTB Hess

DGTB Hess

Stephan_080915_OpenPowerNet_engl.ppt (Figure 56)

Simulation of Railway Power Supply Graphical time table


Line A

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 57)

Simulation of Railway Power Supply

COMPRAIL 2008

Stephan_080915_OpenPowerNet_engl.ppt (Figure 58)

Spannung [V] 100 200 300 400 500 600 700 800 900 0 1
Lette-Limmatp LIMMt [1.288]

1,5
ROEN [1.581] MILA [1.913]

Minimum voltage: catenary and pantograph

Trenner
HELVt [2.311]

2,5
KERN [2.493] KALKt [2.762]

Baden-Langstr Baden-Kalkbre

3
ZWIN [3.175]

Toleranz U (EN 50163) 3,5 Weg [km]


GOLPt [3.469] HOEF [3.748]

U_nenn 4 U_min_abs 4,5

Heuri-Hfliwe FRIB [4.304] Heuri-Friesen

Simulation of Railway Power Supply

Stephan_080915_OpenPowerNet_engl.ppt (Figure 59)


FRIE [4.681]

U_min_Tfz

IHAG [5.017]

HEGA [5.398]

Normal operation

5,5
Albis-Schweig STRVt [5.804]

COMPRAIL 2008

Spannung [V] 10 20 30 40 50 60 70 80 0 1
SIHL [1.391] MUFG [1.732]

Rail-to-earth potential

2
LIMMp [2.003] LIMM [2.092] QUEL [2.416] DAMM [2.689]

Lette-o.Limma

3
EWYS [3.063] Lette-Wipking WIPK [3.297] Lette-i.Limma WAIF [3.754]

4
EGUT [4.234] ATRO [4.602] SCHT [4.998] Tobel-m_Limma

Normal operation

Weg [km] 5
MEIE [5.374]

Simulation of Railway Power Supply

Stephan_080915_OpenPowerNet_engl.ppt (Figure 60)


ZWIE [5.691]

6
WART [6.051] WINZ [6.494] Frank-.Limma FRAN [6.915]

COMPRAIL 2008

Simulation of Railway Power Supply Converter current and bus-bar voltage


750

COMPRAIL 2008

Normal operation
10000

9000 700 8000 650

7000

Spannung [V]

6000 Strom [A] 600 5000 550 4000

500

3000

2000 450 1000

400 0 450 900 1350 1800 2250 2700 3150 3600 Zeit [s] U-Sammelschiene I-Sammelschiene 4050 4500 4950 5400 5850 6300 6750

0 7200

Stephan_080915_OpenPowerNet_engl.ppt (Figure 61)

Simulation of Railway Power Supply Converter current and bus-bar-voltage


750

COMPRAIL 2008

Depot gateway 4:50 - 7:05 h


4500

4000 700 3500 650 3000

Spannung [V]

550

2000

1500 500 1000 450 500

400 0 450 900 1350 1800 2250 2700 3150 3600 4050 4500 4950 5400 5850 6300 6750 7200 7650 8100 Zeit [s] U-Sammelschiene I-Sammelschiene

Stephan_080915_OpenPowerNet_engl.ppt (Figure 62)

Strom [A]

600

2500

Simulation of Railway Power Supply Load and loading capacity


9000

COMPRAIL 2008

Substation Normal operation, blackout in neighbouring subst.


Sammelschiene SK i.Limmatst

8000

SK i.Hardturm SK Rosengarte SK Hardbrcke

7000

SK ZWest RK Hardturmst RK Rosengarte BK V, 2381 A BK VI, 2381 A

6000 Effektivstrom [A]

5000

4000

3000

2000

1000

0 1 10 100 Zeit [s] 1000 10000

Stephan_080915_OpenPowerNet_engl.ppt (Figure 63)

Simulation of Railway Power Supply Load values


Station

COMPRAIL 2008

Substation, Normal operation without blackouts


Sektor Imax [A] 1s Ieff [A] 7200 s 2h Pmax [kW] Eab Eauf Everl IEinst [kA] IKmin [kA]
soll > 110% soll < 90%

IKmin/IEinst Imax/IEinst

[kWh] [kWh] [kWh]

SK -o.Rmistrae SK -Seilergraben SK -Hottingerstrae SK -Klosbachstrae SK -Kreuzbhlstrae SK -Heimplatz SK -u.Rmistrae 40 SK -u.Rmistrae 129 SK -Bellevueplatz SK -Zeltweg TB RK -Heimplatz 2 Kabel RK -Kreuzbhlstrae RK -o.Rmistrae RK -Heimplatz RK -Bellevueplatz RK -Zeltweg TB gesamt

1915 1686 1961 1665 3710 1128 172 1145 2824 912 -1242 -2164 -649 -3425 -1742 -912 8773

588 404 475 332 1018 310 50 316 1075 279 513 678 238 1375 657 279 3527

1221 1072 1252 1048 2312 720 111 738 1770 582 -749 -1324 -393 -2065 -1050 -582 5289

520 264 417 257 1000 290 36 220 1226 153 0 2 0 0 0 28 4305

-10 0 0 0 -33 0 0 0 -6 -28 -627 -789 -281 -1683 -804 -153 0

4 2 3 4 36 1 0 1 18 1 3 8 2 8 7 1 97

Promenade

3,5 3,0 3,0 3,5 4,2 3,0 3,0 3,0 3,5 2,5

14,0 11,7 10,4 10,4 12,7 34,0 23,0 16,6 2,7

400% 390% 347% 297% 302% 1133% 767% 474% 108%

54,7% 56,2% 65,4% 47,6% 88,3% 37,6% 5,7% 38,2% 80,7% 36,5%

SK: Speisekabel SK: Feeder cable RK: Return current RK: Rckleiterkabel cable

Stephan_080915_OpenPowerNet_engl.ppt (Figure 64)

Simulation of Railway Power Supply Load and loading capacity


1400 A 1200
Belastbarkeit Ri107 Abnutzung 0 % Belastbarkeit Ri107 Abnutzung 20 % Ieff je VL Abnutzung 0 % Ieff je FD Abnutzung 20 %

COMPRAIL 2008

Catenary wire at feeding point Normal operation, blackout in neighbouring subst.

1000

Stromstrke

800

600

400

200

0 1 10 100 Zeit 1000 s 10000

Stephan_080915_OpenPowerNet_engl.ppt (Figure 65)

Simulation of Railway Power Supply Energy balance

COMPRAIL 2008

Recovered energy Delivered energy of all substations

Case 1

Case 2

Case 3

Case 4

Stephan_080915_OpenPowerNet_engl.ppt (Figure 66)

Simulation of Railway Power Supply Power losses balance

COMPRAIL 2008

Case 1

Case 2

Case 3

Case 4

Stephan_080915_OpenPowerNet_engl.ppt (Figure 67)

Simulation of Railway Power Supply Recovering balance

COMPRAIL 2008

Case 1

Case 2

Case 3

Case 4

Stephan_080915_OpenPowerNet_engl.ppt (Figure 68)

Simulation of Railway Power Supply

COMPRAIL 2008

Conclusions

Stephan_080915_OpenPowerNet_engl.ppt (Figure 69)

Simulation of Railway Power Supply

COMPRAIL 2008

Conclusions
OpenPowerNet is able to simulate all common a.c. and d.c. railway power supply systems.

Stephan_080915_OpenPowerNet_engl.ppt (Figure 69)

Simulation of Railway Power Supply

COMPRAIL 2008

Conclusions
OpenPowerNet is able to simulate all common a.c. and d.c. railway power supply systems. The accuracy of the electrical simulation was verified by field measurements.

Stephan_080915_OpenPowerNet_engl.ppt (Figure 69)

Simulation of Railway Power Supply

COMPRAIL 2008

Conclusions
OpenPowerNet is able to simulate all common a.c. and d.c. railway power supply systems. The accuracy of the electrical simulation was verified by field measurements. OpenPowerNet works as a co-simulation with the commercial OpenTrack railway operation simulator.

Stephan_080915_OpenPowerNet_engl.ppt (Figure 69)

Simulation of Railway Power Supply

COMPRAIL 2008

Conclusions
OpenPowerNet is able to simulate all common a.c. and d.c. railway power supply systems. The accuracy of the electrical simulation was verified by field measurements. OpenPowerNet works as a co-simulation with the commercial OpenTrack railway operation simulator. Simulation service can be provided including or excluding the operation modelling ( already existing models can be used easily).

Stephan_080915_OpenPowerNet_engl.ppt (Figure 69)

Simulation of Railway Power Supply

COMPRAIL 2008

Conclusions
OpenPowerNet is able to simulate all common a.c. and d.c. railway power supply systems. The accuracy of the electrical simulation was verified by field measurements. OpenPowerNet works as a co-simulation with the commercial OpenTrack railway operation simulator. Simulation service can be provided including or excluding the operation modelling ( already existing models can be used easily). OpenPowerNet is intended to bring into the market after a further internal test and documentation phase.

Stephan_080915_OpenPowerNet_engl.ppt (Figure 69)

Simulation of Railway Power Supply

COMPRAIL 2008

Eine Expertenrunde fr das Gesamtsystem Bahn The Expert Team for the Complete Railway System

IFB

Niederlassung Dresden, Wiener Str. 114-116, 01219 Dresden, Germany


E-Mail: ifb-dresden@bahntechnik.de www.bahntechnik.de

Phone: +49 351 87759-0

Stephan_080915_OpenPowerNet_engl.ppt (Figure 70)