Documente Academic
Documente Profesional
Documente Cultură
COMPRAIL 2008
AC Railway
DC Railway / Trolleybus
Stephan_080915_OpenPowerNet_engl.ppt (Figure 1)
COMPRAIL 2008
AC Railway
DC Railway / Trolleybus
Stephan_080915_OpenPowerNet_engl.ppt (Figure 1)
COMPRAIL 2008
Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)
COMPRAIL 2008
Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)
COMPRAIL 2008
Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)
COMPRAIL 2008
Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)
COMPRAIL 2008
Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)
COMPRAIL 2008
Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)
COMPRAIL 2008
Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)
COMPRAIL 2008
Stephan_080915_OpenPowerNet_engl.ppt (Figure 2)
COMPRAIL 2008
Special Requirements
The network voltage situation affects the electrical load flows and may have retroaction to the propulsion characteristics of the trains:
Stephan_080915_OpenPowerNet_engl.ppt (Figure 3)
COMPRAIL 2008
Special Requirements
The network voltage situation affects the electrical load flows and may have retroaction to the propulsion characteristics of the trains: currents and power losses increase with decreasing voltage,
Stephan_080915_OpenPowerNet_engl.ppt (Figure 3)
COMPRAIL 2008
Special Requirements
The network voltage situation affects the electrical load flows and may have retroaction to the propulsion characteristics of the trains: currents and power losses increase with decreasing voltage, under low voltage conditions current or power limitations of the train propulsion control are activated impact on driving dynamics,
Stephan_080915_OpenPowerNet_engl.ppt (Figure 3)
COMPRAIL 2008
Special Requirements
The network voltage situation affects the electrical load flows and may have retroaction to the propulsion characteristics of the trains: currents and power losses increase with decreasing voltage, under low voltage conditions current or power limitations of the train propulsion control are activated impact on driving dynamics, the network voltage influences the braking energy recovering decisively (energy absorption capability).
Stephan_080915_OpenPowerNet_engl.ppt (Figure 3)
COMPRAIL 2008
Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning
Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)
COMPRAIL 2008
Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning each trains driving state and its required traction power,
Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)
COMPRAIL 2008
Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning each trains driving state and its required traction power, the trains positions within the network,
Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)
COMPRAIL 2008
Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning each trains driving state and its required traction power, the trains positions within the network, the layout and the capability of the power supply system.
Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)
COMPRAIL 2008
Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning each trains driving state and its required traction power, the trains positions within the network, the layout and the capability of the power supply system. All these information are needed exactly at the same time.
Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)
COMPRAIL 2008
Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning each trains driving state and its required traction power, the trains positions within the network, the layout and the capability of the power supply system. All these information are needed exactly at the same time. In the past a number of compromises were made
Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)
COMPRAIL 2008
Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning each trains driving state and its required traction power, the trains positions within the network, the layout and the capability of the power supply system. All these information are needed exactly at the same time. In the past a number of compromises were made either concerning the complexity of the railway operation simulation,
Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)
COMPRAIL 2008
Initial Situation
Energy consumption simulation for electrical railway systems requires detailed information concerning each trains driving state and its required traction power, the trains positions within the network, the layout and the capability of the power supply system. All these information are needed exactly at the same time. In the past a number of compromises were made either concerning the complexity of the railway operation simulation, or regarding the modelling depth of the propulsion technology and the electrical network.
Stephan_080915_OpenPowerNet_engl.ppt (Figure 4)
COMPRAIL 2008
Stephan_080915_OpenPowerNet_engl.ppt (Figure 5)
COMPRAIL 2008
Stephan_080915_OpenPowerNet_engl.ppt (Figure 5)
COMPRAIL 2008
Stephan_080915_OpenPowerNet_engl.ppt (Figure 5)
COMPRAIL 2008
Line routing and alignment Train propulsion data Track layout Power grid parameter Signalling system Substations arrangement Train data Switch states Plug-in Timetable Feeder lines and cables Connecting conditions Catenary system Operating rules Earthing system
Stephan_080915_OpenPowerNet_engl.ppt (Figure 5)
COMPRAIL 2008
Line routing and alignment Train propulsion data Track layout Power grid parameter Signalling system Substations arrangement Train data Switch states Plug-in Timetable Feeder lines and cables Connecting conditions Catenary system Operating rules Earthing system
Stephan_080915_OpenPowerNet_engl.ppt (Figure 5)
COMPRAIL 2008
Line routing and alignment Train propulsion data Track layout Power grid parameter Signalling system Substations arrangement Train data Switch states Plug-in Timetable Feeder lines and cables Connecting conditions Catenary system Operating rules Earthing system
Stephan_080915_OpenPowerNet_engl.ppt (Figure 5)
COMPRAIL 2008
Source: ETHZ
Stephan_080915_OpenPowerNet_engl.ppt (Figure 6)
COMPRAIL 2008
Source: IFB
Stephan_080915_OpenPowerNet_engl.ppt (Figure 7)
COMPRAIL 2008
Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)
COMPRAIL 2008
Propulsion Technology
Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)
COMPRAIL 2008
Propulsion Technology
Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)
COMPRAIL 2008
Propulsion Technology
Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)
COMPRAIL 2008
ATM
Advanced Train Module
Propulsion Technology
Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)
COMPRAIL 2008
ATM
Advanced Train Module
PSC
Power Supply Calculation
Propulsion Technology
Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)
COMPRAIL 2008
ATM
Advanced Train Module
Interaction
PSC
Power Supply Calculation
Propulsion Technology
Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)
COMPRAIL 2008
ATM
Advanced Train Module
Interaction
PSC
Power Supply Calculation
Propulsion Technology
Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)
COMPRAIL 2008
Co-Simulation
ATM
Advanced Train Module
Interaction
PSC
Power Supply Calculation
Propulsion Technology
Stephan_080915_OpenPowerNet_engl.ppt (Figure 8)
COMPRAIL 2008
OpenTrack
PSC
ATM
Stephan_080915_OpenPowerNet_engl.ppt (Figure 9)
COMPRAIL 2008
OpenTrack
Train Position, Requested Effort
PSC
ATM
Stephan_080915_OpenPowerNet_engl.ppt (Figure 9)
COMPRAIL 2008
OpenTrack
Train Position, Requested Effort
PSC
Train Current
ATM
Stephan_080915_OpenPowerNet_engl.ppt (Figure 9)
COMPRAIL 2008
OpenTrack
Train Position, Requested Effort Achieved Effort
PSC
Train Current
ATM
Stephan_080915_OpenPowerNet_engl.ppt (Figure 9)
COMPRAIL 2008
OpenTrack
Train Position, Requested Effort Achieved Effort
PSC
Train Current
ATM
Stephan_080915_OpenPowerNet_engl.ppt (Figure 9)
COMPRAIL 2008
PSC
ATM
COMPRAIL 2008
AP Server
PSC
ATM
COMPRAIL 2008
AP Server
PSC
ATM
COMPRAIL 2008
train_ID, engine_ID, line_ID, track_ID, train location, time, requested force, speed
1
network data base
AP Server
PSC
ATM
COMPRAIL 2008
train_ID, engine_ID, line_ID, track_ID, train location, time, requested force, speed
1
network data base
line_ID, track_ID, train location, time, train current
AP Server
PSC
ATM
COMPRAIL 2008
train_ID, engine_ID, line_ID, track_ID, train location, time, requested force, speed
1
network data base
line_ID, track_ID, train location, time, train current
AP Server
3
train voltage, nominal voltage, nominal frequency
PSC
ATM
COMPRAIL 2008
train_ID, engine_ID, line_ID, track_ID, train location, time, requested force, speed
1
network data base
line_ID, track_ID, train location, time, train current
AP Server
3
train voltage, nominal voltage, nominal frequency train_ID, engine_ID, requested force, speed, train voltage, nominal voltage, nominal frequency
PSC
ATM
COMPRAIL 2008
train_ID, engine_ID, line_ID, track_ID, train location, time, requested force, speed
1
network data base
line_ID, track_ID, train location, time, train current
AP Server
3
train voltage, nominal voltage, nominal frequency train_ID, engine_ID, requested force, speed, train voltage, nominal voltage, nominal frequency
5
achieved force, train current
PSC
ATM
COMPRAIL 2008
6
train_ID, engine_ID, line_ID, track_ID, train location, time, requested force, speed achieved force
1
network data base
line_ID, track_ID, train location, time, train current
AP Server
3
train voltage, nominal voltage, nominal frequency train_ID, engine_ID, requested force, speed, train voltage, nominal voltage, nominal frequency
5
achieved force, train current
PSC
ATM
COMPRAIL 2008
SOAP interface
6
train_ID, engine_ID, line_ID, track_ID, train location, time, requested force, speed achieved force
1
network data base
line_ID, track_ID, train location, time, train current
AP Server
3
train voltage, nominal voltage, nominal frequency train_ID, engine_ID, requested force, speed, train voltage, nominal voltage, nominal frequency
5
achieved force, train current
PSC
ATM
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
Pel
Pmech
COMPRAIL 2008
0,9
Wirkungsgrad
0,8
Transformator 4-QS
0,7
0,6
Simulation of Railway Power Supply Propulsion Component Modelling (example for traction motor)
COMPRAIL 2008
i1
R1
L 1
L' 2
i1 + i '2
R '2 s
i '2
1 u1
H
'2
LH
M
M
e le k t
= M
m ech
+ M
L u fe r v e r lu s te
3 2
L u fe r v e r lu s te
P = R o to r v e r lu s te = 2n
i '2 2 R '2 2n
COMPRAIL 2008
V
26500
A
400,00
25000
0,00
23000 00:00 00:30 01:00 01:30 02:00 02:30 03:00 03:30 04:00 04:30 05:00 05:30 06:00 06:30 07:00 07:30 08:00 08:30 09:00
-500,00
Zeit in Minuten
time
h:min
Strom in Ampere
100,00
current
COMPRAIL 2008
8
MW
120 100 80 60 40
Fehlertoleranzen: Fahrschaubild < 1 % Energie ab Stromabnehmer < 2 %
2
v Mefahrt v Simulation P Mefahrt P Simulation
-2
20 0 0 10 20 30 40 50 Weg 60
km
70
80
90
-4 100
Quelle: IFB
PStr
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
Simulation of Railway Power Supply Power Supply Network Structure (DC 0.6 3.0 kV)
Power Grid Connection 3 AC 10 / 20 / 30 kV
COMPRAIL 2008
SS1
sw sw sw
Substation
SS2
sw sw sw
SS3
sw sw sw
SS4
sw sw sw
single-end
GO1 GO2
double-end
GO3 GO4
double-end
GO5
0.6 kV
GR1 GR2 GR3 GR4
OCS Rails
GRE
GRE
GRE
GRE
GRE
GRE
GRE
Earth
train in section
Simulation of Railway Power Supply Power Supply Network Structure (1 AC 15 kV 16,7 Hz)
Power Grid Connection 1 AC 110 kV 16,7 Hz
COMPRAIL 2008
SS1
sw sw sw
Substation
CS
sw sw
SS2
sw sw sw
YO1
YO2
YO3
15 kV
YR1 YR2 YR3
OCS Rails
YRE
YRE
YRE
YRE
YRE
YRE
YRE
Earth
COMPRAIL 2008
Substation SS
sw sw sw
Autotransformer
Autotransformer
Autotransformer
AT1
sw sw sw
AT2
sw sw sw
AT3
sw sw sw
YO1
YO2
YO3
YO4
25 kV
YR1 YN1 YR2 YN2 YR3 YN3 YR4
OCS Rails
-25 kV
YRE YRE YRE YRE YRE YRE YRE
train in section
Simulation of Railway Power Supply Modelling of infrastructure Catenary arrangement and switch status
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
hollow coils
RL
RR
COMPRAIL 2008
RF hollow coils
RL
RR
COMPRAIL 2008
RF hollow coils
RL
RR
COMPRAIL 2008
RF hollow coils
RL
RR
m ax .
15 00
COMPRAIL 2008
RF hollow coils
RL
RR
m ax .
15 00
COMPRAIL 2008
RF E hollow coils
RL
RR
m ax .
15 00
COMPRAIL 2008
MW RF CW E hollow coils
RL
RR
m ax .
15 00
COMPRAIL 2008
RL
RR
m ax .
15 00
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
Slice
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
(0; 0)
COMPRAIL 2008
(x1; y1)
(0; 0)
COMPRAIL 2008
(0; 0)
COMPRAIL 2008
(0; 0)
COMPRAIL 2008
Slice n
(0; 0)
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
inductive voltages
currents
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
COMPRAIL 2008
Comparison of measurement data with the simulation results for predefined load cases
COMPRAIL 2008
Comparison of measurement data with the simulation results for predefined load cases driving dynamics of the trains
COMPRAIL 2008
Comparison of measurement data with the simulation results for predefined load cases driving dynamics of the trains current-, voltage- and power characteristics
COMPRAIL 2008
50
Geschwidnigkeit [km/h]
40
30
20
10
COMPRAIL 2008
4000
800
3500
700
3000
2500
500
2000
400
1500
1000
500
0 0 20 40 60 Zeit [s] Toleranz U (EN 50163) U_nenn U_TFZ_2099 U_Tfz_Simu I_TFZ_2099 I_Tfz_Simu 80 100 120
-500
Strom [A]
COMPRAIL 2008
COMPRAIL 2008
Simulation Example: High Speed Railway 966 km, Track Alignment (Detail)
COMPRAIL 2008
Simulation Example: High Speed Railway 966 km, OCS Infeed (Detail)
COMPRAIL 2008
Simulation Example: High Speed Railway 966 km, Timetable Draft (Detail)
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
COMPRAIL 2008
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
COMPRAIL 2008
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
COMPRAIL 2008
Detail
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
COMPRAIL 2008
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
COMPRAIL 2008
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
COMPRAIL 2008
Detail
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
COMPRAIL 2008
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
TSS Energy Delivery (1 h)
WGPDL - Operation Program 2028
120,0
107,8 107,8
COMPRAIL 2008
100,0
91,5 90,9 85,2 81,0 92,92,9 9 92,52,1 9 91,3 90,5
91,01,0 9 87,57,5 8
80,0
78,5 74,0
79,6
81,81,8 8 78,08,0 7
62,42,1 6
60,0
40,0
37,7
20,0
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
Recovery Rates (peak operation)
WGPDL - Operation Program 2028
18,0%
COMPRAIL 2008
16,6%
16,0%
15,1%
14,0%
13,7%
10,0%
8,0%
7,0% 6,0%
6,0%
4,0%
2,0%
0,9% 0,5% 0,3% 0,5% 0,3% 0,0% 0,6% 0,0% 0,9% 0,5% 0,0% 0,0% 0,0% 0,0% 0,0%
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
COMPRAIL 2008
Vehicle Type
EngineID Transport Work [tkm] G469-0 G469-1 G371-0 G371-1 G299-0 G299-1 G355-0 G355-1 G509-0 G509-1 G600-0 G600-1 G520-0 G520-1 26001,806 26001,806 25973,739 25973,739 26002,845 26002,845 25996,262 25996,262 8741,502 8741,502 7635,276 7635,276 15460,187 15460,187
Total Energy [kWh] 1754,227 1754,227 1759,052 1759,052 1754,247 1754,247 1756,881 1756,881 588,711 588,711 533,004 533,004 1068,943 1068,943
Specific Consumed Recovered Energy Energy Energy [Wh/ tkm] [kWh] [kWh] 67,466 67,466 67,724 67,724 67,464 67,464 67,582 67,582 67,347 67,347 69,808 69,808 69,142 69,142 1755,741 1755,741 1759,052 1759,052 1755,755 1755,755 1758,806 1758,806 588,711 588,711 533,004 533,004 1068,943 1068,943 1,513 1,513 0,000 0,000 1,508 1,508 1,926 1,926 0,000 0,000 0,000 0,000 0,000 0,000
Degree Of Regeneration [% ] 0,1 0,1 0,0 0,0 0,1 0,1 0,1 0,1 0,0 0,0 0,0 0,0 0,0 0,0
Available Braking Energy [kWh] 1,942 1,942 0,000 0,000 1,936 1,936 3,791 3,791 0,000 0,000 0,000 0,000 0,000 0,000
Used Braking Energy [kWh] 1,596 1,596 0,000 0,000 1,591 1,591 2,009 2,009 0,000 0,000 0,000 0,000 0,000 0,000
CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3 CRH3
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
COMPRAIL 2008
Energy output to catenary at substation [kWh] Energy input from catenary at substation [kWh] Total energy at substation [kWh] Vehicles energy consumption [kWh] Vehicles braking energy used for auxiliaries [kWh] Vehicles braking energy recovered by catenary [kWh] Total used vehicles braking energy [kWh] Total vehicles energy [kWh] Total energy consumption [kWh] Energy consumption from national power grid [kWh] Average efficiency of traction power supply
72300,187 1154,082 71146,105 78540,848 639,139 9230,867 9870,007 69309,980 81016,112 71233,480 97,6%
Losses in contact wire [kWh] Losses in messenger wire [kWh] Losses in negative feeder [kWh] Losses in return conductor [kWh] Losses in left rail [kWh] Losses in right rail [kWh] Losses in LEBC [kWh] Total losses in conductors [kWh] Losses in connectors [kWh] Losses in autotransformers [kWh] Total losses in catenary system [kWh] Losses in feeders [kWh] Losses in traction transformers [kWh]
525,588 565,248 481,426 138,879 13,174 13,196 31,117 1768,629 1,495 21,896 1792,020 44,072 87,375
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
Busbar Power, Wuhan-Guangzhou Substation TSS_1444_Hua, Transformer 1444_Hua_TT-02
80000 70000 60000 50000
COMPRAIL 2008
9000
8000
7000
6000 40000 5000 30000 4000 20000 3000 10000 0 -10000 -20000 2000
1000
12:00:01
12:05:01
12:10:01
12:15:01
12:20:01
12:25:01
12:30:01
12:35:01
12:40:01
12:45:01
12:50:01
12:55:01
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
Maximum Substation Power
WGPDL - Operation Program 2028
120
115
COMPRAIL 2008
100
94 88
95
93
93
94
93
93 94 89 82 83
93 93
93 94
92 92
95 94 90
92
92
91
91
92
80
73 70 67 69 66 69 70 70 69 69
60
44
40
20
0 1 2 3 4 5 6 7 8 9 10 11 12 Substation No. 13 14 15 16 17 18 19 20
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
Maximum Return Cable Current
WGPDL - Operation Program 2028
1200
COMPRAIL 2008
600
400
200
0 1 2 3 4 5 6 7 8 9 10 11 Section No. 12 13 14 15 16 17 18 19 20
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
Short Circuit Current, Wuhan-Guangzhou Line Wuh-Gua_2, Track Up, km 1961.2-2015.12
ATS_1974_Sha [1974.539] TSS_1986_Sha [1986.37] TSS_1986_Sha [1986.79]
COMPRAIL 2008
20000
SP_1961_Sha [1961.41]
ATS_1997_Sha [1997.4]
18000
16000
14000
12000
Current [A]
10000
8000
4000
2000
0 1961
1971
1981
6000
1991
2001
2011
SP_2015_Sha [2014.91]
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
Maximum Rail-Earth Potential, Wuhan-Guangzhou Line Wuh-Gua_2, Track Up, km 1961.2-2015.12
ATS_1974_Sha [1974.539]
COMPRAIL 2008
180
SP_1961_Sha [1961.41]
ATS_1997_Sha [1997.4]
160
140
120
Voltage [V]
100
80
78 V
40
20
0 1961
1971
1981
60
1991
2001
2011
Position [km] Isolator LR_U_LEBC_Up RR_U_LEBC_Up-2 AT LR_U_LEBC_Up-2 RR_U_LEBC_Up-3 Infeed LR_U_LEBC_Up-3 URE_max RR_U_LEBC_Up
SP_2015_Sha [2014.91]
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
TSS SHA
ATS
COMPRAIL 2008
SP km 2015,1
km 1986,8
km 1997,4
OCS
10,9 MW
10,9 MW
Rails
NF
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
TSS SHA
ATS
COMPRAIL 2008
SP km 2015,1
km 1986,8
km 1997,4
OCS
10,9 MW
10,9 MW
Rails RC LEBC NF
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
TSS SHA
ATS
COMPRAIL 2008
SP km 2015,1
km 1986,8
1988,000
km 1997,4
2014,300 10,9 MW
OCS
2x CRH 3 10,9 MW 2x CRH 3
Rails RC LEBC NF
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
TSS SHA
ATS
COMPRAIL 2008
SP km 2015,1
km 1986,8
1988,000
km 1997,4
2014,300 10,9 MW
OCS
2x CRH 3 880 A 880 A 10,9 MW 2x CRH 3
Rails RC LEBC NF
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
TSS SHA
ATS
COMPRAIL 2008
SP km 2015,1
km 1986,8
1988,000
km 1997,4
OCS
1150 A 2x CRH 3
Rails RC LEBC NF
103A 7A 13 A 387 A
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
TSS SHA
ATS
COMPRAIL 2008
SP km 2015,1
km 1986,8
1988,000
km 1997,4
OCS
1150 A 2x CRH 3
Rails RC LEBC NF
103A 7A 13 A 387 A
1997,000 EMC 3
1998,000 EMC 4
Simulation of Railway Power Supply Simulation Results: High Speed Railway 2AC 25 kV
COMPRAIL 2008
tunnel
subgrade
COMPRAIL 2008
Simulation of Railway Power Supply Network modelling: Catenary and cable plan detail
COMPRAIL 2008
COMPRAIL 2008
2 x Mirage
Cobra
Tram2000
Tram2000+Pony
Tram2000 Snfte
Mercedes
GTB Hess
DGTB Hess
COMPRAIL 2008
COMPRAIL 2008
Spannung [V] 100 200 300 400 500 600 700 800 900 0 1
Lette-Limmatp LIMMt [1.288]
1,5
ROEN [1.581] MILA [1.913]
Trenner
HELVt [2.311]
2,5
KERN [2.493] KALKt [2.762]
Baden-Langstr Baden-Kalkbre
3
ZWIN [3.175]
U_min_Tfz
IHAG [5.017]
HEGA [5.398]
Normal operation
5,5
Albis-Schweig STRVt [5.804]
COMPRAIL 2008
Spannung [V] 10 20 30 40 50 60 70 80 0 1
SIHL [1.391] MUFG [1.732]
Rail-to-earth potential
2
LIMMp [2.003] LIMM [2.092] QUEL [2.416] DAMM [2.689]
Lette-o.Limma
3
EWYS [3.063] Lette-Wipking WIPK [3.297] Lette-i.Limma WAIF [3.754]
4
EGUT [4.234] ATRO [4.602] SCHT [4.998] Tobel-m_Limma
Normal operation
Weg [km] 5
MEIE [5.374]
6
WART [6.051] WINZ [6.494] Frank-.Limma FRAN [6.915]
COMPRAIL 2008
COMPRAIL 2008
Normal operation
10000
7000
Spannung [V]
500
3000
400 0 450 900 1350 1800 2250 2700 3150 3600 Zeit [s] U-Sammelschiene I-Sammelschiene 4050 4500 4950 5400 5850 6300 6750
0 7200
COMPRAIL 2008
Spannung [V]
550
2000
400 0 450 900 1350 1800 2250 2700 3150 3600 4050 4500 4950 5400 5850 6300 6750 7200 7650 8100 Zeit [s] U-Sammelschiene I-Sammelschiene
Strom [A]
600
2500
COMPRAIL 2008
8000
7000
5000
4000
3000
2000
1000
COMPRAIL 2008
IKmin/IEinst Imax/IEinst
SK -o.Rmistrae SK -Seilergraben SK -Hottingerstrae SK -Klosbachstrae SK -Kreuzbhlstrae SK -Heimplatz SK -u.Rmistrae 40 SK -u.Rmistrae 129 SK -Bellevueplatz SK -Zeltweg TB RK -Heimplatz 2 Kabel RK -Kreuzbhlstrae RK -o.Rmistrae RK -Heimplatz RK -Bellevueplatz RK -Zeltweg TB gesamt
1915 1686 1961 1665 3710 1128 172 1145 2824 912 -1242 -2164 -649 -3425 -1742 -912 8773
588 404 475 332 1018 310 50 316 1075 279 513 678 238 1375 657 279 3527
1221 1072 1252 1048 2312 720 111 738 1770 582 -749 -1324 -393 -2065 -1050 -582 5289
520 264 417 257 1000 290 36 220 1226 153 0 2 0 0 0 28 4305
4 2 3 4 36 1 0 1 18 1 3 8 2 8 7 1 97
Promenade
3,5 3,0 3,0 3,5 4,2 3,0 3,0 3,0 3,5 2,5
54,7% 56,2% 65,4% 47,6% 88,3% 37,6% 5,7% 38,2% 80,7% 36,5%
SK: Speisekabel SK: Feeder cable RK: Return current RK: Rckleiterkabel cable
COMPRAIL 2008
1000
Stromstrke
800
600
400
200
COMPRAIL 2008
Case 1
Case 2
Case 3
Case 4
COMPRAIL 2008
Case 1
Case 2
Case 3
Case 4
COMPRAIL 2008
Case 1
Case 2
Case 3
Case 4
COMPRAIL 2008
Conclusions
COMPRAIL 2008
Conclusions
OpenPowerNet is able to simulate all common a.c. and d.c. railway power supply systems.
COMPRAIL 2008
Conclusions
OpenPowerNet is able to simulate all common a.c. and d.c. railway power supply systems. The accuracy of the electrical simulation was verified by field measurements.
COMPRAIL 2008
Conclusions
OpenPowerNet is able to simulate all common a.c. and d.c. railway power supply systems. The accuracy of the electrical simulation was verified by field measurements. OpenPowerNet works as a co-simulation with the commercial OpenTrack railway operation simulator.
COMPRAIL 2008
Conclusions
OpenPowerNet is able to simulate all common a.c. and d.c. railway power supply systems. The accuracy of the electrical simulation was verified by field measurements. OpenPowerNet works as a co-simulation with the commercial OpenTrack railway operation simulator. Simulation service can be provided including or excluding the operation modelling ( already existing models can be used easily).
COMPRAIL 2008
Conclusions
OpenPowerNet is able to simulate all common a.c. and d.c. railway power supply systems. The accuracy of the electrical simulation was verified by field measurements. OpenPowerNet works as a co-simulation with the commercial OpenTrack railway operation simulator. Simulation service can be provided including or excluding the operation modelling ( already existing models can be used easily). OpenPowerNet is intended to bring into the market after a further internal test and documentation phase.
COMPRAIL 2008
Eine Expertenrunde fr das Gesamtsystem Bahn The Expert Team for the Complete Railway System
IFB